County: Field: Well:...

37
Run 1 Run 2 Run @ @ @ @ @ @ Witnessed By Recorded By Location Unit Number Time Logger On Bottom Time Circulation Stopped Maximum Recorded Temperatures RMF @ MRT RM @ MRT RMC Source RMF RMC @ Measured Temperature RMF @ Measured Temperature RM @ Measured Temperature Source Of Sample PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date @ 402.00 ft 386.00 ft 402.00 ft above Perm. Datum QUAD NEW YORK @ @ @ @ @ DAN COLLINS TIM ZOTARA BRADFORD 3039 17:00 31-Aug-2011 68 degF 68 @ 5.617 68 @ 7.490 CALCULATED CALCULATED 77 degF @ 10.035 ohm.m 77 degF @ 5.017 ohm.m 77 degF @ 6.690 ohm.m MEASURED 9.3 lbm/gal FRESH WATER BASED MUD 12.250 in 602 ft 603 ft @ 13.375 in 602 ft 1482 ft 1500 ft 1528 ft 1 31-Aug-2011 Witnessed By Recorded By Location Unit Number Time Logger On Bottom Time Circulation Stopped Maximum Recorded Temperatures RMF @ MRT RM @ MRT RMC Source RMF RMC @ Measured Temperature RMF @ Measured Temperature RM @ Measured Temperature Source Of Sample PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date 402.00 ft D.F. 386.00 ft G.L. 402.00 ft K.B. KELLY BUSHING Drilling Measured From: above Perm. Datum 16.00 ft KELLY BUSHING Log Measured From: CLARKSTOWN Township Section Elev.: 386.00 ft GROUND LEVEL Permanent Datum: Elev.: 31-087-27016-00-00 API Serial No. County: Field: Location: Well: Company: ROCKLAND WILDCAT LAT: 41.1039 NYSTA TANDEM LOT 1 SANDIA TECHNOLOGIES, LLC LOCATION LAT: 41.1039 LONG: -74.027 4 ARM CALIPER LOG POWERED POSITIONING CALIPER - PPC NEW YORK ROCKLAND WILDCAT NYSTA TANDEM LOT 1 SANDIA TECHNOLOGIES, LLC State: County: Field: Well: Company:

Transcript of County: Field: Well:...

Page 1: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

Run 1

Run 2

Run 3@

@@

@ @ @ @

Witnessed B

yR

ecorded By

LocationU

nit Num

berT

ime

Logger On B

ottomT

ime

Circulation S

topped M

aximum

Recorded T

emperatures

RM

F @

MR

TR

M @

MR

TR

MC

Source R

MF

RM

C @

Measured T

emperature

RM

F @

Measured T

emperature

RM

@ M

easured Tem

peratureS

ource Of S

ample

PH

Fluid Loss

Viscosity

Density

MUD Type F

luid In Hole

Bit S

izeC

asing Schlum

bergerC

asing Driller S

ize @ D

epthT

op Log IntervalB

ottom Log Interval

Schlum

berger Depth

Depth D

rillerR

un Num

berLogging D

ate

@

402.00 ft

386.00 ft

402.00 ft

above Perm

. Datum

QU

AD

NE

W Y

OR

K

@

@ @ @ @

DA

N C

OLLIN

ST

IM Z

OT

AR

AB

RA

DF

OR

D3039

17:0031−

Aug−

2011

68 degF68

@5.617

68 @

7.490C

ALC

ULA

TE

DC

ALC

ULA

TE

D77 degF

@10.035 ohm

.m77 degF

@5.017 ohm

.m77 degF

@6.690 ohm

.mM

EA

SU

RE

D

9.3 lbm/gal

FR

ES

H W

AT

ER

BA

SE

D M

UD

12.250 in602 ft

603 ft@

13.375 in602 ft1482 ft1500 ft1528 ft1 31−

Aug−

2011

Witnessed B

yR

ecorded By

LocationU

nit Num

berT

ime

Logger On B

ottomT

ime

Circulation S

topped M

aximum

Recorded T

emperatures

RM

F @

MR

TR

M @

MR

TR

MC

Source R

MF

RM

C @

Measured T

emperature

RM

F @

Measured T

emperature

RM

@ M

easured Tem

peratureS

ource Of S

ample

PH

Fluid Loss

Viscosity

Density

MUD Type F

luid In Hole

Bit S

izeC

asing Schlum

bergerC

asing Driller S

ize @ D

epthT

op Log IntervalB

ottom Log Interval

Schlum

berger Depth

Depth D

rillerR

un Num

berLogging D

ate

402.00 ftD

.F.

386.00 ftG

.L.

