cover page of Booklet

94

Transcript of cover page of Booklet

Page 1: cover page of Booklet
Page 2: cover page of Booklet
Page 3: cover page of Booklet
Page 4: cover page of Booklet
Page 5: cover page of Booklet
Page 6: cover page of Booklet
Page 7: cover page of Booklet
Page 8: cover page of Booklet
Page 9: cover page of Booklet
Page 10: cover page of Booklet
Page 11: cover page of Booklet
Page 12: cover page of Booklet
Page 13: cover page of Booklet
Page 14: cover page of Booklet
Page 15: cover page of Booklet

ANNEXURE

Page 16: cover page of Booklet

1�

CONTENT

Sl Items Page No 1 Brief Note on enhancement of Coal Production 2 2 Coal Projects where growth is more than 0.50 Mt - Overall CIL 9 ECL 10 BCCL 11 CCL 12 NCL 13 WCL 14 SECL 15 MCL 16 3 Subsidiary wise Group wise Coal Production Plan - Overall

CIL 17

ECL 18 BCCL 21 CCL 23 NCL 25 WCL 26 SECL 29 MCL 32 4 Issue wise Project wise details 33 Requirement of Blocks 34 Geological Reports 35 Project Report Approval 36 Env. Clearances 37 Forestry Clearances 43 Land Acquisition 47 R&R Issue 53 Evacutation - Rail 55 Evacutation - Road 58 Construction of CHP/ SILO 59 Nallah Diversion 60 Road Diversion 61 Construction /Shifting of Power line 62 Procurement of Equipment/ Conract finalisation 63 Drivage of Incline 65 FSA/CSA Issue 66 Other 67 5 Technological Plan for attaining 1 Bt 68

Page 17: cover page of Booklet

2�

Note on 1 Billion Tonne Coal production by 2019-20

An exercise has been carried out to prepare a roadmap for achieving a production level of 1 Billion Tonne coal by the year 2019-20. All the subsidiary companies were requested to identify the potential units/projects to achieve the desired goal. So far mines/projects to produce about 908.10 Mt in 2019-20 has been identified and for balance to reach 1 Bt is underway.

The Subsidiary-wise year-wise breakup of the production projection is as below:

Figures in Mt

Company 14-15 15-16 16-17 17-18 18-19 19-20 Growthover 14-15

ECL 38.00 42.03 46.90 51.70 56.60 62.00 24.00

BCCL 34.00 35.51 37.00 41.00 46.00 53.00 19.00

CCL 55.00 60.50 67.00 80.00 102.00 133.50 78.50

NCL 77.00 80.00 82.00 90.00 99.00 110.00 33.00

WCL 44.00 45.00 48.00 50.00 55.00 60.00 16.00

SECL 131.20 135.00 149.70 161.00 193.10 239.60 108.40

MCL 127.00 150.00 167.00 187.00 222.00 250.00 123.00

CIL 506.20* 548.04 597.60 660.70 773.70 908.10 401.90

* Figure excluding NEC

It is seen that maximum growth has been envisaged is 123 Mt, and is from MCL, followed by 108.40 Mt from SECL, 78.50 Mt from CCL, 33 Mt from NCL, 24 Mt from ECL, 19 Mt from BCCL and 16 Mt from WCL.

The group-wise, year-wise distribution of the projected production is given below:

Group 14-15 15-16 16-17 17-18 18-19 19-20 Growth over14-15

Existing mines & Completed projects

190.57 190.57 185.03 177.24 177.64 164.96 -25.61

Ongoing projects 315.56 354.93 399.76 437.56 502.65 561.48 245.92

Future projects 0.07 2.55 12.81 45.89 93.40 181.66 181.59

Total 506.20 548.04 597.60 660.68 773.70 908.10 401.90

It is seen that there is drop in contribution from existing mines and completed projects to the tune of 25 Mt whereas there is growth in both ongoing & future group of projects for about 246 Mt & 181 Mt respectively. After a project-wise analysis, for assessment of growth and drop it is seen that

Page 18: cover page of Booklet

3�

� 278 nos. of projects/units have growth and 186 nos. of units have reduction in production contribution. The net resultant growth is 401.90 Mt.

� Out of the 278 projects, where growth has been envisaged, 153 projects have been identified where envisaged growth is more than 0.5 Mt. The total growth envisaged from these 153 projects is 493.28 Mt.

� The major issues for achieving the envisaged growth are Allocation of coal Block, GR & PR approval, Grant of EC, Grant of FC, Land acquisition / possession and associated R&R, Coal evacuation facilities & other reasons like finalization of contracts, diversion of Nulla, highways and power lines etc.

SUBSIDIARYWISE GROUPWISE PRODUCTION PROJECTIONS

1. Eastern Coalfields Limited

Group 14-15 15-16 16-17 17-18 18-19 19-20 Growth Over 2014-15

Existing 6.23 6.93 7.85 10.50 9.99 10.51 4.28 Completed 4.80 5.02 5.06 4.48 4.28 3.18 -1.62 Ongoing 26.97 30.08 33.67 35.18 36.52 36.75 9.78 Future 0.00 0.00 0.36 1.52 5.77 11.56 11.56 Total 38.0 42.0 46.9 51.7 56.6 62.0 24.00

On detailed examination, it is seen that,

� 41 nos. of projects/units have growth and 63 nos. of units have reduction in production contribution. The net resultant growth is 24 Mt.

� Out of the 41 projects, where growth has been envisaged, 27 projects have been identified where envisaged growth is more than 0.5 Mt. The total growth envisaged from these 27 projects is 29.92 Mt.

� The major issues for achieving the envisaged growth are PR approval, Grant of EC, Land acquisition / possession and associated R&R, Coal evacuation facilities & other reasons like finalization of contracts, diversion of Nulla, highways and power lines etc.

2. Bharat Coking Coal Limited

Group 14-15 15-16 16-17 17-18 18-19 19-20 Growth Over

2014-15 Existing 31.13 31.94 32.99 35.64 37.00 41.44 10.31 Completed 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Ongoing 2.80 3.32 3.42 3.83 4.93 5.77 2.97 Future 0.07 0.25 0.60 1.53 4.08 5.80 5.73 Total 34.0 35.5 37.0 41.0 46.0 53.0 19.00

Page 19: cover page of Booklet

4�

� Of all the producing projects/units of BCCL, 44 nos. of projects/units have growth and 34 nos. of units have reduction in production contribution. The net resultant growth is 19 Mt.

� Out of the projects, where growth has been envisaged, 16 projects have been identified where envisaged growth is more than 0.5 Mt. The total growth envisaged from these 16 projects is 22.60 Mt.

� The major constraints for achieving the envisaged growth are PR approval, Grant of EC, Possession of Tenancy land and Construction of Silo etc.

3. Central Coalfields Limited

Group 14-15 15-16 16-17 17-18 18-19 19-20 Growth Over 2014-15

Existing 3.87 2.46 0.47 0.47 0.47 0.47 -3.40

Completed 14.04 14.66 15.47 16.32 17.10 18.47 4.43

Ongoing 37.10 43.39 50.82 56.63 66.41 84.16 47.06

Future 0.00 0.00 0.25 6.58 18.03 30.41 30.41

Total 55.0 60.5 67.0 80.0 102.01 133.51 78.50

� In CCL, it has been observed that, 38 nos. projects/units have growth and 22 nos. of units have reduction in production contribution. The net resultant growth is 78.50 Mt.

� Out of the projects, where growth has been envisaged, 25 projects have been identified where envisaged growth is more than 0.5 Mt. The total growth envisaged from these 25 projects is 91.44 Mt.

� The major constraints for achieving the envisaged growth are PR approval, Grant of EC, Grant of FC, Acquisition & Possession of Land, R&R of major villages, Coal evacuation facilities & Construction of infrastructure roads etc.

4. Northern Coalfields Limited

Group 14-15 15-16 16-17 17-18 18-19 19-20 Growth Over

2014-15 Existing 1.63 1.70 1.20 0.00 0.00 0.00 -1.63 Completed 35.50 35.30 34.80 24.00 24.00 24.00 -11.50 Ongoing 39.88 43.00 45.00 51.00 50.00 52.50 12.62 Future 0.00 0.00 1.00 15.00 25.00 33.50 33.50 Total 77.0 80.0 82.0 90.0 99.0 110.0 32.99

� In case of NCL, 13 nos. of projects/units have growth and 6 nos. of units have reduction in production contribution. The net resultant growth is 32.99 Mt.

� Out of the projects, where growth has been envisaged, 13 projects have been identified where envisaged growth is more than 0.5 Mt. The total growth envisaged from these 13 projects is 47 Mt.

Page 20: cover page of Booklet

5�

� The major constraints for achieving the envisaged growth are PR approval, Grant of EC, Grant of FC, Acquisition & Possession of Land and associated R&R, Coal evacuation facilities & finalization of contracts.

5. Western Coalfields Limited

Group 14-15 15-16 16-17 17-18 18-19 19-20 Growth Over 2014-15

Existing 0.49 0.30 0.25 0.25 0.20 0.20 -0.29 Completed 23.54 22.27 15.38 12.39 10.20 10.15 -13.39 Ongoing 19.97 21.13 22.77 22.10 26.67 30.05 10.08 Future 0.00 1.30 9.60 15.26 17.93 19.60 19.60 Total 44.0 45.0 48.0 50.0 55.0 60.0 16.00

� In the producing units of WCL, 58 nos. of projects/units have growth and 31 nos. of units have reduction in production contribution. The net resultant growth is 16 Mt.

� Out of the projects, where growth has been envisaged, 22 projects have been identified where envisaged growth is more than 0.5 Mt. The total growth envisaged from these 22 projects is 38.13 Mt.

� The major constraints for achieving the envisaged growth are PR approval, Grant of EC, Grant of FC, Acquisition & Possession of Land, R&R of major villages, Diversion of nallah, Highway & Power line, Award of contracts & signing of FSA.

6. South Eastern Coalfields Limited

Group 14-15 15-16 16-17 17-18 18-19 19-20 Growth Over 2014-15

Existing 1.85 1.66 1.66 1.64 1.57 1.11 -0.74 Completed 20.46 19.80 18.67 16.80 15.59 14.43 -6.03 Ongoing 108.90 112.57 128.34 136.57 157.38 180.26 71.36 Future 0.00 1.00 1.00 6.00 18.60 43.80 43.80 Total 131.2 135.0 149.7 161.01 193.14 239.60 108.40

� Further, in case of SECL, 65 nos. of projects/units have growth and 26 nos. of units have reduction in production contribution. The net resultant growth is 108.40 Mt.

� Out of the projects, where growth has been envisaged, 33 projects have been identified where envisaged growth is more than 0.5 Mt. The total growth envisaged from these 33 projects is 114.15 Mt.

� The major constraints for achieving the envisaged growth are Allocation of coal block, PR approval, Grant of EC, Grant of FC, Acquisition & Possession of Land, R&R of major villages, Coal evacuation facility, Diversion of irrigation canal, Procurement & Commissioning of HEMMs and Construction of CHP.

Page 21: cover page of Booklet

6�

7. Mahanadi Coalfields Limited

Group 14-15 15-16 16-17 17-18 18-19 19-20 Growth Over 2014-15

Existing 1.39 1.36 1.36 1.36 1.36 1.36 -0.03 Completed 45.66 47.19 49.89 53.39 55.89 39.64 -6.02 Ongoing 79.95 101.45 115.75 132.25 160.75 172.00 92.05 Future 0.00 0.00 0.00 0.00 4.00 37.00 37.00 Total 127.0 150.0 167.0 187.0 222.0 250.0 123.00

� For MCL, 19 nos. of projects/units have growth and 4 no. of units have reduction in production contribution. The net resultant growth is 123 Mt.

� Out of the projects, where growth has been envisaged, 17 projects have been identified where envisaged growth is more than 0.5 Mt. The total growth envisaged from these 17 projects is 150.05 Mt.

� The major constraints for achieving the envisaged growth are Allocation of coal block, PR approval, Grant of EC, Grant of FC, Acquisition & Possession of Land, R&R of major villages, Coal evacuation through rail & road, Diversion of nallah & Construction of Silo.

Assessment of project-wise issues :

A project wise detailed assessment has also been done to identify issues involved with it. As has been summarized above, it is seen that in most of the cases, multiple issues are involved and need to be addressed to achieve the projected target. Activity-wise timeline has also been prepared for achieving the envisaged target. Achievement of these timelines is subject to timely and proper response from multiple extraneous agencies like MOEF, State Govts, Railways, Equipment manufacturers, Power generation & Distribution companies, DGMS, Public Works Dept etc.

The subsidiary-wise details of issues with no. of projects involved is given in the following table:

SL Issue involved No. of Projects Involved

Subsidiary-wise distribution

1 Allocation of Coal Block 3 MCL SECL

21

2 Preparation of GR 8 ECL NCL

44

3 PR Approval 80 ECL CCL NCL WCLSECLMCL

24 5

10 27 13 2

Page 22: cover page of Booklet

7�

SL Issue involved No. of Projects Involved

Subsidiary-wise distribution

4 Env Clearance (Including Clusters under process)

212 ECL BCCL CCL NCL WCLSECLMCL

109 21 14 13 18 27 10

5 Forestry Clearance 151 ECL BCCL CCL NCL WCLSECLMCL

15 6

45 5

18 37 25

6 Land Acquisition 172 ECL BCCL CCL NCL WCLSECLMCL

51 6

32 5

35 41 2

7 R & R 73 ECL CCL NCL WCLSECLMCL

714 4

13 20 15

8 Coal Evacuation by Rail 121 ECL BCCL CCL NCL SECLMCL

10 38 27 1

24 21

9 Coal Evacuation by Road 11 ECL WCLMCL

128

10 CHP/SILO Construction 23 ECL NCL WCLSECLMCL

5314

10 11 Nallah Diversion 23 ECL

WCLSECLMCL

116 15

12 Road Diversion 11 ECL WCL

110

Page 23: cover page of Booklet

8�

SL Issue involved No. of Projects Involved

Subsidiary-wise distribution

13 Other Issues 17 ECL BCCL CCL NCL WCLSECLMCL

1341215

14 Powerline Construction 24 ECL WCL

321

15 Issues related to HOE/HEMM/P&M

63 ECL NCL WCLSECL

416 35 8

16 Issues related to Incline Drivage

9 ECL NCL WCL

216

17 Issues related to FSA/CSA 11 WCL 11

Page 24: cover page of Booklet

9�

Subsidiary-wise Group-wise Production Plan - Growth more than 0.50 MtECL 14-15 15-16 16-17 17-18 18-19 19-20 Growth Existing 0.20 1.34 2.24 4.94 6.16 7.53 7.33 Completed 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Ongoing 23.30 26.10 29.59 31.16 33.11 35.17 11.87 Future 0.00 0.00 0.36 1.52 5.67 10.72 10.72

23.5 27.4 32.2 37.6 44.9 53.4 29.92 BCCL Existing 5.77 12.50 12.59 14.86 17.15 20.40 14.63 Completed 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Ongoing 2.73 3.25 3.35 3.76 4.86 5.70 2.97 Future 0.00 0.25 0.45 1.13 3.28 5.00 5.00

8.5 16.0 16.4 19.8 25.3 31.1 22.60 CCL Existing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Completed 6.14 6.03 7.60 8.40 8.98 10.55 4.41 Ongoing 24.61 31.78 41.01 47.89 60.57 81.44 56.83 Future 0.00 0.00 0.25 6.53 17.93 30.20 30.20

30.8 37.8 48.9 62.8 87.5 122.2 91.44 NCL Existing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Completed 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Ongoing 30.50 33.00 35.00 41.00 41.50 44.00 13.50 Future 0.00 0.00 1.00 15.00 25.00 33.50 33.50

30.5 33.0 36.0 56.0 66.5 77.5 47.00 WCL Existing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Completed 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Ongoing 1.65 2.65 9.10 12.23 16.60 21.30 19.65 Future 0.00 1.30 9.40 14.91 17.18 18.48 18.48

1.7 4.0 18.5 27.1 33.8 39.8 38.13 SECLExisting 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Completed 0.50 0.50 0.50 0.60 0.60 1.00 0.50 Ongoing 96.89 100.16 115.29 123.19 143.92 166.74 69.85 Future 0.00 1.00 1.00 6.00 18.60 43.80 43.80

97.4 101.7 116.8 129.8 163.1 211.5 114.15 MCLExisting 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Completed 26.50 28.00 31.00 34.50 37.00 39.50 13.00 Ongoing 46.95 67.45 81.75 98.25 126.75 147.00 100.05 Future 0.00 0.00 0.00 0.00 4.00 37.00 37.00

73.5 95.5 112.8 132.8 167.8 223.5 150.05 CIL Existing 5.97 13.84 14.83 19.80 23.31 27.93 21.96 Completed 33.14 34.53 39.10 43.50 46.58 51.05 17.91 Ongoing 226.63 264.39 315.09 357.48 427.31 501.35 274.72 Future 0.00 2.55 12.46 45.09 91.65 178.70 178.70

TOTAL 265.74 315.31 381.48 465.88 588.84 759.03 493.28

Page 25: cover page of Booklet

10�

PROJECTS / UNITS WITH GROWTH MORE THAN 0.50 Mt - ECL

SL SUB GROUP PROJECT TYPE 14-15 19-20 GROWTH1 ECL EX Dabor Ph-III OC(H) 0.00 1.28 1.28 2 ECL EX Madhabpur (harispur) OC(H) 0.20 0.70 0.50 3 ECL EX Mohanpur OC Patch OC(H) 0.00 0.80 0.80 4 ECL EX Nirsha OC(H) 0.00 0.80 0.80 5 ECL EX CL Jambad OC OC(H) 0.00 0.60 0.60 6 ECL EX Shankarpur OC Ph-IV OC(H) 0.00 0.60 0.60 7 ECL EX Dalurband OCP (H)

PHASE III OC(H) 0.00 0.55 0.55

8 ECL EX New Kenda Quarry III OC

OC(H) 0.00 0.50 0.50

9 ECL EX Bhanora (W) OC OC(H) 0.00 0.50 0.50 10 ECL EX Lakhimata OC(H) OC(H) 0.00 0.60 0.60 11 ECL EX Ghusick OC (H) OC(H) 0.00 0.60 0.60 12 ECL ONG Jhanjra L/W R-VI UG 0.00 1.70 1.70 13 ECL ONG Khottadih CM UG 0.00 0.90 0.90 14 ECL ONG Kumardihi B CM UG 0.00 0.87 0.87 15 ECL ONG Chitra East OC(D) 2.00 2.50 0.50 16 ECL ONG Rajmahal Expn OC(H) 14.80 17.00 2.20 17 ECL ONG Sonepur (Comb) OC (D) 6.50 11.00 4.50 18 ECL ONG New Kenda OC(H) 0.00 1.20 1.20 19 ECL FUT Jhanjra Low height CM UG 0.00 0.72 0.72 20 ECL FUT Chuperbhita OC(H) 0.00 2.50 2.50 21 ECL FUT Hura-C OC(H) 0.00 2.50 2.50 22 ECL FUT Simlong OC (

Extension) OC(H) 0.00 1.50 1.50

23 ECL FUT North Searsole OC OC(H) 0.00 0.80 0.80 24 ECL FUT Nakrakonda- Kumardih-

B OC OC(H) 0.00 0.70 0.70

25 ECL FUT Itapara OC OC(H) 0.00 1.00 1.00 26 ECL FUT Madanpur OC 0.00 0.50 0.50 27 ECL FUT Chaidhar-Gariapani OC 0.00 0.50 0.50

Total 23.50 53.42 29.92

Page 26: cover page of Booklet

11�

PROJECTS / UNITS WITH GROWTH MORE THAN 0.50 Mt - BCCL

SL SUB GROUP PROJECT TYPE 14-15 19-20 GROWTH1 BCCL EX Phularitand H/OC 0.90 2.55 1.65 2 BCCL EX Amalgmated Block-II OCP D/OC 1.84 3.00 1.16 3 BCCL EX AKWMC D/OC 1.75 3.30 1.55 4 BCCL EX AKWMC/ Kantapahari H/OC 1.70 1.70 5 BCCL EX Katras chatudih H/OC 0.50 0.50 6 BCCL EX Ena-Industry Mega Project H/OC 0.19 3.15 2.96 7 BCCL EX Dobari H/OC 0.17 1.70 1.53 8 BCCL EX Bolck-VIII/ Ghanoodih H/OC 0.24 1.40 1.16 9 BCCL EX Joyrampur/Bagdigi/Lodna

Mega project H/OC 0.03 0.70 0.67

10 BCCL EX DBOCP D/OC 0.65 1.30 0.65 11 BCCL EX DOCP/Borira H/OC 1.10 1.10 12 BCCL ONG NT-ST & Jeenagora D/OC 0.82 2.00 1.18 13 BCCL ONG NT-ST & Jeenagora H/OC 1.91 3.70 1.79 14 BCCL FUT Muraidih U/G 2.00 2.00 15 BCCL FUT Moonidih XV U/G 1.50 1.50 16 BCCL FUT Kapuria U/G 1.50 1.50

Total 8.50 31.10 22.60

Page 27: cover page of Booklet

12�

PROJECTS / UNITS WITH GROWTH MORE THAN 0.50 Mt - CCL

SL SUB GROUP PROJECT TYPE 14-15 19-20 GROWTH1 CCL ONG Amrapali OC OC 3.00 12.00 9.00 2 CCL ONG Ashoka EPR 10 MTY OC OC 8.00 20.00 12.00 3 CCL ONG Churi-Benti UGP (LHD BP) UG 0.03 0.54 0.51 4 CCL ONG KARMA OC OC 0.45 1.00 0.55 5 CCL ONG KARO OC OC 1.50 3.50 2.00 6 CCL ONG Kathara RCE OC OC 0.90 1.90 1.00 7 CCL ONG Konar 3.5 OC OC 1.11 3.50 2.39 8 CCL ONG Magadh OC OC 2.00 20.00 18.00 9 CCL ONG North Urimari OC OC 0.60 3.00 2.40 10 CCL ONG Purnadih OC OC 1.80 3.00 1.20 11 CCL ONG Rajrappa RCE OC OC 1.20 2.00 0.80 12 CCL ONG Rohini OC OC 1.00 2.00 1.00 13 CCL ONG Tapin OC OC 1.20 2.80 1.60 14 CCL ONG Tapin South OS OC OC 0.32 2.00 1.68 15 CCL ONG Tarmi OS OC OC 0.30 1.00 0.70 16 CCL ONG Tetariakhar OC OC 0.60 2.00 1.40 17 CCL ONG Topa RO OC OC 0.60 1.20 0.60 18 CCL COM Amlo OC OC 1.84 2.50 0.66 19 CCL COM KD Hesalong (RPR) OC OC 2.00 4.30 2.30 20 CCL COM Parej East RPR OC OC 1.10 1.75 0.65 21 CCL COM Urimari EPR OC OC 1.20 2.00 0.80 22 CCL FUT Pachra OC OC 15.00 15.00 23 CCL FUT Pichri OC OC 1.20 1.20 24 CCL FUT Sanghmitra OC OC 12.50 12.50 25 CCL FUT Kalyani OC OC 1.50 1.50

Total 30.75 122.19 91.44

Page 28: cover page of Booklet

13�

PROJECTS / UNITS WITH GROWTH MORE THAN 0.50 Mt - NCL

SL SUB GROUP PROJECT TYPE 14-15 19-20 GROWTH1 NCL ONG Amlohri Expn OC 10.00 14.00 4.00 2 NCL ONG Khadia Expn OC 5.50 12.00 6.50 3 NCL ONG Nigahi Expn OC 15.00 18.00 3.00 4 NCL FUT Dudhichua Expn OC 0.00 6.00 6.00 5 NCL FUT Jayant Expn OC 0.00 6.00 6.00 6 NCL FUT Bina-Kakri Amalg. OC 0.00 10.00 10.00 7 NCL FUT Block-B Expn OC 0.00 3.50 3.50 8 NCL FUT Semaria OC 0.00 2.00 2.00 9 NCL FUT Jhingurdah Bttom OC 0.00 2.00 2.00 10 NCL FUT Dongrital UG 0.00 1.50 1.50 11 NCL FUT Patpahari UG/OC 0.00 1.00 1.00 12 NCL FUT Marki-Barka (W) UG 0.00 0.50 0.50 13 NCL FUT Marki-Barka (E) UG/OC 0.00 1.00 1.00

Total 30.50 77.50 47.00

Page 29: cover page of Booklet

14�

PROJECTS / UNITS WITH GROWTH MORE THAN 0.50 Mt - WCL

SL SUB GROUP PROJECT TYPE 14-15 19-20 GROWTH1 WCL ONG Bhanegaon OC 0.20 1.00 0.80 2 WCL ONG Durgapur Expn. Deep OC 0.50 2.50 2.00 3 WCL ONG Gokul OC 0.00 1.50 1.50 4 WCL ONG Kolar pimpri Extn. OC 0.75 1.50 0.75 5 WCL ONG Makardhokra I OC 0.20 2.00 1.80 6 WCL ONG Penganga OC 0.00 4.00 4.00 7 WCL ONG Singori OC 0.00 0.80 0.80 8 WCL ONG Yekona -I & II Amalgamate OC 0.00 2.00 2.00 9 WCL ONG Umrer Expansion (Amb River

Phase - IV) OC 0.00 2.00 2.00

10 WCL ONG Dinesh OC OC 0.00 4.00 4.00 11 WCL FUT Bellora/ Naigaon Deep OC 0.00 1.08 1.08 12 WCL FUT Dhuptala (Sasti UG to OC) OC 0.00 0.80 0.80 13 WCL FUT Hindustan Lalpeth Expn OC 0.00 0.60 0.60 14 WCL FUT Kamptee Deep OC 0.00 0.90 0.90 15 WCL FUT Mungoli Nirguda Deep Extn.

