Costal VLH Turbine
-
Upload
ciprian-albert -
Category
Documents
-
view
60 -
download
3
description
Transcript of Costal VLH Turbine
![Page 1: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/1.jpg)
Click icon to add picture
11-10-27
1 1
Very Low Head (VLH) TurbineOWA 11th Annual Power of Water
ConferenceOctober 2011
![Page 2: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/2.jpg)
Coastal hydropower Corp.
Commercialization of low-head turbine deployment and open-flow water turbine technologies in rivers, canals and ocean current regimes
Expertise and investment capital for rapid commercial turbine deployment
2 years of low-head turbine deployment R&D
3 years of tidal turbine technology development patents and other related technologies
Science and Nature in Harmony for the Responsible Development of our Water Resources
![Page 3: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/3.jpg)
C A N A D I A N
P R O J E C T SL I M I T E D
Sustainable Energy Engineering
Hydro Wind SolarC A N A D I A N
P R O J E C T SL I M I T E D
C A N A D I A N
P R O J E C T SL I M I T E D
![Page 4: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/4.jpg)
11-10-274
Very Low Head (“VLH”) Turbine
Development Story:
Developed in France and Canada.
Double regulated Kaplan turbine with slow rotating 8 bladed runner
Designed for low head <5 m that was previously commercially unfeasible
Fits into existing water control structures
Eliminates high cost conventional civil works ~ 50% of typical hydro plant costs
Short development timeframe - simple design with low impact attributes can allow projects to be done in about a year instead of typical hydro project of 3 - 6 years
4
![Page 5: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/5.jpg)
Very Low Head Turbine
Application:
Existing structure sites
Head: 1.4 – 5.0 m
4 Sizes: 3.5, 4.0, 4.5 & 5.0 m dia.
Capacity: 350 kW – 500 kW / unit
Flow: 10 - 30 m3/s.
High w2w Efficiency : ~ 80%
Lifts for floods & maintenance
Interconnects to low voltage distribution lines or off-grid
11-10-275
5
![Page 6: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/6.jpg)
Technology Attributes:
Use PMG synchronous generator (direct-drive – variable speed)
Incorporates trash cleaning system
Low Environmental Impact:
Fish Friendliness (site tested & verified in France)
Silent operation
Very low visual impact (below deck/ mostly submersed)
Coastal has deployment methods for adaptation to North America
11-10-276
Very Low Head Turbine
6
![Page 7: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/7.jpg)
Holistic Design Click to edit Master text styles
Second levelThird level
Fourth levelFifth level
Single element design includes:TurbineGeneratorGateTrashrack & Cleaner Fish Passage (~100%)Lift System
Fits in existing gate bays with minimal modifications
![Page 8: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/8.jpg)
VLH Turbine
![Page 9: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/9.jpg)
Cranage of the 26 T VLH into its final location
Rotation of the VLH to its inclined working position
VLH Turbine Installation
After site assembly of the unit and mounting brackets simply lower into place
![Page 10: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/10.jpg)
17 units are now deployed
Over four years of full scale operation in France
Initial Operations
![Page 11: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/11.jpg)
VLH Turbines Installed - Europe
1110/7/2010
![Page 12: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/12.jpg)
Upstream view of the VLH in the empty inlet channel
VLH in Operation
VLH Turbine Operation
![Page 13: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/13.jpg)
Low Environmental Impact
Fish-friendly Minimal footprint No flow diversion Silent operation Low visual impact Low impact on heritage
and cultural values
Designed specifically to have low environmental impact which facilitates ease of approval and rapid development deployment
![Page 14: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/14.jpg)
CFD Analysis show the VLH fulfils all criteria for fish friendliness:
1) Peripheral SpeedAcceptable: 6 to 12 m/s VLH: 4.5 to 8 m/s
2) Minimum PressureAcceptable : 69 kPa VLH: 94 kPa
3) Maximum Pressure VariationAcceptable: <550 kPa/s VLH: 80 kPa/s