402.00 ftK

.B.

KE

LLY B

US

HIN

GD

rilling Measured F

rom:

above Perm

. Datum

16.00 ftK

ELLY

BU

SH

ING

Log Measured F

rom:

CLA

RK

ST

OW

NT

ownship

Section

Elev.:

386.00 ftG

RO

UN

D LE

VE

LP

ermanent D

atum:

Elev.:

31−087−

27016−00−

00A

PI S

erial No.

County:

Field:

Location:

Well:

Company:

ROCKLAND

WILDCAT

LAT: 41.1039

NYSTA TANDEM LOT 1

SANDIA TECHNOLOGIES, LLC

LOCATION

LAT

: 41.1039

LON

G: −

74.027

4 AR

M C

ALIP

ER

LOG

PO

WE

RE

D P

OS

ITIO

NIN

G C

ALIP

ER

− P

PC

NE

W Y

OR

KR

OC

KLA

ND

WILD

CA

TN

YS

TA

TA

ND

EM

LOT

1

SA

ND

IA T

EC

HN

OLO

GIE

S, LLC

State:

County:

Field:

Well:

Com

pany:

Page 2: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

Depth Control Remarks

1. ALL SCHLUMBERGER DEPTH CONTROL POLICIES FOLLOWED2. IDW USED AS PRIMARY DEPTH DEVICE3. Z−CHART USED AS SECONDARY DEPTH DEVICE4. 5. 6.

Stretch Correction:Tool Zero Check At Surface: 0.50 FT

RUN4: MSCT RUN5: MDT RUN6: CBL/VDL−USITRUN1: PEX−AIT RUN2: CMR−ECS−HNGS RUN3: PPC−SSCAN−FMI

ALL WELLSITE DATA, PERMIT, MUD REPORT, SOP PROVIDED BY CLIENTTOOLS RUN AS PER TOOL SKETCH, W/BOWSPRING & STANDOFFS ON AIT

THANK YOU FOR CHOOSING SCHLUMBERGERREMARKS: RUN NUMBER 1 REMARKS: RUN NUMBER 2

CBL/VDL−USITOS5: OS5:MDT−MSCTOS4: OS4:PPC−SSCAN−FMIOS3: OS3:CMR−ECS−HNGSOS2: OS2:PEX−AITOS1: OS1:

OTHER SERVICES1 OTHER SERVICES2

DISCLAIMERTHE USE OF AND RELIANCE UPON THIS RECORDED−DATA BY THE HEREIN NAMED COMPANY (AND ANY OF ITSAFFILIATES, PARTNERS, REPRESENTATIVES, AGENTS, CONSULTANTS AND EMPLOYEES) IS SUBJECT TO THE TERMSAND CONDITIONS AGREED UPON BETWEEN SCHLUMBERGER AND THE COMPANY, INCLUDING: (a) RESTRICTIONS ONUSE OF THE RECORDED−DATA; (b) DISCLAIMERS AND WAIVERS OF WARRANTIES AND REPRESENTATIONS REGARDINGCOMPANY’S USE OF AND RELIANCE UPON THE RECORDED−DATA; AND (c) CUSTOMER’S FULL AND SOLE RESPONSIBILITYFOR ANY INFERENCE DRAWN OR DECISION MADE IN CONNECTION WITH THE USE OF THIS RECORDED−DATA.

DEPTH SUMMARY LISTING

Depth System Equipment

Depth Control Parameters

Date Created: 31−AUG−2011 1:45:23

Depth Measuring Device

Type: IDW−BSerial Number: 2828Calibration Date: 1−JAN−2011Calibrator Serial Number: 33Calibration Cable Type: 7−39P LXSWheel Correction 1: −5Wheel Correction 2: −4

Tension Device

Type: CMTD−B/ASerial Number: 2929Calibration Date: 2−AUG−2011Calibrator Serial Number: 1095Number of Calibration Points: 10Calibration RMS: 45Calibration Peak Error: 71

Logging Cable

Type: 7−39P LXSSerial Number: 3039Length: 13300 FT

Conveyance Method: WirelineRig Type: LAND

Log Sequence: First Log In the Well

Rig Up Length At Surface:Rig Up Length At Bottom:Rig Up Length Correction:Stretch Correction:

Run 3

Run 4

@@

@ @ @ @

Page 3: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

51.2MAXS−B MASS−BAMAXS−BA

72.2MAPC−B MAPC−BAECH−SFMAMS−BA 8235

78.7PPC2 PPC2−BPPC_CAL_STD

85.2EDTC−B EDTH−BEDTC−BEDTG−A/B

LEH−QT

56.8MAMS−PS

72.2PPC_Cartr

77.6Calipers

78.7EDTCB Ele TelStatus

EFTB DIAG 79.8Gamma Ray 81.7CTEM 85.2Mud Tempe

MDSB_EDTC

RUN 1 RUN 2

SLB CREW: THIMLAR / CANNON

CMR TUNED @ 1184’RUN1 LOGGED AT: REPEAT & MAIN @ 1600’/HR3 MAX TEMP THERMOMETERS RUN IN HEAD, PER RUN, MAX TEMP FROM HTEM.GEO REQUESTED MATR = SANDSTONE / MDEN = 2.65 G/CC

RUN4: MSCT RUN5: MDT RUN6: CBL/VDL−USIT

STOP STOPSTART STARTLOGGED INTERVAL LOGGED INTERVAL0 ftFLUID LEVEL: FLUID LEVEL:

19C0−187PROGRAM VERSION: PROGRAM VERSION:AXPS−00185SERVICE ORDER #: SERVICE ORDER #:

RUN 1 RUN 2EQUIPMENT DESCRIPTION

DOWNHOLE EQUIPMENT

88.1LEH−QT LEH−QT MDSB_EDTC

SURFACE EQUIPMENTWITM (EDTS)−A

Page 4: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

OP System Version: 19C0−187

FBST−B 19C0−187 PPC1 19C0−187MAXS−B 19C0−187 MAPC−B 19C0−187PPC2 19C0−187 EDTC−B 19C0−187

Integrated Hole/Cement Volume Summary Hole Volume = 106.68 F3

Cement Volume = 46.04 F3 (assuming 9.63 IN casing O.D.)

Computed from 1500.0 FT to 1380.5 FT using data channel(s) CRD1_PPC1 CRD2_PPC1 CRD3_PPC1 CRD4_PPC1

Output DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_084PUP FN:127 PRODUCER 31−Aug−2011 22:40 1500.0 FT 82.5 FT

RTB FMI_CAL_MAXS_MAPC_084PUP FN:128 PRODUCER 31−Aug−2011 22:40 1500.0 FT 82.5 FT

PPC1 Radius 3 (CRD3_PPC1)(IN)2 12

PPC1 Radius 4 (CRD4_PPC1)(IN)2 12

PPC1 Hole Diameter 1 (HD1_PPC1)(IN)6 16

PPC1 Hole Diameter 2 (HD2_PPC1)(IN)6 16

Tension (TENS)(LBF)10000 0

Cable

Tool/Tot.Drag

From D3Tto STIA

PIP SUMMARY

Integrated Hole Volume Minor Pip Every 10 F3Integrated Hole Volume Major Pip Every 100 F3

Integrated Cement Volume Minor Pip Every 10 F3Integrated Cement Volume Major Pip Every 100 F3

Time Mark Every 60 S

Company: SANDIA TECHNOLOGIES, LLC Well: NYSTA TANDEM LOT 1

Input DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_074PUP FN:110 PRODUCER 31−Aug−2011 20:42 1500.0 FT 82.5 FT

ALL LENGTHS IN FEETMEASUREMENTS RELATIVE TO TOOL ZERO

MAXIMUM STRING DIAMETER 5.00 IN

24.4FBST−B ECH−MRAFBCC−AAH−185FBSH−AGPIC−FFBSC−BFBSS−B

30.9PPC1 PPC1−BPPC_CAL_STD

TOOL ZERO0.0Tension DHRU

HV DF ACCZ 1.3FBCC FBSC

PADS

24.4PPC_Cartr

29.8Calipers

30.9MAXS−PS

Page 5: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

200

Bit Size (BS)(IN)6 16

PPC1 Radius 1 (CRD1_PPC1)(IN)2 12

PPC1 Radius 2 (CRD2_PPC1)(IN)2 12

PPC1 Ellipse Hole Diameter 1 (EHD1_PPC1)

(IN)6 16

PPC1 Ellipse Hole Diameter 2 (EHD2_PPC1)

(IN)6 16

PPC1 Relative Bearing (RB_PPC1)(DEG)0 360

StuckStretch(STIT)

(F)0 50

CableDrag

From STIAto STIT

100

PPC1

Page 6: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

400

300

Page 7: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

700

500

600

Page 8: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

900

800

Page 9: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

1100

1000

Page 10: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

1300

1200

Page 11: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

Parameters

DLIS Name Description ValuePPC1: Powered Positioning Device/Caliper 1

Bit Size (BS)(IN)6 16

PPC1 Radius 1 (CRD1_PPC1)(IN)2 12

PPC1 Radius 2 (CRD2_PPC1)(IN)2 12

PPC1 Radius 3 (CRD3_PPC1)(IN)2 12

PPC1 Radius 4 (CRD4_PPC1)(IN)2 12

PPC1 Ellipse Hole Diameter 1 (EHD1_PPC1)