OC OC 0.00 3.50 3.50

16 WCL FUT New Majri UG to OC OC 0.00 0.80 0.80 17 WCL FUT New Majri Sector IA & II A

Extn. OC 0.00 1.00 1.00

18 WCL FUT Niljai Expansion (Deep) OC 0.00 3.50 3.50 19 WCL FUT Padmapur Deep Extention OC 0.00 2.00 2.00 20 WCL FUT Pimpalgaon Deep OC 0.00 0.80 0.80 21 WCL FUT Ukni Deep OC 0.00 2.00 2.00 22 WCL FUT Combined (Pauni II+ Pauni III) OC 0.00 1.50 1.50

Total 1.65 39.78 38.13

Page 30: cover page of Booklet

15�

PROJECTS / UNITS WITH GROWTH MORE THAN 0.50 Mt - SECL

SL SUB GROUP PROJECT TYPE 14-15 19-20 GROWTH

1 SECL COM SHARDA HIGHWALL UG 0.50 1.00 0.50 2 SECL ONG AMADAND OC 1.44 2.15 0.71 3 SECL ONG AMLAI (1.5 MTY) OC 0.70 2.03 1.33 4 SECL ONG AMGAON OC 1.00 2.00 1.00 5 SECL ONG AMAERA OC 1.30 2.00 0.70 6 SECL ONG AMBIKA (1 MTY) OC 0.00 1.00 1.00 7 SECL ONG BATURA (2 MTY) OC 0.00 1.50 1.50 8 SECL ONG BIJARI (1.5 MTY) OC 0.00 2.20 2.20 9 SECL ONG CHURCHA * (1.35 MTY) UG 1.40 2.10 0.70

10 SECL ONG DIPKA EXPN (25.00 MT) OC 30.00 31.00 1.00 11 SECL ONG GEVRA EXPN (35.00 MT) OC 40.00 41.00 1.00

12 SECL ONG JAGANNATHPUR (3 MTY) OC 0.00 3.00 3.00

13 SECL ONG JAMPALI (2 MTY) OC 0.95 3.00 2.05

14 SECL ONG KARTALI EAST (2.5 MTY) OC 0.00 2.50 2.50

15 SECL ONG KUSMUNDA EXPN (15-50 MTY) OC 18.75 50.00 31.25

16 SECL ONG MAHAMAYA (0.48 MTY) UG/OC 0.25 1.50 1.25 17 SECL ONG MAHAN (0.36 MTY) OC 0.20 1.36 1.16 18 SECL ONG PELMA (15 MTY) OC 0.00 10.00 10.00 19 SECL ONG SARAIPALLI (1.4 MTY) OC 0.90 2.40 1.50

20 SECL ONG CHHAL OC Seam III Expn (6 MTY) OC 0.00 6.00 6.00

21 SECL FUT GEVRA EXPN (35.00 MT-50 MTY) OC 0.00 24.00 24.00

22 SECL FUT MADAN NAGAR (12 MTY) OC 0.00 2.00 2.00

23 SECL FUT MALACHUA (3 MTY) OC 0.00 3.00 3.00

24 SECL FUT AMADAND OC EXPN (4 MTY) OC 0.00 1.60 1.60

25 SECL FUT AMRITDHARA (2 MTY) OC 0.00 1.00 1.00 26 SECL FUT RAI (15 MTY) OC 0.00 5.00 5.00

27 SECL FUT VIJAYWEST/VIJAY CENTRAL OC 0.00 1.50 1.50

28 SECL FUT BATURA UG(HW) (0.5 MTY) UG 0.00 0.50 0.50

29 SECL FUT KANCHAN RPR (2 MTY) OC 0.00 2.00 2.00 30 SECL FUT BATURA WEST EXTN OC 0.00 0.50 0.50

31 SECL FUT RAMPUR BATURA (4 MTY) OC 0.00 1.00 1.00

32 SECL FUT RAJNAGAR RPR OC 0.00 0.70 0.70 33 SECL FUT CHIRIMIRI EXPN OC 0.00 1.00 1.00

Total 97.39 211.54 114.15

Page 31: cover page of Booklet

16�

PROJECTS / UNITS WITH GROWTH MORE THAN 0.50 Mt - MCL

SL SUB GROUP PROJECT TYPE 14-15 19-20 GROWTH

1 MCL COM Samleswari OCP OC 12.50 15.00 2.50 2 MCL COM Lajkura O.C.P. OC 2.50 4.50 2.00 3 MCL COM Lingaraj OCP OC 11.50 20.00 8.50 4 MCL ONG Talabira OCP OC 10.00 10.00 5 MCL ONG Basundhara(W) Extn. OCP OC 3.70 7.00 3.30 6 MCL ONG Kulda & Kulda Expansion OC 4.80 15.00 10.20 7 MCL ONG Garjanbahal OCP OC 10.00 10.00 8 MCL ONG Siarmal OCP 10.00 10.00 9 MCL ONG Hingula O.C.P. OC 3.50 12.00 8.50

10 MCL ONG Balram OCP OC 5.00 8.00 3.00 11 MCL ONG Gopalprasad OCP OC 15.00 15.00 12 MCL ONG Jagannath & Jagannath Re-

org'n OC 5.00 6.00 1.00

13 MCL ONG Ananta OCP OC 9.00 20.00 11.00 14 MCL ONG Bharatpur OCP OC 7.50 20.00 12.50 15 MCL ONG Kaniha OCP OC 8.45 14.00 5.55 16 MCL FUT Integ Belpahar Lakhanpur

Lilari OCP. OC 30.00 30.00

17 MCL FUT Gopalji Kaniha OCP OC 7.00 7.00 Total 73.45 223.50 150.05

Page 32: cover page of Booklet

17�

Subsidiary-wise Group-wise Production Plan - 1 BtECL 14-15 15-16 16-17 17-18 18-19 19-20 Existing 6.23 6.93 7.85 10.50 9.99 10.51 Completed 4.80 5.02 5.06 4.48 4.28 3.18 Ongoing 26.97 30.08 33.67 35.18 36.52 36.75 Future 0.00 0.00 0.36 1.52 5.77 11.56

38.0 42.0 46.9 51.7 56.6 62.0 BCCL Existing 31.13 31.94 32.99 35.64 37.00 41.44 Completed Ongoing 2.80 3.32 3.42 3.83 4.93 5.77 Future 0.07 0.25 0.60 1.53 4.08 5.80

34.0 35.5 37.0 41.0 46.0 53.0 CCL Existing 3.87 2.46 0.47 0.47 0.47 0.47 Completed 14.04 14.66 15.47 16.32 17.10 18.47 Ongoing 37.10 43.39 50.82 56.63 66.41 84.16 Future 0.00 0.00 0.25 6.58 18.03 30.41

55.0 60.5 67.0 80.0 102.0 133.5 NCL Existing 1.63 1.70 1.20 0.00 0.00 0.00 Completed 35.50 35.30 34.80 24.00 24.00 24.00 Ongoing 39.88 43.00 45.00 51.00 50.00 52.50 Future 0.00 0.00 1.00 15.00 25.00 33.50

77.0 80.0 82.0 90.0 99.0 110.0 WCL Existing 0.49 0.30 0.25 0.25 0.20 0.20 Completed 23.54 22.27 15.38 12.39 10.20 10.15 Ongoing 19.97 21.13 22.77 22.10 26.67 30.05 Future 0.00 1.30 9.60 15.26 17.93 19.60

44.0 45.0 48.0 50.0 55.0 60.0 SECLExisting 1.85 1.66 1.66 1.64 1.57 1.11 Completed 20.46 19.80 18.67 16.80 15.59 14.43 Ongoing 108.90 112.57 128.34 136.57 157.38 180.26 Future 0.00 1.00 1.00 6.00 18.60 43.80

131.2 135.0 149.7 161.0 193.1 239.6 MCLExisting 1.39 1.36 1.36 1.36 1.36 1.36 Completed 45.66 47.19 49.89 53.39 55.89 39.64 Ongoing 79.95 101.45 115.75 132.25 160.75 172.00 Future 0.00 0.00 0.00 0.00 4.00 37.00

127.0 150.0 167.0 187.0 222.0 250.0 CIL Existing 46.58 46.34 45.77 49.86 50.59 55.09 Completed 143.99 144.23 139.26 127.38 127.05 109.87 Ongoing 315.56 354.93 399.76 437.56 502.65 561.48 Future 0.07 2.55 12.81 45.89 93.40 181.66

TOTAL 506.21 548.05 597.60 660.68 773.70 908.09

Page 33: cover page of Booklet

18�

PRODUCTION PROJECTION (Mt) - ECL SL GROUP PROJECT TYPE 14-15 15-16 16-17 17-18 18-19 19-20 1 EX Badjna UG 0.08 0.08 0.08 0.08 0.08 0.08 2 EX Begunia UG 0.01 0.00 0.00 0.00 0.00 0.00 3 EX Bejdih UG 0.03 0.03 0.03 0.03 0.03 0.03 4 EX Belbaid UG 0.09 0.09 0.09 0.09 0.09 0.09 5 EX Barmondia A UG 0.04 0.00 0.00 0.00 0.00 0.00 6 EX C L Jambad UG 0.01 0.04 0.04 0.00 0.00 0.00 7 EX Chapuikhas UG 0.02 0.02 0.02 0.02 0.02 0.02 8 EX Chora 7 & 9 pit UG 0.07 0.07 0.07 0.07 0.07 0.07 9 EX Dalurband UG 0.09 0.00 0.00 0.00 0.00 0.00

10 EX Ghusick UG 0.01 0.00 0.00 0.00 0.00 0.00 11 EX Haripur UG 0.06 0.06 0.00 0.00 0.00 0.00 12 EX Jambad UG 0.10 0.10 0.10 0.10 0.10 0.10 13 EX Jemehari UG 0.02 0.00 0.00 0.00 0.00 0.00 14 EX Kalipahari UG 0.03 0.03 0.03 0.00 0.00 0.00 15 EX Khandra UG 0.10 0.10 0.10 0.10 0.10 0.10 16 EX Khas Kajora UG 0.20 0.20 0.20 0.20 0.20 0.20 17 EX Kumardhubi UG 0.08 0.07 0.07 0.07 0.07 0.07 18 EX Kumardihi A UG 0.10 0.10 0.10 0.10 0.10 0.10 19 EX Kumardihi B UG 0.07 0.07 0.05 0.00 0.00 0.00 20 EX Lakhimata UG 0.08 0.08 0.08 0.00 0.00 0.00 21 EX Madhaipur UG 0.09 0.08 0.08 0.08 0.08 0.08 22 EX Madhabpur UG 0.05 0.05 0.05 0.05 0.05 0.03 23 EX Manderboni-South Samla UG 0.09 0.09 0.09 0.09 0.09 0.09 24 EX Mandman UG 0.03 0.03 0.03 0.03 0.03 0.03 25 EX Methani UG 0.03 0.03 0.03 0.03 0.03 0.03 26 EX Moira UG 0.06 0.03 0.03 0.03 0.03 0.03 27 EX Nabakajora UG 0.05 0.05 0.05 0.05 0.05 0.00 28 EX New Kenda UG 0.04 0.00 0.00 0.00 0.00 0.00 29 EX Nimcha UG 0.15 0.15 0.15 0.15 0.15 0.15 30 EX Ningah UG 0.05 0.03 0.03 0.03 0.03 0.03 31 EX Pandaveswar UG 0.12 0.12 0.12 0.12 0.12 0.12 32 EX Parascole ( East and West) UG 0.20 0.20 0.20 0.20 0.20 0.20 33 EX Parasea UG 0.17 0.14 0.14 0.14 0.14 0.14 34 EX Parbelia UG 0.08 0.06 0.06 0.00 0.00 0.00 35 EX Pure Searsole UG 0.03 0.03 0.00 0.00 0.00 0.00 36 EX Shampur B UG 0.06 0.07 0.07 0.07 0.07 0.07 37 EX Siduli UG 0.09 0.09 0.09 0.09 0.09 0.09 38 EX Sripur Seam Incline UG 0.06 0.05 0.05 0.05 0.05 0.05 39 EX Tilaboni UG 0.14 0.13 0.13 0.13 0.13 0.00 40 EX Tirath/kuardih UG 0.02 0.02 0.02 0.02 0.02 0.02 41 EX Gopinathpur OC OC(D) 0.14 0.14 0.14 0.15 0.00 0.00 42 EX Mahabir OC(D) 0.15 0.15 0.15 0.15 0.00 0.00 43 EX Dabor OC OC(D) 0.10 0.00 0.00 0.00 0.00 0.00 44 EX Bansra OC OC(D) 0.02 0.00 0.00 0.00 0.00 0.00 45 EX Damalia OC OC(D) 0.01 0.00 0.00 0.00 0.00 0.00 46 EX Bahula OC(H) 0.20 0.20 0.00 0.00 0.00 0.00 47 EX Bansra OC(H) 0.25 0.40 0.40 0.50 0.50 0.00 48 EX Bonbahal OC OC(H) 0.00 0.00 0.16 0.31 0.00 0.00 49 EX Chapapur 10 Quarry OC(H) 0.20 0.20 0.20 0.20 0.00 0.00 50 EX Dabor II OC(H) 0.50 0.00 0.00 0.00 0.00 0.00 51 EX Dabor Ph-III OC(H) 0.00 0.50 0.70 1.50 1.50 1.28

Page 34: cover page of Booklet

19�

SL GROUP PROJECT TYPE 14-15 15-16 16-17 17-18 18-19 19-20 52 EX Damalia OC OC(H) 0.00 0.15 0.15 0.00 0.00 0.00 53 EX Gourangdih Begunia OC

PatchOC(H) 0.00 0.00 0.20 0.30 0.35 0.40

54 EX Kalipahari OC ( Part C) OC(H) 0.00 0.08 0.00 0.00 0.00 0.00 55 EX Kapasara/ Kapasara

Extension OC(H) 0.25 0.25 0.10 0.00 0.00 0.00

56 EX Kumardihi B OC(H) 0.10 0.00 0.00 0.00 0.00 0.00 57 EX Madhabpur (harispur) OC(H) 0.20 0.30 0.40 0.50 0.70 0.70 58 EX Mohanpur OC Patch OC(H) 0.00 0.00 0.00 0.00 0.00 0.80 59 EX Narainkuri OC(H) 0.20 0.20 0.30 0.40 0.40 0.20 60 EX North searsole OC(H) 0.60 0.80 0.80 0.80 0.00 0.00 61 EX Nirsha OC(H) 0.00 0.00 0.10 0.50 0.65 0.80 62 EX Simlong 2,3,4 OC(H) 0.46 0.26 0.26 0.26 0.00 0.00 63 EX CL Jambad OC OC(H) 0.00 0.00 0.00 0.20 0.40 0.60 64 EX Shankarpur OC Ph-IV OC(H) 0.00 0.20 0.30 0.40 0.50 0.60 65 EX Dalurband OCP (H) PHASE

III OC(H) 0.00 0.20 0.30 0.40 0.50 0.55

66 EX Nakrakonda (H) OC OC(H) 0.00 0.20 0.30 0.00 0.00 0.00 67 EX New Kenda Quarry III OC OC(H) 0.00 0.00 0.00 0.30 0.41 0.50 68 EX Gaurangdih Extension OCP

(ph-I) /Gourangdih D Block OC(H) 0.00 0.00 0.00 0.30 0.40 0.40

69 EX Bhanora (W) OC OC(H) 0.00 0.10 0.20 0.50 0.50 0.50 70 EX Lakhimata OC(H) OC(H) 0.00 0.00 0.00 0.30 0.50 0.60 71 EX Ghusick OC (H) OC(H) 0.00 0.04 0.24 0.34 0.50 0.60 SUB TOTAL: 6.23 6.93 7.85 10.50 9.99 10.51

72 COM Amritnagar UG 0.10 0.14 0.14 0.14 0.14 0.14 73 COM Bahula ( incl. Lower Kenda) UG 0.23 0.23 0.23 0.23 0.23 0.23 74 COM Bankola UG 0.16 0.16 0.16 0.16 0.16 0.16 75 COM Bansra UG 0.21 0.21 0.21 0.21 0.21 0.21 76 COM Bhanora West UG 0.05 0.04 0.04 0.04 0.04 0.04 77 COM Central Kajora UG 0.09 0.07 0.07 0.07 0.07 0.07 78 COM Chapapur-II UG 0.08 0.08 0.08 0.08 0.08 0.08 79 COM Chinakuri I UG 0.00 0.00 0.00 0.00 0.00 0.00 80 COM Chinakuri III UG 0.07 0.06 0.06 0.06 0.06 0.06 81 COM Chora 10 UG 0.04 0.03 0.00 0.00 0.00 0.00 82 COM Chora Block Incline UG 0.06 0.05 0.00 0.00 0.00 0.00 83 COM Dhemomain UG 0.05 0.05 0.05 0.05 0.05 0.05 84 COM Dubeswari UG 0.07 0.05 0.05 0.05 0.05 0.05 85 COM Hariazam UG 0.08 0.09 0.09 0.09 0.09 0.09 86 COM Jhanjra UG 0.39 0.39 0.36 0.20 0.20 0.00 87 COM Jhanjra cm(Ist set) UG 0.43 0.43 0.43 0.40 0.40 0.00 88 COM J K Nagar UG 0.16 0.15 0.20 0.20 0.20 0.20 89 COM Kalidaspur UG 0.10 0.10 0.10 0.10 0.10 0.10 90 COM Khoodia UG 0.04 0.04 0.04 0.04 0.04 0.04 91 COM Khottadih UG 0.30 0.30 0.30 0.30 0.00 0.00 92 COM Kunustoria UG 0.11 0.11 0.11 0.11 0.11 0.11 93 COM Madhusudanpur7 Pit &

incline UG 0.09 0.08 0.08 0.08 0.08 0.00

94 COM Nakrakonda UG 0.04 0.03 0.03 0.00 0.00 0.00 95 COM Narsamuda UG 0.07 0.06 0.06 0.06 0.06 0.06 96 COM Parasea 6&7 UG 0.05 0.03 0.03 0.03 0.03 0.03 97 COM Patmohana UG 0.06 0.06 0.06 0.06 0.06 0.06

Page 35: cover page of Booklet

20�

SL GROUP PROJECT TYPE 14-15 15-16 16-17 17-18 18-19 19-20 98 COM Ratibati UG 0.02 0.01 0.01 0.01 0.01 0.01

99 COM Satgram(Including Satgram Incline)

UG 0.12 0.10 0.10 0.10 0.10 0.10

100 COM Sodepur UG 0.04 0.03 0.03 0.03 0.03 0.00 101 COM Shankarpur UG 0.13 0.11 0.11 0.11 0.11 0.11 102 COM Barmuri OC 0.16 0.30 0.30 0.20 0.20 0.10 103 COM Belbaid OC 0.17 0.17 0.17 0.00 0.00 0.00 104 COM Bonjemehari OC 0.30 0.30 0.30 0.30 0.30 0.30 105 COM Jambad OC 0.35 0.50 0.60 0.70 0.80 0.80 106 COM Rajpura OC 0.17 0.20 0.20 0.00 0.00 0.00 107 COM Shankarpur Extension OC 0.20 0.30 0.30 0.30 0.30 0.00 108 COM West Kenda OC 0.02 0.00 0.00 0.00 0.00 0.00

SUB TOTAL: 4.80 5.02 5.06 4.48 4.28 3.18 109 ONG Jhanjra 2nd set CM UG 0.48 0.51 0.51 0.45 0.51 0.51 110 ONG Jhanjra L/W R-VI UG 0.00 0.90 1.70 1.70 1.70 1.70 111 ONG Khottadih CM UG 0.00 0.00 0.00 0.00 0.45 0.90 112 ONG Sarpi Aug UG 0.49 0.67 0.67 0.67 0.50 0.67 113 ONG Kumardihi B CM UG 0.00 0.00 0.29 0.36 0.36 0.87 114 ONG Chitra East OC(D) 2.00 2.00 2.50 2.50 2.50 2.50 115 ONG Khottadih OC OC(D) 1.70 1.70 1.70 1.70 1.20 0.00 116 ONG Mohanpur Expansion OC(H) 1.00 1.10 1.20 1.20 1.20 0.40 117 ONG Rajmahal Expn OC(H) 14.80 16.00 16.50 17.00 17.00 17.00 118 ONG Sonepur (Comb) OC (D) 6.50 7.00 7.50 8.50 10.00 11.00 119 ONG New Kenda OC(H) 0.00 0.20 1.10 1.10 1.10 1.20

SUB TOTAL: 26.97 30.08 33.67 35.18 36.52 36.75 120 FUT Jhanjra Low height CM UG 0.00 0.00 0.36 0.72 0.72 0.72 121 FUT Tilaboni UG 0.00 0.00 0.00 0.00 0.00 0.15 122 FUT Ghusik UG UG 0.00 0.00 0.00 0.00 0.00 0.15 123 FUT Chuperbhita OC(H) 0.00 0.00 0.00 0.00 0.70 2.50 124 FUT Hura-C OC(H) 0.00 0.00 0.00 0.50 1.25 2.50 125 FUT Simlong OC ( Extension) OC(H) 0.00 0.00 0.00 0.00 0.50 1.50 126 FUT North Searsole OC OC(H) 0.00 0.00 0.00 0.00 0.80 0.80 127 FUT Nakrakonda- Kumardih-B

OCOC(H) 0.00 0.00 0.00 0.30 0.70 0.70

128 FUT Itapara OC OC(H) 0.00 0.00 0.00 0.00 0.20 1.00 129 FUT Madanpur OC 0.00 0.00 0.00 0.00 0.50 0.50 130 FUT Bakulia UG 0.00 0.00 0.00 0.00 0.10 0.14 131 FUT Dhangajore UG 0.00 0.00 0.00 0.00 0.00 0.30 132 FUT Madhukunda UG 0.00 0.00 0.00 0.00 0.00 0.10 133 FUT Chaidhar-Gariapani OC 0.00 0.00 0.00 0.00 0.30 0.50 134 FUT Brahmani/ Chicropastimal OC 0.00 0.00 0.00 0.00 0.00 0.00

SUB TOTAL: 0.00 0.00 0.36 1.52 5.77 11.56 GRAND TOTAL: 38.00 42.03 46.94 51.68 56.56 62.00

Page 36: cover page of Booklet

21�

PRODUCTION PROJECTION (Mt) - BCCL SL SUB GROUP PROJECT TYPE 14-15 15-16 16-17 17-18 18-19 19-20 1 BCCL EX Muraidih-Shatabdi amal. D/OC 2.41 1.90 1.90 2.10 2.10 2.10 2 BCCL EX Phularitand U/G 0.13 0.15 0.30 0.30 0.30 0.30 3 BCCL EX Phularitand H/OC 0.90 2.45 2.45 2.45 2.55 2.55 4 BCCL EX Damoda H/OC 0.13 0.10 0.10 0.10 0.00 0.00 5 BCCL EX Amalgmated Block-II OCP D/OC 1.84 3.00 3.00 3.10 3.00 3.00 6 BCCL EX Amalgmated Block-II OCP H/OC 3.10 1.30 1.30 1.54 1.90 3.00 7 BCCL EX Kharkharee U/G 0.05 0.05 0.05 0.05 0.05 0.05 8 BCCL EX Jogidih U/G 0.05 0.05 0.05 0.05 0.05 0.05 9 BCCL EX Maheshpur U/G 0.04 0.04 0.04 0.04 0.04

10 BCCL EX Maheshpur H/OC 0.05 0.05 0.25 0.30 0.40 11 BCCL EX Amal.Block-IV GVP. U/G 0.05 0.09 0.09 0.09 0.09 0.09 12 BCCL EX Amal.Block-IV GVP. D/OC 0.53 0.50 0.50 0.60 0.60 0.60 13 BCCL EX Amal.Block-IV GVP. H/OC 0.31 0.10 0.10 0.20 0.20 0.30 14 BCCL EX New Akashkinaree U/G 0.17 0.15 0.16 0.16 0.16 0.16 15 BCCL EX New Akashkinaree D/OC 0.29 0.40 0.45 0.50 0.50 0.50 16 BCCL EX New Akashkinaree H/OC 0.05 0.05 0.25 0.25 0.35 17 BCCL EX AARC U/G 0.14 0.13 0.13 0.13 0.13 0.13 18 BCCL EX Salanpur U/G 0.23 0.13 0.13 0.13 0.13 0.13 19 BCCL EX AKWMC U/G 0.13 0.13 0.13 0.13 0.13 20 BCCL EX AKWMC D/OC 1.75 3.10 3.14 3.30 3.30 3.30 21 BCCL EX AKWMC/ Kantapahari H/OC 0.20 0.20 0.30 1.00 1.70 22 BCCL EX AKWMC/ Mega Project H/OC 0.16 0.16 0.25 0.00 0.00 23 BCCL EX AKWMC/ Kumarijore H/OC 2.35 0.15 0.20 0.20 0.00 0.00 24 BCCL EX Katras chatudih H/OC 0.20 0.20 0.20 0.30 0.50 25 BCCL EX Gaslitand H/OC 0.37 0.10 0.10 0.00 0.00 0.00 26 BCCL EX Mudidih U/G 0.18 0.09 0.09 0.09 0.09 0.09 27 BCCL EX Jogta H/OC 0.40 0.00 0.10 0.10 0.10 0.30 28 BCCL EX Tetulmari U/G 0.11 0.09 0.09 0.09 0.00 0.00 29 BCCL EX Tetulmari D/OC 1.13 1.00 1.05 1.10 1.10 1.10 30 BCCL EX Nichitpur D/OC 0.31 0.30 0.31 0.35 0.45 0.45 31 BCCL EX Nichitpur H/OC 0.20 0.20 0.20 0.30 0.30 32 BCCL EX Sendra Bansjora H/OC 0.70 0.65 0.65 0.65 0.65 0.85 33 BCCL EX Kankanee H/OC 0.30 0.30 0.35 0.35 0.35 34 BCCL EX Godhur U/G 0.08 0.08 0.08 0.08 0.08 0.08 35 BCCL EX Godhur H/OC 0.77 0.20 0.20 0.20 0.30 0.60 36 BCCL EX Dhansar/VOCP D/OC 0.40 0.75 0.80 0.00 0.00 0.00 37 BCCL EX Dhansar H/OC 1.63 1.60 1.60 1.65 1.65 0.00 38 BCCL EX Kusunda H/OC 1.49 1.70 1.70 1.70 1.70 1.70 39 BCCL EX Ena-Industry Mega Project H/OC 0.19 1.00 1.00 1.96 1.90 3.15 40 BCCL EX Gondudih -Khas Kusunda H/OC 0.20 0.20 0.00 0.00 0.00 41 BCCL EX East Bassuriya H/OC 0.34 0.10 0.10 0.10 0.10 0.20 42 BCCL EX P.B. Project U/G 0.07 0.07 0.07 0.07 0.07 0.10 43 BCCL EX K.B. 10/12 pit U/G 0.04 0.04 0.04 0.04 0.04 0.04 44 BCCL EX Gopalichak U/G 0.03 0.03 0.03 0.03 0.03 0.03 45 BCCL EX Gopalichak H/OC 0.04 0.04 0.04 0.04 0.04 0.00 46 BCCL EX Bhagabandh U/G 0.05 0.05 0.05 0.05 0.05 0.05 47 BCCL EX Simlabahal U/G 0.10 0.05 0.05 0.05 0.05 0.05 48 BCCL EX Burragarh U/G 0.03 0.03 0.03 0.03 0.03 49 BCCL EX Hurrladih U/G 0.02 0.02 0.02 0.02 0.02 50 BCCL EX Bastacolla U/G 0.17 0.13 0.13 0.13 0.13 0.13

Page 37: cover page of Booklet

22�

SL SUB GROUP PROJECT TYPE 14-15 15-16 16-17 17-18 18-19 19-20 51 BCCL EX Bera U/G 0.08 0.04 0.04 0.04 0.04 0.04 52 BCCL EX Bera D/OC 0.12 0.20 0.30 0.35 0.35 0.35 53 BCCL EX Dobari H/OC 0.17 0.80 0.80 1.50 1.50 1.70 54 BCCL EX Ghanoodih D/OC 0.21 0.50 0.60 0.65 0.65 0.65 55 BCCL EX Bolck-VIII/ Ghanoodih H/OC 0.24 0.00 0.00 0.00 1.10 1.40 56 BCCL EX Rajapur D/OC 0.42 0.40 0.50 0.60 0.70 0.70 57 BCCL EX Rajapur H/OC 0.22 0.10 0.10 0.00 0.00 0.00 58 BCCL EX Kuya U/G 0.05 0.04 0.04 0.04 0.04 0.04 59 BCCL EX Kuya D/OC 0.24 0.30 0.30 0.35 0.40 0.45 60 BCCL EX Golukdih NC H/OC 1.80 1.80 1.10 0.00 0.00 61 BCCL EX Joyrampur/Bagdigi/Lodna

Mega project H/OC 0.03 0.00 0.00 0.20 0.40 0.70

62 BCCL EX Kujama H/OC 0.22 0.20 0.20 0.00 0.00 0.00 63 BCCL EX NTC Patch A H/OC 2.04 0.20 0.20 0.20 0.00 0.00 64 BCCL EX Bhowrah (N) U/G 0.03 0.03 0.03 0.03 0.03 0.03 65 BCCL EX Bhowrah (N) C1 Patch H/OC 0.16 0.20 0.20 0.20 0.20 0.20 66 BCCL EX Bhowrah (S) U/G 0.05 0.03 0.03 0.03 0.03 0.03 67 BCCL EX Bhowrah (S) 3 Pit West, H/OC 0.23 0.05 0.05 0.05 0.05 0.20 68 BCCL EX Amalgamated Sudamdih

PatherdihD/OC 0.05 0.00 0.05 0.05 0.10 0.20

69 BCCL EX Bhutgoria U/G 0.12 0.18 0.20 0.20 0.35 70 BCCL EX Moonidih XVI (T) U/G 0.44 0.64 0.70 0.70 0.70 0.70 71 BCCL EX Murulidih 20/21 Pits U/G 0.04 0.03 0.00 0.00 0.00 0.00 72 BCCL EX DBOCP U/G 0.05 0.03 0.00 0.00 0.00 0.00 73 BCCL EX DBOCP D/OC 0.65 1.05 1.10 1.15 1.20 1.30 74 BCCL EX DBOCP H/OC 1.11 0.70 0.70 1.00 1.00 1.00 75 BCCL EX Damagoria U/G 0.00 0.08 0.13 0.18 0.27 76 BCCL EX DOCP/ Chaptoria H/OC 1.23 0.40 0.40 0.50 0.55 0.65 77 BCCL EX DOCP/Borira H/OC 0.70 0.70 0.70 0.90 1.10 78 BCCL EX DOCP/ Patch-A H/OC 0.00 0.00 0.40 0.40 0.40 SUB TOTAL 31.13 31.94 32.99 35.64 37.00 41.44

79 BCCL ONG Bararee U/G 0.07 0.07 0.07 0.07 0.07 0.07 80 BCCL ONG NT-ST & Jeenagora D/OC 0.82 1.70 1.80 2.00 2.00 2.00 81 BCCL ONG NT-ST & Jeenagora H/OC 1.91 1.55 1.55 1.76 2.86 3.70 SUB TOTAL 2.80 3.32 3.42 3.83 4.93 5.77