4) Max Flow Velocity VariationAcceptable: <180 m/s/m VLH: 10 m/s/m
5) Blade to Discharge Ring GapAcceptable: <2.0 mm VLH: <2.0 mm
Pressure values on runner according to hub distance
Fish FriendlinessCFD Analysis
![Page 15: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/15.jpg)
Tests have been done in France with live Eels and Salmon smolts
Recovery system Recovery Platform Injection Device
Eels size 0.7 up to 1.2 m Eels Injection Recovering eels with a dipnet
Fish Friendliness Full Scale Live Testing
![Page 16: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/16.jpg)
- 200 eels were injected at 3 locations- Recaptured eels were observed for 24 to 48 hours to check for internal injuries
- Careful visual inspection showed superficial injuries in 2% of the specimens-Over 200 other fish entered the turbine from the river during the testing and were captured downstream - All Survived
Survival Rate : 100%
Injection Point of
Eels
Inner
Median
Outer
Fish Friendliness Full Scale Live Testing
Latest tests performed at Frouard, France - Late 2010 Peer Reviewed Report Released - March 2011
![Page 17: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/17.jpg)
112 sites have been identified across Canada for VLH deployment so far
~ 2,000 undeveloped dams in Ontario are likely suitable for power generation. Potential for low head hydro in Ontario is ~ 7,000 MW. Small projects under 1 MW have not been fully assessed specifically but are expected to add substantially to this potential.
11-10-2717
Market Opportunity
17
US: DOE estimates more than 80,000 dams and water control structures in the US, 2,400 of those presently have power generation. Unpowered dams and weirs could amount to an additional 73,000 GWh per year.
![Page 18: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/18.jpg)
VLH Adaptation for cold climate operations through implementation of the VLH Cold-climate adaptation package
Regulatory Acceptance with a modified approval process suitable to accommodate rapid VLH deployment
Fish Testing / Monitoring in North America to prove performance with local species
11-10-2718
Challenges for VLH Technology
18
![Page 19: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/19.jpg)
Access to a new innovative technology for hydropower generation
Generation at very low-head sites (<4m) previously not considered feasible
Can generate 100’s of MW’s from existing structures across Ontario/Canada
VLH technology has a very low environmental impact when deployed at existing structures & is fish friendly
Cooperation and support is required to implement the VLH in NA
Need to demonstrate the VLH technology in NA to gain understanding
This investment & successful implementation enables us to tap a significant new source of renewable energy in Ontario/Canada/NA
Regulatory regime for this emerging technology needs to be streamlined
11-10-2719
VLH Deployment in Ontario
19
Key Points:
![Page 20: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/20.jpg)
Questions?
![Page 21: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/21.jpg)
The Archimedes Screw – environmental impacts, opportunities, and challenges as an Emergent Hydro Techonology in CANADA.Date: 25 Oct 2011 Presented by: Tony Bouk – VP Business Development
![Page 22: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/22.jpg)
Archimedes Screw
• Click to edit Master text styles– Second level
• Third level– Fourth level
» Fifth level
1645 Hwy#3, Delhi, ON, N4B 2W6T: 519 582 8563
GreenBug Energy Inc.
22
The weight of water falling through the screw turns the screw which turns the gear box and generator and produces electricity as it turns.
The diameter of the screw increases as the design flow increases.
The length of the screw increases as the “head” or vertical drop increases.
How it works
![Page 23: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/23.jpg)
Technology OverviewOur Form of Emergent Hydro
Type of Turbine – Archimedes Screw
KW Size – Micro (10-100 KW) – Pico (1KW – 10KW) (1KW powers an average home)
Heads – Head Levels of 1-10 Meters, very low but still very useful.
Flows – 200 liters/ sec – 6000 liters/sec (1000 lps = 1 cubic meter/sec)
Run of River – water flows are not managed, naturally occurring flows are maintained.