(IN)6 16

PPC1 Ellipse Hole Diameter 2 (EHD2_PPC1)

(IN)6 16

PPC1 Hole Diameter 1 (HD1_PPC1)(IN)6 16

PPC1 Hole Diameter 2 (HD2_PPC1)(IN)6 16

PPC1 Relative Bearing (RB_PPC1)(DEG)0 360

StuckStretch(STIT)

(F)0 50

Tension (TENS)(LBF)10000 0

CableDrag

From STIAto STIT

Tool/Tot.Drag

From D3Tto STIA

PIP SUMMARY

Integrated Hole Volume Minor Pip Every 10 F3Integrated Hole Volume Major Pip Every 100 F3

Integrated Cement Volume Minor Pip Every 10 F3Integrated Cement Volume Major Pip Every 100 F3

Time Mark Every 60 S

1500

1400

Page 12: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

OP System Version: 19C0−187

FBST−B 19C0−187 PPC1 19C0−187MAXS−B 19C0−187 MAPC−B 19C0−187PPC2 19C0−187 EDTC−B 19C0−187

Integrated Hole/Cement Volume Summary Hole Volume = 106.68 F3

Cement Volume = 46.04 F3 (assuming 9.63 IN casing O.D.)

Computed from 1500.0 FT to 1380.5 FT using data channel(s) CRD1_PPC1 CRD2_PPC1 CRD3_PPC1 CRD4_PPC1

Input DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_074PUP FN:110 PRODUCER 31−Aug−2011 20:42 1500.0 FT 82.5 FT

Output DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_081PUP FN:123 PRODUCER 31−Aug−2011 22:21 1500.0 FT 82.5 FT

RTB FMI_CAL_MAXS_MAPC_081PUP FN:124 PRODUCER 31−Aug−2011 22:21 1500.0 FT 82.5 FT

Company: SANDIA TECHNOLOGIES, LLC Well: NYSTA TANDEM LOT 1

Output DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_084PUP FN:127 PRODUCER 31−Aug−2011 22:40

RTB FMI_CAL_MAXS_MAPC_084PUP FN:128 PRODUCER 31−Aug−2011 22:40

PIP SUMMARY

Integrated Hole Volume Minor Pip Every 10 F3Integrated Hole Volume Major Pip Every 100 F3

Integrated Cement Volume Minor Pip Every 10 F3

OP System Version: 19C0−187

FBST−B 19C0−187 PPC1 19C0−187MAXS−B 19C0−187 MAPC−B 19C0−187PPC2 19C0−187 EDTC−B 19C0−187

Format: PPC1_Logging Vertical Scale: 5" per 100’ Graphics File Created: 31−Aug−2011 22:40

PPC1: Powered Positioning Device/Caliper 1PPC1 Caliper Type CAL_STD

CLBD_PPC PPC Calibration data selection ROMMAPC−B: Multimode Array Sonic Power Cartridge

BS Bit Size 12.250 INPPC2: Powered Positioning Device/Caliper 2

PPC2 Caliper Type CAL_STDCLBD_PPC PPC Calibration data selection ROM

DIP: Dip ComputationDIP Tool FBST

DIR: Directional Survey ComputationSPVD TVD of Starting Point 1499.87 FTTIMD Along−hole depth of Tie−in Point 650 FTTIVD TVD of Tie−in Point 650 FT

STI: Stuck Tool IndicatorLBFR Trigger for MAXIS First Reading Label TDLSTKT STI Stuck Threshold 2.5 FTTDD Total Depth − Driller 1528.00 FTTDL Total Depth − Logger 1500.00 FT

HOLEV: Integrated Hole/Cement VolumeFCD Future Casing (Outer) Diameter 9.625 INHVCS Integrated Hole Volume Caliper Selection AUTOMATIC

System and MiscellaneousDO Depth Offset for Playback 0.0 FTPP Playback Processing OFFTD Total Depth 1500 FT

Input DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_074PUP FN:110 PRODUCER 31−Aug−2011 20:42 1500.0 FT 82.5 FT

Output DLIS Files

Page 13: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

200

Bit Size (BS)(IN)24 4

Bit Size (BS)(IN)4 24

Bit Size (BS)(IN)24 4

PPC1 Tool Center 1 (ETC1_PPC1)

(IN)−10 10

PPC1 Tool Center 2 (ETC2_PPC1)