82 BCCL FUT BLOCK-II U/G U/G 0.00 0.15 0.30 0.45 0.45 83 BCCL FUT Muraidih U/G 0.25 0.45 0.83 1.83 2.00 84 BCCL FUT Moonidih XV U/G 0.00 0.00 0.10 0.54 1.50 85 BCCL FUT Lohapatti U/G 0.07 0.00 0.00 0.10 0.35 0.35 86 BCCL FUT Kapuria U/G 0.00 0.00 0.20 0.90 1.50

SUB TOTAL 0.07 0.25 0.60 1.53 4.08 5.80 GRAND TOTAL 34.00 35.50 37.00 41.00 46.00 53.00

Page 38: cover page of Booklet

23�

PRODUCTION PROJECTION (Mt)- CCLSL GROUP PROJECT TYPE 14-15 15-16 16-17 17-18 18-19 19-20 1 EX Sel Dhori Q3 Man. OC 3.30 2.00 2 EX Argada UG UG 0.04 0.04 0.04 0.04 0.04 0.04 3 EX Bhukuranda UG UG 0.18 0.12 0.13 0.13 0.13 0.13 4 EX Dhori Khas UG (SDL BP) UG 0.06 0.06 0.06 0.06 0.06 0.06 5 EX Jarangdih UG (Manaul BP) UG 0.05 0.03 0.03 0.03 0.03 0.03 6 EX Sarubera UG (SDL BP) UG 0.06 0.05 0.05 0.05 0.05 0.05 7 EX Sayal 'D' UG (SDL BP) UG 0.06 0.06 0.06 0.06 0.06 0.06 8 EX Sirka UG (Manual BP) UG 0.09 0.08 0.08 0.08 0.08 0.08 9 EX Swang UG (Manual BP) UG 0.02 0.01 0.01 0.01 0.01 0.01

10 EX Topa UG UG 0.03 0.03 0.03 0.03 0.03 0.03 SUB TOTAL: 3.87 2.46 0.47 0.47 0.47 0.47

11 ONG Amrapali OC OC 3.00 6.00 8.50 9.00 11.00 12.00 12 ONG Ara(RO) OC OC 0.00 0.00 0.00 0.00 0.00 0.00 13 ONG Ashoka EPR 10 MTY OC OC 8.00 9.00 10.00 12.00 14.50 20.00 14 ONG Bokaro(Bermo) OC OC 0.06 0.06 0.10 15 ONG Chainpur (Sarubera OC) OC 0.10 0.40 0.40 0.40 0.40 16 ONG Churi-Benti UGP (LHD BP) UG 0.03 0.03 0.10 0.21 0.42 0.54 17 ONG Govinpur PH II (New Swang)OC OC 2.00 2.00 2.00 2.00 2.00 2.00 18 ONG Hesagara OS OC OC 0.15 0.00 0.00 0.00 0.00 0.00 19 ONG Kargali UGP MECH OF BERMO(SDL BP) UG 0.04 0.04 0.04 0.04 0.04 0.04 20 ONG KARMA OC OC 0.45 0.45 0.60 0.73 0.90 1.00 21 ONG KARO OC OC 1.50 1.50 1.75 1.90 2.20 3.50 22 ONG Kathara RCE OC OC 0.90 0.90 1.35 1.90 1.90 1.90 23 ONG Konar 3.5 OC OC 1.11 1.40 1.60 1.80 2.30 3.50 24 ONG Kuju UGP (SDL BP) UG 0.03 0.02 0.03 0.03 0.03 0.03 25 ONG Parej East UGP UG 0.10 0.20 26 ONG Kuju OC (OS) OC 0.10 0.20 0.00 0.00 0.00 0.00 27 ONG Magadh OC OC 2.00 2.00 3.70 5.00 10.00 20.00 28 ONG North Urimari OC OC 0.60 1.40 1.60 2.20 2.70 3.00 29 ONG Pindra REORG. OC 0.05 0.00 0.00 0.00 0.00 0.00 30 ONG Piparwar EPR OC OC 10.00 9.14 7.20 6.23 3.23 31 ONG Purnadih OC OC 1.80 1.80 2.00 2.25 2.50 3.00 32 ONG Rajrappa RCE OC OC 1.20 1.25 1.71 1.80 2.00 2.00 33 ONG Rohini OC OC 1.00 1.50 2.00 2.00 2.00 2.00 34 ONG Tapin OC OC 1.20 1.85 2.00 2.60 2.80 2.80 35 ONG Tapin South OS OC OC 0.32 0.32 0.50 0.80 1.40 2.00 36 ONG Tarmi OS OC OC 0.30 0.30 1.00 1.00 1.00 1.00 37 ONG Tetariakhar OC OC 0.60 0.88 1.40 1.50 1.75 2.00 38 ONG Topa RO OC OC 0.60 1.20 1.20 1.20 1.20 1.20 39 ONG Urimari UGP UG 0.06 0.05 0.05 0.05 0.05 0.06 SUB TOTAL: 37.10 43.39 50.82 56.63 66.41 84.16

40 COM Amlo OC OC 1.84 2.00 2.35 2.50 2.50 2.50 41 COM Dakra Bubka OC OC 0.30 0.30 0.40 0.40 0.40 0.00 42 COM Dhori East RO OC OC 0.25 0.30 0.50 0.60 0.60 0.60 43 COM Giddi A OC OC 0.51 0.51 0.50 0.50 0.50 0.60 44 COM Govindpur UG UG 0.11 0.07 0.07 0.07 0.07 0.07 45 COM Jarangdih OC OC 0.70 0.70 0.70 0.70 0.70 0.70 46 COM Jharkhand OC OC 0.54 1.00 1.00 1.00 1.00 1.00 47 COM Kabribad RO OC OC 0.60 0.65 0.65 0.65 0.65 0.65 48 COM Karo SPL.PH-II UGP UG 0.02 0.02 0.02 0.02 0.02 0.02

Page 39: cover page of Booklet

24�

SL GROUP PROJECT TYPE 14-15 15-16 16-17 17-18 18-19 19-20 49 COM KD Hesalong (RPR) OC OC 2.00 1.50 2.25 2.50 2.88 4.30 50 COM Kedla OC OC 0.30 0.42 0.50 0.50 0.60 0.70 51 COM Kedla UG UG 0.13 0.12 0.12 0.12 0.12 0.12 52 COM Khasmahal OC OC 1.05 1.10 1.30 1.40 1.50 1.50 53 COM New Giddi C OC OC 0.50 0.60 0.60 0.60 0.60 0.60 54 COM Parej East RPR OC OC 1.10 1.20 1.40 1.60 1.60 1.75 55 COM Phusro/Kargali OC OC 0.07 0.07 0.11 56 COM Pundi RO OC OC 0.40 0.55 0.55 0.55 0.55 0.55 57 COM Ray Bachra UG UG 0.06 0.04 0.04 0.00 0.00 0.00 58 COM Religara OC OC 0.31 0.30 0.30 0.30 0.30 0.30 59 COM Sangam OC OC 0.14 0.15 0.25 0.25 0.25 0.25 60 COM Saunda D UG UG 0.06 0.06 0.06 0.06 0.06 0.06 61 COM Kalyani OC OC 1.70 1.50 62 COM Sirka OC OC 0.15 0.17 0.20 0.20 0.20 0.20 63 COM Urimari EPR OC OC 1.20 1.33 1.60 1.80 2.00 2.00 SUB TOTAL: 14.04 14.66 15.47 16.32 17.10 18.47

64 FUT Pachra OC OC 3.00 8.20 15.00 65 FUT Pichri OC OC 0.20 0.70 0.80 1.20 66 FUT PPR Mangardaha UGP UG 0.05 0.10 0.21 67 FUT Sanghmitra OC OC 2.50 8.10 12.50 68 FUT Kalyani OC OC 0.05 0.33 0.83 1.50

SUB TOTAL: 0.25 6.58 18.03 30.41 GRAND TOTAL: 55.00 60.50 67.00 80.00 102.00 133.50

Page 40: cover page of Booklet

25�

PRODUCTION PROJECTION(Mt) - NCL

SL GROUP PROJECT TYPE 14-15 15-16 16-17 17-18 18-19 19-20 1 EX Jhingurdah OC 1.63 1.70 1.20 0.00 0.00 0.00 SUB TOTAL: 1.63 1.70 1.20 0.00 0.00 0.00 2 COM Bina Extn OC 6.50 7.50 7.50 0.00 0.00 0.00 3 COM Dudhichua OC 14.00 13.00 13.00 12.00 12.00 12.00 4 COM Jayant OC 13.00 13.00 13.00 12.00 12.00 12.00 5 COM Kakri OC 2.00 1.80 1.30 0.00 0.00 0.00 SUB TOTAL: 35.50 35.30 34.80 24.00 24.00 24.00 6 ONG Amlohri Expn OC 10.00 12.00 12.00 14.00 14.00 14.00 7 ONG Block-B OC 4.38 5.00 5.00 5.00 3.50 3.50 8 ONG Khadia Expn OC 5.50 6.00 8.00 10.00 10.00 12.00 9 ONG Krishnashila OC 5.00 5.00 5.00 5.00 5.00 5.00

10 ONG Nigahi Expn OC 15.00 15.00 15.00 17.00 17.50 18.00 SUB TOTAL: 39.88 43.00 45.00 51.00 50.00 52.50

11 FUT Dudhichua Expn OC 0.00 0.00 0.00 3.00 4.00 6.00 12 FUT Jayant Expn OC 0.00 0.00 1.00 3.00 4.00 6.00 13 FUT Bina-Kakri Amalg. OC 0.00 0.00 0.00 8.50 10.00 10.00 14 FUT Block-B Expn OC 0.00 0.00 0.00 0.00 2.50 3.50 15 FUT Semaria OC 0.00 0.00 0.00 0.00 1.00 2.00 16 FUT Jhingurdah Bttom OC 0.00 0.00 0.00 0.00 1.00 2.00 17 FUT Dongrital UG 0.00 0.00 0.00 0.50 1.00 1.50 18 FUT Patpahari UG/OC 0.00 0.00 0.00 0.00 0.50 1.00 19 FUT Marki-Barka (W) UG 0.00 0.00 0.00 0.00 0.25 0.50 20 FUT Marki-Barka (E) UG/OC 0.00 0.00 0.00 0.00 0.75 1.00

SUB TOTAL: 0.00 0.00 1.00 15.00 25.00 33.50 GRAND TOTAL: 77.01 80.00 82.00 90.00 99.00 110.00

Page 41: cover page of Booklet

26�

PRODUCTION PROJECTION (Mt) -WCLSL GROUP PROJECT TYPE 14-15 15-16 16-17 17-18 18-19 19-20 1 EX Ambara UG 0.08 0.09 0.13 0.13 0.08 0.08 2 EX Ganpati UG 0.12 0.10 0.00 0.00 0.00 0.00 3 EX Mahakali UG 0.12 0.11 0.12 0.12 0.12 0.12 4 EX New Majri UG 0.18 0.00 0.00 0.00 0.00 0.00 SUB TOTAL: 0.49 0.30 0.25 0.25 0.20 0.20 5 COM Adasa UG 0.32 0.33 0.35 0.36 0.36 0.36 6 COM Ballarpur RO UG 0.13 0.17 0.15 0.16 0.20 0.20 7 COM Chattarpur I (including

Umri) UG 0.55 0.55 0.55 0.55 0.55 0.55

8 COM Chatarpur II UG 0.15 0.14 0.15 0.16 0.16 0.16 9 COM Durgapur Rayatwari RPR UG 0.15 0.18 0.15 0.16 0.20 0.20

10 COM Hindusthan Lalpeth UG 0.38 0.33 0.38 0.38 0.38 0.38 11 COM Jharna UG 0.18 0.18 0.00 0.00 0.00 0.00 12 COM Kumberkhani UG 0.19 0.20 0.20 0.20 0.20 0.20 13 COM Mahadeopuri UG 0.07 0.07 0.12 0.12 0.12 0.12 14 COM Mathani UG 0.12 0.12 0.12 0.12 0.12 0.12 15 COM Mauri Scheme RCE UG 0.33 0.34 0.45 0.45 0.45 0.45 16 COM Morpar UG 0.06 0.05 0.07 0.08 0.08 0.08 17 COM Naharia UG 0.28 0.30 0.32 0.34 0.34 0.34 18 COM Patansaongi RPR

(Patansongi Scheme) UG 0.18 0.19 0.18 0.18 0.20 0.20

19 COM Pipla UG 0.09 0.08 0.11 0.12 0.12 0.12 20 COM Rajur (Incl. RO) UG 0.13 0.13 0.14 0.14 0.14 0.14 21 COM Saoner RPR (including

Expansion) UG 0.76 0.77 0.80 0.80 0.80 0.80

22 COM Sarni (including D2 Dyke) UG 0.45 0.46 0.45 0.46 0.47 0.47 23 COM Sasti RO UG 0.18 0.20 0.21 0.00 0.00 0.00 24 COM Shobhapur UG 0.52 0.53 0.55 0.56 0.56 0.56 25 COM Silewara Ph-II UG 0.41 0.42 0.40 0.40 0.40 0.40 26 COM Tandsi Expan. (Incl. Tandsi

RPR)UG 0.26 0.26 0.40 0.40 0.40 0.40

27 COM Tawa Phase-I UG 0.71 0.70 0.70 0.70 0.70 0.70 28 COM Tawa - II UG 0.56 0.56 0.60 0.60 0.60 0.60 29 COM Thesgora UG 0.06 0.10 0.09 0.09 0.09 0.09 30 COM Vishnupuri -I UG 0.06 0.08 0.09 0.09 0.09 0.09 31 COM Vishnupuri II UG 0.10 0.11 0.12 0.12 0.12 0.12 32 COM Ambara & other Quarry

Patches (Kalyani, Vaibhabhi, Mohan, Bharat, Narayani)

OC 0.15 0.50 0.30 0.30 0.00 0.00

33 COM Chhinda OC 0.18 0.18 0.15 0.15 0.15 0.00 34 COM Durgapur RCE (Incl. Expn.)

& Motaghat Scheme OC 1.70 1.60 2.00 2.00 0.00 0.00

35 COM Explo.of Patch Pench (Shivpuri, Sethia, Barkui, Bhajipani))

OC 0.54 1.04 0.55 0.50 0.50 0.50

36 COM Ghorawari Patch (Phase III/ Gorawari 16/17, Ghogra/Takia Nala VII, VIII, IX)

OC 0.12 0.40 0.30 0.30 0.30 0.30

Page 42: cover page of Booklet

27�

SL GROUP PROJECT TYPE 14-15 15-16 16-17 17-18 18-19 19-20 37 COM Hindustan Lalpeth RCE OC 0.55 0.40 0.00 0.00 0.00 0.00 38 COM Kamptee UG to OC OC 0.80 0.80 0.00 0.00 0.00 0.00 39 COM Kolgaon RPR OC 0.45 0.50 0.60 0.50 0.50 0.60 40 COM Makardhokra - II UG to OC OC 1.05 0.65 0.00 0.00 0.00 0.00 41 COM Mungoli (Including Nirguda

OC) OC 3.30 3.30 0.00 0.00 0.00 0.00

42 COM Navinkunada Expn. OC 1.17 0.23 0.00 0.00 0.00 0.00 43 COM Niljai OC 1.05 1.30 1.00 0.00 0.00 0.00 44 COM Padampur RCE (Inclu

Scheme) OC 1.75 1.30 1.73 0.00 0.00 0.00

45 COM Pauni OC 0.90 0.90 0.90 0.90 0.90 0.90 46 COM Pimpalgaon OC 0.80 0.80 0.00 0.00 0.00 0.00 47 COM Scheme for New Majri

Sector IA OC 0.85 0.00 0.00 0.00 0.00 0.00

48 COM Umrer (Incl. Expn.) OC 0.84 0.85 0.00 0.00 0.00 0.00 49 COM Completed Mines Closed OC 0.00 0.00 0.00 0.00 0.00 0.00 SUB TOTAL: 23.54 22.27 15.38 12.39 10.20 10.15

50 ONG Durgapur Ryt. 6,7,&8 Inclines

UG 0.07 0.08 0.07 0.07 0.07 0.10

51 ONG Waghoda UG 0.00 0.00 0.05 0.15 0.15 0.20 52 ONG Amalgamated Gondegaon -

Ghatrohan. OC 1.80 1.80 1.80 1.80 2.00 2.00

53 ONG Bhanegaon OC 0.20 0.30 0.70 0.80 0.80 1.00 54 ONG Bhatadih Expn. OC 0.60 0.60 0.60 0.60 0.60 0.60 55 ONG Durgapur Expn. Deep OC 0.50 0.50 1.00 1.00 2.00 2.50 56 ONG Gauri Deep OC 0.50 0.50 0.60 0.60 0.60 0.60 57 ONG Gauri I & II Expn. Scheme OC 1.20 1.40 1.00 1.00 1.00 0.80 58 ONG Ghonsa RPR OC 0.45 0.45 0.45 0.45 0.60 0.45 59 ONG Ghugus Deep Scheme OC 1.90 1.40 0.00 0.00 0.00 0.00 60 ONG Gokul OC 0.00 0.00 0.60 0.70 1.00 1.50 61 ONG Inder UG to OC OC 0.65 0.65 0.90 0.90 1.00 1.00 62 ONG Junad Extn. OC 0.80 0.80 0.75 0.75 0.70 0.70 63 ONG Junakunada OC 1.20 1.20 1.20 0.80 0.55 0.00 64 ONG Kolar pimpri Extn. OC 0.75 0.85 1.50 1.50 1.50 1.50 65 ONG Makardhokra I OC 0.20 1.00 1.30 1.50 1.50 2.00 66 ONG Penganga OC 0.00 0.00 1.50 2.00 3.00 4.00 67 ONG Sasti Expn. OC 1.65 1.65 1.60 1.60 1.60 1.60 68 ONG Scheme for Naigaon

/Bellora Deep OC 1.25 1.25 0.00 0.00 0.00 0.00

69 ONG Scheme for Ballarpur OC OC 0.50 0.50 0.50 0.50 0.50 0.00

70 ONG Scheme for Deepening Niljai OC

OC 2.20 2.20 2.20 0.00 0.00 0.00

71 ONG Scheme for Dhurwasa Expn. OC

OC 0.80 0.80 0.50 0.00 0.00 0.00

72 ONG Scheme for Telwasa Expn. OC

OC 0.80 1.20 0.80 0.00 0.00 0.00

73 ONG Scheme for Uknideep OC OC 1.30 1.50 0.00 0.00 0.00 0.00 74 ONG Singori OC 0.00 0.00 0.00 0.23 0.80 0.80 75 ONG Urdhan OC 0.65 0.50 0.65 0.65 0.70 0.70 76 ONG Yekona -I & II Amalgamate OC 0.00 0.00 0.50 1.00 1.00 2.00 77 ONG Umrer Expansion (Amb

River Phase - IV) OC 0.00 0.00 1.50 2.00 2.00 2.00

Page 43: cover page of Booklet

28�

SL GROUP PROJECT TYPE 14-15 15-16 16-17 17-18 18-19 19-20 78 ONG Dinesh OC OC 0.00 0.00 0.50 1.50 3.00 4.00 SUB TOTAL: 19.97 21.13 22.77 22.10 26.67 30.05

79 FUT Dhau North UG 0.00 0.00 0.00 0.00 0.05 0.05 80 FUT Harradol UG 0.00 0.00 0.00 0.00 0.05 0.07 81 FUT Jamuniya UG 0.00 0.00 0.00 0.00 0.20 0.30 82 FUT Sharda UG 0.00 0.00 0.00 0.10 0.15 0.20 83 FUT Tawa -II Expansion UG 0.00 0.00 0.00 0.00 0.00 0.00 84 FUT Tawa -III UG 0.00 0.00 0.00 0.00 0.05 0.20 85 FUT Bellora/ Naigaon Deep OC 0.00 0.00 1.00 1.00 1.08 1.08 86 FUT Chincholi OC 0.00 0.00 0.20 0.25 0.25 0.30 87 FUT Dhuptala (Sasti UG to OC) OC 0.00 0.00 0.00 0.25 0.50 0.80 88 FUT Hindustan Lalpeth Expn OC 0.00 0.00 0.25 0.25 0.60 0.60 89 FUT Kamptee Deep OC 0.00 0.00 0.90 0.90 0.90 0.90 90 FUT Mungoli Nirguda Deep

Extn. OC OC 0.00 0.00 3.50 3.50 3.50 3.50

91 FUT New Majri UG to OC OC 0.00 0.50 0.60 0.80 0.80 0.80 92 FUT New Majri Sector IA & II A

Extn.OC 0.00 0.80 0.75 0.85 1.00 1.00

93 FUT Niljai Expansion (Deep) OC 0.00 0.00 0.00 2.86 3.50 3.50 94 FUT Padmapur Deep Extention OC 0.00 0.00 0.00 1.50 2.00 2.00 95 FUT Pimpalgaon Deep OC 0.00 0.00 0.80 0.80 0.80 0.80 96 FUT Ukni Deep OC 0.00 0.00 1.60 1.70 1.70 2.00 97 FUT Combined (Pauni II+ Pauni

III) OC 0.00 0.00 0.00 0.50 0.80 1.50

SUB TOTAL: 0.00 1.30 9.60 15.26 17.93 19.60 GRAND TOTAL: 44.00 45.00 48.00 50.00 55.00 60.00

Page 44: cover page of Booklet

29�

PRODUCTION PROJECTION (Mt) -SECL SL GROUP PROJECT TYPE 14-15 15-16 16-17 17-18 18-19 19-20 1 EX BANKI MAIN UG 0.14 0.14 0.14 0.14 0.14 0.05 2 EX Birsinghpur UG UG 0.12 0.12 0.12 0.12 0.12 0.12 3 EX BARTUNGA HILL UG 0.38 0.20 0.20 0.20 0.20 0.00 4 EX DHANPURI UG 0.16 0.16 0.16 0.16 0.09 0.00 5 EX KURASHIYA UG 0.34 0.35 0.35 0.35 0.35 0.35 6 EX NORTH CHIRIMIRI UG 0.05 0.00 0.00 0.00 0.00 0.00 7 EX NOWROZABAD (W) UG 0.12 0.12 0.12 0.10 0.10 0.10 8 EX SURAKACHAR 5 & 6 UG 0.07 0.08 0.08 0.08 0.08 0.00 9 EX SURAKACHAR MAIN UG 0.17 0.17 0.17 0.17 0.17 0.17

10 EX SURAKACHAR 3/4 UG 0.13 0.15 0.15 0.15 0.15 0.15 11 EX WEST JKD A SEAM UG 0.17 0.17 0.17 0.17 0.17 0.17 SUB TOTAL: 1.85 1.66 1.66 1.64 1.57 1.11

12 COM BAHERABAND UG 0.52 0.45 0.60 0.60 0.60 0.60 13 COM BALGI UG 0.17 0.16 0.15 0.15 0.15 0.15 14 COM BALARAMPUR UG UG 0.26 0.15 0.15 0.15 0.15 0.15 15 COM BANGWAR UG 0.32 0.35 0.35 0.40 0.40 0.40 16 COM BARTARAI/AMADAND UG 0.36 0.38 0.39 0.39 0.40 0.40 17 COM BHATGAON UG 0.47 0.48 0.48 0.48 0.48 0.48 18 COM BHADRA (7&8/

NARAYAN INCL) UG 0.10 0.15 0.15 0.15 0.15 0.15

19 COM BISRAMPUR UG 0.35 0.30 0.25 0.00 0.00 0.00 20 COM BIJURI UG 0.37 0.37 0.38 0.38 0.38 0.38 21 COM CHHAL OC 3.50 3.50 1.75 0.00 0.00 0.00 22 COM CHIRIMIRI OC 1.50 1.00 1.00 1.00 1.00 1.00 23 COM DHARAM UG 0.15 0.15 0.15 0.00 0.00 0.00 24 COM DHELWADI UG 0.21 0.21 0.21 0.21 0.26 0.26 25 COM DHANPURI OC 2.50 2.50 2.50 2.60 1.30 0.00 26 COM GAYATRI UG 0.25 0.30 0.66 0.66 0.66 0.66 27 COM JAMUNA 1&2/5&6 UG 0.21 0.22 0.22 0.23 0.24 0.24 28 COM JAMUNA 9 & 10 UG 0.25 0.25 0.26 0.26 0.27 0.27 29 COM JHIRIYA UG 0.33 0.33 0.33 0.33 0.33 0.33 30 COM KALYANI UG 0.13 0.13 0.13 0.13 0.13 0.13 31 COM KATKONA 1 & 2 UG 0.14 0.14 0.14 0.14 0.14 0.14 32 COM KATKONA 3 & 4 UG 0.12 0.12 0.12 0.12 0.12 0.12 33 COM KAPILDHARA UG 0.51 0.61 0.61 0.61 0.61 0.61 34 COM KURJA SHEETALDHARA UG 0.76 0.80 0.88 0.88 0.88 0.88 35 COM KUMDA NEW UG 0.36 0.25 0.25 0.25 0.25 0.00 36 COM KURASIA OC OC 0.00 0.10 0.10 0.10 0.10 0.10 37 COM MALGA UG 0.11 0.06 0.00 0.00 0.00 0.00

Page 45: cover page of Booklet

30�

SL GROUP PROJECT TYPE 14-15 15-16 16-17 17-18 18-19 19-20 38 COM MEERA UG 0.13 0.13 0.13 0.13 0.15 0.15 39 COM NAWAPARA UG 0.32 0.35 0.45 0.50 0.54 0.54 40 COM NCPH NEW UG 0.45 0.40 0.40 0.40 0.40 0.40 41 COM NCPH OLD UG 0.20 0.20 0.20 0.20 0.00 0.00 42 COM PALI UG 0.22 0.22 0.22 0.20 0.20 0.20 43 COM PALKIMARA UG 0.06 0.06 0.09 0.09 0.09 0.09 44 COM PIPARIYA UG 0.13 0.13 0.13 0.13 0.13 0.13 45 COM PANDAVPARA UG 0.38 0.40 0.40 0.40 0.40 0.40 46 COM RAJENDRA UG 0.42 0.44 0.44 0.44 0.44 0.44 47 COM RAJGAMAR UG 0.20 0.25 0.25 0.25 0.25 0.25 48 COM RAJNAGAR OC 1.20 1.00 1.00 1.00 1.00 1.00 49 COM RAJNAGAR RO UG 0.45 0.35 0.30 0.28 0.00 0.00 50 COM REHAR UG 0.31 0.31 0.31 0.31 0.66 0.66 51 COM SHARDA HIGHWALL UG 0.50 0.50 0.50 0.60 0.60 1.00 52 COM SHIVANI UG 0.35 0.35 0.35 0.35 0.60 0.60 53 COM SINGHALI UG 0.33 0.33 0.33 0.33 0.33 0.33 54 COM SOMNA UG 0.17 0.15 0.15 0.15 0.15 0.15 55 COM UMARIYA UG 0.18 0.17 0.17 0.17 0.17 0.17 56 COM WCC OC 0.05 0.14 0.17 0.19 0.00 0.00 57 COM DAMINI UG 0.48 0.48 0.48 0.48 0.48 0.48 SUB TOTAL: 20.46 19.80 18.67 16.80 15.59 14.43

58 ONG AMADAND OC 1.44 1.15 2.15 2.15 2.15 2.15 59 ONG AMLAI (1.5 MTY) OC 0.70 0.70 1.50 1.50 2.03 2.03 60 ONG AMGAON OC 1.00 1.00 1.75 2.00 2.00 2.00 61 ONG AMAERA OC 1.30 1.26 2.00 2.00 2.00 2.00 62 ONG AMBIKA (1 MTY) OC 0.00 0.00 0.60 1.00 1.00 1.00 63 ONG BAGDEVA (0.75 MTY) UG 0.52 0.52 0.55 0.55 0.55 0.60 64 ONG BAROUD OC 3.50 3.50 3.50 3.50 3.50 3.50 65 ONG BATURA (2 MTY) OC 0.00 0.00 0.00 0.40 1.00 1.50 66 ONG BIJARI (1.5 MTY) OC 0.00 0.50 1.00 1.50 2.00 2.20 67 ONG BINKARA (0.36 MTY) UG 0.00 0.00 0.10 0.30 0.42 0.48 68 ONG CHURCHA * (1.35 MTY) UG 1.40 1.65 1.84 1.84 1.84 2.10 69 ONG DIPKA EXPN (25.00 MT) OC 30.00 30.00 31.00 31.00 31.00 31.00 70 ONG GEVRA EXPN (35.00 MT) OC 40.00 40.00 41.00 41.00 41.00 41.00 71 ONG HALDIBARI (0.42 MTY) UG 0.24 0.29 0.60 0.66 0.66 0.66 72 ONG JAGANNATHPUR (3