Application for use on small water control structures already in existence – old mills sites, reservoirs, etc. Thousands across Canada. (10,000+)
23
1645 Hwy#3, Delhi, ON, N4B 2W6T: 519 582 8563
GreenBug Energy Inc.
![Page 24: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/24.jpg)
The Archimedes ScrewThen
image
Invented in 200 AD --- by --- Archimedes
Used to pump water up and irrigate land
image
Still used to pump water up
Used extensively in sewage treatment plants due to robust design
24
1645 Hwy#3, Delhi, ON, N4B 2W6T: 519 582 8563
GreenBug Energy Inc.
Now
![Page 25: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/25.jpg)
The Archimedes Screw
image
Have been used in Europe for about 10 years to generate electricity.
None in Canada to date that we are aware of.
image
25
1645 Hwy#3, Delhi, ON, N4B 2W6T: 519 582 8563
GreenBug Energy Inc.
To generate electricity
![Page 26: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/26.jpg)
Environmental IssuesSafe Fish Passage
Fish can Safely Pass through the screw (down)image Extensive fish passage tests in the UK have conclusively demonstrated that the large water chambers and slow rotation of the Archimedes Screw allow fish of all sizes safe passage through the turbine. As a result, the Environment Agency in the UK has agreed that no screening is required.
Fish Pumps
image
In fact Archimedes screws are used as “fish Pumps” in the aquaculture industry to move fish.
26
1645 Hwy#3, Delhi, ON, N4B 2W6T: 519 582 8563
GreenBug Energy Inc.
The screw does not affect the upstream passage of fish, however it does allow safe downstream passage
![Page 27: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/27.jpg)
Environmental IssuesEquipment related
Lower Bearing– the submerged lower bearing is a water lubricated composite or wood bearing that requires no grease.
Upper Gearbox– contains food grade oil. Upper gearbox is within a concrete room above the water.
Protective Coating on the steel screw– after application and hardening the coating is chemically inert- potable water coatings can be used but are not in Europe.
Sitework – minimal concrete site work is necessary to install the screw beside the existing water control structures. Existing control structures are unaffected.
Equipment is Manufactured off site – because the screw is manufactured off-site and then installed by crane beside existing water control structures, disturbance to stream beds and water flows is minimal during installation.
27
1645 Hwy#3, Delhi, ON, N4B 2W6T: 519 582 8563
GreenBug Energy Inc.
![Page 28: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/28.jpg)
Environmental IssuesWater Resources
100% of water is returned to the water course – essentially part of the water just travels down the screw instead of over the dam
Does not increase the height of the existing water control structure
Does not have to affect the water levels above or below the water control structure
Existing natural flows are maintained – In this run of river type of installation flows are not managed in any way. (operational range of screw down to 15% of max flow)
There is no depleted reach – because the screw is installed beside the existing water control structure and the water is returned at the base of the structure there is no depleted reach.
Will not affect water turbidity – water is pulled from top of impoundment the same as water flowing over dam.
Will not affect the flood flow capacity of the existing water control structures
28
1645 Hwy#3, Delhi, ON, N4B 2W6T: 519 582 8563
GreenBug Energy Inc.
![Page 29: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/29.jpg)
Opportunities NowFor the Archimedes Screw
image
29
1645 Hwy#3, Delhi, ON, N4B 2W6T: 519 582 8563
GreenBug Energy Inc.
Many sites – thousands of small low head sites across Canada (10,000+ according to Hatch)
An example – to the left are the sites located around the GreenBug location in Delhi, Ontario.