(IN)−10 10

PPC1 Ellipse Hole Diameter 1(EHD1_PPC1)

(IN)24 4

PPC1 Ellipse Hole Diameter 2(EHD2_PPC1)

(IN)4 24

PPC1 Hole Diameter 1 (HD1_PPC1)

(IN)24 4

PPC1 Hole Diameter 2 (HD2_PPC1)

(IN)4 24

PPC1 Relative Bearing (RB_PPC1)(DEG)0 360

StuckStretch(STIT)

(F)0 50

Tension (TENS)(LBF)10000 0

CableDrag

From D4Tto STIT

FormationFrom F2 to EHD1_PPC1

FormationFrom EHD2_PPC1 to F3

HD differenceFrom EHD1_PPC1 to HD1_

PPC1

HD differenceFrom HD2_PPC1 to EHD2_

PPC1

Tool/Tot.Drag

From D4Tto STIA

Integrated Cement Volume Minor Pip Every 10 F3Integrated Cement Volume Major Pip Every 100 F3

Integrated Transit Time Minor Pip Every 1 MSIntegrated Transit Time Major Pip Every 10 MS

Time Mark Every 60 S

100

PPC 1

Page 14: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

400

300

Page 15: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

600

500

Page 16: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

800

700

Page 17: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

1000

1100

900

Page 18: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

1300

1100

1200

Page 19: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

Bit Size (BS)(IN)24 4

Bit Size (BS)(IN)4 24

Bit Size (BS)(IN)24 4

PPC1 Tool Center 1 (ETC1_PPC1)

(IN)−10 10

PPC1 Tool Center 2 (ETC2_PPC1)

(IN)−10 10

PPC1 Ellipse Hole Diameter 1(EHD1_PPC1)

(IN)24 4

PPC1 Ellipse Hole Diameter 2(EHD2_PPC1)

(IN)4 24

PPC1 Hole Diameter 1 (HD1_PPC1)

PPC1 Hole Diameter 2 (HD2_PPC1)

PPC1 Relative Bearing (RB_PPC1)

StuckStretch(STIT)

(F)0 50

CableDrag

From D4Tto STIT

Tool/Tot.Drag

From D4T

1500

1400

Page 20: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

Company: SANDIA TECHNOLOGIES, LLC Well: NYSTA TANDEM LOT 1

Input DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_074PUP FN:110 PRODUCER 31−Aug−2011 20:42 1500.0 FT 82.5 FT

Output DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_081PUP FN:123 PRODUCER 31−Aug−2011 22:21

RTB FMI_CAL_MAXS_MAPC_081PUP FN:124 PRODUCER 31−Aug−2011 22:21

OP System Version: 19C0−187

FBST−B 19C0−187 PPC1 19C0−187MAXS−B 19C0−187 MAPC−B 19C0−187PPC2 19C0−187 EDTC−B 19C0−187

Format: PPC1_HoleDiameter Vertical Scale: 5" per 100’ Graphics File Created: 31−Aug−2011 22:21

TIVD TVD of Tie−in Point 650 FTSTI: Stuck Tool Indicator

LBFR Trigger for MAXIS First Reading Label TDLSTKT STI Stuck Threshold 2.5 FTTDD Total Depth − Driller 1528.00 FTTDL Total Depth − Logger 1500.00 FT

HOLEV: Integrated Hole/Cement VolumeFCD Future Casing (Outer) Diameter 9.625 INHVCS Integrated Hole Volume Caliper Selection AUTOMATIC

System and MiscellaneousDO Depth Offset for Playback 0.0 FTPP Playback Processing OFFTD Total Depth 1500 FT

Input DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_074PUP FN:110 PRODUCER 31−Aug−2011 20:42 1500.0 FT 82.5 FT

Parameters

DLIS Name Description ValuePPC1: Powered Positioning Device/Caliper 1

PPC1 Caliper Type CAL_STDCLBD_PPC PPC Calibration data selection ROM

MAPC−B: Multimode Array Sonic Power CartridgeBS Bit Size 12.250 INITTS Integrated Transit Time Source DTCO

PPC2: Powered Positioning Device/Caliper 2PPC2 Caliper Type CAL_STD

CLBD_PPC PPC Calibration data selection ROMDIP: Dip Computation

DIP Tool FBSTDIR: Directional Survey Computation

SPVD TVD of Starting Point 1499.87 FTTIMD Along−hole depth of Tie−in Point 650 FTTIVD TVD of Tie−in Point 650 FT