MTY) OC 0.00 0.00 0.60 2.00 3.00 3.00

73 ONG JAMPALI (2 MTY) OC 0.95 1.50 3.00 3.00 3.00 3.00 74 ONG JHILIMILI (0.5 MTY) UG 0.43 0.41 0.43 0.44 0.45 0.50 75 ONG KANCHAN OC 0.75 0.75 0.75 0.25 0.00 0.00 76 ONG KARTALI EAST (2.5 MTY) OC 0.00 0.00 0.00 0.75 1.50 2.50

Page 46: cover page of Booklet

31�

SL GROUP PROJECT TYPE 14-15 15-16 16-17 17-18 18-19 19-20 77 ONG KETKI (0.42 MTY) UG 0.03 0.05 0.10 0.15 0.42 0.42 78 ONG KHAIRAHA (0.585 MTY) UG 0.15 0.15 0.16 0.49 0.58 0.58 79 ONG KUSMUNDA EXPN (15-

50 MTY) OC 18.75 20.75 24.75 25.00 37.00 50.00

80 ONG MAHAMAYA (0.48 MTY) UG/OC 0.25 0.25 0.25 0.25 1.00 1.50 81 ONG MAHAN (0.36 MTY) OC 0.20 0.50 0.70 0.80 1.00 1.36 82 ONG MAHAN II OC 2.00 2.00 2.00 2.00 2.00 2.00 83 ONG MANIKPUR EXPN OC 3.50 3.50 3.50 3.50 3.50 3.50 84 ONG PELMA (15 MTY) OC 0.00 0.00 0.00 1.60 4.00 10.00 85 ONG PINOURA UG 0.49 0.49 0.50 0.50 0.40 0.30 86 ONG RANIATARI UG 0.21 0.21 0.21 0.21 0.00 0.00 87 ONG SARAIPALLI (1.4 MTY) OC 0.90 0.90 1.40 1.40 2.40 2.40 88 ONG VIJAY WEST (0.50 MTY) UG 0.03 0.39 0.50 0.50 0.50 0.50 89 ONG VINDHYA (0.585 MTY) UG 0.16 0.15 0.15 0.33 0.48 0.48 90 ONG CHHAL OC Seam III Expn

(6 MTY) OC 0.00 0.00 1.75 4.00 5.00 6.00

SUB TOTAL: 108.90 112.57 128.34 136.57 157.38 180.26 91 FUT GEVRA EXPN (35.00 MT-

50 MTY) OC 0.00 0.00 0.00 4.00 9.00 24.00

92 FUT MADAN NAGAR (12 MTY)

OC 0.00 0.00 0.00 0.00 0.50 2.00

93 FUT MALACHUA (3 MTY) OC 0.00 0.00 0.00 0.50 1.75 3.00 94 FUT AMADAND OC EXPN (4

MTY) OC 0.00 0.00 0.00 0.00 0.85 1.60

95 FUT AMRITDHARA (2 MTY) OC 0.00 0.00 0.00 0.00 0.50 1.00 96 FUT RAI (15 MTY) OC 0.00 0.00 0.00 0.00 3.00 5.00 97 FUT VIJAYWEST/VIJAY

CENTRALOC 0.00 0.00 0.00 0.00 0.50 1.50

98 FUT BATURA UG(HW) (0.5 MTY)

UG 0.00 0.00 0.00 0.00 0.00 0.50

99 FUT KANCHAN RPR (2 MTY) OC 0.00 0.00 0.00 0.50 1.00 2.00 100

FUT BATURA WEST EXTN OC 0.00 0.00 0.00 0.00 0.00 0.50

101

FUT RAMPUR BATURA (4 MTY)

OC 0.00 0.00 0.00 0.00 0.00 1.00

102

FUT RAJNAGAR RPR OC 0.00 0.00 0.00 0.00 0.50 0.70

103

FUT CHIRIMIRI EXPN OC 0.00 1.00 1.00 1.00 1.00 1.00

SUB TOTAL: 0.00 1.00 1.00 6.00 18.60 43.80 GRAND TOTAL: 131.20 135.03 149.67 161.01 193.13 239.60

Page 47: cover page of Booklet

32�

PRODUCTION PROJECTION (Mt) - MCL SL GROUP PROJECT TYPE 14-15 15-16 16-17 17-18 18-19 19-20 1 EX OC-1 & OC-2 UG 0.30 0.30 0.30 0.30 0.30 0.30 2 EX OC-3 (UG) UG 0.42 0.42 0.42 0.42 0.42 0.42 3 EX OC-4 (UG) UG 0.04 0.04 0.04 0.04 0.04 0.04 4 EX H.B.I (UG) UG 0.54 0.49 0.49 0.49 0.49 0.49 5 EX Tal. Colliery(UG) UG 0.09 0.11 0.11 0.11 0.11 0.11 SUB TOTAL: 1.39 1.36 1.36 1.36 1.36 1.36 6 COM Samleswari OCP OC 12.50 12.00 12.00 13.00 14.00 15.00 7 COM Lajkura O.C.P. OC 2.50 3.00 3.00 3.50 4.00 4.50 8 COM Lilari OCP OC 0.30 0.30 9 COM Lakhanpur OCP. OC 18.75 18.75 18.75 18.75 18.75

10 COM Nandira Colliery(UG) UG 0.11 0.14 0.14 0.14 0.14 0.14 11 COM Lingaraj OCP OC 11.50 13.00 16.00 18.00 19.00 20.00 SUB TOTAL: 45.66 47.19 49.89 53.39 55.89 39.64

12 ONG Talabira OCP OC 4.00 8.00 10.00 13 ONG Basundhara(W) Extn. OCP OC 3.70 3.00 3.25 6.00 6.00 7.00 14 ONG Kulda & Kulda Expansion OC 4.80 7.00 12.25 12.25 13.75 15.00 15 ONG Garjanbahal OCP OC 5.00 10.00 16 ONG Siarmal OCP 6.00 10.00 17 ONG Belpahar OCP. OC 8.00 9.00 9.00 9.00 9.00 18 ONG Hingula O.C.P. OC 3.50 5.00 8.75 10.00 11.00 12.00 19 ONG Balram OCP OC 5.00 7.45 8.00 8.00 8.00 8.00 20 ONG Gopalprasad OCP OC 4.00 11.00 15.00 21 ONG Jagannath & Jagannath Re-

org'n OC 5.00 6.00 6.00 6.00 6.00 6.00

22 ONG Ananta OCP OC 9.00 12.00 14.50 16.00 18.00 20.00 23 ONG Bhubaneswari OCP OC 25.00 25.00 25.00 25.00 25.00 25.00 24 ONG Bharatpur OCP OC 7.50 17.00 19.00 20.00 20.00 20.00 25 ONG Kaniha OCP OC 8.45 10.00 10.00 12.00 14.00 14.00 SUB TOTAL: 79.95 101.45 115.75 132.25 160.75 172.00

26 FUT Integ Belpahar Lakhanpur Lilari OCP.

OC 30.00

27 FUT Gopalji Kaniha OCP OC 4.00 7.00 SUB TOTAL: 4.00 37.00

GRAND TOTAL: 127.00 150.00 167.00 187.00 222.00 250.00

Page 48: cover page of Booklet

33�

PROJECTS- ISSEUES INVOLVED ISSUES INVOLVED ECL BCCL CCL WCL SECL MCL NCL TOTAL BLOCK 1 2 3GR 4 4 8PR 24 5 27 12 2 10 80 EC 109 21 14 18 27 10 13 212 FC 15 6 45 18 37 25 5 151 LAND 51 6 32 35 41 2 5 172 R&R 7 14 13 20 15 4 73 RAIL EVACUATION 10 38 27 24 21 1 121 ROAD EVACUATION 1 2 8 11 CHP/SILO 5 1 4 10 3 23 NALLAH 1 16 1 5 23 ROAD DIVERSION 1 10 11 POWER LINE 3 21 24 EQUIPEMENT/CONTRACT 4 35 8 16 63 INCLINE DRIVAGE 2 6 1 9FSA 11 11 OTHER 1 3 4 2 1 1 5 17

Page 49: cover page of Booklet

34�

PROJECTS- BLOCK ALLOCATION SL SUB PROJECT Group TYPE Issue Timeline Responsibility 1 MCL Talabira OCP ONG OC Talabira-II Block allotment Dec-14 MOC 2 MCL Gopalprasad OCP ONG OC Utkal A Block allotment Dec-14 MOC 3 SECL VIJAYWEST/VIJAY

CENTRALFUT OC Was a previously allocated

block to SECL on JV basis. Now Deallocated Block lying between Vijay East & West and to be mined with Vijay West OC

Feb-15 MoC

Page 50: cover page of Booklet

35�

PROJECTS- GR PREPARATION SL SUB PROJECT GRP TYPE Issue Timeline Responsibility 1 ECL Chaidhar-Gariapani FUT OC GR

Prepration Mar-15 CMPDIL

2 NCL Dongrital FUT UG GR Prepration

Mar-17 NCL, MoEF, CMPDI

3 NCL Patpahari FUT UG/OC GR Prepration

Mar-17 NCL, MoEF, CMPDI

4 NCL Marki-Barka (W) FUT UG GR Prepration

Mar-17 MoEF, CMPDI

5 NCL Marki-Barka (E) FUT UG/OC GR Prepration

Mar-17 CMPDI

6 ECL Dhangajore FUT UG GR Prepration

Mar-17 CMPDIL

7 ECL Madhukunda FUT UG GR Prepration

Mar-17 CMPDIL

8 ECL Brahmani/ Chicropastimal

FUT OC GR Prepration

Mar-17 CMPDIL

Page 51: cover page of Booklet

36�

PROHECTS- PR APPROVAL SL SUB PROJECT GRP TYPE Issue Timeline Responsibility 4 SECL RAMPUR BATURA

(4 MTY) FUT OC Submission &

approvalJan-15 CMPDIL, SECL,CIL

5 ECL Jhanjra Low height CM

FUT UG Approval of PR Jan-15 CMPDIL, ECL, CIL

12 ECL Tilaboni FUT UG Approval of PR Mar-15 CMPDIL, ECL, CIL 13 ECL Hura-C FUT OC(H) Approval of Recast

PRMar-15 CMPDIL, ECL, CIL

18 SECL GEVRA EXPN (35.00 MT-50 MTY)

FUT OC Submission & approval

Apr-15 CMPDIL, SECL, CIL

26 SECL MADAN NAGAR (12 MTY)

FUT OC Sumitted PR Unviable. PR to be recasted for viability

Jun-15 CMPDIL, SECL, CIL

27 SECL AMADAND OC EXPN (4 MTY)

FUT OC Sumitted PR Unviable. PR to be recasted for viability

Jun-15 CMPDIL, SECL, CIL

28 SECL RAI (15 MTY) FUT OC Sumitted PR Unviable. PR to be recasted for viability

Jun-15 CMPDIL, SECL, CIL

32 ECL Nakrakonda- Kumardih-B OC

FUT OC(H) Approval of PR Jun-15 CMPDIL, ECL, CIL

36 NCL Jayant Expn FUT OC PR preparation & approval

Sep-15 CMPDI, NCL, CIL

37 SECL MALACHUA (3 MTY)

FUT OC Sumitted PR Unviable. PR to be recasted for viability

Sep-15 CMPDIL, SECL, CIL

45 WCL Niljai Expansion (Deep)

FUT OC Approval of updated PR

Dec-15 CMPDI, WCL, CIL

47 ECL North Searsole OC FUT OC(H) Approval of PR Dec-15 CMPDIL, ECL, CIL 48 ECL Chaidhar-Gariapani FUT OC Approval of PR Dec-15 CMPDIL, ECL, CIL 57 NCL Dudhichua Expn FUT OC Recast PR approval Mar-16 CMPDI, NCL, CIL 58 NCL Bina-Kakri Amalg. FUT OC PR preparation &

approvalMar-16 CMPDI, NCL, CIL

60 ECL Chuperbhita FUT OC(H) Approval of PR / UCE

Mar-16 CMPDIL, ECL, CIL

61 ECL Simlong OC ( Extension)

FUT OC(H) Approval of PR / UCE

Mar-16 CMPDIL, ECL, CIL

62 ECL Itapara OC FUT OC(H) Approval of PR Mar-16 CMPDIL, ECL, CIL 64 NCL Block-B Expn FUT OC PR preparation &

approvalJul-16 CMPDI, NCL, CIL

68 ECL Madanpur FUT OC Approval of PR Dec-16 CMPDIL, ECL, CIL 69 ECL Bakulia FUT UG Approval of PR Dec-16 CMPDIL, ECL, CIL 73 ECL Ghusik UG FUT UG Approval of PR Jun-17 CMPDIL, ECL, CIL 78 ECL Dhangajore FUT UG Approval of PR Mar-18 CMPDIL, ECL, CIL 79 ECL Madhukunda FUT UG Approval of PR Mar-18 CMPDIL, ECL, CIL 80 ECL Brahmani/

Chicropastimal FUT OC Approval of PR Dec-18 CMPDIL, ECL, CIL

Page 52: cover page of Booklet

37�

PROJECTS-ENVIRONMENTAL CLEARANCE SL SUB PROJECT GRP TYPE Issue Timeline Responsibility 1 MCL Lajkura O.C.P. COM OC 3 to 4.5 MTY Dec-14 MCL, MOEF 2 MCL Belpahar OCP. ONG OC 6 to 9 MTY (50%

increase) Dec-14 MCL,MOEF

3 WCL Pauni COM OC Approval of EC for 0.90 Mty

Dec-14 MOEF

4 NCL Nigahi Expn ONG OC EC for 18.75 MT-EAC held on 24-07-14.

Jan-15 MoEF

5 ECL Simlong 2,3,4 COM OC(H) EC Aproval for 2 MTY

Jan-15 CMPDI, ECL, MoEF

6 ECL Gourangdih Begunia OC Patch COM OC(H) EC Approval under cluster 4

Jan-15 CMPDI, ECL, MoEF

7 SECL DIPKA EXPN (25.00 MT) ONG OC EC for additional 1 Mty

Feb-15 SECL, CG State & MoEF

8 SECL GEVRA EXPN (35.00 MT) ONG OC EC for additional 1 Mty

Feb-15 SECL, CG State & MoEF

9 WCL Penganga ONG OC Consent to establish & Consent to Operate withheld due to RRZ policy. Team of Govt of Maharashtra to visit site on 12/13.12.14

Feb-15 WCL/ MH State Govt

10 ECL Shankarpur Ph-IV COM OC(H) EC Approval Feb-15 CMPDI, ECL, MoEF 11 CCL Govinpur PH II (New

Swang)OC ONG OC Final Clearance Mar-15 MOEF

12 SECL KUSMUNDA EXPN (15-50 MTY)

ONG OC EC for 50 Mty Mar-15 CMPDIL, SECL, CG State & MoEF

13 WCL Gauri Deep ONG OC EC for 0.6 Mty Mar-15 WCL, MOEF 14 ECL Badjna EX UG EC Approval under

cluster 1 Mar-15 CMPDI, ECL, MoEF

15 ECL Begunia EX UG EC Approval under cluster 4

Mar-15 CMPDI, ECL, MoEF

16 ECL Bejdih EX UG EC Approval under cluster 6

Mar-15 CMPDI, ECL, MoEF

17 ECL Belbaid EX UG EC Approval under cluster 10

Mar-15 CMPDI, ECL, MoEF

18 ECL Barmondia A EX UG EC Approval under cluster 7

Mar-15 CMPDI, ECL, MoEF

19 ECL C L Jambad EX UG EC Approval under cluster 11

Mar-15 CMPDI, ECL, MoEF

20 ECL Chapuikhas EX UG EC Approval under cluster 9

Mar-15 CMPDI, ECL, MoEF

21 ECL Chora 7 & 9 pit EX UG EC Approval under cluster 11

Mar-15 CMPDI, ECL, MoEF

22 ECL Dalurband EX UG EC Approval under cluster 12

Mar-15 CMPDI, ECL, MoEF

23 ECL Ghusick EX UG EC Approval under cluster 9

Mar-15 CMPDI, ECL, MoEF

24 ECL Haripur COM UG EC Approval under cluster 11

Mar-15 CMPDI, ECL, MoEF

25 ECL Jambad COM UG EC Approval under cluster 10

Mar-15 CMPDI, ECL, MoEF

26 ECL Jemehari COM UG EC Approval under cluster 9

Mar-15 CMPDI, ECL, MoEF

27 ECL Kalipahari COM UG EC Approval under cluster 9

Mar-15 CMPDI, ECL, MoEF

28 ECL Khandra COM UG EC Approval under cluster 9

Mar-15 CMPDI, ECL, MoEF

29 ECL Khas Kajora COM UG EC Approval under cluster 10

Mar-15 CMPDI, ECL, MoEF

30 ECL Kumardhubi COM UG EC Approval under cluster 2

Mar-15 CMPDI, ECL, MoEF

31 ECL Kumardihi A COM UG EC Approval under cluster 12

Mar-15 CMPDI, ECL, MoEF

Page 53: cover page of Booklet

38�

PROJECTS-ENVIRONMENTAL CLEARANCE SL SUB PROJECT GRP TYPE Issue Timeline Responsibility 32 ECL Kumardihi B COM UG EC Approval under

cluster 12 Mar-15 CMPDI, ECL, MoEF

33 ECL Lakhimata COM UG EC Approval under cluster 1

Mar-15 CMPDI, ECL, MoEF

34 ECL Madhaipur COM UG EC Approval under cluster 12

Mar-15 CMPDI, ECL, MoEF

35 ECL Madhabpur COM UG EC Approval under cluster 10

Mar-15 CMPDI, ECL, MoEF

36 ECL Manderboni-South Samla COM UG EC Approval under cluster 12

Mar-15 CMPDI, ECL, MoEF

37 ECL Mandman COM UG EC Approval under cluster 1

Mar-15 CMPDI, ECL, MoEF

38 ECL Methani COM UG EC Approval under cluster 6

Mar-15 CMPDI, ECL, MoEF

39 ECL Moira COM UG EC Approval under cluster 10

Mar-15 CMPDI, ECL, MoEF

40 ECL Nabakajora COM UG EC Approval under cluster 10

Mar-15 CMPDI, ECL, MoEF

41 ECL New Kenda COM UG EC Approval under cluster 11

Mar-15 CMPDI, ECL, MoEF

42 ECL Nimcha COM UG EC Approval under cluster 9

Mar-15 CMPDI, ECL, MoEF

43 ECL Ningah COM UG EC Approval under cluster 8

Mar-15 CMPDI, ECL, MoEF

44 ECL Pandaveswar COM UG EC Approval under cluster 12

Mar-15 CMPDI, ECL, MoEF

45 ECL Parascole ( East and West) COM UG EC Approval under cluster 10

Mar-15 CMPDI, ECL, MoEF

46 ECL Parasea COM UG EC Approval under cluster 10

Mar-15 CMPDI, ECL, MoEF

47 ECL Shampur B COM UG EC Approval under cluster 1

Mar-15 CMPDI, ECL, MoEF

48 ECL Siduli COM UG EC Approval under cluster 11

Mar-15 CMPDI, ECL, MoEF

49 ECL Sripur Seam Incline COM UG EC Approval under cluster 8

Mar-15 CMPDI, ECL, MoEF

50 ECL Tilaboni COM UG EC Approval under cluster 12

Mar-15 CMPDI, ECL, MoEF

51 ECL Tirath/kuardih COM UG EC Approval under cluster 9

Mar-15 CMPDI, ECL, MoEF

52 ECL Gopinathpur OC COM OC(D) EC Approval under cluster 1

Mar-15 CMPDI, ECL, MoEF

53 ECL Bansra COM OC(H) EC Approval under cluster 10

Mar-15 CMPDI, ECL, MoEF

54 ECL Chapapur 10 Quarry COM OC(H) EC Approval under cluster 1

Mar-15 CMPDI, ECL, MoEF

55 ECL Kalipahari (Part C) COM OC(H) EC Approval under cluster 9

Mar-15 CMPDI, ECL, MoEF

56 ECL Kapasara/ Kapasara Extension COM OC(H) EC Approval under cluster 1

Mar-15 CMPDI, ECL, MoEF

57 ECL Narainkuri COM OC(H) EC Approval under cluster 9

Mar-15 CMPDI, ECL, MoEF

58 ECL North searsole COM OC(H) EC Approval under cluster 10

Mar-15 CMPDI, ECL, MoEF

59 ECL New Kenda Quarry III OC COM OC(H) EC Approval under cluster 11

Mar-15 CMPDI, ECL, MoEF

60 ECL Amritnagar COM UG EC Approval under cluster 9

Mar-15 CMPDI, ECL, MoEF

61 ECL Bahula ( incl. Lower Kenda) COM UG EC Approval under cluster 11

Mar-15 CMPDI, ECL, MoEF

62 ECL Bankola COM UG EC Approval under cluster 12

Mar-15 CMPDI, ECL, MoEF

63 ECL Bansra COM UG EC Approval under cluster 10

Mar-15 MoEF, CMPDI, ECL

64 ECL Bhanora West COM UG EC Approval under cluster 7

Mar-15 MoEF, CMPDI, ECL

Page 54: cover page of Booklet

39�

PROJECTS-ENVIRONMENTAL CLEARANCE SL SUB PROJECT GRP TYPE Issue Timeline Responsibility 65 ECL Central Kajora COM UG EC Approval under

cluster 10 Mar-15 MoEF, CMPDI, ECL

66 ECL Chapapur-II COM UG EC Approval under cluster 1

Mar-15 MoEF, CMPDI, ECL

67 ECL Chinakuri I COM UG EC Approval under cluster 6

Mar-15 MoEF, CMPDI, ECL

68 ECL Chinakuri III COM UG EC Approval under cluster 6

Mar-15 MoEF, CMPDI, ECL

69 ECL Chora 10 COM UG EC Approval under cluster 11

Mar-15 MoEF, CMPDI, ECL

70 ECL Chora Block Incline COM UG EC Approval under cluster 11

Mar-15 MoEF, CMPDI, ECL

71 ECL Dhemomain COM UG EC Approval under cluster 6

Mar-15 MoEF, CMPDI, ECL

72 ECL Dubeswari COM UG EC Approval under cluster 5

Mar-15 MoEF, CMPDI, ECL

73 ECL Hariazam COM UG EC Approval under cluster 1

Mar-15 MoEF, CMPDI, ECL

74 ECL Jhanjra COM UG EC Approval under cluster 12

Mar-15 MoEF, CMPDI, ECL

75 ECL Jhanjra cm(Ist set) COM UG EC Approval under cluster 12

Mar-15 MoEF, CMPDI, ECL

76 ECL J K Nagar COM UG EC Approval under cluster 9

Mar-15 MoEF, CMPDI, ECL

77 ECL Khoodia COM UG EC Approval under cluster 1

Mar-15 MoEF, CMPDI, ECL

78 ECL Khottadih COM UG EC Approval under cluster 12

Mar-15 MoEF, CMPDI, ECL

79 ECL Kunustoria COM UG EC Approval under cluster 10

Mar-15 MoEF, CMPDI, ECL

80 ECL Madhusudanpur7 Pit & incline COM UG EC Approval under cluster 10

Mar-15 MoEF, CMPDI, ECL

81 ECL Nakrakonda COM UG EC Approval under cluster 12

Mar-15 MoEF, CMPDI, ECL

82 ECL Narsamuda COM UG EC Approval under cluster 6

Mar-15 MoEF, CMPDI, ECL

83 ECL Parasea 6&7 COM UG EC Approval under cluster 10

Mar-15 MoEF, CMPDI, ECL

84 ECL Patmohana COM UG EC Approval under cluster 6

Mar-15 MoEF, CMPDI, ECL

85 ECL Ratibati COM UG EC Approval under cluster 9

Mar-15 MoEF, CMPDI, ECL

86 ECL Satgram(Including Satgram Incline)

COM UG EC Approval under cluster 8

Mar-15 MoEF, CMPDI, ECL

87 ECL Sodepur COM UG EC Approval under cluster 6

Mar-15 MoEF, CMPDI, ECL

88 ECL Shankarpur COM UG EC Approval under cluster 11

Mar-15 MoEF, CMPDI, ECL

89 ECL Barmuri COM OC EC Approval under cluster 2

Mar-15 MoEF, CMPDI, ECL

90 ECL Belbaid COM OC EC Approval under cluster 10

Mar-15 MoEF, CMPDI, ECL

91 ECL Jambad COM OC EC Approval under cluster 10

Mar-15 MoEF, CMPDI, ECL

92 ECL Rajpura COM OC EC Approval under cluster 2

Mar-15 MoEF, CMPDI, ECL

93 ECL Shankarpur Extension COM OC EC Approval under cluster 11

Mar-15 MoEF, CMPDI, ECL

94 ECL West Kenda COM OC EC Approval under cluster 11

Mar-15 MoEF, CMPDI, ECL

95 ECL Jhanjra 2nd set CM ONG UG EC Approval under cluster 12

Mar-15 MoEF, CMPDI, ECL

96 ECL Mohanpur Expansion ONG OC(H) EC from 1 MTY to 2 MTY

Mar-15 MoEF, CMPDI, ECL, WB Govt.

97 ECL Sonepur (Comb) ONG OC (D) Enhancement of EC to 12.0 MTY

Mar-15 MoEF, CMPDI, ECL, WB Govt.

Page 55: cover page of Booklet

40�

PROJECTS-ENVIRONMENTAL CLEARANCE SL SUB PROJECT GRP TYPE Issue Timeline Responsibility 98 ECL New Kenda ONG OC(H) EC Approval under

cluster 11 Mar-15 MoEF, CMPDI, ECL

99 ECL Tilaboni FUT UG EC Approval under cluster 12

Mar-15 MoEF, CMPDI, ECL

100 ECL Dalurband OCP (H) PHASE III COM OC(H) EC Approval for 0.75 MTY

Mar-15 CMPDI, ECL, MoEF

101 ECL Ghusick OC (H) COM OC(H) EC Approval under cluster 9

Mar-15 CMPDI, ECL, MoEF

102 ECL Gaurangdih Extension OCP (ph-I) /Gourangdih D Block

COM OC(H) EC Approval under cluster 4

Mar-15 CMPDI, ECL, MoEF

103 ECL Bhanora (W) OC COM OC(H) EC Approval under cluster 7

Mar-15 CMPDI, ECL, MoEF

104 ECL North Searsole OC FUT OC(H) EC Approval under cluster 10

Mar-15 MoEF, CMPDI, ECL

105 ECL Bonbahal OC COM OC(H) EC Approval Mar-15 CMPDI, ECL, MoEF 106 ECL Lakhimata OC(H) COM OC(H) EC Approval under

cluster 1 Mar-15 CMPDI, ECL, MoEF

107 NCL Amlohri Expn ONG OC EC for 14 MTY- EAC held 16-10-14.

Apr-15 MoEF

108 SECL AMADAND ONG OC Grant of 1 Mty Enhanced EC u/s 7(ii)

Apr-15 SECL, MoEF

109 SECL AMLAI (1.5 MTY) ONG OC Obtaining Consent to Operate

Apr-15 SECL, MP State

110 WCL Explo.of Patch Pench (Shivpuri, Sethia, Barkui, Bhajipani))

COM OC EC for 0.50 Mty for additional land

Apr-15 State, MOEF, WCL

111 SECL AMAERA ONG OC Grant of 1 Mty Enhanced EC u/s 7(ii)

Apr-15 SECL, MoEF

112 SECL BIJARI (1.5 MTY) ONG OC EC for 1.5 Mty May-15 SECL, CG State & MoEF 113 BCCL AKWMC EX D/OC Approval of EC

under Cluster-IV May-15 BCCL, Jharkhand State, MoEF

114 BCCL AKWMC/ Kantapahari EX H/OC Approval of EC under Cluster-IV

May-15 BCCL, Jharkhand State, MoEF

115 BCCL AKWMC/ Mega Project EX H/OC Approval of EC under Cluster-IV

May-15 BCCL, Jharkhand State, MoEF

116 BCCL AKWMC/ Kumarijore EX H/OC Approval of EC under Cluster-IV

May-15 BCCL, Jharkhand State, MoEF

117 BCCL Katras chatudih EX H/OC Approval of EC under Cluster-IV

May-15 BCCL, Jharkhand State, MoEF

118 BCCL Gaslitand EX H/OC Approval of EC under Cluster-IV

May-15 BCCL, Jharkhand State, MoEF

119 CCL Sel Dhori Q3 Man. EX OC EC under Cluster Jun-15 CCL, MOEF 120 CCL Kalyani OC COM OC EC under Cluster Jun-15 CCL, MOEF 121 ECL Simlong OC ( Extension) FUT OC(H) EC Approval Aug-15 MoEF, CMPDI, ECL 122 CCL KARO OC ONG OC Final clearance Sep-15 MOEF 123 CCL Parej East UGP ONG UG Final clearance Sep-15 MOEF 124 CCL KD Hesalong (RPR) OC COM OC Final Clearance Sep-15 MOEF 125 CCL Kedla OC COM OC Final Clearance Sep-15 MOEF 126 CCL Tapin South OS OC ONG OC Final clearance Dec-15 MOEF 127 CCL Pachra OC FUT OC Final Clearance Dec-15 CCL, MOEF 128 CCL Kalyani OC FUT OC Final Clearance Dec-15 MOEF 129 WCL Kamptee Deep FUT OC Final approval of

EC for 2 Mty Dec-15 WCL, MOEF, MH State

130 ECL Nakrakonda- Kumardih-B OC FUT OC(H) EC Approval for 3.00 MTY

Dec-15 MoEF, CMPDI, ECL, WB Govt.