Carbon reduction– there is the opportunity to generate electricity in a distributed renewable way right where it is used and sell it to the grid using existing infrastructure and without large transmission lines
![Page 30: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/30.jpg)
Existing ChallengesFacing the Archimedes Screw use on small hydro sites (1kw – 100kw)Approval time and cost relative to a small systems ability to pay–
these are much smaller hydro developments than Canada is used to. They are similar in size and cost to the numerous solar panel installations now dotting the landscape and are meant to be replicated in the same way. Therefore, from a financial standpoint we can’t spend thousands of dollars and years on uncertain approvals. But the current approval process is the same approval process for a 200,000 KW development (200 MW)
We’re going to need an effective approval process but one that is less costly and more timely and focused, that recognizes the inherent lower risk and intended replication of these systems.
Luckily we have 10 years of European experience and research to draw on.
A way forward – a more adaptive management approach for small hydro within current policy– which utilizes all available research, knowledge and experience to form a series of “SOP’s” or “Best practice checklists” which get approved once and which if adhered to greatly reduce the approval process.
30
1645 Hwy#3, Delhi, ON, N4B 2W6T: 519 582 8563
GreenBug Energy Inc.
![Page 31: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/31.jpg)
Small Archimedes Screw
31
1645 Hwy#3, Delhi, ON, N4B 2W6T: 519 582 8563
GreenBug Energy Inc.
See full video tour at www.greenbugenergy.com/testsitevideo1.wmv & www.greenbugenergy.com/testsitevideo2.wmv
• Click to edit Master text styles– Second level
• Third level– Fourth level
» Fifth level
![Page 32: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/32.jpg)
1645 Hwy#3, Delhi, ON, N4B 2W6T: 519 582 8563
GreenBug Energy Inc.
![Page 33: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/33.jpg)
Vigor Clean Tech Inc.
Emergent Hydro and New Technologies
October 25, 2011OWA Power of Water Conference
Dale Brubacher-CressmanPresidentVigor Clean Tech Inc.
![Page 34: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/34.jpg)
The Contributors
Vigor Clean Tech:
An Ontario-based renewable energy developer and solution provider.
Lucid Energy:• A renewable energy company producing
clean, reliable, low cost electricity from gravity fed water transmission pipes.
![Page 35: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/35.jpg)
Technology 1: GHT• Cross Axis (“Vertical axis”)• Free flow• Easily scalable
![Page 36: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/36.jpg)
Application – In-stream, or“Hydro-Kinetic”
• Affix to permanent structure anchored to shoreline
• Floating support structure• Potential off-grid application• Scale: 10’s to 100’s of kWs
![Page 37: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/37.jpg)
Technology 2: LucidPipeTM• In conduit• Existing or new
![Page 38: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/38.jpg)
Applications - Low Head Hydro• Typical target installations
• Existing dams• Below 3M head• Scale: 10’s to 100’s of kW
![Page 39: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/39.jpg)
Applications - Incremental Hydro• Fish ladder attraction
conduit• Hydro plant bypass conduit• New auxiliary power
systems
![Page 40: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/40.jpg)
Applications – Existing Conduit• Industrial Effluent Emitters• Water & Waste Water
Utilities• Water Transmission
Agencies
![Page 41: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/41.jpg)
Technology Context
Conventional Hydropower
• Complex system infrastructure
• Deplete all pipeline pressure
• Require pipeline bypass
LucidPipeTM• Simple, in-pipe technology• Extracts marginal head
pressure• Requires no bypass• Complete installation in a day• Grid connected in a week
![Page 42: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/42.jpg)
Opportunities
• To generate a steady supply of reliable renewable energy at a smaller scale than is currently economically feasible
• To leverage existing under-utilized infrastructure (eg. low head dams)
• To capture lost energy in existing applications (eg. Pipelines, Spillways, Bypasses)
![Page 43: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/43.jpg)
Seeking Partnerships
• Project developers• Engineering firms• Customer / application opportunities
Opportunities for government funding for demonstration projects
![Page 44: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/44.jpg)
Thank you!