STI: Stuck Tool Indicator

PPC1)(IN)24 4

PPC1)(IN)4 24

PPC1)(DEG)0 360

Tension (TENS)(LBF)10000 0

FormationFrom F2 to EHD1_PPC1

FormationFrom EHD2_PPC1 to F3

HD differenceFrom EHD1_PPC1 to HD1_

PPC1

HD differenceFrom HD2_PPC1 to EHD2_

PPC1

DragFrom D4T

to STIA

PIP SUMMARY

Integrated Hole Volume Minor Pip Every 10 F3Integrated Hole Volume Major Pip Every 100 F3

Integrated Cement Volume Minor Pip Every 10 F3Integrated Cement Volume Major Pip Every 100 F3

Integrated Transit Time Minor Pip Every 1 MSIntegrated Transit Time Major Pip Every 10 MS

Time Mark Every 60 S

Page 21: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

Bit Size (BS)(IN)6 16

PPC2 Radius 1 (CRD1_PPC2)(IN)2 12

PPC2 Radius 2 (CRD2_PPC2)(IN)2 12

PPC2 Ellipse Hole Diameter 1 (EHD1_PPC2)

(IN)6 16

PPC2 Ellipse Hole Diameter 2 (EHD2_PPC2)

(IN)6 16

PPC2 Relative Bearing (RB_PPC2)(DEG)0 360

StuckStretch(STIT)

(F)0 50

CableDrag

From STIAto STIT

100

PPC2

OP System Version: 19C0−187

FBST−B 19C0−187 PPC1 19C0−187MAXS−B 19C0−187 MAPC−B 19C0−187PPC2 19C0−187 EDTC−B 19C0−187

Integrated Hole/Cement Volume Summary Hole Volume = 106.68 F3

Cement Volume = 46.04 F3 (assuming 9.63 IN casing O.D.)

Computed from 1500.0 FT to 1380.5 FT using data channel(s) CRD1_PPC1 CRD2_PPC1 CRD3_PPC1 CRD4_PPC1

DEFAULT FMI_CAL_MAXS_MAPC_074PUP FN:110 PRODUCER 31−Aug−2011 20:42 1500.0 FT 82.5 FT

Output DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_084PUP FN:127 PRODUCER 31−Aug−2011 22:40 1500.0 FT 82.5 FT

RTB FMI_CAL_MAXS_MAPC_084PUP FN:128 PRODUCER 31−Aug−2011 22:40 1500.0 FT 82.5 FT

PPC2 Radius 3 (CRD3_PPC2)(IN)2 12

PPC2 Radius 4 (CRD4_PPC2)(IN)2 12

PPC2 Ellipse Hole Diameter 2 (EHD2_

PPC2 Hole Diameter 1 (HD1_PPC2)(IN)6 16

PPC2 Hole Diameter 2 (HD2_PPC2)(IN)6 16

Tension (TENS)(LBF)10000 0

Cable

Tool/Tot.Drag

From D3Tto STIA

PIP SUMMARY

Integrated Hole Volume Minor Pip Every 10 F3Integrated Hole Volume Major Pip Every 100 F3

Integrated Cement Volume Minor Pip Every 10 F3Integrated Cement Volume Major Pip Every 100 F3

Time Mark Every 60 S

Page 22: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

300

200

Page 23: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

500

600

400

Page 24: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

800

700

Page 25: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

1000

900

Page 26: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

1200

1100

Page 27: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

1400

1300

Page 28: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

OP System Version: 19C0−187

FBST−B 19C0−187 PPC1 19C0−187MAXS−B 19C0−187 MAPC−B 19C0−187PPC2 19C0−187 EDTC−B 19C0−187

Format: PPC2_Logging Vertical Scale: 5" per 100’ Graphics File Created: 31−Aug−2011 22:40

PPC1: Powered Positioning Device/Caliper 1PPC1 Caliper Type CAL_STD

CLBD_PPC PPC Calibration data selection ROMMAPC−B: Multimode Array Sonic Power Cartridge

BS Bit Size 12.250 INPPC2: Powered Positioning Device/Caliper 2

PPC2 Caliper Type CAL_STDCLBD_PPC PPC Calibration data selection ROM

DIP: Dip ComputationDIP Tool FBST

DIR: Directional Survey ComputationSPVD TVD of Starting Point 1499.87 FTTIMD Along−hole depth of Tie−in Point 650 FTTIVD TVD of Tie−in Point 650 FT

STI: Stuck Tool IndicatorLBFR Trigger for MAXIS First Reading Label TDLSTKT STI Stuck Threshold 2.5 FTTDD Total Depth − Driller 1528.00 FTTDL Total Depth − Logger 1500.00 FT

