    1 - What is a PROJECT ?

    Philippe Reed

  • 8/13/2019 Cours Project Management

    2/59

    Introduction: What is a Project ?

    In simple terms it is a group of people (Team) executing

    multiple tasks within an established time frame in order to

    achieve specific objectives. Having said that we can assume that if we are capable of

    bringing together:

    A Team to work on multiple Tasks within an established

    Time frame in order to achieve specific Objectives:

    We can consider ourselves as Project Managers

  • 8/13/2019 Cours Project Management

    3/59

    Working within a Team environment is a Skill.

    In the first stages of Project Management you will have to beable to integrate within a team.

    This means you will bepart of a team not lead a team.

    Getting the right people for the right tasks is essential:

    Getting people to work in a coordinated / Harmonious manoris essential.

    One of the most difficult things in business is moving people.

    Team Management & leadership approach is essential.

  • 8/13/2019 Cours Project Management

    4/59

    The W.W.W.W.H. concept is applied.

    The Taskis associated with a project step / phase, person,function & responsibility.

    For proper Task Management you need to be the specialist.

    Identify the tools you need to execute your Tasks.

    Identify the in line / main line functions & the sub projectfunctions in order to assure overallproject performance.

    Interpersonal skills are essential for proper communication /

    negotiation to assure your Tasks get completed & on time.

  • 8/13/2019 Cours Project Management

    5/59

    Be very clear & specific about the Results (Multiple).

    Develop apositive results balance: Market , Financial ,Productfor example.

    Develop & obtain a common motivation with the team players

    Managing theproject scope is an essential part of + Results.

    100% project involvement with the key players.

    Identify & manage potential Risks

    Project results are managed throughout the project cycle and

    not at the project end.

  • 8/13/2019 Cours Project Management

    6/59

    The project scope is linked to a specific time frame.

    Project check points must be respected to assure propertransition towards the next steps or phase.

    A linear progressive approach is applied to each project step.

    Certain project steps are however are overlapping.

    The concept of time is influence by culture and particularlyimportant within multicultural working environments.

    The one single most repeated mistake in Project Management

    isbeing late.

  • 8/13/2019 Cours Project Management

    7/59

    2 Fast Moving Consumer Goodso

    Philippe Reed

  • 8/13/2019 Cours Project Management

    8/59

    The F.M.C.G. sector will be one of our focus points along with specialized S.M.E. companies. In other words our Project Managementapproach will be orientated with this type of activity. Some specific industry examples with the F.M.C.G.s sector are:

    - Toy products

    - House hold products

    - Fashion / Leisure Products

    - Entertainment Products

    - Sport products

    - School products

    - Craft products

    - Cosmetic Products

    -These types of products are often associated with a short retail shelf life ex: 1 to 30 days

    -These types of products are often associated with a low to mid price point ex: 24.99 129.99

    -These types of products are often considered as No think products ex: I like it ! I buy it !

    -Sector: Is the F.M.C.G.s The global business outlook

    -Industry: is the economic model (the specific product or expertise) of the business sector. Such as:

    -- The apparel industry

    -- The sports industry

    -- The toy industry

  • 8/13/2019 Cours Project Management

    9/59

  • 8/13/2019 Cours Project Management

    10/59

    Fast

    Moving

    Consumer

    Goods B to C

    The product development cycle

    The retail shelf life

    Retail / e-commerce / Direct / B to C

    The finished product

  • 8/13/2019 Cours Project Management

    11/59

    3 Project Preparation & Launch

    Philippe Reed

  • 8/13/2019 Cours Project Management

    12/59

    Overview:

    Within the project LAUNCH notion it is absolutely necessary to have a total understanding of what our

    overall objectives are. Some points to consider are:

    -Is this aNew, Ongoing, Innovative type of project.

    -How are we financing the project.

    -Project Time frames.

    -The structure,

    -The organization

    -The size of the project

    -Outside consulting services required

    -The location

    -Is their an established project manager

  • 8/13/2019 Cours Project Management

    13/59

    P.D.C.A.