131 BCCL Tetulmari EX D/OC Approval of EC under Cluster-V

Feb-16 BCCL, Jharkhand State, MoEF

132 SECL AMGAON ONG OC Grant of 1 Mty Enhanced EC u/s 7(ii)

Mar-16 SECL, MoEF

133 SECL KANCHAN RPR (2 MTY) FUT OC EC for 2 Mty Mar-16 CMPDIL, SECL, CG State & MoEF

134 BCCL DBOCP EX H/OC Approval of EC under Cluster-XVI

Mar-16 BCCL,CMPDI, State, MoEF

135 BCCL Damagoria EX U/G Approval of EC Mar-16 BCCL,CMPDI, WB Statte Govt,

Page 56: cover page of Booklet

41�

PROJECTS-ENVIRONMENTAL CLEARANCE SL SUB PROJECT GRP TYPE Issue Timeline Responsibility

under Cluster-XVII MoEF 136 BCCL DOCP/ Chaptoria EX H/OC Approval of EC

under Cluster-XVII Mar-16 BCCL,CMPDI, WB Statte Govt,

MoEF 137 BCCL DOCP/Borira EX H/OC Approval of EC

under Cluster-XVII Mar-16 BCCL,CMPDI, WB Statte Govt,

MoEF 138 BCCL DOCP/ Patch-A EX H/OC Approval of EC

under Cluster-XVII Mar-16 BCCL,CMPDI, WB Statte Govt,

MoEF 139 WCL Ghonsa RPR ONG OC Final EC Apr-16 WCL, MOEF 140 WCL Niljai Expansion (Deep) FUT OC EC for 3.5 Mty &

additional land Apr-16 WCL, MOEF, State

141 CCL Kedla UG COM UG Final Clearance Jun-16 MOEF 142 MCL Garjanbahal OCP ONG OC EC for10 Mty Jun-16 CMPDI, MCL,STATE,MOEF 143 SECL BATURA (2 MTY) ONG OC EC for 2 Mty Jun-16 CMPDI, SECL, MP State & MoEF 144 WCL Makardhokra I ONG OC EC for 2 Mty. Jun-16 CMPDI, WCL, MoEF, MH State 145 NCL Dongrital FUT UG EC for 2.196 MTY Jul-16 CMPDI, NCL, MoEF, MP State 146 SECL AMBIKA (1 MTY) ONG OC Obtaining EC for 1

Mty Aug-16 CMPDI, SECL, CG State & MoEF

147 SECL JAGANNATHPUR (3 MTY) ONG OC EC for 3 Mty Aug-16 CMPDIL, SECL, CG State & MoEF

148 SECL KARTALI EAST (2.5 MTY) ONG OC EC for 2.5 Mty Aug-16 CMPDIL, SECL, CG State & MoEF

149 SECL CHHAL OC Seam III Expn (6 MTY)

ONG OC EC for 6 Mty Aug-16 CMPDIL, SECL, CG State & MoEF

150 MCL Basundhara(W) Extn. OCP ONG OC for extn area Sep-16 CMPDI, MCL,STATE,MOEF 151 NCL Jayant Expn FUT OC EC for Expn PR-25

Mty Sep-16 CMPDI, NCL,MoEF, MP State

152 SECL PELMA (15 MTY) ONG OC EC for 15 Mty Oct-16 CMPDIL, SECL, CG State & MoEF

153 CCL Pichri OC FUT OC Final Clearance Dec-16 CCL, MOEF 154 CCL Sanghmitra OC FUT OC Final Clearance Dec-16 CCL, MOEF 155 CCL PPR Mangardaha UGP FUT UG Final Clearance Dec-16 CCL, MOEF 156 ECL Itapara OC FUT OC(H) EC Approval for 3

MTY Dec-16 MoEF, CMPDI, ECL, WB Govt.

157 MCL Integ Belpahar Lakhanpur Lilari OC

FUT OC EC for 30 Mty Dec-16 CMPDI, MCL,STATE,MOEF

158 MCL Lingaraj OCP COM OC EC for 20 Mty Dec-16 MCL,MOEF 159 MCL Kulda & Kulda Expansion ONG OC EC for 10 to 15 Mty Dec-16 CMPDI, MCL,STATE,MOEF 160 MCL Siarmal OCP ONG EC APPROVAL Dec-16 CMPDI, MCL,STATE,MOEF 161 NCL Dudhichua Expn FUT OC EC for Expn PR 19

Mty Dec-16 CMPDI, NCL,MoEF, MP State

162 NCL Bina-Kakri Amalg. FUT OC EC for 14 MTY Dec-16 CMPDI, NCL,MoEF, MP State 163 ECL Chaidhar-Gariapani FUT OC EC Approval Dec-16 MoEF, CMPDI, ECL, Jharkhand

Govt. 164 MCL Gopalji Kaniha OCP FUT OC EC FOR 30 Mty Jan-17 CMPDI, MCL,STATE,MOEF 165 NCL Jhingurdah Bttom FUT OC EC for 3 MTY Jan-17 CMPDI, NCL, MoEF, MP State 166 BCCL Ena-Industry Mega Project EX H/OC Approval of EC

under Cluster-VII Jan-17 BCCL,CMPDI, Jharkhand State,

MoEF 167 MCL Talabira OCP ONG OC EC for 20 Mty Mar-17 MOEF 168 NCL Block-B Expn FUT OC EC for 9 MTY Mar-17 CMPDI, NCL,MoEF, MP State 169 NCL Semaria FUT OC EC for 3 MTY Mar-17 CMPDI, NCL, MoEF, MP State 170 SECL AMADAND OC EXPN (4

MTY) FUT OC EC for 4 Mty Mar-17 CMPDIL, SECL, CG State &

MoEF 171 SECL MALACHUA (3 MTY) FUT OC EC for 3 Mty Mar-17 CMPDIL, SECL, CG State &

MoEF 172 WCL Padmapur Deep Extention FUT OC EC for additional

landMar-17 WCL, MOEF, MH State

173 WCL Bhanegaon ONG OC Final EC for 1 Mty Mar-17 WCL/MOEF/ MH State 174 SECL RAMPUR BATURA (4 MTY) FUT OC EC for 2 Mty Mar-17 CMPDIL, SECL, CG State &

MoEF 175 ECL Madanpur FUT OC EC Approval for 3

MTY Mar-17 MoEF, CMPDI, ECL, WB Govt.

176 ECL Ghusik UG FUT UG EC Approval Mar-17 MoEF, CMPDI, ECL, WB Govt. 177 ECL Kumardihi B CM ONG UG EC Approval for

1.02 MTY (0.42 MTY Available)

Mar-17 MoEF, CMPDI, ECL, WB Govt.

Page 57: cover page of Booklet

42�

PROJECTS-ENVIRONMENTAL CLEARANCE SL SUB PROJECT GRP TYPE Issue Timeline Responsibility 178 BCCL Maheshpur EX H/OC Approval of EC

under Cluster-III Apr-17 BCCL,CMPDIL, Jharkhand State,

MoEF 179 BCCL Bera EX D/OC Approval of EC

under Cluster-VIII May-17 BCCL,CMPDI, Jharkhand State,

MoEF 180 BCCL Dobari EX H/OC Approval of EC

under Cluster-VIII May-17 BCCL,CMPDI, Jharkhand State,

MoEF 181 BCCL Ghanoodih EX D/OC Approval of EC

under Cluster-VIII May-17 BCCL,CMPDI, Jharkhand State,

MoEF 182 BCCL Bolck-VIII/ Ghanoodih EX H/OC Approval of EC

under Cluster-VIII May-17 BCCL,CMPDI, Jharkhand State,

MoEF 183 BCCL Golukdih NC EX H/OC Approval of EC

under Cluster-VIII May-17 BCCL,CMPDI, Jharkhand State,

MoEF 184 BCCL Joyrampur/Bagdigi/Lodna Mega

project EX H/OC Approval of EC

under Cluster-IX Jul-17 BCCL,CMPDI, Jharkhand State,

MoEF 185 BCCL NTC Patch A EX H/OC Approval of EC

under Cluster-IX Jul-17 BCCL,CMPDI, Jharkhand State,

MoEF 186 SECL GEVRA EXPN (35.00 MT-50

MTY) FUT OC EC for 70 Mty Dec-17 CMPDIL, SECL, CG State &

MoEF 187 SECL MADAN NAGAR (12 MTY) FUT OC EC for 4 Mty Mar-18 CMPDIL, SECL, CG State &

MoEF 188 WCL Yekona -I & II Amalgamate ONG OC EC for 2.5 Mty Mar-18 CMPDI, WCL, MoEF , MH State 189 WCL Combined (Pauni II+ Pauni III) FUT OC Approval of 2.5

Mty EC Mar-18 WCL, MOEF, MH State

190 WCL Dhau North FUT UG EC for extension area

Mar-18 CMPDIL,WCL, MoEF, MH State

191 WCL Tawa -III FUT UG Final EC approval Mar-18 MOEF, WCL, MP State 192 WCL Mungoli Nirguda Deep Extn.

OCFUT OC EC Approval for

expansion area- 4 Mty

Mar-18 WCL, MOEF, State

193 SECL VIJAYWEST/VIJAY CENTRAL

FUT OC EC for 1.5 Mty Mar-18 CMPDIL, SECL, CG State & MoEF

194 SECL BATURA UG(HW) (0.5 MTY) FUT UG EC for 1.5 Mty Mar-18 CMPDIL, SECL, CG State & MoEF

195 SECL BATURA WEST EXTN FUT OC EC for 2 Mty Mar-18 CMPDIL, SECL, CG State & MoEF

196 SECL AMRITDHARA (2 MTY) FUT OC EC for 2 Mty Mar-18 CMPDIL, SECL, CG State & MoEF

197 SECL RAI (15 MTY) FUT OC EC for 15 Mty Mar-18 CMPDIL, SECL, CG State & MoEF

198 SECL RAJNAGAR RPR FUT OC EC for 2 Mty Mar-18 CMPDIL, SECL, CG State & MoEF

199 ECL Bakulia FUT UG EC Approval Mar-18 MoEF, CMPDI, ECL, WB Govt. 200 SECL MAHAMAYA (0.48 MTY) ONG EC for 1.5 Mty (For

OC) Mar-18 CMPDIL, SECL, CG State &

MoEF 201 NCL Patpahari FUT UG/OC EC for 4 MTY Jun-18 CMPDI, NCL, MoEF, MP State 202 NCL Marki-Barka (W) FUT UG EC for 0.50 MTY Jun-18 CMPDI, NCL, MoEF, MP State 203 NCL Marki-Barka (E) FUT UG/OC EC for 3 MTY Jun-18 CMPDI, NCL, MoEF, MP State 204 WCL Jamuniya FUT UG EC for 0.72 Mty Dec-18 MOEF, WCL, MP State 205 ECL Jhanjra Low height CM FUT UG EC Approval Dec-18 MoEF, CMPDI, ECL, WB Govt. 206 WCL Gokul ONG OC EC for 1.5 Mty Mar-19 CMPDI,WCL,MoEF, MH State 207 WCL Dinesh OC ONG OC Approval of EC for

4 Mty Mar-19 CMPDIL,WCL, MoEF, MH State

208 ECL Dhangajore FUT UG EC Approval Mar-19 MoEF, CMPDI, ECL, WB Govt. 209 ECL Madhukunda FUT UG EC Approval Mar-19 MoEF, CMPDI, ECL, WB Govt. 210 NCL Khadia Expn ONG OC EC for 14 Mty May-19 CMPDI, NCL, MoEF, MP State 211 ECL Nirsha COM OC(H) EC Approval under

cluster 1 Jul-19 CMPDI, ECL, MoEF

212 ECL Brahmani/ Chicropastimal FUT OC EC Approval Dec-19 MoEF, CMPDI, ECL, Jharkhand Govt.

Page 58: cover page of Booklet

43�

PROJECTS-FORESTRY CLEARANCE SL SUB PROJECT GRP TYPE Issue Timeline Responsibility 1 CCL Urimari EPR OC COM 91.1 Ha site handover required Dec-14 State 2 MCL Lajkura O.C.P. COM OC 156.67 Ha ST-II Jan-15 MCL, MOEF 3 SECL SARAIPALLI (1.4 MTY) ONG OC Stage II & possession of 40.53

HaJan-15 SECL, CG state, MoEF

4 ECL Jhanjra 2nd set CM ONG UG 78.0 Ha FC Stage -I is under process,

Jan-15 MoEF, ECL, WB Govt.

5 CCL Amrapali OC ONG OC Application to be submitted Feb-15 CCL 6 CCL Magadh OC ONG OC To be applied in Feb'15 Feb-15 CCL 7 CCL Rohini OC ONG OC 74.81 Ha ST-II Clearance Mar-15 8 CCL Tapin South OS OC ONG OC Forest application submission Mar-15 CCL 9 WCL Ghorawari Patch (Phase III/

Gorawari 16/17, Ghogra/Takia Nala VII, VIII, IX)

COM OC ST-II FC for 19.50 Ha Mar-15 MOEF

10 ECL Jhanjra L/W R-VI ONG UG Stage -II Approval for 90.3 Ha. Mar-15 ECL, WB Govt., MoEF 11 ECL Chitra East ONG OC(D) FC Stage-II Clearance for

124.28 Ha. Mar-15 Jharkhand GOVT.,

MoEF, ECL 12 ECL Hura-C FUT OC(H) Stage -II FC for 260 Ha in

phase-I. Mar-15 MoEF,Jharkhand Govt.,

ECL 13 SECL CHHAL OC Seam III Expn (6 MTY) ONG OC Stage II & possession of

185.16 Ha Mar-15 SECL, CG state, MoEF

14 BCCL Bera EX U/G Physical possession of 234.08 Ha forest land

Mar-15 BCCL, State Govt.

15 BCCL Bera EX D/OC Physical possession of 234.08 Ha forest land

Mar-15 BCCL, State Govt.

16 BCCL Ghanoodih EX D/OC Physical possession of 234.08 Ha forest land

Mar-15 BCCL, State Govt.

17 WCL Ghonsa RPR ONG OC Release of 24 Ha Apr-15 MOEF 18 WCL Ambara & other Quarry Patches

(Kalyani, Vaibhabhi, Mohan, Bharat, Narayani)

COM OC ST-II FC of 48.92 Ha Apr-15 MOEF

19 MCL Samleswari OCP COM POSSESSION May-15 MCL, STATE 20 MCL Lajkura O.C.P. COM POSSESSION May-15 MCL, STATE 21 SECL GEVRA EXPN (35.00 MT) ONG Stage II FC for 564.85 Ha,

192.04 & 46.20 Ha for regularization of revenue forest land

May-15 SECL, MoEF

22 SECL JAMPALI (2 MTY) ONG OC Stage II & possession of 251.65 Ha

May-15 SECL, CG state, MoEF

23 ECL Jhanjra 2nd set CM ONG UG Stage-II Approval May-15 MoEF, ECL, WB Govt. 24 CCL Churi-Benti UGP (LHD BP) ONG UG 79.00 Ha ST-I Jun-15 25 CCL Govinpur PH II (New Swang)OC ONG OC 10.52 Ha ST-I Jun-15 CCL, MOEF 26 CCL KARO OC ONG OC 226.51 Ha ST-I Clearance Jun-15 MOEF 27 CCL Parej East UGP ONG UG 87 Ha ST-I clearance Jun-15 CCL, State, MOEF 28 CCL Purnadih OC ONG OC 170.9 Ha ST-I clearance Jun-15 CCL, MOEF 29 CCL Rajrappa RCE OC ONG OC 277.15 Ha ST-I clearance Jun-15 30 CCL Tarmi OS OC ONG OC 97.44 Ha ST-I clearance Jun-15 CCL, State, MOEF 31 CCL Dhori East RO OC COM OC 25.40 Ha ST-I clearance Jun-15 32 CCL KD Hesalong (RPR) OC COM OC 126.72 Ha ST-I clearance Jun-15 MOEF 33 CCL Kedla OC COM OC 50.50 Ha ST-I clearance Jun-15 MOEF 34 CCL Urimari EPR OC COM OC 63.64 Ha ST-I clearance Jun-15 MOEF 35 SECL HALDIBARI (0.42 MTY) ONG UG Stage II & Possession of 120 Ha

in MP State Jun-15 SECL, MoEF, MP state

36 SECL CHURCHA * (1.35 MTY) ONG UG Stage II for 2600 Ha Renewal proposals

Jun-15 SECL, CG State, MoEF

37 SECL RAJNAGAR COM OC Stage II FC for 419.34 Ha Jun-15 CG State & MoEF 38 SECL DIPKA EXPN (25.00 MT) ONG OC Stage II FC for Regularization

of 148.86 Ha Jun-15 SECL, CG State, MoEF

39 SECL DIPKA EXPN (25.00 MT) ONG OC Stage II FC for Regularization of 206.64 Ha

Jun-15 SECL, CG State, MoEF

40 SECL DIPKA EXPN (25.00 MT) ONG OC Stage II renewal of 33.84 Ha Jun-15 SECL, CG State, MoEF 41 WCL Gokul ONG OC Release of 11.90 Ha. To be

placed in SAG meeting Jul-15 MOEF

42 MCL Hingula O.C.P. ONG OC 440.53 Ha ST-I/ST-II Aug-15 MCL, MOEF 43 MCL Ananta OCP ONG OC 240.672 Ha ST-I/ST-II Aug-15 NOC STATE

Page 59: cover page of Booklet

44�

PROJECTS-FORESTRY CLEARANCE SL SUB PROJECT GRP TYPE Issue Timeline Responsibility 44 ECL Simlong OC ( Extension) FUT OC(H) St-I/II FC for 84.57 Ha. Aug-15 MoEF,Jharkhand Govt.,

ECL 45 CCL Govinpur PH II (New Swang)OC ONG 10.52 Ha ST-II Sep-15 CCL, MOEF 46 CCL KARO OC ONG ST-II Clearance Sep-15 MOEF 47 CCL Parej East UGP ONG 87 Ha ST-II clearance Sep-15 CCL, State, MOEF 48 CCL Tarmi OS OC ONG 97.44 Ha ST-II clearance Sep-15 CCL, State, MOEF 49 CCL Topa RO OC ONG OC 71.58 Ha ST-I clearance Sep-15 50 CCL Urimari EPR OC COM 63.64 Ha ST-II clearance Sep-15 MOEF 51 CCL Pachra OC FUT OC 409.28 Ha ST-I clearance Sep-15 MOEF 52 CCL Pichri OC FUT OC ST-I clearance Sep-15 MOEF 53 CCL Sanghmitra OC FUT OC 572.72 Ha ST-I clearance Sep-15 MOEF 54 CCL PPR Mangardaha UGP FUT UG 43.08 Ha ST-I clearance Sep-15 MOEF 55 SECL RAJNAGAR RO COM UG Stage II FC for 461.80 Ha

(renewal Proposal) Sep-15 SECL, MoEF & CG

State 56 SECL KUSMUNDA EXPN (15-50 MTY) ONG OC Stage II for Regularization of

324.80 Ha revenue forest land Sep-15 SECL, CG state, MoEF

57 WCL Durgapur Expn. Deep ONG OC FC for 121.58 Ha land Sep-15 MOEF 58 ECL Chuperbhita FUT OC(H) St-I/II FC for 260.193 Ha. Sep-15 MoEF,Jharkhand Govt.,

ECL 59 WCL Hindustan Lalpeth Expn FUT OC ST-II for 36.98 Ha Oct-15 WCL, State, MOEF 60 NCL Nigahi Expn ONG OC St-I/II FC for 424.5 Ha,

Application Submitted. Nov-15 NCL, MoEF, MP State

61 SECL AMLAI (1.5 MTY) ONG OC Stage II FC & Possession for 166.92 Ha

Nov-15 SECL, MP State, MoEF

62 CCL Amrapali OC ONG ST-I Clearance Dec-15 CCL, State, MOEF 63 CCL Magadh OC ONG ST-I clearance Dec-15 CCL, State, MOEF 64 CCL Purnadih OC ONG 170.9 Ha ST-II clearance Dec-15 CCL, MOEF 65 CCL Rajrappa RCE OC ONG 277.15 Ha ST-I clearance Dec-15 66 CCL Amlo OC COM 39.664 Ha ST-II clearance Dec-15 67 CCL Dhori East RO OC COM 25.40 Ha ST-II clearance Dec-15 68 CCL KD Hesalong (RPR) OC COM 126.72 Ha ST-II clearance Dec-15 MOEF 69 CCL Kedla OC COM 50.50 Ha ST-II clearance Dec-15 MOEF 70 MCL Hingula O.C.P. ONG OC POSSESSION Dec-15 STATE 71 MCL Ananta OCP ONG OC POSSESSION Dec-15 STATE 72 WCL Singori ONG OC Release of 15.19 Ha Dec-15 WCL, MOEF, MH State 73 WCL Dinesh OC ONG OC 1. FC for 69.85 Ha Dec-15 CMPDI, WCL, MoEF ,

MH State 74 SECL KETKI (0.42 MTY) ONG UG Stage II & possession of 207.99

HaDec-15 SECL, CG state, MoEF

75 ECL Sonepur (Comb) ONG OC (D) St-I/II FC for 32.65 Ha Dec-15 MoEF, ECL, WB Govt. 76 SECL AMBIKA (1 MTY) ONG OC Stage II FC & Possession for

6.28 Ha Jan-16 SECL, CG State, MoEF

77 SECL JAGANNATHPUR (3 MTY) ONG OC Stage II & Possession of 126.43 Ha in CG State

Jan-16 SECL, CG state, MoEF

78 MCL Gopalprasad OCP ONG OC 85.66 Ha ST-I/ST-II Feb-16 MCL, STATE, MOEF 79 MCL Garjanbahal OCP ONG OC 88.89 Ha ST-I/ST-II Feb-16 MCL,STATE,MOEF 80 MCL Jagannath & Jagannath Re-org'n ONG OC 11.30 Ha ST-I/ST-II Feb-16 MCL, STATE, MOEF 81 BCCL DBOCP EX U/G Stage-II clearance of 43.15 Ha

forest land Feb-16 BCCL, State, MoEF

82 BCCL DBOCP EX D/OC Stage-II clearance of 43.15 Ha forest land

Feb-16 BCCL, State, MoEF

83 BCCL DBOCP EX H/OC Stage-II clearance of 43.15 Ha forest land

Feb-16 BCCL, State, MoEF

84 CCL Pundi RO OC COM OC 60.32 Ha ST-II clearance Mar-16 MOEF 85 SECL AMGAON ONG OC Stage II FC & Possession for

93.58 Ha Mar-16 SECL, CG State, MoEF

86 SECL BATURA (2 MTY) ONG OC Stage II & Possession of 76.84 Ha

Mar-16 SECL, MP State, MoEF

87 WCL Padmapur Deep Extention FUT OC ST-II for 38.87 Ha Mar-16 WCL,MH State, MOEF 88 SECL KANCHAN RPR (2 MTY) FUT OC Stage II & possession of FL Mar-16 CMPDIL, SECL, CG

State & MoEF 89 SECL MAHAMAYA (0.48 MTY) ONG UG/OC Stage II & possession of

additional 196.19 Ha Mar-16 SECL, CG state, MoEF

90 SECL GEVRA EXPN (35.00 MT) ONG OC Stage II FC of 126.34 Ha of revenue forest land

Mar-16 SECL, CG State, MoEF

Page 60: cover page of Booklet

45�

PROJECTS-FORESTRY CLEARANCE SL SUB PROJECT GRP TYPE Issue Timeline Responsibility 91 MCL Talabira OCP ONG OC 1038.19 ST-I/ST-II May-16 MCL, MOEF 92 MCL Siarmal OCP ONG 409.99 Ha ST-I/ST-II May-16 MCL,STATE,MOEF 93 MCL Jagannath & Jagannath Re-org'n ONG OC POSSESSION May-16 STATE 94 SECL KARTALI EAST (2.5 MTY) ONG OC Stage II & possession of 406.29

HaMay-16 SECL, CG state, MoEF

95 CCL Amrapali OC ONG ST-II Clearance Jun-16 CCL, State, MOEF 96 CCL Ashoka EPR 10 MTY OC ONG 403.84 Ha ST-II Jun-16 97 CCL Churi-Benti UGP (LHD BP) ONG 79.00 Ha ST-II Jun-16 98 CCL Magadh OC ONG ST-II clearance Jun-16 CCL, State, MOEF 99 CCL Tapin South OS OC ONG ST-II clearance Jun-16 CCL, State, MOEF 100 CCL Topa RO OC ONG 71.58 Ha ST-II clearance Jun-16 101 CCL Pachra OC FUT 409.28 Ha ST-II clearance Jun-16 MOEF 102 CCL Pichri OC FUT ST-II clearance Jun-16 MOEF 103 CCL PPR Mangardaha UGP FUT 43.08 Ha ST-II clearance Jun-16 MOEF 104 CCL Sanghmitra OC FUT 572.72 Ha ST-II clearance Jun-16 MOEF 105 MCL Garjanbahal OCP ONG POSSESSION Jun-16 MCL, STATE 106 MCL Gopalprasad OCP ONG OC POSSESSION Jun-16 STATE 107 NCL Bina-Kakri Amalg. FUT OC St-I FC for 430 Ha Jun-16 NCL, MoEF, MP State 108 ECL Tilaboni FUT UG St-I/II FC for 39 Ha Jun-16 MoEF, ECL, WB Govt. 109 MCL Basundhara(W) Extn. OCP ONG OC ST-I/ST-II Aug-16 MCL,STATE,MOEF 110 SECL PELMA (15 MTY) ONG OC Stage II & possession of

additional 676 Ha Aug-16 SECL, CG state, MoEF

111 MCL Talabira OCP ONG OC POSSESSION Sep-16 STATE 112 MCL Siarmal OCP ONG POSSESSION Sep-16 MCL, STATE 113 SECL BAGDEVA (0.75 MTY) ONG UG Stage II & Possession of

additional 108.47 Ha Sep-16 SECL, CG State, MoEF

114 SECL BINKARA (0.36 MTY) ONG UG Stage II & Possession of 35.09 Ha

Sep-16 SECL, CG State, MoEF

115 WCL Dhau North FUT UG ST-II of 57.62 Ha Sep-16 WCL, MH State, MoEF 116 MCL Basundhara(W) Extn. OCP ONG POSSESSION Dec-16 MCL, STATE 117 ECL Chaidhar-Gariapani FUT OC St-I/II FC Dec-16 ECL, Jhankhand Govt.,

MoEF 118 ECL Itapara OC FUT OC(H) St- I FC for 3 HA Dec-16 ECL,WB Govt.,MoEF 119 WCL Jamuniya FUT UG Possession of 54.64 ha Dec-16 WCL, MOEF, MP State 120 WCL Bhatadih Expn. ONG OC Proposal of forestry clearance

for 0.20 Ha. Dec-16 MOEF

121 NCL Dudhichua Expn FUT OC St-I/II FC for 443 Ha+24 Rev Forest

Mar-17 NCL, MoEF, MP State

122 NCL Semaria FUT OC St-I/II FC for 426 Ha Mar-17 NCL, MoEF, MP State 124 SECL MALACHUA (3 MTY) FUT OC Stage II for Additional forest

landMar-17 SECL, CG state, MoEF

125 WCL Combined (Pauni II+ Pauni III) FUT OC St-II for 12.07 Ha Mar-17 MH State, WCL, MoEF 126 SECL RAMPUR BATURA (4 MTY) FUT OC Stage II & possession of FL Mar-17 CMPDIL, SECL, CG

State & MoEF 127 NCL Block-B Expn FUT OC St-I FC -To be assessed May-17 NCL, MoEF, MP State 128 WCL Tawa -III FUT UG Diversion o 101.60 Ha Stage II Jun-17 WCL, State, MOEF 129 MCL Kaniha OCP ONG OC 161.81 Ha ST-I/ST-II Jul-17 MCL, STATE, MOEF 130 MCL Integ Belpahar Lakhanpur Lilari

OCP. FUT OC ST-I/ST-II Aug-17 MCL,STATE,MOEF

131 MCL Gopalji Kaniha OCP FUT OC Ha ST-I/ST-II Aug-17 MCL, STATE, MOEF 132 MCL Kaniha OCP ONG OC POSSESSION Nov-17 STATE 133 MCL Lakhanpur OCP. COM POSSESSION Dec-17 MCL, STATE 134 MCL Gopalji Kaniha OCP FUT OC POSSESSION Dec-17 STATE 135 WCL Tawa -II Expansion FUT UG FC for 201.08 Ha Dec-17 WCL, State, MOEF 136 SECL MADAN NAGAR (12 MTY) FUT OC Stage II for Additional forest

landMar-18 SECL, CG state, MoEF

137 WCL Tawa - II COM UG Proposal for acquisition of Mining Rights of 201.079 Ha. forest land forwarded to APCCF(LM) Bhopal.