HOLEV: Integrated Hole/Cement VolumeFCD Future Casing (Outer) Diameter 9.625 INHVCS Integrated Hole Volume Caliper Selection AUTOMATIC

System and MiscellaneousDO Depth Offset for Playback 0.0 FTPP Playback Processing OFFTD Total Depth 1500 FT

Input DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_074PUP FN:110 PRODUCER 31−Aug−2011 20:42 1500.0 FT 82.5 FT

Output DLIS Files

Parameters

DLIS Name Description ValuePPC1: Powered Positioning Device/Caliper 1

Bit Size (BS)(IN)6 16

PPC2 Radius 1 (CRD1_PPC2)(IN)2 12

PPC2 Radius 2 (CRD2_PPC2)(IN)2 12

PPC2 Radius 3 (CRD3_PPC2)(IN)2 12

PPC2 Radius 4 (CRD4_PPC2)(IN)2 12

PPC2 Ellipse Hole Diameter 1 (EHD1_PPC2)

(IN)6 16

PPC2 Ellipse Hole Diameter 2 (EHD2_PPC2)

(IN)6 16

PPC2 Hole Diameter 1 (HD1_PPC2)(IN)6 16

PPC2 Hole Diameter 2 (HD2_PPC2)(IN)6 16

PPC2 Relative Bearing (RB_PPC2)(DEG)0 360

StuckStretch(STIT)

(F)0 50

Tension (TENS)(LBF)10000 0

CableDrag

From STIAto STIT

Tool/Tot.Drag

From D3Tto STIA

PIP SUMMARY

Integrated Hole Volume Minor Pip Every 10 F3Integrated Hole Volume Major Pip Every 100 F3

Integrated Cement Volume Minor Pip Every 10 F3Integrated Cement Volume Major Pip Every 100 F3

Time Mark Every 60 S

1500

Page 29: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

Bit Size (BS)(IN)24 4

Bit Size (BS)(IN)4 24

Bit Size (BS)(IN)24 4

PPC2 Tool Center 1 (ETC1_PPC2)

(IN)−10 10

PPC2 Tool Center 2 (ETC2_PPC2)

(IN)−10 10

PPC2 Ellipse Hole Diameter 1(EHD1_PPC2)

(IN)24 4

PPC2 Ellipse Hole Diameter 2(EHD2_PPC2)

(IN)4 24

PPC2 Hole Diameter 1 (HD1_PPC2)

(IN)24 4

PPC2 Hole Diameter 2 (HD2_PPC2)

(IN)4 24

PPC2 Relative Bearing (RB_PPC2)(DEG)0 360

StuckStretch(STIT)

(F)0 50

Tension (TENS)(LBF)10000 0

CableDrag

From D4Tto STIT

FormationFrom F2 to EHD1_PPC2

FormationFrom EHD2_PPC2 to F3

HD differenceFrom EHD1_PPC2 to HD1_

PPC2

HD differenceFrom HD2_PPC2 to EHD2_

PPC2

Tool/Tot.Drag

From D4Tto STIA

Integrated Cement Volume Minor Pip Every 10 F3Integrated Cement Volume Major Pip Every 100 F3

Integrated Transit Time Minor Pip Every 1 MSIntegrated Transit Time Major Pip Every 10 MS

Time Mark Every 60 S

100

PPC 2

OP System Version: 19C0−187

FBST−B 19C0−187 PPC1 19C0−187MAXS−B 19C0−187 MAPC−B 19C0−187PPC2 19C0−187 EDTC−B 19C0−187

Integrated Hole/Cement Volume Summary Hole Volume = 106.68 F3

Cement Volume = 46.04 F3 (assuming 9.63 IN casing O.D.)

Computed from 1500.0 FT to 1380.5 FT using data channel(s) CRD1_PPC1 CRD2_PPC1 CRD3_PPC1 CRD4_PPC1

Input DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_074PUP FN:110 PRODUCER 31−Aug−2011 20:42 1500.0 FT 82.5 FT

Output DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_081PUP FN:123 PRODUCER 31−Aug−2011 22:21 1500.0 FT 82.5 FT

RTB FMI_CAL_MAXS_MAPC_081PUP FN:124 PRODUCER 31−Aug−2011 22:21 1500.0 FT 82.5 FT

Company: SANDIA TECHNOLOGIES, LLC Well: NYSTA TANDEM LOT 1

Output DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_084PUP FN:127 PRODUCER 31−Aug−2011 22:40

RTB FMI_CAL_MAXS_MAPC_084PUP FN:128 PRODUCER 31−Aug−2011 22:40

PIP SUMMARY

Integrated Hole Volume Minor Pip Every 10 F3Integrated Hole Volume Major Pip Every 100 F3