Dale Brubacher-CressmanPresidentVigor Clean Tech Inc.Tel: (519) 279 4630 ext [email protected]
![Page 45: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/45.jpg)
Loïc Pétillon, Eng.Project Director
2011 OWA Conference www.ossberger.ca
The movable hydroelectric plant
OSSBERGER
IN COLLABORATION WITH HSI
![Page 46: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/46.jpg)
Plan of the presentation
1. Introduction
2. Turbine types
3. The Movable Power planti. The concept
ii. R&D
iii. Prototype
iv. Project examples
v. Conclusion
![Page 47: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/47.jpg)
1. Introduction of Ossberger
Ossberger is a small hydro turbine manufacturer since 1903
OSSBERGER turbine (cross-flow type)
Now in collaboration with HSI and Cink for Kaplan and Pelton turbines
More than 10,000 turbines installed
![Page 48: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/48.jpg)
2. Turbine types
Ossberger – up to 1.25 m of runner Ø Pelton – up to 2,500 kW Horizontal or inclined Kaplan up to 2.8 m runner Ø
Vertical Kaplan up to 3 m runner Ø
![Page 49: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/49.jpg)
3. The movable hydroelectric plant
Application area: Head: 1 – 8 m Discharge: 1 – 25 m³/s Runner Ø: 1,0 – 2,0 m Output: up to 2000 kW with 3, 4 and 5 runner blades
![Page 50: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/50.jpg)
3.i. The concept Specifically designed for existing weirs/dams/canals No powerhouse, intake and tail race required Simple civil structure with two concrete walls Contributes to the evacuation capacity of the scheme Generation all year long with increased power during flood
season (hydraulic jet effect) Enables fish to go downstream Enables flushing of debris above and below the turbine (logs,
rocks, etc.) High efficiency unit (Turbine:91-92%,PMG: over 98%)
![Page 51: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/51.jpg)
3.i. The concept - features
Direct – coupled PM generator
Circular trash rack and integrated cleaner
Double regulated kaplan bulb turbine
Integrated steel draft tube
Hydraulic cylinders on both sides of the unit
HPU and Turbine control panel inside the casing
![Page 52: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/52.jpg)
3.ii. Research and Development
CFD - Intake
CFD – Draft tube
Finite Element Analysis
Vibration analysis
![Page 53: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/53.jpg)
3.ii. R&D - Hydraulic jet effect
Hydraulic jet effect VS Gross Head
0
0.2
0.4
0.6
0.8
1
1.2
1.4
0 1 2 3 4 5 6
Gross Head (m)
Hyd
rau
lic
jet
effe
ct (
m)
3D Simulation
2D Simulation
![Page 54: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/54.jpg)
3.iii. Prototype
Artist impression
Movable power house and fish-pass
![Page 55: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/55.jpg)
3.iii. Prototype - workshop
- Upstream section frame where circular trash rack and rake will be installed
- Double regulated Kaplan runner
- Hydraulic Power Unit and Turbine control panel installed in a pressurized section
![Page 56: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/56.jpg)
3.iii. Prototype - installation
- 20 mm trash rack spacing
- Capacity of the rake 2.5 tonnes
- Simple civil structure
- Fully assembled unit
![Page 57: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/57.jpg)
3.iv. Project examplesGengenbach Project
H = 3.10 m
Q = 20 m³/s
P = 550 kW
![Page 58: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/58.jpg)
3.iv. Project examplesGengenbach Project
![Page 59: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/59.jpg)
3.iv. Project examplesGengenbach project
Maintenance
- All required maintenance done with bulkheads upstream and downstream
- Only two generator bearings
![Page 60: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/60.jpg)
3.iv. Project examples Thurfeld project
H = 4.50 m
Q = 20 m³/s
P = 800 kW
![Page 61: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/61.jpg)
3.iv. Project examplesThurfeld project
- Multiple unit installation possible
- 25% cost reduction in some projects compared to traditional hydro
- Dimensions: length=20m; Width = 5.3m; Height = 4.3m; Runner Ø = 2m
- Total weight = 145,000 kg
![Page 62: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/62.jpg)
3.iv. Project examplesOther projects
Offenburg projectH = 3.00 mQ = 20 m³/sP = 520 kW
Hausach projectH = 2.40 mQ = 18 m³/sP = 380 kW