    Plan: What we want to do and the overall project objectives. (Mission Statement)

    Do: The project implementation (step by step approach)

    Check: Control and evaluate progress (Check points)

    Act: Corrective required actions (modifications, cycle, steps)

  • 8/13/2019 Cours Project Management

    14/59

    The golden triangle takes into consideration different parameters such as the:

    Project Scope

    Costs

    Time Frames

    Risks

    All within a balanced working environment around our project resources:

    Our Team

    Systems

    Equipment

    See AVA

  • 8/13/2019 Cours Project Management

    15/59

    Specialized Activities ex:

    Freelance Market analysis. This would be an outside marketing expert having a specific mission to study

    bench mark product in a specific country, segment and product category.

    Develop the context:

    Sub Project Activities ex:

    Special events management to assure maximum awareness at a specific trade show.

    Develop the context:

  • 8/13/2019 Cours Project Management

    16/59

    The Project Scope is a term used over and over again and throughout the project.

    As a starting point we could say the scope develops the nature of the project. This the project layout and

    should be supported by a visual. (V.T.T.).

    - It defines what a project does and does not do.

    - The project scope should be supported with a project matrix.

    - The scope identifies special services and required expertise (in-house or freelance).

    - The different steps within the project need to be prioritized.

    - We need to agree on how we are going to evaluate the project performance.

    - Adapt the W.W.W.W. H. concept

  • 8/13/2019 Cours Project Management

    17/59

    See Agreeement & Go Ahead process

  • 8/13/2019 Cours Project Management

    18/59

  • 8/13/2019 Cours Project Management

    19/59

    4 Team Building

    Philippe Reed

  • 8/13/2019 Cours Project Management

    20/59

    Overview:Team building and leadership programs go hand in hand. Getting the right people in place which

    means getting your people operational is crucial to project management. Individual skills and

    expertise should be maximized (the right person in the right place) to assure effective project

    execution.

    In building your team there are several different factors which should be considered such as:

    -Build a project team platform. (the 5 line management functions) which is the:

    -Work Breakdown Structure (W.B.S.)

    -Develop global understanding through out the team. (the W.W.W.W.H. concept).

    -Develop a common motivation throughout the team and its functions. (agreement process)

  • 8/13/2019 Cours Project Management

    21/59

    For successful Team Building the project manager should pay particular attention to the following pointsand adapt the appropriate method for the betterment of the overall project.

    -Communication: With and towards each team player on the project scope, different roles, functions and

    responsibilities.

    -Culture: Take into consideration different cultures especially within an multi cultural working

    environment.

    -Adaptability: The project manager should be flexible at all time throughout the product and will be

    required to adapt certain approaches based on individual needs.

    -Goals: Identify and highlight the overall and individual goals to be obtain throughout the project.

    -Harmony: Generate an overall harmonious working environment.

    -Motivation: Assure that each player has a motivating role within the project.

    -Common Business interest: generate a common business interest throughout the team to assure a strong

    team spirit.

    -Support: Assure each team player that you provide total support and reinforce the need for individualsupport with other team players.

  • 8/13/2019 Cours Project Management

    22/59

    To conclude on Team Building and a leadership approach:

    Project management is about systems, methods, approach, objectives, goals, profit etc. but for me its really

    about people.

    To assure your Team is working in a balanced, harmonious, motivated way you need to show and

    administer:

    Full Commitment

    Show AVA: Building the project team

  • 8/13/2019 Cours Project Management

    23/59

    Market Product Finance Structure Communication

    Distribution Logistics Added Values ResultsFuture BusinessOpportunities

    Location

    Women

    Age 20 - 55

    InnovationDesign

    Preppy

    Sportswear

    Equipment

    Office

    Events

    Internet

    Magazine

    Direct

    InternetRetail stores

    Chain Stores

    RisksDelays

    Costs

    BrandCustomers

    Expansion

    ProfitNew customer

    Market share

    New CollectionsNew Markets

    Co-Brandingns

    Budget

    Return on

    Investment

    The Operational Management

    Tool

  • 8/13/2019 Cours Project Management

    24/59

    Market Product FinanceReference

    Building

    Communication

    Distribution Logistics Added Value ResultsFuture BusinessOpportunities

    Location

    Women

    Age 20 - 55

    InnovationDesign

    Preppy

    Sportswear

    Ambassadors

    Events

    Internet

    Magazines

    InternetDepartment

    stores

    RL Stores

    Riskmanagement

    Team

    management

    For BrandFor Customers

    ProfitNew

    customers

    Market shares

    New CollectionsNew Markets

    Accessories

    Co-Branding

    Kids Collections

    Budget

    Return on

    Investment

  • 8/13/2019 Cours Project Management

    25/59

    Innovation

    s

    ns

  • 8/13/2019 Cours Project Management

    26/59

  • 8/13/2019 Cours Project Management

    27/59

    5 Project Kick off

    Philippe Reed

  • 8/13/2019 Cours Project Management

    28/59

    The Kick off meeting or start-up meeting terminology could be a little deceiving as

    their has been a lot of work already completed. The Team is already established.

    What it usually indicates is that:

    the clock is turning. So from now on we need to stay on schedule.

    The principle back bone, corner stone, pillar (just expressions) of the kick off is

    the Project SCOPE.

    The kick off is not just one meeting it could be several meetings both individual and team

    meetings.- Get the key people together in the right environment at the right time.

    - Develop the individual steps / responsibilities and explain how they interface.

    - Develop the common motivation through a successful project.

    - Establish your self as the Project Manager.

  • 8/13/2019 Cours Project Management

    29/59

    Operational Planning: The Planning Process:Tasks: We are now have the established Team so we can assign, establish, appoint, confirm all project

    tasks. Again the implementation of the W.W.W.W.H. concept.

    Schedule: The schedule or overall timing of a project should could be a bottom up approach or

    top down approach. Explain:

    Each projectphase or step must have an associated step by step time frame.

    Budget: At this start-up stage a budget subject to check points throughout the project would be good

    practice. If you present an overall budget it must be supported by details such as:

    Internal expense

    External expense

    Equipment

    Salaries

    Travel & entertainment

    Special purchases

    Cash reserve

    Contingincy

  • 8/13/2019 Cours Project Management

    30/59

    Agreement & the go ahead process: Extra emphasis on the importance of this process.Agreement within project management is a principle action and project step necessary towards managing

    successful projects. Getting agreement is much more than a simple nod or OKfrom the boss.

    If we want to measure our state on agreement we could look at it like this: The Process

    Agreement Develops the Yes I agree lets do it notion This is not sufficient.

    Go Ahead Go Ahead shows involvement in the start-up or kick off in addition to Agreement

    Support Develops the notion of: Yes I agree, lets go ahead, I will support you with the project.

    Commitment Is a project managers best support. Having your boss & team in agreement and

    supplying the necessary support and commitment is an extraordinary Project Added Value.

    This is why we call it a Process

  • 8/13/2019 Cours Project Management

    31/59

    6 Project Implementation

    Philippe Reed

  • 8/13/2019 Cours Project Management

    32/59

    This is our building phase or Installation / Application Phase or W.I.P. Phase (Work in Progress)

    We can assume we have all the tools necessary to get to work. What that means is managing the

    project scope.

    One of the first things I suggest is to reinforce the Market Analysis step of the project.

    The market study (I will give a specific approach) has a scope in its self. Depending on the overall project

    time frame this could be a limited scope.

    I conceder the Market Analysis as the stepping stone towards building product.

    Some of the principle elements within the Market analysis are:

    - Bench Mark (Brands)

    - Bench Mark ( Products)

    - Segmentations

    - Price Points- Volumes

  • 8/13/2019 Cours Project Management

    33/59

    Dont Forget the Golden Triangle

    Systems

    Activity

    Team

    Everything must work

    in

    Harmony

  • 8/13/2019 Cours Project Management

    34/59

    Your Management StyleReview AVA management style in the implementation phase.

    Team and individual management style should be adapted to the project requirements not each individual.

    You can not satisfy all the people all the time

    If you try to adapt a personal individual management style during the project this is most likely to causeconfusion, disruption, and several sub project situations.