Mar-18 WCL/MOEF

138 SECL VIJAYWEST/VIJAY CENTRAL FUT OC Stage II & possession of FL Mar-18 CMPDIL, SECL, CG State & MoEF

139 SECL BATURA UG(HW) (0.5 MTY) FUT UG Stage II & possession of FL Mar-18 CMPDIL, SECL, CG State & MoEF

140 SECL KUSMUNDA EXPN (15-50 MTY) ONG Stage II & possession of Mar-18 SECL, CG state, MoEF

Page 61: cover page of Booklet

46�

PROJECTS-FORESTRY CLEARANCE SL SUB PROJECT GRP TYPE Issue Timeline Responsibility

additional 172 Ha 141 SECL BATURA WEST EXTN FUT OC Stage II & possession of FL Mar-18 CMPDIL, SECL, CG

State & MoEF 142 SECL AMRITDHARA (2 MTY) FUT OC Stage II & possession of FL Mar-18 CMPDIL, SECL, CG

State & MoEF 143 SECL RAI (15 MTY) FUT OC Stage II & possession of FL Mar-18 CMPDIL, SECL, CG

State & MoEF 146 SECL RAJNAGAR RPR FUT OC Stage II & possession of FL Mar-18 CMPDIL, SECL, CG

State & MoEF 147 ECL Bakulia FUT UG St-I/II FC Mar-18 ECL,WB Govt.,MoEF 148 SECL MAHAMAYA (0.48 MTY) ONG Stage II & Possession of

additional land Mar-18 SECL, CG state, MoEF

149 SECL GEVRA EXPN (35.00 MT-50 MTY)

FUT OC Stage II for Additional forest land

Mar-19 SECL, CG state, MoEF

150 ECL Dhangajore FUT UG St-I/II FC Mar-19 ECL,WB Govt.,MoEF 151 ECL Madhukunda FUT UG St-I/II FC Mar-19 ECL,WB Govt.,MoEF 152 ECL Brahmani/ Chicropastimal FUT OC St-I/II FC Dec-19 ECL, Jhankhand Govt.,

MoEF 153 WCL Ballarpur RO COM UG ST-II FC of 138 Ha MOEF, State 154 WCL Chattarpur I (including Umri) COM UG FC for 239.82 Ha WCL, MOEF, State

Page 62: cover page of Booklet

47�

PROJECTS-LAND ACQUISITION SL SUB PROJECT GRP TYPE Issue Timeline Responsibility 1 CCL Amrapali OC ONG OC Authentication of 239.47 Ha Dec-14 STATE 2 CCL KARO OC ONG OC Authentication of 22.95 Ha

landDec-14 STATE

3 CCL Kuju OC (OS) ONG OC Authentication of 76.99 Ha land

Dec-14 STATE

4 CCL Magadh OC ONG OC Authentication of 568.00 Ha land

Dec-14 STATE

5 CCL North Urimari OC ONG OC Authentication of 78.38 Ha land

Dec-14 STATE

6 CCL Piparwar EPR OC ONG OC Authentication of 27.58 Ha land

Dec-14 STATE

7 CCL Purnadih OC ONG OC Authentication of 298.78 Ha land

Dec-14 STATE

8 CCL Rajrappa RCE OC ONG OC Authentication of 134.25 Ha land

Dec-14 STATE

9 CCL Topa RO OC ONG OC Land authentication of 82.59 Ha (Total of OC&UG)

Dec-14 STATE

10 CCL Govindpur UG COM UG 107 Ha Land Authentication Dec-14 STATE 11 ECL Bansra COM OC(H) Acquisition & Possession of

150.51 acre Tenancy land & 14.29 acre Govt land

Dec-14 ECL, WB Govt.

12 ECL Dabor Ph-III COM OC(H) Acquisition & Possession of Tenancy:165.41 acre & Govt: land of 23.61 acre.

Dec-14 ECL, WB Govt.

13 ECL Narainkuri COM OC(H) Acquisition & Possession of 22.05 acre of Govt. land

Dec-14 ECL, WB Govt.

14 ECL Chitra East ONG OC(D) Possession of 323 Ha Tenancy Land Legal hand over is stalled due to insistence of signing of DOC

Dec-14 ECL, Jharkhand Govt.

15 ECL Khottadih OC ONG OC(D) Possession of 56.34 Ha of Govt land

Dec-14 ECL, WB Govt.

16 CCL Konar 3.5 OC ONG OC Authentication of 59.76 Ha land

Dec-14 STATE

17 WCL Penganga ONG Taking physical possession of 4.23 Ha for bridge

Jan-15 WCL, MH State Govt

18 ECL North searsole COM OC(H) Acquisition & Possession of 73.18 acre of Tenancy land & 4.55 acre of Govt. land

Jan-15 ECL, WB Govt.

19 ECL Chitra East ONG OC(D) Acquisition 7 Possession of 61.78 ha Govt Land

Jan-15 ECL, Jharkhand Govt.

20 WCL Penganga ONG OC Physical possession of 300 Ha land. Disbursement of compensation & employment in progress

Feb-15 WCL , MH State Govt

21 ECL Shankarpur OC Ph-IV COM OC(H) Acquisition & Possession of Tenancy land 209.384 acre

Feb-15 ECL, WB Govt.

22 CCL Chainpur (Sarubera OC) ONG OC 13.76 Ha Land Authentication Mar-15 STATE 23 CCL Tetariakhar OC ONG OC Land acquisition of 73.55 Ha

u/s 4(1) being sent to MOC for extn.

Mar-15 MOC

24 CCL Khasmahal OC COM OC Land authentication 15.05 GMK Land

Mar-15 STATE

25 CCL New Giddi C OC COM OC Land authentication of Bermo, Govindpur & Kurpania Block.

Mar-15 STATE

26 CCL Pundi RO OC COM OC Shifting of Village Mahuatand Mar-15 STATE 27 CCL Pachra OC FUT OC Land acqusition of 1348.78 Ha Mar-15 MOC 28 SECL AMBIKA (1 MTY) ONG OC Possession of 133.66 Ha Mar-15 SECL, MP State 29 WCL Bhanegaon ONG OC Phase I- Disbursement of

compensation and possession of 215.47 Ha land

Mar-15 WCL/ MH State

30 ECL Bonjemehari COM OC Acquisition & Possession of 30.69 acre of Tenancy land & 2.36 acre Govt land

Mar-15 ECL, WB Govt.

31 ECL Bonjemehari COM OC Possession of 35.84 acre of Mar-15 ECL, WB Govt.

Page 63: cover page of Booklet

48�

PROJECTS-LAND ACQUISITION SL SUB PROJECT GRP TYPE Issue Timeline Responsibility

Tenancy land 32 ECL Mohanpur Expansion ONG OC(H) Acquisition & Possession of

15.38 Ha Tenancy land 13.68 Ha Govt. Land

Mar-15 ECL, WB Govt.

33 ECL Mohanpur Expansion ONG Possession of 38.73 Ha Tenancy land

Mar-15 ECL, WB Govt.

34 ECL New Kenda ONG OC(H) Acquisition & possession of 148.72 Ha Tenancy Land

Mar-15 ECL, WB Govt.

35 CCL Kedla OC COM OC Shifting & Physical possession of 10.41 Ha land

Mar-15 CCL, STATE

36 CCL KD Hesalong (RPR) OC COM OC Authentication of 158 Ha GMK Land

Apr-15 STATE

37 WCL Gokul ONG OC Physical possession of Land -Employment etc.

Apr-15 WCL, MH State

38 WCL Ghonsa RPR ONG OC Physical possession of 110.66 Ha land

May-15 WCL

39 ECL Dalurband OCP (H) PHASE III COM OC(H) Acquisition & Possession of Tenancy land 7.41 acre

May-15 ECL, WB Govt.

40 CCL Pachra OC FUT Land authentication Jun-15 State 41 CCL Pichri OC FUT OC Phase-I 53 ha acquisition Jun-15 MOC 42 CCL Sanghmitra OC FUT OC 608.5 Ha Land acquisition Jun-15 MOC 43 ECL Simlong OC ( Extension) FUT OC(H) Acquisition & Possession of

188.69 Ha Tenancy land Jun-15 MoC,Jharkhand

Govt. &ECL 44 ECL Sarpi Aug ONG UG Possession of 91.25 Ha

Tenancy Land Jun-15 ECL, WB Govt.

45 WCL Kolgaon RPR COM OC Notification U/s. 9(1) for 51.42 Ha. land issued . Revised Compensation Bill sanctioned by MoC.

Jun-15 WCL

46 WCL Junad Extn. ONG OC Physical possession of 132.73 Ha land

Jul-15 WCL

47 ECL Sonepur (Comb) ONG OC (D) Possession of 100 Ha of Tenancy land

Jul-15 ECL, WB Govt.

48 WCL Jamuniya FUT UG Physical possession Aug-15 WCL/ MP State 49 WCL Combined (Pauni II+ Pauni III) FUT OC Physical possession of land Aug-15 WCL/MH State 50 WCL New Majri UG to OC FUT OC Acquisition & Possession of

431.27 Ha Aug-15 WCL,State

51 WCL Singori ONG OC Payment of compensation & Physical possession of Ph-I land

Sep-15 WCL

52 WCL Durgapur Expn. Deep ONG OC Physical possesion of land 410.96 Ha.

Sep-15 WCL

53 ECL Bhanora (W) OC COM OC(H) Acquisition & Possession of Tenancy land 210 acre , Govt: 0.97 acre,

Sep-15 ECL, WB Govt.

54 ECL Bonbahal OC COM OC(H) Acquisition & Possession of 50.06 acre Tenancy land

Sep-15 ECL, WB Govt.

55 SECL GEVRA EXPN (35.00 MT) ONG OC Possession of 146.26 Ha of Village Pondi (127.75 Ha already possessed).

Oct-15 SECL, CG State

56 WCL Yekona -I & II Amalgamate ONG OC Physical possession of Phase I land

Oct-15 WCL, MoC, MH State

57 WCL Sasti Expn. ONG OC Disbursement of compensation Oct-15 WCL 58 WCL Singori ONG Direct purchase of Ph-II land

(86.84 Ha) Oct-15 WCL

59 ECL Gaurangdih Extension OCP (ph-I) /Gourangdih D Block

COM OC(H) Acquisition & Possession of Tenancy land 42.486 acre

Oct-15 ECL, WB Govt.

60 CCL Amrapali OC ONG 423.37 Ha land acquisition Dec-15 MOC 61 CCL Ashoka EPR 10 MTY OC ONG 300 Ha land acquisition Dec-15 MOC 62 CCL KARO OC ONG 58.86 Ha land acquisition Dec-15 MOC 63 CCL Topa RO OC ONG 82.72 Ha land acquisition Dec-15 MOC 64 MCL Gopalji Kaniha OCP FUT OC CBA notification 4,7,9,11-

Nilachal Block Dec-15 MOC, MCL

65 MCL Lajkura O.C.P. COM OC CBA Notification 4,7,9,11-346.45 Ha

Dec-15 MCL, MOC

Page 64: cover page of Booklet

49�

PROJECTS-LAND ACQUISITION SL SUB PROJECT GRP TYPE Issue Timeline Responsibility 66 WCL Sharda FUT UG Physical possession of land Dec-15 WCL., MP State 67 WCL Kamptee Deep FUT OC Physical possession of land Dec-15 WCL, MH State 68 WCL Bhanegaon ONG Phase-II- Acquisition &

physical possession of 131.99 Ha

Dec-15 WCL/ MH State

69 WCL Gauri Deep ONG OC Physical possession of balance 32 Ha land

Dec-15 WCL

70 SECL JAGANNATHPUR (3 MTY) ONG OC Possession of 497.66 Ha land in four no villages

Dec-15 SECL, CG State

71 ECL Jhanjra 2nd set CM ONG UG Possession of 151 Ha Tenancy land & 7.2 Ha Govt. land.

Dec-15 ECL, WB Govt.

72 ECL Rajmahal Expn ONG OC(H) Possession of 100 Ha of Tenancy land & 29.49 Ha Govt Land

Dec-15 Jharkhand Govt., ECL

73 ECL Gourangdih Begunia OC Patch COM OC(H) Acquisition & Possession of Tenancy: 96.34 acre & Govt: 113.52 acre

Dec-15 ECL, WB Govt.

74 ECL Nakrakonda- Kumardih-B OC FUT OC(H) Acquisition & Possession of 224 Ha Tenancy land

Dec-15 ECL, WB Govt.

75 WCL Bellora/ Naigaon Deep FUT OC Physical possession of 292.26 Ha land

Dec-15 WCL

76 WCL Chincholi FUT OC Physical possession of land Jan-16 WCL, MH State 77 WCL Amalgamated Gondegaon -Ghatrohan. ONG OC Acquisition & Physical

possession of 191 Ha land under CBA

Feb-16 WCL/ MOC/State

78 SECL NAWAPARA COM UG Surface rights of land under CBA

Mar-16 SECL, MoC, CG State

79 SECL SHIVANI COM UG Possession of 114.78 Ha of Bansipur Village

Mar-16 SECL, CG State

80 SECL BATURA (2 MTY) ONG OC Acquisition & possession of 942.87 Ha under CBA

Mar-16 SECL, MP State

81 WCL Kamptee UG to OC COM OC 1.46 Ha tribal land Mar-16 MH State 82 WCL Kolar pimpri Extn. ONG OC Physical possession of 522.54

Ha land Mar-16 WCL

83 WCL Dinesh OC ONG OC 1. Possession of land Mar-16 WCL 84 SECL GEVRA EXPN (35.00 MT) ONG Possession of 245.90 Ha of

Village Amgaon (136 Ha already in possession)

Mar-16 SECL, CG State

85 SECL KANCHAN RPR (2 MTY) FUT OC Acquisition & Possession of land under CBA

Mar-16 SECL, CG State, MoC

86 ECL Sonepur (Comb) ONG OC (D) Possession of 35 Ha of Govt. land

Mar-16 ECL, WB Govt.

87 ECL Kumardihi B CM ONG UG Possessionof 6.13 ha of Tenancy land

Mar-16 ECL, WB Govt.

88 SECL BIJARI (1.5 MTY) ONG OC Possession of 269.02 Ha Mar-16 SECL, CG State 89 SECL BINKARA (0.36 MTY) ONG UG Possession of 7.08 Ha for

Surface Rights under CBA Mar-16 SECL, CG State

90 SECL CHURCHA * (1.35 MTY) ONG UG Possession of 5.85 Ha for Surface Rights under CBA

Mar-16 SECL, CG State

91 SECL JAMPALI (2 MTY) ONG OC Possession of 250.61 Ha Mar-16 SECL, CG State 92 SECL KARTALI EAST (2.5 MTY) ONG OC Possession of 301.11 Ha Mar-16 SECL, CG State 93 SECL DIPKA EXPN (25.00 MT) ONG OC Possession of 5.85 Ha for

Surface Rights under CBA of village Suabhondi & Malgaon

Mar-16 SECL, CG State

94 WCL Ukni Deep FUT OC Physical possession of 304.41 Ha

May-16 WCL

95 WCL Makardhokra I ONG OC Disbursement of compensation & Physical possession of 502 Ha land

May-16 WCL, MH State

96 ECL Simlong OC ( Extension) FUT OC(H) Acquisition & Possession of 39.96 Ha Govt land.

Jun-16 MoC,Jharkhand Govt. &ECL

97 ECL Jhanjra L/W R-VI ONG UG Possession of 249.76 Ha Tenancy Land

Jun-16 ECL, WB Govt.

98 ECL Chuperbhita FUT OC(H) Possession of 1038.145 Ha Tenancy land & 165.095 ha Govt. land

Jun-16 ECL, Jharkhand Govt.

Page 65: cover page of Booklet

50�

PROJECTS-LAND ACQUISITION SL SUB PROJECT GRP TYPE Issue Timeline Responsibility 99 BCCL Kapuria FUT U/G Compensation payment for

812.33 Ha Tenancy land Jun-16 BCCL, MOC,

State Govt. 100 WCL Bhatadih Expn. ONG OC Physical possesion of land

467.21 Ha. Jul-16 WCL

101 ECL Sonepur (Comb) ONG OC (D) Possession of 100 Ha of Tenancy land

Jul-16 ECL, WB Govt.

102 WCL Niljai Expansion (Deep) FUT OC Acquisition & Possession of 410 Ha

Aug-16 WCL, State

103 BCCL Moonidih XVI (T) EX U/G Compensation payment for 1826.73 Ha Tenancy land

Sep-16 BCCL, MOC, State Govt.

104 BCCL Moonidih XV FUT U/G Compensation payment for 1826.73 Ha Tenancy land

Sep-16 BCCL, MOC, State Govt.

105 NCL Dongrital FUT UG CBA Notification U/S 4,7,9,11 Dec-16 NCL, MoC, MP State

106 WCL Dhuptala (Sasti UG to OC) FUT OC Physical possession of land Dec-16 WCL, MH State 107 ECL Rajmahal Expn ONG OC(H) Possession of 150 Ha of

Tenancy land Dec-16 Jharkhand Govt.,

ECL 108 ECL Lakhimata OC(H) COM OC(H) Acquisition & Possession of

Tenancy land 70 acre Dec-16 ECL,

JHARKHAND Govt.

109 ECL Itapara OC FUT OC(H) Acquisition & Possession of 1128.50 HA Tenancy land & 17 HA Govt land

Dec-16 ECL, WB Govt.

110 SECL MADAN NAGAR (12 MTY) FUT OC Acquisition & Possession of land under CBA

Mar-17 SECL, CG State, MoC

111 SECL AMGAON ONG OC Possession of 388.62 Ha of village Patna

Mar-17 SECL, MP State

112 SECL BAGDEVA (0.75 MTY) ONG UG Acquisition & possession of 204.71 Ha under CBA

Mar-17 SECL, CG State

113 SECL PELMA (15 MTY) ONG OC Possession of 1376.41 Ha of Mar-17 SECL, CG State 114 SECL VINDHYA (0.585 MTY) ONG UG Possession of 148.37 Ha of Mar-17 SECL, CG State 115 WCL Yekona -I & II Amalgamate ONG Acquisition and physical

possession of Ph-II land Mar-17 WCL, MoC, MH

State 116 WCL Inder UG to OC ONG OC Physical possession of 217.40

Ha land Mar-17 WCL

117 WCL Mungoli Nirguda Deep Extn. OC FUT OC Acquisition & Possession of 348.30Ha

Mar-17 WCL, State

118 SECL MALACHUA (3 MTY) FUT OC Acquisition & Possession of land under CBA

Mar-17 SECL, CG State, MoC

119 SECL AMAERA ONG OC Possession of 148.47 Ha of village Katkona

Mar-17 SECL, MP State

120 SECL CHHAL OC Seam III Expn (6 MTY) ONG OC Acquisition & Possession of additional 443.35 Ha land under CBA

Mar-17 SECL, CG State, MoC

121 SECL RAMPUR BATURA (4 MTY) FUT OC Acquisition & Possession of land under CBA

Mar-17 SECL, CG State, MoC

122 ECL North Searsole OC FUT OC(H) Acquisition & Possession of 651.57 Ha Tenancy Land & 22.72 Ha Govt land

Mar-17 ECL, WB Govt.

123 ECL Sonepur (Comb) ONG OC (D) Possession of 100 Ha of Tenancy land

Jul-17 ECL, WB Govt.

124 BCCL NTC Patch A EX H/OC Possession of 609 Ha tenanacy land

Aug-17 BCCL, MOC, State Govt.

125 BCCL NT-ST & Jeenagora ONG D/OC Possession of 609 Ha tenanacy land

Aug-17 BCCL, MOC, State Govt.

126 BCCL NT-ST & Jeenagora ONG H/OC Possession of 609 Ha tenanacy land

Aug-17 BCCL, MOC, State Govt.

127 ECL Chaidhar-Gariapani FUT OC Acquisition & Possession of land

Sep-17 ECL, Jharkhand Govt., MoC

128 ECL Madanpur FUT OC Acquisition & Possession of land

Sep-17 ECL, WB Govt., MoC

129 ECL Rajmahal Expn ONG OC(H) Possession of 150 Ha of Tenancy land

Dec-17 Jharkhand Govt., ECL

130 ECL Ghusik UG FUT UG Acquisition and possession of Tenancy:land of 675 Ha

Dec-17 ECL, WB Govt.

131 ECL Mohanpur OC Patch COM OC(H) Acquisition & Possession of Jan-18 ECL, WB Govt.

Page 66: cover page of Booklet

51�

PROJECTS-LAND ACQUISITION SL SUB PROJECT GRP TYPE Issue Timeline Responsibility

Tenancy land : 174.58 acre & Govt: 20.75 acre.

132 SECL KUSMUNDA EXPN (15-50 MTY) ONG OC Possession of 641.60 Ha Mar-18 SECL, CG State 133 WCL Kumberkhani COM UG Acquisition of surface land for

depillaring.Mar-18 WCL

134 SECL MAHAN (0.36 MTY) ONG OC Possession of 63.21 Ha of Kapsara Village

Mar-18 SECL, CG State

135 SECL VIJAYWEST/VIJAY CENTRAL FUT OC Acquisition & Possession of land under CBA

Mar-18 SECL, CG State, MoC

136 SECL BATURA UG(HW) (0.5 MTY) FUT UG Acquisition & Possession of land under CBA

Mar-18 SECL, CG State, MoC

137 SECL BATURA WEST EXTN FUT OC Acquisition & Possession of land under CBA

Mar-18 SECL, CG State, MoC

138 SECL AMRITDHARA (2 MTY) FUT OC Acquisition & Possession of land under CBA

Mar-18 SECL, CG State, MoC

139 SECL RAI (15 MTY) FUT OC Acquisition & Possession of land under CBA

Mar-18 SECL, CG State, MoC

140 SECL RAJNAGAR RPR FUT OC Acquisition & Possession of land under CBA

Mar-18 SECL, CG State, MoC

141 ECL Jhanjra L/W R-VI ONG UG Acquisition and Possession of 30 Ha of tenancy land

Mar-18 ECL, WB Govt. MoC

142 SECL GEVRA EXPN (35.00 MT) ONG Possession of 99.81 Ha of village Bahanpat

Mar-18 SECL, CG State

143 SECL GEVRA EXPN (35.00 MT) ONG Possession of 130.19 Ha of village Bhatora

Mar-18 SECL, CG State

144 SECL GEVRA EXPN (35.00 MT) ONG Possession of 47.25 Ha of village Ralia

Mar-18 SECL, CG State

145 SECL GEVRA EXPN (35.00 MT) ONG Possession of 192.50 Ha of village Naraibodh

Mar-18 SECL, CG State

146 SECL GEVRA EXPN (35.00 MT) ONG Possession of 32.44Ha of village Bhilaibazar

Mar-18 SECL, CG State

147 NCL Block-B Expn FUT OC Acq of Land Mar-18 NCL, State, MoC 148 SECL REHAR COM UG Surface rights of land under

CBAMar-18 SECL, MoC

149 ECL Sonepur (Comb) ONG OC (D) Possession of 100 Ha of Tenancy land

Jul-18 ECL, WB Govt.

150 NCL Patpahari FUT UG/OC CBA Notification U/S 4,7,9,11 Aug-18 NCL, MoC, MP State

151 NCL Marki-Barka (W) FUT UG CBA Notification U/S 4,7,9,11 Aug-18 NCL, MoC, MP State

152 NCL Marki-Barka (E) FUT UG/OC CBA Notification U/S 4,7,9,11 Aug-18 NCL, MoC, MP State

153 ECL Bakulia FUT UG Acquisition & Possession of land

Sep-18 ECL, WB Govt., MoC

154 ECL Rajmahal Expn ONG OC(H) Possession of 160 Ha of Tenancy land

Dec-18 Jharkhand Govt., ECL

155 SECL KUSMUNDA EXPN (15-50 MTY) ONG Possession of 1127.58 Ha Mar-19 SECL, CG State 156 SECL MAHAMAYA (0.48 MTY) ONG UG/OC Possession of 601.95 Ha Mar-19 SECL, CG State,

MoC 157 ECL Brahmani/ Chicropastimal FUT OC Acquisition & Possession of

landMar-19 ECL, Jharkhand

Govt., MoC 158 ECL Sonepur (Comb) ONG OC (D) Possession of 100 Ha of

Tenancy land Jul-19 ECL, WB Govt.

159 ECL Dhangajore FUT UG Acquisition & Possession of land

Sep-19 ECL, WB Govt., MoC

160 ECL Madhukunda FUT UG Acquisition & Possession of land

Sep-19 ECL, WB Govt., MoC

161 ECL Hura-C FUT OC(H) Possession of 419.17 Ha Tenancy land to be done in phased manner

Mar-20 ECL, Jharkhand Govt.

162 ECL Tilaboni FUT UG Acquisition and possession of - 693.10Ha Tenancy land to be done in phased manner.

Mar-20 ECL, WB Govt.