![Page 63: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/63.jpg)
3.iv. Project examplesOffenburg project
Offenburg unit contributes to the evacuation capacity of the scheme
- Discharge 60 m3/s in flood season: 20 m3/s in the turbine and 40 m3/s above and under the unit
- During high flow season, a wave appears downstream the unit (Hydraulic jet effect)
![Page 64: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/64.jpg)
3.v. Conclusion
- Very low head application
- Low construction cost
- Very high efficiency
- Contributes to the evacuation capacity
- Good productivity during flood season
- Aquatic life and debris can pass above and under the unit
![Page 65: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/65.jpg)
Thank you for your attention
Visit us at: www.ossberger.ca
![Page 66: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/66.jpg)
Power of Water Conference Presentation
By Laurie Arron, CEPP Program DirectorOctober 25, 2011
![Page 67: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/67.jpg)
Presentation Overview
• Community Power
• Renewable Energy Co-ops
• FIT incentives for Community Power
• CEPP Grants
• Case Study
![Page 68: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/68.jpg)
What is Community Power?
• CP means renewable energy projects developed by Ontario co-ops, non-profits, charities and residents who are not in the commercial power business (FIT definition)
• European experience:
• CP keeps economic benefits of renewable power development close to home
• CP fosters harmony within communities
• CP empowers local individuals to make a difference in fighting climate change.
![Page 69: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/69.jpg)
Renewable Energy Co-ops
• Green Energy Act created Renewable Energy Co-ops
• RE Co-ops are an ideal vehicle for a large group of people to own all or part of a renewable energy project
• RE Co-ops can be For-Profit or Not-for-Profit
• Democratic: one member = one vote
• Public offerings are not as complex as for corporations
• Regulated by FSCO instead of OSC
• Eligible for FIT community incentives and CEPP grants
![Page 70: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/70.jpg)
FIT Incentives for Community Power
• FIT incentives for Community projects:• Price Adder of up to 0.6 cents per kWh (5% bump in revenue)
• 50% or more community: Full Adder
• 25% community: 50% of Adder
• 10% community: 20% of Adder
• <10% community: No Adder
• Reduced FIT security payments ($5 per KW at each stage)
• CEPP soft cost grants of up to $200,000 ($500,000 for co-op projects over 10 MW)
• Commercial developers can access Price Adder by doing a joint venture with a community group
![Page 71: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/71.jpg)
Impact of Price Adder
• Assume the following:
• 400 kW project / 3,100 MWh annual production
• $3 million total cost
• 50/50 joint venture with a Renewable Energy Co-op
• Projected returns (IRR after debt)
• Whole project, no price adder: 15.9%
• Whole project, 0.6 cent price adder: 17.7%
• CEPP grant goes entirely to Co-op, which has a projected IRR after debt of 17.5% (full adder, $200,000 grant, after co-op costs)
![Page 72: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/72.jpg)
CEPP Program Overview
• A grant program to support FIT renewable energy projects owned and developed by Ontario landowners and residents
• Provides early stage funding for pre-NTP soft costs
• Maximum total CEPP grant is $200,000 per project ($500,000 for Co-op projects over 10 MW)
• Maximum coverage is 90% of Funded Activities
• Excludes payments to OPA, LDCs and other gov’t entities
• CEPP also provides grants to educate about community energy
• A program of the Ontario Power Authority, co-managed by Community Power Fund and Deloitte
![Page 73: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/73.jpg)
Project Eligibility:
Projects must satisfy the following criteria:
• Project size: >10 kW - 10 MW (an exception exists for co-op projects >10 MW)
• Technologies include: wind, solar PV, biomass, biogas, landfill gas or waterpower
• Site: located in Ontario
• Financing: economically viable/future FIT contract
• Ownership: developed by a “Community”
‘For profit’ projects are eligible for CEPP grants
![Page 74: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/74.jpg)
Eligibility: Who is considered ‘community’?