    Example: For your assignment I require a paper copy on the last day of class. If I accept that some of yousend me your assignment by e-mail then:

    -Others will want to do the same

    -Additional work for me

    -Risk of it getting misplaced

    -School requires a paper copy

    -You get penalized

    -Individual check points on a daily basis

    -Team meetings on a weekly basis

  • 8/13/2019 Cours Project Management

    35/59

    View A project Matrix / Lay out

  • 8/13/2019 Cours Project Management

    36/59

    Market to Market Approach

    Mission

    statement

    Market

    Analysis

    Platform

    Development

    Results

    F.B.O.

    L & D

    International Project Management Layout

    Analysis

    PhaseOperational Phase Results & F.B.O. Phase

    26 WEEKS

  • 8/13/2019 Cours Project Management

    37/59

    7 Project Results

    Philippe Reed

  • 8/13/2019 Cours Project Management

    38/59

    Overview:Project results are firstly developed in the start-up phase:

    in the Mission Statement (step 1) and

    confirmed in the Project Platform (step 3).

    What we have set out to achieve (our objectives)

    This process (Project Results) is not developed at the end of a project.

    This process should be started after check point 2.

    What we have achieved (our Results)

  • 8/13/2019 Cours Project Management

    39/59

    Project Results are built around our Project Added Values (our Story)

    This should be a balanced approach which includes the overall project elements in a progressive

    comprehensive manner.

  • 8/13/2019 Cours Project Management

    40/59

    Results focus points should be:

    Market developments

    Product developments

    Financial developments

    Organizational developments

    And finely set the path for Future Business Opportunities

    A successful Project Never Ends

  • 8/13/2019 Cours Project Management

    41/59

    8 Future Business Opportunities

    Philippe Reed

  • 8/13/2019 Cours Project Management

    42/59

    The Future Business Opportunities Approach is probably the most powerful of all within ProjectManagement. Successful projects should always lead toproject extensions or new projects.

    F.B.O. opens the doors for simply said future projects with an orientation towards:

    -New Markets

    -New Product

    -New Distribution

    -New Business Partners

    Ongoing project developments are at the heart of international business strategies.

    The approach and methods applied within successful project management programs are key towardsdynamic international growth.

    The F.B.O. Approach should be developed in collaboration and sequentially with your Project ResultsApproach

    A successful project never ends

  • 8/13/2019 Cours Project Management

    43/59

    9 Decision Making Support System

    Philippe Reed

  • 8/13/2019 Cours Project Management

    44/59

    TimeW W W W HMaybe

    Process Partnership Performance

  • 8/13/2019 Cours Project Management

    45/59

    The decision making process needs to be adapted to each individual as we mayhave different ideas and values. Some important guidelines however allow us

    to enhance this process towards our business and project objectives.

    This integrated approach is particularly effective within a dynamic project and

    management environment.

    Aprogressive approach towards getting people to make decisions relative to

    your business objectives is essential and proves to be effective.

    Often immediate and forced decisions are notmade in your favor or put off

    towards a non decision.

    Getting people to do what you want them to do some my say requires force or

    luck. This is not a management approach.

    A Concept, Approach and Method is part of a managerial system allowing you tomove people and move forward with your project.

  • 8/13/2019 Cours Project Management

    46/59

    Apply a step by step process towards assuring that your audience has acomprehensive and complete understanding of your presentation.

    Transmit first of all the Concept(What you want to do) to the key person beforethe key people The Team in a formatted appropriate language. This assures weare :

    On the same wave length

    We can enhance this approach towards full understanding through creating thenecessary context, environment and atmosphere.

    Develop A comfort Zone

    Step 1

  • 8/13/2019 Cours Project Management

    47/59

    This phase involves the transition from complete understanding of the overallsituation to taking action.

    The V.T.T. approach is particularly effective at this stage. This creates a force

    which links imagination to feel, perception and allows an individual self-

    awareness process to be developed and appreciated.

    The image in my mind

    At this stage we must reinforce the importance of deleating

    Sub Problems

    and concentrate on the business applications at hand.

    This W.I.P. approach should be focused within a specific time frame.

    Step 2

  • 8/13/2019 Cours Project Management

    48/59

    Working within a common business interest brought together through thePlatform and the key people generates a working environment whichestablishes reasoning and common business sense.

    This positions ourselves within a working expertise which generatesconfidence at a high level in order to make decisions towards our projectmanagement process and Future Business Opportunities .