163 SECL GEVRA EXPN (35.00 MT-50 MTY) FUT OC Acquisition & Possession of additional land under CBA

Mar-20 SECL, CG State, MoC

164 ECL Sonepur (Comb) ONG OC (D) Possession of 100 Ha of Jul-20 ECL, WB Govt.

Page 67: cover page of Booklet

52�

PROJECTS-LAND ACQUISITION SL SUB PROJECT GRP TYPE Issue Timeline Responsibility

Tenancy land 165 CCL Bokaro(Bermo) OC ONG OC Land Authentication STATE 166 CCL Churi-Benti UGP (LHD BP) ONG UG Land Authentication STATE 167 CCL Govinpur PH II (New Swang)OC ONG OC Land Authentication of

govindpur Village STATE

168 CCL Kuju UGP (SDL BP) ONG UG Land Authentication STATE 169 CCL Dakra Bubka OC COM OC Shifting of Jetlitand &

Bishrampur Villages CCL & STATE

170 CCL Kedla UG COM UG Shifting of Kedla Village 171 SECL AMADAND ONG OC Possession of additional 699

Ha which is subjudice SECL, MP State

172 WCL Kamptee UG to OC COM 18.06 Ha MIDC land MH State

Page 68: cover page of Booklet

53�

PROJECTS-R & R SL SUB PROJECT GRP TYPE Issue Timeline Responsibility 1 CCL Amrapali OC ONG OC Shifting of Binglath, Ursu, Honhe

villageDec-14 STATE, CCL

2 CCL Topa RO OC ONG OC Shifting of Mangardaha village Dec-14 STATE, CCL 3 ECL Rajmahal Expn ONG OC(H) Acquisition/ possession of

46.15Ha of Ranidih Mouza Dec-14 ECL, Jharkhand Govt.,

4 CCL Parej East RPR OC COM OC Shifting & possession of 61.13 Ha land of Durukasmar village

Dec-14 CCL, STATE

5 CCL KARO OC ONG OC Shifting of Karo village Mar-15 CCL, State 6 CCL Konar 3.5 OC ONG OC Shifting of Barwabera village Mar-15 CCL, State 7 CCL Magadh OC ONG OC Shifting of Ara.Chamatu,

Phulbasia, Masilang, Devalgada, Kundi

Mar-15 CCL, State

8 CCL North Urimari OC ONG OC Shifting of 486 PAFs Mar-15 CCL, State 9 CCL Piparwar EPR OC ONG OC Shifting of village Vijayan Mar-15 CCL, State 10 MCL Bhubaneswari OCP ONG OC Talasahi & Saharsahi bsti of

Hensmul village Mar-15 MCL

11 ECL New Kenda ONG OC(H) Rehabilitation of 6 No Villages Mar-15 ECL, WB GOVT. 12 CCL Kathara RCE OC ONG OC Shifting of 250 families Jun-15 CCL, State 13 MCL Siarmal OCP ONG Gopalpur & Other village-845

PAF Jun-15 MCL, STATE

14 MCL Ananta OCP ONG OC Hilloi, Ekdal village with possession of land

Sep-15 MCL, MOC, STATE

15 CCL Pachra OC FUT OC Village shifting Dec-15 State, CCL 16 CCL Pichri OC FUT OC Village shifting Dec-15 State, CCL 17 CCL Sanghmitra OC FUT OC Village shifting Dec-15 State, CCL 19 CCL Purnadih OC ONG OC Shifting of Kutki & Henzda

villageMar-16 CCL, State

20 CCL Rajrappa RCE OC ONG OC Shifting of Semrabera, Dhawaiya, Gopo village

Mar-16 CCL, State

23 MCL Basundhara(W) Extn. OCP ONG OC Telendih village Mar-16 MCL, STATE 22 SECL BATURA (2 MTY) ONG OC Rehab of PAFs Mar-16 SECL, MP State 18 WCL Hindustan Lalpeth Expn FUT OC Rehab of 300 houses etc Mar-16 WCL 21 WCL Durgapur Expn. Deep ONG OC Rehab of 3 no. of villages Mar-16 WCL 24 ECL Sonepur (Comb) ONG OC (D) Rehabilitationof1615 PAFs Mar-16 ECL, WB GOVT. 25 ECL Nakrakonda- Kumardih-B OC FUT OC(H) Rehab of 1 village, 2 Bastiees ,

'Joalbhanga More' Mar-16 ECL, WB GOVT.

26 MCL Kulda & Kulda Expansion ONG OC Final RnR Jun-16 MCL 27 MCL Garjanbahal OCP ONG OC Garjanbahal village Jun-16 MCL, STATE 28 MCL Siarmal OCP ONG Siarmal village-143 PAF Oct-16 MCL, STATE 30 MCL Gopalprasad OCP ONG OC Bhauguabol Kankarai village Dec-16 MCL, MOC, STATE 31 MCL Hingula O.C.P. ONG OC Bhalugadia village Dec-16 MCL, STATE 29 WCL Urdhan ONG OC Rehabilitation of Urdhan village Dec-16 WCL 32 WCL Kamptee Deep FUT OC Tekadi village shifting Dec-16 WCL 33 WCL Penganga ONG OC Rehabilitation of Wirur village.

Site identified, required after 3 years

Dec-16 WCL, MH State

34 MCL Talabira OCP ONG OC Talabira, Khinda village Mar-17 MCL, MOC, STATE 38 MCL Balram OCP ONG OC Nathgaon, Majhika, Kalamchuin

& Solada village Mar-17 MCL, STATE

39 MCL Bharatpur OCP ONG OC Rakas village Mar-17 MCL, STATE 40 MCL Kaniha OCP ONG OC Jarada village Mar-17 MCL, STATE 35 WCL Ukni Deep FUT OC Rehabilitation of Pimpalgaon

villageMar-17 WCL

36 WCL Bhatadih Expn. ONG OC Bhatadih village Mar-17 WCL 37 WCL Kolar pimpri Extn. ONG OC Rehabilitation of 3 villages Mar-17 WCL 41 SECL BIJARI (1.5 MTY) ONG OC Rehab of 170 no PAFs Mar-17 SECL, CG State 42 MCL Gopalprasad OCP ONG OC Pirkhaman & Chota Bherini

villageSep-17 MCL, MOC, STATE

43 WCL Dhuptala (Sasti UG to OC) FUT OC Rehab. Of Sasti village Nov-17 MH State, WCL 44 NCL Dongrital FUT UG R & R Dec-17 NCL, MP State 45 MCL Integ Belpahar Lakhanpur Lilari

OCP. FUT OC RnR for 30 Mty Project Mar-18 MCL, STATE

46 SECL MADAN NAGAR (12 MTY) FUT OC Vacating of Jaganathpur Village Mar-18 SECL, CG State, MoC 49 SECL AMAERA ONG OC R&R of PAFs Mar-18 SECL, CG State

Page 69: cover page of Booklet

54�

PROJECTS-R & R SL SUB PROJECT GRP TYPE Issue Timeline Responsibility 50 SECL GEVRA EXPN (35.00 MT) ONG OC Rehab of PAFs Mar-18 SECL, CG State 47 WCL Niljai Expansion (Deep) FUT OC Rehab of Ukni village Mar-18 WCL, State 48 WCL Inder UG to OC ONG OC Rehab of Tekadi village Mar-18 WCL 51 WCL New Majri UG to OC FUT OC Shifting of Dafai Mar-18 WCL 52 SECL GEVRA EXPN (35.00 MT) ONG Rehab of PAFs Mar-18 SECL, CG State 53 SECL GEVRA EXPN (35.00 MT) ONG Rehab of PAFs Mar-18 SECL, CG State 54 SECL GEVRA EXPN (35.00 MT) ONG Rehab of PAFs Mar-18 SECL, CG State 55 SECL GEVRA EXPN (35.00 MT) ONG Rehab of PAFs Mar-18 SECL, CG State 56 SECL GEVRA EXPN (35.00 MT) ONG Rehab of PAFs Mar-18 SECL, CG State 57 SECL GEVRA EXPN (35.00 MT) ONG Rehab of PAFs Mar-18 SECL, CG State 58 ECL Sonepur (Comb) ONG OC (D) Rehabilitaion of about 3000 PAFs Mar-18 ECL, WB GOVT. 59 SECL JAGANNATHPUR (3 MTY) ONG OC Rehab of PAFs Mar-18 SECL, CG State 60 SECL JAMPALI (2 MTY) ONG OC Rehab of PAFs Mar-18 SECL, CG State 61 SECL KARTALI EAST (2.5 MTY) ONG OC Rehab of PAFs Mar-18 SECL, CG State 62 SECL AMGAON ONG OC R&R of PAFs Mar-18 SECL, CG State 63 WCL Mungoli Nirguda Deep Extn.

OCFUT OC Rehab of Mungoli village Mar-19 WCL

64 ECL North Searsole OC FUT OC(H) Rehabilitation of One big village Mar-19 WB Govt, ECL 65 ECL Itapara OC FUT OC(H) Rehab of 11 No of villages Mar-19 ECL, WB GOVT. 66 SECL KUSMUNDA EXPN (15-50

MTY) ONG OC Rehab of PAFs Mar-19 SECL, CG State

67 SECL MAHAN (0.36 MTY) ONG OC Rehab of PAFs Mar-19 SECL, CG State 68 SECL PELMA (15 MTY) ONG OC Rehab of PAFs Mar-19 SECL, CG State 69 SECL CHHAL OC Seam III Expn (6

MTY) ONG OC Rehab of PAFs Mar-19 SECL, CG State

70 NCL Patpahari FUT UG/OC R & R Aug-19 NCL, MP State 71 NCL Marki-Barka (W) FUT UG R & R Aug-19 NCL, MP State 72 NCL Marki-Barka (E) FUT UG/OC R & R Aug-19 NCL, MP State 73 SECL GEVRA EXPN (35.00 MT-50

MTY) FUT OC Rehab of PAFs Mar-20 SECL, CG State, MoC

Page 70: cover page of Booklet

55�

PROJECTS- EVACUATION BY RAIL SL SUB PROJECT GRP TYPE Issue Timeline Responsibility 1 CCL Kabribad RO OC COM OC CP Siding renovation Dec-14 Indian Railways 2 CCL Tapin OC ONG OC NR & Sarubera Siding Ph-I Jan-15 Indian Railwayss 3 MCL Balram OCP ONG OC Starting of Siding no.X Mar-15 MCL 4 CCL Piparwar EPR OC ONG OC Piparwar siding construction &

bachra siding renovation Jun-15 Indian railways

5 MCL Lingaraj OCP COM OC Connectivity from MGR to Talcher Stn.

Jun-15 E Co Railways

6 BCCL DBOCP EX U/G Construction of Dahibari Siding Aug-15 BCCL 7 BCCL DBOCP EX D/OC Construction of Dahibari Siding Aug-15 BCCL 8 BCCL DBOCP EX H/OC Construction of Dahibari Siding Aug-15 BCCL 9 MCL Lakhanpur OCP. COM Doubling of track between Y-curve &

siding no. 6&7 Sep-15 SEC railway

10 CCL Tarmi OS OC ONG OC Tarmi siding renovation Oct-15 Indian Railways 11 CCL Urimari EPR OC COM OC Saunda-B siding renovation Oct-15 Indian Railway 12 CCL Govinpur PH II (New

Swang)OC ONG OC Pipradih siding Dec-15 Indian railway

13 CCL Govinpur PH II (New Swang)OC

ONG Jarangdih PF-II siding renovation Dec-15 Indian railway

14 CCL KARO OC ONG OC Jarangdih siding (PF-1) - renovation Dec-15 Indian railway 15 CCL Topa RO OC ONG OC NR & Sarubera siding (Ph-II)

renovation Dec-15 Indian Railways

16 CCL Amlo OC COM Extn. Of new Sel. Dhori siding Dec-15 Indian Railways 17 CCL Jarangdih OC COM OC Jarangdih siding (PF-2) - renovation Dec-15 Indian Railways 18 ECL Hura-C FUT OC(H) Constrction of MGR & rail track Dec-15 NTPC, Jharkhand

Govt. 19 CCL Konar 3.5 OC ONG OC Konar Rly siding Mar-16 Indian railway 20 CCL Rohini OC ONG OC Dakra siding renovation Mar-16 Indian Railwayss 21 CCL KD Hesalong (RPR) OC COM OC KDH siding renovation Mar-16 Indian Railways 22 MCL Lakhanpur OCP. COM OC Jharsaguda hawrah 3rd line Mar-16 SE railway 23 MCL Siarmal OCP ONG Jharsaguda-Wardah 3rd line Mar-16 SEC Rail 24 MCL Hingula O.C.P. ONG OC Doubling of link between siding no.9

of hingula to sinding 7 &8 of Bharatpur

Mar-16 E Co Railway

25 MCL Ananta OCP ONG OC TLS Cabin - Talcher Stn 3rd line Mar-16 E Co Railway 26 MCL Bharatpur OCP ONG OC Angul Kalinga connectivity Mar-16 E Co Railway 27 ECL Chuperbhita FUT OC(H) Constrction of MGR & rail track Mar-16 NTPC, Jharkhand

Govt. 28 ECL Simlong OC ( Extension) FUT OC(H) Construction of New Rly. Siding Mar-16 ECL, RITES,

Jharkhand Govt 29 BCCL Muraidih-Shatabdi amal. EX D/OC Construction of Maheshpur RLS Mar-16 BCCL 30 BCCL Phularitand EX U/G Construction of Maheshpur RLS Mar-16 BCCL 31 BCCL Phularitand EX H/OC Construction of Maheshpur RLS Mar-16 BCCL 32 BCCL Amalgmated Block-II OCP EX D/OC Construction of Maheshpur RLS Mar-16 BCCL 33 BCCL Amalgmated Block-II OCP EX H/OC Construction of Maheshpur RLS Mar-16 BCCL 34 BCCL Jogidih EX U/G Construction of Maheshpur RLS Mar-16 BCCL 35 BCCL Maheshpur EX U/G Construction of Maheshpur RLS Mar-16 BCCL 36 BCCL Maheshpur EX H/OC Construction of Maheshpur RLS Mar-16 BCCL 37 BCCL Amal.Block-IV GVP. EX U/G Construction of Maheshpur RLS Mar-16 BCCL 38 BCCL Amal.Block-IV GVP. EX D/OC Construction of Maheshpur RLS Mar-16 BCCL 39 BCCL Amal.Block-IV GVP. EX H/OC Construction of Maheshpur RLS Mar-16 BCCL 40 BCCL New Akashkinaree EX U/G Construction of Maheshpur RLS Mar-16 BCCL 41 BCCL New Akashkinaree EX D/OC Construction of Maheshpur RLS Mar-16 BCCL 42 BCCL New Akashkinaree EX H/OC Construction of Maheshpur RLS Mar-16 BCCL 43 BCCL BLOCK-II U/G FUT U/G Construction of Maheshpur RLS Mar-16 BCCL 44 BCCL Muraidih FUT U/G Construction of Maheshpur RLS Mar-16 BCCL 45 CCL Amrapali OC ONG OC TORI-SHIVPUR Rly Line to be

completed- Single line Jun-16 Indian Railway

46 CCL Magadh OC ONG OC TORI-SHIVPUR Rly Line to be completed- Single line

Jun-16 Indian Railway

47 CCL Pachra OC FUT OC TORI-SHIVPUR Rly Line to be completed- Single line

Jun-16 Indian Railway

48 CCL Sanghmitra OC FUT OC TORI-SHIVPUR Rly Line to be completed- Single line

Jun-16 Indian Railway

49 ECL Sonepur (Comb) ONG OC (D) Construction of New Rly. Siding Jun-16 ECL, RITES,

Page 71: cover page of Booklet

56�

PROJECTS- EVACUATION BY RAIL SL SUB PROJECT GRP TYPE Issue Timeline Responsibility

CMPDIL50 MCL Kulda & Kulda Expansion ONG OC Jharsaguda-Barpali single Line Jul-16 SE Railway 51 MCL Garjanbahal OCP ONG OC Jharsaguda-Barpali single Line Jul-16 SE Railway 52 MCL Siarmal OCP ONG Jharsaguda-Barpali single Line Jul-16 SE Railway 53 CCL North Urimari OC ONG OC Rly siding Dec-16 Indian Railway 54 MCL Talabira OCP ONG OC Temp. warfwall r/siding Dec-16 MCL 55 ECL Amritnagar COM UG Renovation of Kunustoria Railway

Siding Dec-16 ECL, RITES

56 ECL North Searsole OC FUT OC(H) Renovation of Kunustoria Railway Siding required Timeline by Dec, 2016

Dec-16 ECL

57 MCL Talabira OCP ONG OC Connectivity with Lapanga Stn with construction of siding

Mar-17 RITES, MCL

58 MCL Gopalprasad OCP ONG OC Belt/Rail connection to siding 10 Mar-17 MCL 59 MCL Lingaraj OCP COM Rail connection for SILO loading for

Lingaraj Mar-17 E Co Railways

60 MCL Talabira OCP ONG Connectivity with Lapanga Stn Mar-17 SE raliway 61 MCL Bhubaneswari OCP ONG Talcher Kuttak 3rd line Mar-17 E Co Railway 62 MCL Kaniha OCP ONG OC Construction of MGR by NTPC Mar-17 NTPC 63 SECL AMBIKA (1 MTY) ONG OC Connectivity with East West Corridor Mar-17 SECL, Railways 64 SECL KARTALI EAST (2.5 MTY) ONG OC Connectivity with East WestCorridor Mar-17 SECL, Railways 65 BCCL AARC EX U/G Construction of Tentulmari RLS Mar-17 BCCL 66 BCCL Salanpur EX U/G Construction of Tentulmari RLS Mar-17 BCCL 67 BCCL AKWMC EX U/G Construction of Tentulmari RLS Mar-17 BCCL 68 BCCL AKWMC EX D/OC Construction of Tentulmari RLS Mar-17 BCCL 69 BCCL AKWMC/ Kantapahari EX H/OC Construction of Tentulmari RLS Mar-17 BCCL 70 BCCL AKWMC/ Mega Project EX H/OC Construction of Tentulmari RLS Mar-17 BCCL 71 BCCL AKWMC/ Kumarijore EX H/OC Construction of Tentulmari RLS Mar-17 BCCL 72 BCCL Katras chatudih EX H/OC Construction of Tentulmari RLS Mar-17 BCCL 73 BCCL Gaslitand EX H/OC Construction of Tentulmari RLS Mar-17 BCCL 74 BCCL Mudidih EX U/G Construction of Tentulmari RLS Mar-17 BCCL 75 BCCL Jogta EX H/OC Construction of Tentulmari RLS Mar-17 BCCL 76 BCCL Tetulmari EX U/G Construction of Tentulmari RLS Mar-17 BCCL 77 BCCL Tetulmari EX D/OC Construction of Tentulmari RLS Mar-17 BCCL 78 BCCL Nichitpur EX D/OC Construction of Tentulmari RLS Mar-17 BCCL 79 BCCL Nichitpur EX H/OC Construction of Tentulmari RLS Mar-17 BCCL 80 BCCL Sendra Bansjora EX H/OC Construction of Tentulmari RLS Mar-17 BCCL 81 ECL Chitra East ONG OC(D) Construction of new Railway Siding (

25 KMs) Jun-17 RITES, ECL

82 BCCL NTC Patch A EX H/OC Construction of NTST Siding Jul-17 BCCL 83 BCCL NT-ST & Jeenagora ONG D/OC Construction of NTST Siding Jul-17 BCCL 84 BCCL NT-ST & Jeenagora ONG H/OC Construction of NTST Siding Jul-17 BCCL 85 MCL Siarmal OCP ONG Temp. siding at Barpali yard Sep-17 MCL 86 SECL BIJARI (1.5 MTY) ONG OC Commissoning of New Siding & East

Rail Corridor Sep-17 IRCON, CH State,

SECL,Railways 87 CCL Amrapali OC ONG Double line Dec-17 Indian Railway 88 CCL Amrapali OC ONG SHIVPUR-KATHUTIA Rly Line to

be completed- Single line Dec-17 Indian Railway

89 CCL Magadh OC ONG Double line Dec-17 Indian Railway 90 CCL Magadh OC ONG SHIVPUR-KATHUTIA Rly Line to

be completed- Single line Dec-17 Indian Railway

91 CCL Pachra OC FUT Double line Dec-17 Indian Railway 92 CCL Pachra OC FUT SHIVPUR-KATHUTIA Rly Line to

be completed- Single line Dec-17 Indian Railway

93 CCL Sanghmitra OC FUT Double line Dec-17 Indian Railway 94 CCL Sanghmitra OC FUT SHIVPUR-KATHUTIA Rly Line to

be completed- Single line Dec-17 Indian Railway

95 SECL JAMPALI (2 MTY) ONG OC Commissoning of New Siding & East Rail Corridor

Dec-17 IRCON, CH State, SECL,Railways

96 SECL KUSMUNDA EXPN (15-50 MTY)

ONG Expansion & construction of siding by RITES

Dec-17 RITES & SECL

97 SECL PELMA (15 MTY) ONG OC Commissoning of New Siding & East Rail Corridor with spur

Dec-17 IRCON, CH State, SECL,Railways

98 SECL CHHAL OC Seam III Expn (6 MTY)

ONG OC Commissoning of New Siding & East Rail Corridor with spur

Dec-17 IRCON, CH State, SECL,Railways

Page 72: cover page of Booklet

57�

PROJECTS- EVACUATION BY RAIL SL SUB PROJECT GRP TYPE Issue Timeline Responsibility 99 SECL KUSMUNDA EXPN (15-50

MTY) ONG Connectivity of EW Rail corridor

with Kusmunda Siding & Backward Integration

Dec-17 IRCON, SECL

100 SECL GEVRA EXPN (35.00 MT-50 MTY)

FUT OC Commissoning of East- West Rail Corridor

Mar-18 IRCON, CH State, SECL, Railways

101 SECL RAI (15 MTY) FUT OC Commissoning of East Rail Corridor Mar-18 IRCON, CH State, SECL, Railways

102 SECL VIJAYWEST/VIJAY CENTRAL

FUT OC Commissoning of East- West Rail Corridor

Mar-18 IRCON, CH State, SECL, Railways

103 SECL BINKARA (0.36 MTY) ONG UG Commissoning of New Siding Mar-18 SECL, Railways 104 SECL JAGANNATHPUR (3 MTY) ONG OC Rail & centralized siding Mar-18 SECL, Railways 105 SECL KUSMUNDA EXPN (15-50

MTY) ONG OC Commissoning of East- West Rail

Corridor (For despatch beyond 25 Mty)

Mar-18 IRCON, CH State, SECL, Railways

106 SECL MALACHUA (3 MTY) FUT OC Construction of Rail siding Mar-18 SECL, Railways, RITES

107 SECL GEVRA EXPN (35.00 MT-50 MTY)

FUT Construction of Rail siding Mar-18 SECL, Railways, RITES

108 SECL SYANG GROUP (20 MTY) FUT OC Commissoning of East Rail Corridor Mar-18 IRCON, CH State, SECL, Railways

109 SECL BATURA UG(HW) (0.5 MTY)

FUT UG Commissoning of New Siding Mar-18 SECL, Railways

110 SECL BATURA (2 MTY) ONG OC Commissoning of New Siding Mar-18 SECL, Railways 111 SECL BATURA WEST EXTN FUT OC Commissoning of New Siding Mar-18 SECL, Railways 112 SECL AMADAND OC EXPN (4

MTY) FUT OC Rail Infrastructure from Baihatola

Rly Stn Mar-18 SECL, Railways,

RITES 113 SECL RAMPUR BATURA (4 MTY) FUT OC Commissoning of New Siding Mar-18 SECL, Railways 114 SECL GEVRA EXPN (35.00 MT) ONG OC Commissoning of East-West Rail

Corridor Sep-18 IRCON, CH State,

SECL,Railways 115 ECL Bonjemehari COM OC Constructiojn of New Rly Siding. Dec-18 ECL, RITES 116 ECL Itapara OC FUT OC(H) Construction of New Rly. Siding Dec-18 ECL,RITES 117 MCL Siarmal OCP ONG Jharsaguda-Barpali double Line Mar-19 SE Railway 118 MCL Belpahar OCP. ONG OC Shifting of OPGC Rail line/MGR

siding Mar-19 OPGC

119 NCL Khadia Expn ONG OC Construction of PR Siding Mar-19 NCL 120 ECL Tilaboni FUT UG Construction of New Rly. Siding Mar-19 ECL, RITES 121 SECL SARAIPALLI (1.4 MTY) ONG OC Connectivity with East West Corridor

Page 73: cover page of Booklet

58�

PROJECTS-EVACUATION BY ROAD

SL SUB PROJECT GRP TYPE Issue Timeline Responsibility 1 WCL Penganga ONG OC Construction of approach bridge

over Penganga River. Estmate approved by WCL board - Floating of tender

Jan-15 WCL/ MH State

2 WCL Penganga ONG Award of tender Mar-15 WCL

3 ECL Sonepur (Comb) ONG OC(D)

Diversion of NH-60 by NHAI Dec-15 NHAI, ECL, WB Govt.

4 MCL Basundhara(W) Extn. OCP

ONG OC Const. of Road, Culvert, Bridge of Basundhara River

Jun-16 MCL

5 MCL Gopalprasad OCP ONG OC Bridge from Gopalprasad OCP to Hingula OCP over Sinai jore nallah

Sep-16 MCL

6 MCL Balram OCP ONG OC CT road construction from Salboni chak to R/siding no.IX

Sep-16 MCL

7 MCL Siarmal OCP ONG Bridge no2 construction Dec-16 MCL

8 MCL Siarmal OCP ONG Bridge no1 &3 construction Mar-17 MCL

9 MCL Siarmal OCP ONG Widening of road from 2 lane to 4 lane from Bankibahal to Kanika siding - 27 KM: on deposite basis

Mar-17 MCL, State

10 MCL Siarmal OCP ONG 4 lane coal transport road to Barpali yard

Jun-17 MCL

11 MCL Siarmal OCP ONG 4 lane dedicated road from Bankibahal to Bhedabahal on SH-10

Mar-18 MCL,State

Page 74: cover page of Booklet

59�

PROJECTS-CHP/SILO CONSTRUCTION

SL SUB PROJECT GRP TYPE Issue Timeline Responsibility 1 MCL Lingaraj OCP COM Widening of Deulbera R/Siding Mar-15 MCL

2 MCL Bharatpur OCP ONG OC SILO Completion Mar-15 MCL

3 ECL Sarpi Aug ONG UG Construction of CHP Jun-15 ECL

4 WCL Penganga ONG OC Construction of CHP loading arrangements.

Dec-15 CMPDIL, WCL

5 MCL Ananta OCP ONG OC SILO Balance work Mar-16 MCL

6 MCL Bhubaneswari OCP ONG Tube Conv. To SILO Mar-16 MCL

7 ECL Jhanjra Low height CM FUT UG Construction of CHP Mar-16 CMPDIL, ECL

8 ECL Rajmahal Expn ONG OC(H) Construction of additional warf wall siding

Mar-16 ECL, CMPDI

9 ECL Sonepur (Comb) ONG OC(D)

Construction of CHP Jun-16 CMPDIL, ECL

10 MCL Lingaraj OCP COM OC SILO Construction Jul-16 MCL

11 MCL Hingula O.C.P. ONG OC Construction of SILO Mar-17 MCL

12 MCL Bhubaneswari OCP ONG OC SILO Construction Mar-17 MCL

13 SECL BATURA (2 MTY) ONG OC Commissioning of CHP Mar-17 SECL

14 NCL Dudhichua Expn FUT OC Construction of CHP (Incr) Jun-17 NCL

15 SECL PELMA (15 MTY) ONG OC Construction of CHP & Silo Sep-17 CMPDIL, SECL

18 MCL Siarmal OCP ONG Construction of washery /SILO Dec-17 MCL

19 MCL Siarmal OCP ONG Conv. From Pit to Washery Dec-17 MCL

16 NCL Jayant Expn FUT OC Construction of CHP Dec-17 NCL

17 NCL Bina-Kakri Amalg. FUT OC Construction of 5.5 Mty CHP Dec-17 NCL

20 SECL KUSMUNDA EXPN (15-50 MTY)

ONG OC Construction of CHP & Silo Dec-17 CMPDIL, SECL

21 MCL Integ Belpahar Lakhanpur Lilari OCP. FUT OC Washery, SILO-30 Mty Intr PR Mar-18 MCL

22 SECL GEVRA EXPN (35.00 MT-50 MTY)

FUT OC Construction of CHP & Silo Mar-18 CMPDIL, SECL

23 ECL Bonjemehari COM OC Installation of Mobile crusher Dec-18 ECL

Page 75: cover page of Booklet

60�

PROJECTS-NALLAH DIVERSION

SL SUB PROJECT GRP TYPE Issue Timeline Responsibility 1 WCL Makardhokra I ONG OC 1 Km long nallah

diversion Apr-15 WCL/ MH State

Govt2 WCL New Majri UG to OC FUT OC Koradi nallah Jul-15 WCL/, MH State

3 WCL Singori ONG OC Nallah diversion Dec-15 WCL, MH State

4 WCL Combined (Pauni II+ Pauni III) FUT OC 2 no. nallah diversion Mar-16 WCL/MH State

5 WCL Chincholi FUT OC Award of work Mar-16 WCL

6 WCL Sasti Expn. ONG OC Sasti nalla diversion Mar-16 WCL

7 WCL Umrer Expansion (Amb River Phase - IV)

ONG OC Amb river diverion Mar-16 WCL

8 WCL Dinesh OC ONG OC Diversion of Amb Nallah & Canal

Mar-16 WCL/ State Govt

9 WCL Penganga ONG OC Peripheral Nullah with HFL above the mine contours

Apr-16 WCL, MH State

11 MCL Gopalprasad OCP ONG OC Garudia Nallah diversion Jun-16 MCL

10 WCL Makardhokra I ONG 10 Km long Jun-16 WCL/ MH State Govt

12 WCL Dhuptala (Sasti UG to OC) FUT OC Sakri nalla Dec-16 WCL, MH State

13 WCL Yekona -I & II Amalgamate ONG OC Irrigation canal. Dec-16 WCL, MH State

14 WCL Ghonsa RPR ONG OC Diversion of Nalla Dec-16 WCL

15 MCL Lakhanpur OCP. COM OC Pullizore nallah Mar-17 MCL

16 MCL Ananta OCP ONG OC Bangaru Nalla diversion Mar-17 MCL

17 WCL Gokul ONG OC Irrigation canal & Nallah Mar-17 WCL, MH State

18 MCL Samleswari OCP COM Panderen nallahh diversion-12 Mty

May-17 MCL

19 WCL Kolar pimpri Extn. ONG OC Diversion of Nalla Dec-17 WCL

20 MCL Integ Belpahar Lakhanpur Lilari OCP.

FUT OC Lilari nallah diversion Mar-18 MCL

21 ECL Itapara OC FUT OC(H) Noonia nala to be diverted

Dec-18 ECL, WB GOVT.