(a) One or more individuals
(b) Registered charity
(d) Not-for-profit organization
(d) Co-op
(h) Private corporation
(i) Limited partnership
Applicant must be 100% community as defined in the FIT Rules
all shareholders / partners must be (a) – (d) above;
none of them can have commercial electricity generation
as their primary business or employment
Joint ventures with ‘non-community partners’ are permitted
cannot have commercial electricity generation as their primary business or employment
![Page 75: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/75.jpg)
Joint Venture Eligibility
• A commercial developer can joint venture with a Community
• The Community group applies to CEPP
• The CEPP grant will apply to:
• The Community entity’s proportionate share of project costs
• 100% of the Community entity’s own costs (e.g. legal, membership costs, raising community capital)
• All CEPP money must flow directly to the Community entity and be for the benefit of the Community entity only
• e.g. if there’s a 50/50 JV, and the JV agreement says the Community entity pays 100% of engineering costs, still only 50% of engineering costs will be eligible for CEPP funding
![Page 76: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/76.jpg)
Two Types of Grants
Grant 1 (G1): Design & Development PhasePre-requisites:
• MNR Site Release Application submission (or similar)
• Preliminary resource assessment
• Local Distribution Company (LDC) consultation
• RETScreen financial analysis
Grant 2 (G2): Regulatory ApprovalsPre-requisites:
• Feed In Tariff (FIT) Contract or placement into the FIT production line or Economic Connection Test queue
• MNR Site Release Approval (or similar)
![Page 77: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/77.jpg)
Funded Activities – Examples
• Site investigation and control• Resource assessment• Preparing FIT application (not including payments to the OPA)• Site planning• EA work• Business plan• Engineering studies• Project manager or Project coordinator• Legal costs
![Page 78: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/78.jpg)
Funded Activities – More Examples
• Obtaining water-use rights, licenses, permits• Final Business Plan• Connection Impact Assessment (not including payments to
LDC)• Supplier Agreements• Construction Contracts• ESA Approval (not including payments to ESA)• Operating and Maintenance Agreement• Co-op Offering Document / Membership agreement• Co-op Sales and Marketing Plan (to find Members / Investors)
![Page 79: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/79.jpg)
Tools and Resources
www.communityenergyprogram.ca
It’s all online! • Sign-up for newsletter • Check out our resources
section• Read up on the Grant Program• Download the relevant forms
etc.
![Page 80: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/80.jpg)
CEPP Grants Awarded
As of October 19, 2011:• 121 grants for 116 projects• Total capacity – 87 MW• Total project costs – $345 million• Total grant funding – $6.6 million
![Page 81: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/81.jpg)
Case Study - Latchford
![Page 82: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/82.jpg)
Case Study - Latchford• Developed by the Water Power Group
• 1.4 MW FIT project using existing dams and new Very Low Head turbine technology
• Located in Latchford• 643 km north of Toronto • beside highway 11• community of 600 residents
• Offering investment opportunity to local residents
• % of revenue to the Town of Latchford, Temagami & Timiskaming First Nations for community projects
• Received a CEPP Grant 1 for $200,000 for legal, EA work, engineering, hydrological assessment, and project tendering
![Page 83: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/83.jpg)
Summary
• Joint venturing with a community group makes sense!
• Community adder and CEPP funding
• Increased support from local community
• Potential for higher returns
![Page 84: Costal VLH Turbine](https://reader036.fdocuments.us/reader036/viewer/2022081718/552afa24550346d93a8b45ea/html5/thumbnails/84.jpg)
Questions?
Laurie Arron, Program Director
phone: 416 597-2748 / 888 907-2377 ext. 115
email: [email protected]
communityenergyprogram.ca