Costing Format
-
Upload
gopal-jetani -
Category
Documents
-
view
655 -
download
0
description
Transcript of Costing Format
![Page 1: Costing Format](https://reader036.fdocuments.us/reader036/viewer/2022081908/552c37df4a7959fa7c8b4698/html5/thumbnails/1.jpg)
COST ESTIMATION SHEET
PROJECT : HYDRAULIC ROBOT (JCB)
NAME OF PART: BASE PLATE (18 MM)
PART NO:1
CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)
YEAR:2010 -2011
MATERIAL : WOOD
MATERIAL COST
LENGTH *WIDTH 3*2RATE/MM 44QTY 1TOTAL 260
MACHINING COST
PROCESS COST/ HOUR MINS NET COST
CUTTING 20 60 20SLOTTING 10 15 10DRILLINGTOTAL 75 30
LABOUR COST
LABOUR COST 50
TRANSPROTATION COST
TRANSPROTATION 20
(ALL DIMENSION IN FOOT)
![Page 2: Costing Format](https://reader036.fdocuments.us/reader036/viewer/2022081908/552c37df4a7959fa7c8b4698/html5/thumbnails/2.jpg)
COST ESTIMATION SHEET
PROJECT : HYDRAULIC ROBOT (JCB)
NAME OF PART: CIRCULER LINK(12MM)
PART NO:2
CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)
YEAR:2010 -2011
MATERIAL : WOOD
MATERIAL COST
LENGTH *WIDTH 2*2RATE/MM 45QTY 1TOTAL 180
MACHINING COST
PROCESS COST/ HOUR MINS NET COST
CUTTING 20 60 20TURNING 10 15 10DRILLINGTOTAL 75 30
LABOUR COST
LABOUR COST 50
TRANSPROTATION COST
TRANSPROTATION 20
(ALL DIMENSION IN FOOT)
![Page 3: Costing Format](https://reader036.fdocuments.us/reader036/viewer/2022081908/552c37df4a7959fa7c8b4698/html5/thumbnails/3.jpg)
COST ESTIMATION SHEETPROJECT : HYDRAULIC ROBOT (JCB)
NAME OF PART: VERTICAL LINK (18MM)
PART NO:3
CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)
YEAR:2010 -2011
MATERIAL : WOOD
MATERIAL COST
LENGTH *WIDTH 3*3RATE/MM 60QTY 2TOTAL 540
MACHINING COST
PROCESS COST/ HOUR MINS NET COST
CUTTING 20 60 20DRILLINGTOTAL 60 20
LABOUR COST
LABOUR COST 50
TRANSPROTATION COST
TRANSPROTATION 20
(ALL DIMENSION IN FOOT)
![Page 4: Costing Format](https://reader036.fdocuments.us/reader036/viewer/2022081908/552c37df4a7959fa7c8b4698/html5/thumbnails/4.jpg)
COST ESTIMATION SHEETPROJECT : HYDRAULIC ROBOT (JCB)
NAME OF PART: HORIZONTAL LINK-1 (8MM)
PART NO:4
CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)
YEAR:2010 -2011
MATERIAL : WOOD
MATERIAL COST
LENGTH *WIDTH 3*3RATE/MM 27QTY 2TOTAL 245
MACHINING COST
PROCESS COST/ HOUR MINS NET COST
CUTTING 20 60 20DRILLINGTOTAL 60 20
LABOUR COST
LABOUR COST 50
TRANSPROTATION COST
TRANSPROTATION 20
(ALL DIMENSION IN FOOT)
![Page 5: Costing Format](https://reader036.fdocuments.us/reader036/viewer/2022081908/552c37df4a7959fa7c8b4698/html5/thumbnails/5.jpg)
COST ESTIMATION SHEETPROJECT : HYDRAULIC ROBOT (JCB)
NAME OF PART: HORIZONTAL LINK-2 (6MM)
PART NO:5
CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)
YEAR:2010 -2011
MATERIAL : WOOD
MATERIAL COST
LENGTH *WIDTH 3*3RATE/MM 23QTY 2TOTAL 210
MACHINING COST
PROCESS COST/ HOUR MINS NET COST
CUTTING 20 60 20DRILLINGTOTAL 60 20
LABOUR COST
LABOUR COST 50
TRANSPROTATION COST
TRANSPROTATION 20
(ALL DIMENSION IN FOOT)
![Page 6: Costing Format](https://reader036.fdocuments.us/reader036/viewer/2022081908/552c37df4a7959fa7c8b4698/html5/thumbnails/6.jpg)
COST ESTIMATION SHEETPROJECT : HYDRAULIC ROBOT (JCB)
NAME OF PART: TOOL LINK-1(6MM)
PART NO:6
CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)
YEAR:2010 -2011
MATERIAL : WOOD
MATERIAL COST
LENGTH *WIDTH 2*2RATE/MM 7QTY 2TOTAL 30
MACHINING COST
PROCESS COST/ HOUR MINS NET COST
CUTTING 20 60 20SHAPING 20 15 20DRILLINGTOTAL 75 40
LABOUR COST
LABOUR COST 50
TRANSPROTATION COST
TRANSPROTATION 20
(ALL DIMENSION IN FOOT)
![Page 7: Costing Format](https://reader036.fdocuments.us/reader036/viewer/2022081908/552c37df4a7959fa7c8b4698/html5/thumbnails/7.jpg)
COST ESTIMATION SHEETPROJECT : HYDRAULIC ROBOT (JCB)
NAME OF PART: TOOL LINK-2 (6MM)
PART NO: 7
CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)
YEAR:2010 -2011
MATERIAL : WOOD
MATERIAL COST
LENGTH *WIDTH 0.5*0.5RATE/MM 7QTY 2TOTAL 30
MACHINING COST
PROCESS COST/ HOUR MINS NET COST
CUTTING 20 30 20DRILLINGTOTAL 30 20
LABOUR COST
LABOUR COST 50
TRANSPROTATION COST
TRANSPROTATION 20
(ALL DIMENSION IN FOOT)
![Page 8: Costing Format](https://reader036.fdocuments.us/reader036/viewer/2022081908/552c37df4a7959fa7c8b4698/html5/thumbnails/8.jpg)
COST ESTIMATION SHEETPROJECT : HYDRAULIC ROBOT (JCB)
NAME OF PART: CONNECTING LINK-1/2 (6MM)
PART NO:8
CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)
YEAR:2010 -2011
MATERIAL : WOOD
MATERIAL COST
LENGTH *WIDTH 1*1RATE/MM 7QTY 4TOTAL 45
MACHINING COST
PROCESS COST/ HOUR MINS NET COST
CUTTING 20 60 20DRILLINGTOTAL 60 20
LABOUR COST
LABOUR COST 50
TRANSPROTATION COST
TRANSPROTATION 20
(ALL DIMENSION IN FOOT)
![Page 9: Costing Format](https://reader036.fdocuments.us/reader036/viewer/2022081908/552c37df4a7959fa7c8b4698/html5/thumbnails/9.jpg)
COST ESTIMATION SHEET
PURCHASED PART ESTIMATION SHEET
PURCHASED MATERIAL QTY RS
SMALL GEAR PLASTIC 1 30
BIG GEAR PLASTIC 2 120
THREADED SHAFT M.S. 12 200
RACK PLASTIC 2 30
SYRINGE FIBER 12 350
FLEXIBLE PIPE (HARD) P.V.C 6 FOOT 60
BOLT NUT AND OTHER FASTERNES M.S. AS PER USE 30
HOOK M.S. 10 50
TOTAL 870
(ALL DIMENSION IN FOOT)