Integrated Cement Volume Minor Pip Every 10 F3

Page 30: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

300

200

Page 31: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

500

400

Page 32: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

700

600

Page 33: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

900

800

Page 34: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

1100

1200

1100

1000

Page 35: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

1400

1300

Page 36: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

Parameters

DLIS Name Description ValuePPC1: Powered Positioning Device/Caliper 1

PPC1 Caliper Type CAL_STDCLBD_PPC PPC Calibration data selection ROM

MAPC−B: Multimode Array Sonic Power CartridgeBS Bit Size 12.250 INITTS Integrated Transit Time Source DTCO

PPC2: Powered Positioning Device/Caliper 2PPC2 Caliper Type CAL_STD

CLBD_PPC PPC Calibration data selection ROMDIP: Dip Computation

DIP Tool FBSTDIR: Directional Survey Computation

SPVD TVD of Starting Point 1499.87 FTTIMD Along−hole depth of Tie−in Point 650 FTTIVD TVD of Tie−in Point 650 FT

PPC2)(IN)24 4

PPC2)(IN)4 24

PPC2)(DEG)0 360

Tension (TENS)(LBF)10000 0

FormationFrom F2 to EHD1_PPC2

FormationFrom EHD2_PPC2 to F3

HD differenceFrom EHD1_PPC2 to HD1_

PPC2

HD differenceFrom HD2_PPC2 to EHD2_

PPC2

DragFrom D4T

to STIA

PIP SUMMARY

Integrated Hole Volume Minor Pip Every 10 F3Integrated Hole Volume Major Pip Every 100 F3

Integrated Cement Volume Minor Pip Every 10 F3Integrated Cement Volume Major Pip Every 100 F3

Integrated Transit Time Minor Pip Every 1 MSIntegrated Transit Time Major Pip Every 10 MS

Time Mark Every 60 S

Bit Size (BS)(IN)24 4

Bit Size (BS)(IN)4 24

Bit Size (BS)(IN)24 4

PPC2 Tool Center 1 (ETC1_PPC2)

(IN)−10 10

PPC2 Tool Center 2 (ETC2_PPC2)

(IN)−10 10

PPC2 Ellipse Hole Diameter 1(EHD1_PPC2)

(IN)24 4

PPC2 Ellipse Hole Diameter 2(EHD2_PPC2)

(IN)4 24

PPC2 Hole Diameter 1 (HD1_PPC2)

PPC2 Hole Diameter 2 (HD2_PPC2)

PPC2 Relative Bearing (RB_PPC2)

StuckStretch(STIT)

(F)0 50

CableDrag

From D4Tto STIT

Tool/Tot.Drag

From D4T

1500

Page 37: County: Field: Well: Companybrg.ldeo.columbia.edu/data/lamont/tandem1/field_log_plots/TANDEM1_ppc-1.pdfppc2 78.7 ppc2−b ppc_cal_std edtc−b 85.2 edth−b edtc−b edtg−a/b leh−qt

POWERED POSITIONING CALIPER − PPC4 ARM CALIPER LOG

Field:County:State:

WILDCATROCKLANDNEW YORK

Input DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_074PUP FN:110 PRODUCER 31−Aug−2011 20:42 1500.0 FT 82.5 FT

Output DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_081PUP FN:123 PRODUCER 31−Aug−2011 22:21

RTB FMI_CAL_MAXS_MAPC_081PUP FN:124 PRODUCER 31−Aug−2011 22:21

OP System Version: 19C0−187

FBST−B 19C0−187 PPC1 19C0−187MAXS−B 19C0−187 MAPC−B 19C0−187PPC2 19C0−187 EDTC−B 19C0−187

Format: PPC2_HoleDiameter Vertical Scale: 5" per 100’ Graphics File Created: 31−Aug−2011 22:21

TIVD TVD of Tie−in Point 650 FTSTI: Stuck Tool Indicator

LBFR Trigger for MAXIS First Reading Label TDLSTKT STI Stuck Threshold 2.5 FTTDD Total Depth − Driller 1528.00 FTTDL Total Depth − Logger 1500.00 FT

HOLEV: Integrated Hole/Cement VolumeFCD Future Casing (Outer) Diameter 9.625 INHVCS Integrated Hole Volume Caliper Selection AUTOMATIC

System and MiscellaneousDO Depth Offset for Playback 0.0 FTPP Playback Processing OFFTD Total Depth 1500 FT

Company:

Well:Field:

SANDIA TECHNOLOGIES, LLC

NYSTA TANDEM LOT 1WILDCAT