County CB Extension Study Outagamie County Town of Grand Chute Village of Greenville Virtual Public Involvement Meeting June 9, 2021

Transcript of County CB Extension Study

County CB Extension Study

Outagamie County

Town of Grand Chute

Village of Greenville

Virtual Public Involvement Meeting

June 9, 2021

Agenda

Welcome & Introductions

Meeting logistics

Project location

Corridor history

Current planning efforts

Public comment period

Introductions

Outagamie County

Village of Greenville

Town of Grand Chute

Oneida Engineering Solutions

East Central WI Regional Planning

Meeting Logistics

Meeting is being recorded

Options for submitting questions & comments:

Via Zoom: can be asked via the “Chat” feature

Via Phone: hold until end and ask question

Via Email: submit to [email protected]

Questions submitted after the meeting will be responded to

accordingly

Project website

www.outagamie.org/countycb

Additional exhibits including FAQ’s

Project Location

3 Miles

End corridor study

Begin corridor study

County JJ

WIS 15

N

CN RR

Village of Greenville

Town of Grand Chute

Corridor History

Outagamie County initiated County CB Extension Study (2010)

Alternatives were developed and presented to the public

Lack of local support and funding

Project was put on hold in 2013

WisDOT roundabout construction (2013)

WIS 15 and County CB intersection

Provided for future continuation of CTH CB north of WIS 15

Corridor History

East Central Wisconsin Regional Planning Commission (ECWRPC)

WIS 15 Access and Congestion Management Study (2017)

Study focused on safety issues from Interstate 41 west through

the Town/Village of Greenville

Rapidly growing northwest portion of the Fox Cities Metropolitan

Planning Organization (MPO)

Endorsed the County CB Extension as a near-term priority

Outagamie County Comprehensive Plan

Approved in 2020

Recommended finalizing the preferred route for the north

extension of CTH CB from WIS 15 to CTH JJ

CB Corridor Route Planning Goals

Design

Develop and identify a preferred alternative for County CB

Coordination

Work collaboratively with the Village of Greenville and Town of

Grand Chute to establish a preferred alternative

Responsibly plan for future transportation needs that promotes

growth and development in both municipalities

Planning

Map the corridor to preserve the future right of way in response to

future development

Corridor mapping → Preserve Corridor → Promote development

Information Evaluated to Date

Previous studies & reports

Traffic volumes and traffic forecast

Preliminary environmental screening:

Archaeological and historical sites

Airport

Railroad

Threatened and endangered species

Utilities

Environmental features (wetlands, floodplain, etc.)

Preliminary engineering / geometric deficiencies

Input from local officials

Route Alternatives Analysis

Alternative Evaluation

Alternatives from 2010 study were refined

Additional alternatives developed

Environmental impacts evaluated

Local road connections analyzed

Coordination

Meetings with Village of Greenville and Town of Grand Chute

Identify preferred alternative

Outagamie County, Village of Greenville and Town of Grand Chute

agree on the preferred alternative

County CB

“Maximum Extent” Rural Cross Section

4-lane undivided roadway

10-ft multi-modal trail

140-ft right of way (typical)

County CB

Urban Cross Section

4-lane undivided roadway with curb and gutter

10-ft multi-modal trail w/ 5-ft terrace

110-ft right of way (typical)

Recommended Route – South Segment

Neubert Road to Everglade Road

Recommended Route – North Segment

Everglade Road to County JJ

County CB / Mayflower Road

Everg

lad

e Ro

ad

Co

un

ty JJ

Ed

gew

oo

d R

oad

Next Steps

Review public comments

Finalize recommended route

Initiate official mapping of corridor at the local level

Update relevant plans at the County level

Construction of County CB is currently not included in

Outagamie County’s 5-year Capital Improvement Plan (CIP)

and will be dependent on a variety of factors:

Cost

Development

Utilities

Other

We want your feedback!

1. Question & Answer session

2. Submit written comments after virtual meeting

Written Comments

Joe Zellmer, P.E. Chad Even, P.E.

(920) 832-5673 (920) 884-3975

[email protected] [email protected]

Outagamie County Highway Department

Attn: Joe Zellmer, County CB Extension

1313 Holland Road

Appleton, WI 54911

If you have any additional comments, questions, or

concerns about this project, please contact us:

1. Return the public comment form to:

[email protected]

2. Contact us by phone or email:

3. Send postal mail :

Comments are requested by June 23, 2021

Question & Answer