    Once we have presented our objectives it is important to highlight the need fora decision on the matter at hand in order to move forward.

    Now, today, not tomorrow

    We have

    Understanding, confidence, agreement,

    We need

    The go Ahead

    You have the capacity to make repairable mistakes

    Step 3

  • 8/13/2019 Cours Project Management

    49/59

    10 Thoughts & Concepts

    Philippe Reed

  • 8/13/2019 Cours Project Management

    50/59

    The Thoughts and Concepts approach is designed to help assure that you master

    the necessary Project Management terms.

    To assist you in developing each term and concept in a comprehensive

    structured format.

    To be able to develop talk about Project Management in an intelligent

    manner

    To use (develop) the thoughts & concepts throughout your assignment & exam

  • 8/13/2019 Cours Project Management

    51/59

    W.W.W.W.H. This Concept is particularly effective and should be adapted when presenting new ideas or working

    methods. If you can answer the W.W.W.W.H. questions you have basically covered all of the pertinent

    aspects of your new working desires.

    In other words think through first:

    Who is going to do What, When, Where and How

  • 8/13/2019 Cours Project Management

    52/59

    The Scope:The scope is basically the size and content of the project at hand. It could be the total project Scope or the

    Scope of just one step within the project.

    For example if a marketing project (one step within the total project) consists of:

    - Bench marking

    - Product analysis

    - Volumes

    - Price Points

    -Technical Descriptions

    This would be the Scope of the marketing project (or step) which is actually a limited scope.

  • 8/13/2019 Cours Project Management

    53/59

    The P.P.P. Process, Partnership , PerformanceThe P.P.P. is an overall project management tool designed to develop harmonious team building and leadership

    programs.

    The Process aspect can be developed through the step by step approach and within the project Platform.

    The Partnership develops the relationship between the project key players and the line management functions.

    The performance is the result achieved from the overall project management process such as the Plarform

    development, team building and motivation approach.

  • 8/13/2019 Cours Project Management

    54/59

    The Check Point Process:The check point process basically come after each of the 3 progressive phases.

    The general objective is to check:

    1 : Are we on schedule

    2: Do we have the right people (team) in place

    3: Have we completed Steps 1, 2, 3 (Phase 1)

    4: Have we made the necessary decisions

    5: Do we have the required resources

    - 6: Can we move forward.

    - 7: Do we have agreement

    - 8: Do we have the go ahead

  • 8/13/2019 Cours Project Management

    55/59

    The Project CycleThe project cycle within the F.M.C.G.s sector is very fast. This means the ongoing product development along

    with the complete logistics of the business is Fast. 2 cycles per year.

    Fast

    Moving

    Consumer

    Goods

    The cycle of 26 weeks

    Retail to Consumer

    No Think Purchase

    Useable / Disposable Product

    Fast

  • 8/13/2019 Cours Project Management

    56/59

    Team Building & Leadership ApproachOnce we have established the team

    Team building and leadership within project management develops the essential motivations and project

    support required. This juxtaposed confidence building approach should build a balanced harmony within

    the key team players.

    - Confidence building through: Support & Understanding

    - Work with Team in their territory: Comfort zone

    - Common Business Interests: Motivation points,

    - Cross Cultural Applications: Working within a multi cultural environment

    - Time Management: compensation for on time project completion

    - You can not make all the people happy all the time

    - Team management: Bring me solutions not problems

    - Direct the Direction

  • 8/13/2019 Cours Project Management

    57/59

    Project Results & ObjectivesProject results or our objectives should be clearly defined. This is often a fall out step.

  • 8/13/2019 Cours Project Management

    58/59

    The 3 Progressive PhasesPhase 1: Audit / Analysis

    This is our learning and adapting phase which consists of developing our Mission statement, Market analysis

    and platform development process.

    Phase 2: Installation / Application also know as (W.I.P.)

    This is the operational Phase, the working phase of installing and applying the specific steps required to meet

    out project objectives. The building phase.

    Phase 3: Results and Future Business Opportunities

    This is the phase where we develop the ongoing project opportunities such as:

    New Market developments

    New product developmentsNew distribution outlets

  • 8/13/2019 Cours Project Management

    59/59

    Future Business Opportunities