22 WCL Bhatadih Expn. ONG OC Erai river diversion 1.5 km

Dec-18 WCL/STATE

23 SECL KUSMUNDA EXPN (15-50 MTY)

ONG OC Right Bank Canal Diversion

Beyond 19-20

CG State, CWC, CMPDIL, SECL

Page 76: cover page of Booklet

61�

PROJECTS-ROAD DIVERSION

SL SUB PROJECT GRP TYPE Issue Timeline Responsibility

1 WCL Singori ONG OC Divn of State highway Dec-15 WCL, MH State

2 WCL Chincholi FUT OC Award of work Mar-16 WCL, MH Satte

3 WCL Yekona -I & II Amalgamate

ONG OC Village Road Dec-16 WCL, MH State

4 WCL Dhuptala (Sasti UG to OC)

FUT OC Road diversion Dec-16 WCL, MH Satte

5 WCL Durgapur Expn. Deep ONG OC Diversion of village road - 3km

Dec-16 WCL

6 WCL Ukni Deep FUT OC Arterial road diversion Mar-17 WCL

7 WCL Niljai Expansion (Deep) FUT OC Diversion of Arterial road (8 KM)

Mar-17 WCL

8 WCL Gokul ONG OC 2 no. village roads Mar-17 WCL, MH State

9 WCL Mungoli Nirguda Deep Extn. OC

FUT OC Diversion of Arterial road (4.5 KM)

Sep-17 WCL

10 WCL Amalgamated Gondegaon -Ghatrohan.

ONG OC Diversion of 2.5 KM road Mar-18 WCL

11 ECL Itapara OC FUT OC(H) Amdiha -Domhani Road need to be diverted

Dec-18 ECL, WB GOVT.

Page 77: cover page of Booklet

62�

PROJECTS-POWERLINE CONSTRUCTION SL SUB PROJECT GRP TYPE Issue Timeline Responsibility 1 WCL Bhanegaon ONG OC Diversion of 2 Nos. 11 KV Power

lines Jan-15 WCL/

MSEDCL2 WCL Jamuniya FUT UG Award of work Mar-15 WCL 3 WCL Gokul ONG Establishing Temp power supply Mar-15 WCL, MH State 4 ECL Kumardihi B CM ONG UG Construction of HT Line Mar-15 ECL, WBPDCL 5 WCL Umrer Expansion (Amb

River Phase - IV) ONG OC 33 KV power ine diversion Jun-15 WCL

6 WCL Combined (Pauni II+ Pauni III)

FUT OC High tension 66KV & 11 KV line commissioning

Jul-15 WCL/MH State

7 WCL New Majri UG to OC FUT OC Commissioning of 66KV & 11 KV Power line

Jul-15 WCL, MH State

8 WCL Bhatadih Expn. ONG OC 220 KV HT power line diversion Aug-15 MSETCL 9 WCL Gokul ONG Commissioning of 33KV/ 11KV

power supply. Already applied for connection

Aug-15 WCL, MH State

10 ECL New Kenda ONG OC(H) Diversition of OH Power Line Sep-15 ECL, WBPDCL 11 WCL Yekona -I & II

AmalgamateONG OC Commissioning 33 KV power

line, Nov-15 WCL, MH State

12 WCL Hindustan Lalpeth Expn FUT OC High tension 11 KV line commissioning

Dec-15 WCL, MH State

13 WCL Chincholi FUT OC High tension 66KV & 11 KV line commissioning-

Mar-16 WCL, MH State

14 WCL Penganga ONG OC Commissioning of 33KV/2MVA power line. Application submitted. Estimate to be submitted by MSTCL. Temporary arrangement from Mungoli.

Mar-16 WCL, MSETCL

15 WCL Penganga ONG Diversion of 11KV Power line , Design by CDO Nasik by Dec-14

Mar-16 WCL, MSETCL, MH State

16 WCL Dinesh OC ONG OC Commissioning of 11 KV power line

Mar-16 WCL, MHState

17 WCL Ghonsa RPR ONG OC Diversion of 11 KV power line Dec-16 WCL 18 WCL Dhuptala (Sasti UG to

OC)FUT OC HT line Dec-16 WCL, MH State

19 WCL Tawa -III FUT UG Power line 11 KV Jan-17 WCL 20 ECL North Searsole OC FUT OC(H) 2 No of Power line 132 KV and

6.6 KV -two nos need to be diverted

Mar-17 WBSEB &ECL

21 WCL Niljai Expansion (Deep) FUT OC 11 KV HT line diversion Mar-17 WCL, State 22 WCL Gokul ONG OC Diversion of 11 KV power line Mar-17 WCL, MH State 23 WCL Kolar pimpri Extn. ONG OC Diversion of 11 KV power line Dec-17 WCL, MH State 24 WCL Amalgamated

Gondegaon -Ghatrohan. ONG OC Diversion of 33 KV Power lines Mar-18 WCL/

MSEDCL

Page 78: cover page of Booklet

63�

PROJECTS - HEMM/ HOE/ P&M SL SUB PROJECT GRP TYPE Issue Timeline Responsibility 1 WCL Bhanegaon ONG OC Commissioning of Hired equipment

within possessed land Jan-15 WCL

2 WCL Penganga ONG OC Award of HOE contract Feb-15 WCL 3 WCL Ghonsa RPR ONG OC Award of HOE Mar-15 WCL 4 WCL Gokul ONG OC Preparation, approval , award of

tender & Commissioning May-15 WCL

5 WCL Dinesh OC ONG OC commissioning of HOE Jul-15 WCL 6 WCL New Majri UG to OC FUT OC Award of HoE Contract Aug-15 WCL 7 ECL Jhanjra Low height CM FUT UG Finalizaion & award of contract for

CMAug-15 ECL, CMPDIL,

8 ECL Khottadih CM ONG UG Finalization and award of Contract for CM

Sep-15 ECL

9 WCL Singori ONG OC Award of HOE work Oct-15 WCL 10 WCL Sasti Expn. ONG OC Award of HOE contract Oct-15 WCL 11 WCL Yekona -I & II Amalgamate ONG OC Commissioning of HOE Nov-15 WCL 13 SECL VIJAY WEST (0.50 MTY) ONG UG Commissioning of CM Package Dec-15 SECL 12 WCL Dhau North FUT UG Approval of estimate for composite

drivage and CM Dec-15 WCL

14 WCL Combined (Pauni II+ Pauni III) FUT OC Award of HOE Jan-16 WCL 15 WCL Kolar pimpri Extn. ONG OC Award of HOE Jan-16 WCL 16 WCL Umrer Expansion (Amb River

Phase - IV) ONG OC Award HOE Jan-16 WCL

17 WCL Hindustan Lalpeth Expn FUT Award of HOE Jan-16 WCL 18 WCL Kamptee Deep FUT Award of HOE Jan-16 WCL 19 WCL Chincholi FUT OC Award of HOE Feb-16 WCL 20 WCL Dhuptala (Sasti UG to OC) FUT OC Award of HOE Feb-16 WCL 22 NCL Bina-Kakri Amalg. FUT OC Outsourcing contract Mar-16 NCL 21 WCL Amalgamated Gondegaon -

Ghatrohan. ONG Award of HOE Mar-16 WCL

23 ECL Kumardihi B CM ONG UG Finalization & award of Contract for CM

Mar-16 ECL, CMPDIL

24 WCL Mungoli Nirguda Deep Extn. OC FUT OC Hiring of Eqp - Award Aug-16 WCL 25 ECL Tilaboni FUT UG Finalization and award of Contract

for CM Sep-16 ECL

26 SECL GEVRA EXPN (35.00 MT) ONG OC Commissioning of Additional HEMM

Sep-16 CIL, SECL

27 WCL Penganga ONG Dragline shfting from Ghugus Oct-16 WCL 28 NCL Jayant Expn FUT OC Outsourcing contract Dec-16 NCL 29 WCL Padmapur Deep Extention FUT Award of HOE Jan-17 WCL 30 WCL Niljai Expansion (Deep) FUT Award of HOE Feb-17 WCL 34 SECL KHAIRAHA (0.585 MTY) ONG UG Preparation & approval of Scheme

for deployment of CM Mar-17 SECL

31 WCL Amalgamated Gondegaon -Ghatrohan.

ONG OC Replacement of Gondegaon HEMM Mar-17 WCL

32 WCL Kamptee Deep FUT OC Replacement of Eqp. Mar-17 WCL 33 WCL Penganga ONG Procurement of

6 cum excavator – 2 60 T dumper – 8 160mm drill –1 410 HP dozer

Mar-17 WCL

35 SECL KUSMUNDA EXPN (15-50 MTY)

ONG OC Procurement & Commissioning of additional HEMM

Mar-17 CIL,SECL

36 NCL Dudhichua Expn FUT OC Outsourcing contract Apr-17 NCL 37 WCL Inder UG to OC ONG OC Award of HOE Apr-17 WCL 39 NCL Jhingurdah Bttom FUT OC Tender for MDO May-17 NCL 38 WCL Sharda FUT UG Major P&M procurement May-17 WCL 40 NCL Block-B Expn FUT OC Outsourcing contract Sep-17 NCL 41 NCL Semaria FUT OC Outsourcing contract Sep-17 NCL 42 WCL Mungoli Nirguda Deep Extn. OC FUT OC Shifting & Rehab of Ghugus

DraglineDec-17 WCL

45 NCL Dudhichua Expn FUT OC Procurement of Equip Mar-18 46 NCL Jayant Expn FUT OC Procurement of Equip Mar-18 NCL 47 NCL Bina-Kakri Amalg. FUT OC Procurement of Equip Mar-18 NCL 48 NCL Dongrital FUT UG Procurement of Equip Mar-18 NCL

Page 79: cover page of Booklet

64�

PROJECTS - HEMM/ HOE/ P&M SL SUB PROJECT GRP TYPE Issue Timeline Responsibility 60 SECL REHAR COM UG Preparation & approval of Scheme

for deployment of CM Mar-18 CMPDIL,SECL

61 SECL SHIVANI COM UG Preparation & approval of Scheme for deployment of CM

Mar-18 CMPDIL,SECL

43 WCL Jamuniya FUT UG Hiring of 2 nos. CM Mar-18 WCL 44 WCL Hindustan Lalpeth Expn FUT OC Replacement of Eqp. Mar-18 WCL 49 WCL Ukni Deep FUT OC Replacement of ukni equipement Mar-18 WCL 50 WCL Padmapur Deep Extention FUT OC Replacement of Eqp. Mar-18 WCL 51 WCL Dhau North FUT Major P&M procurement Mar-18 WCL 52 WCL Dhuptala (Sasti UG to OC) FUT HEMM Procurement: 1 shovel, 1

dozer, 4 dumper, 1 drill Mar-18 WCL

53 NCL Khadia Expn ONG OC Procure 2 no 24 CuM Dragline Sep-18 NCL/CIL 54 NCL Block-B Expn FUT OC Procurement of Equip Mar-19 NCL 55 NCL Semaria FUT OC Procurement of Equip Mar-19 NCL 56 NCL Patpahari FUT UG/OC Procurement of Equip/ HoE Mar-19 NCL 57 NCL Marki-Barka (W) FUT UG Procurement of Equipment Mar-19 NCL 58 NCL Marki-Barka (E) FUT UG/OC Procurement of Equip/ HoE Mar-19 NCL 59 WCL Niljai Expansion (Deep) FUT OC Replacement of Niljai HEMM Mar-19 WCL 62 SECL GEVRA EXPN (35.00 MT-50

MTY) FUT OC Under assessment

63 SECL GAYATRI COM UG Preparation & approval of Scheme for deployment of CM

CMPDIL/SECL

Page 80: cover page of Booklet

65�

PROJECTS-INCLINE DRIVAGE

SL SUB PROJECT GRP TYPE Issue Timeline Responsibility

1 WCL Jamuniya FUT UG Tendering & Award of work Mar-15 WCL

2 ECL Kumardihi B CM ONG UG Drivage of Incline Dec-15 ECL

3 ECL Tilaboni FUT UG Drivage of Incline Dec-15 ECL

4 WCL Dhau North FUT UG Incline drivage Mar-17 WCL

5 WCL Sharda FUT UG Completion of work for for 2 inclines & 1 Airshaft

May-17 WCL

6 NCL Dongrital FUT UG Drivage of Incline Sep-17 NCL

7 WCL Waghoda ONG UG 1. Drivage of Incline 2 nos Xsec- 4.8 x 3.00 Length 590 m each, Air Shaft – 4.5 m Dia, Depth

120m

Dec-17 WCL

8 WCL Tawa -III FUT UG 1.. Drivaage of Incline – , Length – 806 m

2. Drivaage of Incline – , Length – 798 m,

Jan-18 WCL

9 WCL Tawa - II COM UG 1. Drivage of Down Cast Air shaft Dia 4.5 m and Depth 70m

2. Provison of Man Riding System

3. Drivage of Reverse Drifts from LWS to Bagdona Seam

length 111m

Mar-18 WCL

Page 81: cover page of Booklet

66�

PROJECTS-FSA/CSA

SL SUB PROJECT GRP TYPE Issue Timeline Responsibility

1 WCL Ukni Deep FUT OC Amendment in CSA with SWPCL & CSA with NTPC

Feb-15 SWPCL/NTPC/WCL

2 WCL New Majri Sector IA & II A Extn.

FUT OC Finalization of FSA with NTPC & VIPL

Mar-15 NTPC/VIPL / WCL

3 WCL Junad Extn. ONG OC Amendment in FSA for revised base price

Mar-15 Mahagenco/WCL

4 WCL Bellora/ Naigaon Deep FUT OC Amendment of FSA for revised base price

Mar-15 M/S SWPCL/WCL

5 WCL Chincholi FUT OC Cost plus FSA Mar-15 Mahagenco/WCL

6 WCL Durgapur RCE (Incl. Expn.) & Motaghat Scheme

COM OC CSA for sec-V PH -II after approval of MOC

Mar-15 MOC

7 WCL Gauri Deep ONG OC Finalization of cost plus FSA for balance quantity

Mar-15 NTPC/Ultatech/WCL

8 WCL Durgapur Expn. Deep ONG OC Amendment of FSA with revised base price

Aug-15 Mahagenco/WCL

9 WCL Bhatadih Expn. ONG OC Amendment of FSA with revised base price

Aug-15 Mahagenco/WCL

10 WCL New Majri UG to OC FUT OC Finalization of FSA with Mahagenco

Dec-15 MAHAGENCO / WCL/ State Govt

11 WCL Kolgaon RPR COM OC CSA to be revised for discount clause.

Dec-15 WCL/Mahagenco

Page 82: cover page of Booklet

67�

PROJECTS-OTHER ISSUES

SL SUB PROJECT GRP TYPE Issue Timeline Responsibility

1 BCCL DBOCP EX U/G Construction of Dahibari NLW Washery

Aug-15 BCCL

2 BCCL DBOCP EX D/OC Construction of Dahibari NLW Washery

Aug-15 BCCL

3 BCCL DBOCP EX H/OC Construction of Dahibari NLW Washery

Aug-15 BCCL

4 CCL Amrapali OC ONG OC Amrapali Balumath Road Dec-15 CCL, State, NHAI

5 CCL Magadh OC ONG OC Amrapali Balumath Road Dec-15 CCL, State, NHAI

6 WCL Umrer Expansion (Amb River Phase - IV)

ONG OC Construction of 2 High level bridges

Jan-16 WCL

7 ECL North Searsole OC FUT OC(H) Diversion of IOC Pipe line by March 2016.

Mar-16 IOC, ECL

8 NCL Khadia Expn ONG OC Box Cut in East Section Jun-16 NCL

9 WCL Mungoli Nirguda Deep Extn. OC

FUT OC Diversion of Water pipeline Sep-17 WCL

10 CCL Amrapali OC ONG NKSTPS fully commissioned by dec-2017 so as to take 8 Mt coal by 2018-19

Mar-18 NTPC

11 MCL Siarmal OCP ONG Embankment over Basundhara river Mar-18 MCL

12 NCL Dudhichua Expn FUT OC Construction of facilities Mar-18

13 NCL Patpahari FUT UG/OC Drivage of Entries/Box cut Dec-18 NCL

14 NCL Marki-Barka (W) FUT UG Drivage of Entries Dec-18 NCL

15 NCL Marki-Barka (E) FUT UG/OC Drivage of Entries Dec-18 NCL

16 CCL Jarangdih OC COM OC OB Dump rehandling CCL

17 SECL SHARDA HIGHWALL COM UG Commisssioning of second Highwall

SECL

Page 83: cover page of Booklet

68�

Technological Plan for attaining 1 Bt of coal production in CIL by 2019-20

An exercise has been carried out to prepare a roadmap for achieving a production level of 1 Bt coal by the year 2019-20 from CIL sources. Production Subsidiaries identified the potential units/projects to achieve the desired goal. So far, mines/projects to produce about 908 Mt in 2019-20 has been identified and for balance to reach 1 Bt is underway.

One day workshop was arranged at Delhi in respect to various technological issues for achieving a production level of 1 Bt coal by the year 2019-20 from CIL sources in which MoC, CIL & its Subsidiaries and equipment manufacturers participated.

The following technological issues recommended in the workshop:

� Use of Surface Miners, wherever feasible

� Use of Ripper especially near habitation & near to sensitive structures.

� Feasibility of OB disposal through belt after sizing viz. through surface miner/crusher

� Transport of coal through tube conveyors

� Enhanced use of High-wall Miners

� Feasibility of High speed stowing/ void filling technology

� Feasibility of high speed drivage of incline/ shaft sinking

� Consignment spares stocks of OEM in each subsidiary HQ

� Review of terms & conditions as per International standards, transparent & fare, beneficial to both parties

� Reintroduce technical merit rating system with adjusted bid price mechanism

� Introduction of 'Cost Cap" for spare parts

� Distribution of orders between L1 & L2

Year-wise, tentative deployment of various equipments both for opencast & underground mines projected by Subsidiaries have been enclosed.

Page 84: cover page of Booklet

69�

Equipment Procurement Plan

Company: Eastern Coalfields Limited

Opencast:

Equipment Tentative Requirement (Numbers Total

15-16 16-17 17-18 18-19 19-20

Rope Shovel 10-20 cum 2 3 5

Rope Shovel 5-10 cum 2 4 1 1 8

Hyd Shovel 10-20 cum 3 3

Hyd Shovel 5-10 cum 2 2

Hyd Shovel less than 5 cum 8 3 3 3 3 20

Dumper 120-190 T 18 18

Dumper 100-120 T 4 3 8 3 5 23

Dumper 60 - 120 T 7 4 5 16

Dumper less than 60 T 14 13 21 3 37 88

Drill 250 mm or less 10 3 3 1 4 21

Drill 250 mm or more 1 2 3

Dozer 320 Hp or less 4 8 5 3 20

Dozer 320-460 Hp 5 4 1 6 16

Underground:

Equipment Tentative Requirement (Numbers)

15-16 16-17 17-18 18-19 19-20

PSLW for 2.5 m seam height or less 1

PSLW for more than 2.5 m seam height 1

Continuous Miner for 2.5 m seam height or less 2 1

Continuous Miner for more than 2.5 m seam height 1 2

SDLs for 2.5 m seam height or less 3 2 8 2

SDLs for more than 2.5 m seam height 22 91 21 26

LHDs for more than 2.5 m seam height (1.5 cu.m.) 15

LHDs for more than 2.5 m seam height (3.0 cu.m.) 2 2 1 2

Page 85: cover page of Booklet

70�

Company: Bharat Cocking Coal Limited

Opencast:

Equipment Size/Capacity Tentative Requirement (Numbers) Total

15-16 16-17 17-18 18-19 19-20

Shovel

10 cum, Electric Rope 1 1 0 0 0 2

5 cum, Electric Rope 3 1 1 3 7 15

> 5 cum, Hydraulic 5 0 0 0 4 9

>2.2 to 5 cum (Hyd.) 9 13 3 2 9 36

1.2 to 2.2 cum (Hyd.) 1 0 1 2 2 6

Dumper 85/100 T 2 6 6 13 7 34

60 T 18 25 19 4 71 137

Dozer 410 Hp 14 14 8 4 11 51

Drill160 mm 12 12 10 9 6 49

250 mm 2 0 0 2 1 5

Underground:

Equipment Tentative Requirement (Numbers)

15-16 16-17 17-18 18-19 19-20

PSLW for more than 2.5 m seam height

1 2

Continuous Miner for 2.5 m seam height or less

1

Continuous Miner for more than 2.5 m seam height

1

Page 86: cover page of Booklet

71�

Company: Central Coalfields Limited

Opencast:

Equipment Size/Capacity Tentative Requirement (Numbers)

14-15 15-16 16-17 17-18 18-19 19-20

Shovel

10 M3 2 3 1 1

4-6 M3 12 4 1 2 3 6

< 4 M3 13 9 3 6

Dumper 100 T 19 25 14 6 5 5

60 T 63 67 62 12 15 49

Dozer 410 Hp 7 11 15 6 7

320 Hp 25 12 21 9 10 6

Drill 160 mm 26 15 5 7 4

Company: Northern Coalfields Limited

Opencast:

HEMM 15-16 16-17 17-18 18-19 19-20 Total

Add Repl Add Repl Add Repl Add Repl Add Repl

Dragline

24 cum 2 3 5

Shovel

10 cum 18 2 2 2 2 26

20 cum 6 3 2 4 3 18

Dumper

100 T 28 39 10 8 14 16 17 5 137

190 T 30 54 8 5 3 100

Page 87: cover page of Booklet

72�

Company: Western Coalfields Limited

Opencast:HEMM to be procured against replacement

Equipment Capacity Year-wise Tentative Procurement (Nos) Total

14-15 15-16 16-17 17-18 18-19

Shovel Hydraulic 4.3/5.5 Cu.mt 9 18 10 7 7 51

Shovel Hydraulic Less than 2.5 cu.mt 3 3 3 2 3 14

Dumper 60 Ton 45 60 45 40 45 235

Dozer, Crawler 410 Hp 0 0 1 1 1 3

Dozer, Crawler 320 Hp 0 20 18 18 14 70

Wheel Dozer 460 Hp 0 1 0 1 0 2

RBH Drill 250 mm 0 0 1 0 1 2

RBH Drill 160 mm 7 6 9 6 8 36

Grader 280 Hp 4 0 3 3 3 13

Crane 30-40 Ton 1 2 1 1 2 7

Total 69 110 91 79 84 433

HEMM required for new projects (Dept.)

Equipment Capacity Year-wise Tentative Procurement (Nos) Total

16-17 17-18 18-19

Shovel Hydraulic 5-6 cu. mt 2 1 0 3

Shovel Hydraulic 4.3/5.5 cu. mt 1 1 1 3

Dumper 60 ton 15 21 11 47

Dozer 410 hp 1 1 0 2

Dozer 320 hp 3 4 4 11

RBH Drill 160 mm 2 5 3 10

Total 24 33 19 76

Page 88: cover page of Booklet

73�

Underground:

Machine 15-16 16-17 17-18 18-19 19-20 Total

SDLs ( 1.0 cum) 20 17 21 10 68

LHDs (1.5 cu.m.) 17 7 20 20 30 94

UDMs 5 4 5 4 8 26

Company: South Eastern Coalfields Limited

Opencast

Equipment 15-16 16-17 17-18 18-19 19-20 Total

Surface Miner 2200-3800 mm 5 1 2 1 1 10

Surface Miner 4200 mm 0 0 5 2 2 9

Rope Shovel more than 20 cum 4 1 2 3 4 14

Rope Shovel 10-20 cum 5 0 5 0 1 11

Hyd Shovel 5-10 cum 0 0 1 1 0 2

Hyd Shovel less than 5 cum 0 0 1 0 0 1

FE Loader 10-20 cum 11 2 13 5 5 36

Dumper more than 190 T 18 10 68 20 84 200

Dumper 120-190 T 0 0 26 1 15 42

Dumper 100-120 T 59 13 31 3 1 107

Dumper 60-100 T 14 26 165 33 69 307

Dumper less than 60 T 0 0 3 0 0 3

Drill 250 mm or less 0 0 1 0 0 1

Drill 250 mm or more 6 2 11 4 8 31

Dozer 320 Hp or less 0 0 1 1 1 3

Dozer 320 -460 Hp 1 3 14 3 2 23

Dozer more than 460 Hp 16 1 4 3 5 29

Page 89: cover page of Booklet

74�

Underground

Equipment 15-16 16-17 17-18 18-19 19-20 Total

Continuous Miner for 2.5 m seam height or less

2 2 4

Continuous Miner for more than 2.5 m seam height

2 3 1 1 7

Sharda Highwall 1 1

Batura Highwall 1 1

Company: Mahanadi Coalfields Limited

Additional Shovel required to achieve 250 Mty by 2019-20

Capacity 15-16 16-17 17-18 18-19 19-20 Total

34 cum 2 1 3

20-22 cum 1 4 2 4 11

9-10 cum 7 27 35 5 4 78

5- 6.5 cum 3 6 8 17

2.5 - 4.3 cum 4 2 6

Grand Total 115

Replacement of Shovel

Capacity Existing 14-15 15-16 16-17 17-18 18-19 19-20 Total

10 cum 12

4.5 - 6.5 cum 40 2 2 4

2.5 - 4.3 cum 37 2 4 5 2 1 14

Page 90: cover page of Booklet

75�

Additional Dumper required to achieve 250 Mty by 2019-20

Capacity 15-16 16-17 17-18 18-19 19-20 Total

35 T 7 8 31 46

50/60 T 48 108 136 295

85 - 100 T 63 229 328 55 53 728

190 T 6 36 20 52 114

240 T 20 20 40

Total 1223

Replacement of Dumper

Capacity Existing 14-15 15-16 16-17 17-18 18-19 19-20 Total

50/60 T 284 34 31 66 17 10 158

Additional Dozer required to achieve 250 Mty by 2019-20

Capacity 15-16 16-17 17-18 18-19 19-20 Total

770 -850 Hp (with Ripper attachment)

4 17 9 5 3 38

410 Hp 15 25 41 9 9 99

Replacement of Dozer

Capacity Existing 14-15 15-16 16-17 17-18 18-19 19-20 Total

410 Hp 75 9 20 1 16 2 48

320 Hp 31 1 5 1 7

Page 91: cover page of Booklet

76�

Additional Drill required to achieve 250 Mty by 2019-20

Capacity 15-16 16-17 17-18 18-19 19-20 Total

250 mm 8 31 46 9 8 102

150 - 160 mm 12 26 30 4 5 77

Replacement of Drill

Capacity Existing 14-15 15-16 16-17 17-18 18-19 19-20 Total

250 mm 34 1 4 1 6

160 mm 55 7 6 1 3 2 19

Additional Surface Miner required to achieve 250 Mty by 2019-20

Capacity 15-16 16-17 17-18 18-19 19-20 Total

3000 - 3800 mm 3 8 14 3 4 32

Additional Loading Machine (Pay Loader) required to achieve 250 Mty by 19-20

Capacity 15-16 16-17 17-18 18-19 19-20 Total

> 5 cum 5 11 13 29

>10 cum 1 4 3 4 12

Replacement of Loading Machine (Pay Loader)

Capacity Existing 14-15 15-16 16-17 17-18 18-19 19-20 Total

> 5 cum 10 4 1 5

Page 92: cover page of Booklet

77�

Additional Equipment required for UG upto 2019-20

Equipment Capacity Nos Existing Replacement

Continuous Miner 1.4 to 4.6 M 2

SDL 1 cum 9 18 18

Low Height SDL 0.8 cum 6

Low Height SDL 1 cum 3

LHD 1.2 cum 2 29 20

LHD 2.7 cum 4

Roof Bolter Quad bolter 2

Shuttle Car 15 Te 6

Conveyor Belt Conveyor 11800 m

Roof Bolter 15