Cost of joint Failure FAILURE IS NOT - Olex Support Services... · Efficient and trouble free...
Transcript of Cost of joint Failure FAILURE IS NOT - Olex Support Services... · Efficient and trouble free...
ENGINEERINGSUPPORTSERVICES
Joints are a primary cause of failureCause of Joint Failure• Incorrect design and or joint selection
• Poor quality joints
• Poor jointing workmanship/lack of skills
• External mechanical impact
Cost of joint Failure• Loss of transmission and related revenue
• Cost of rectification
• Penalty/damages costs
• Loss of reputation
Mitigating the Risk• Minimise/eliminate joints with longer drum lengths
• Connect point to point
• Engineer/select joints to eliminate failure
• Jointer training and accreditation
• Testing of joint design (and jointer skills)
Optimising whole of life reliability & performance of all MV & HV projects • Wind farm HV interconnector and MV collector systems
• Solar Farm HV interconnector, DC Feeder and AC Collector Systems
• Rail Electrification HV and MV Power Systems
• Resource Project main power and process MV and HV connections
• Mining Project main power connections
• Commercial and Industrial development HV Power connections
FAILURE IS NOT AN OPTIONCabling systems can represent as little as 2% of the project capital cost, whilst the cost of rectifying avoidable system failures can be as high as 15% of the operating cost.
No one else can match the specialised expertise, experience and understanding of the local operating environment factors as the Nexans Olex Engineering Support Services Team.
Preventing system failure can be as simple as managing the impact of the operating environment effect on ratings during design, installation and even the life of the system.
OPTIMISE YOUR INVESTMENT WITH THE UNPARALLELED EXPERIENCE AND EXPERTISE OF THE NEXANS OLEX ENGINEERING SUPPORT SERVICES TEAM.
CALL 1300 CABLES NOW TO ARRANGE A BRIEFING ON HOW TO OPTIMISE THE WHOLE OF LIFE OF YOUR CABLE INSTALLATION.
WHOLE OF LIFE OPTIMISATIONFOR MEDIUM AND HIGH VOLTAGE UNDERGROUND CABLE SYSTEMS
Introducing Nexans Olex
Whole of Life Cycle for a Cable System
Most cable system failures are the result of deficiencies in the project’s design and installation, often due to the lack of understanding, experience and familiarity with the specific local operating conditions.The Nexans Olex Engineering Support Services has been developed to assist our customers in achieving the Whole Of Life performance optimisation for medium and high voltage underground cable systems. Efficient and trouble free operation of the cable system is only possible following a careful and detailed consideration of electrical load characteristics along with the installation and operating environment parameters.
Cable System Design Optimise performance and minimise costs:
• Designing route section lengths and
configuration to best minimising jointing while
meeting induced current & voltage limits
• Designing for installation constraints and
special route requirements including road
crossings and under bores.
• Designing MV collector systems to optimise
ratings and cable sizing
• System Condition Monitoring Design
• TR Value Analysis
• Thermal Modelling
• Complex Multiple Circuits
Cable Design & Operating EnvironmentCable construction/designs to best meet operating environment and design life targets:
• Soil/Sand
• Rock/Mechanical Impact
• Cable Joints
• Seasonal Water Ingress
• Other Services and Circuits
• Termites and Rodents
• Direct Burial
• UV
• Lightning
• Ambient Temperature
Cable Standards and Specification Preparation and AdviceReview your needs and develop cable and accessory specifications to best satisfy relevant Australian and International standards, operation & whole of life targets.
• Cable and Accessory Specifications
• Third Party Specification compliance
• Review/recommend Type and Prequalification Test requirements for cable and accessories
25 YEARS +
DESIGN INSTALL OPERATION
Cable Installation DesignPreparation of site and detail drawings covering the essential requirements for effective installation.
• Trench design
• Joint Bay design
• Bridge Crossings
• Directional Bores
• Sleeve Bores
• Open Cut Excavation – Special Scenarios
• As-built Drawings and Specifications
Cable Installation Services• Site Supervision of cable installation
• Jointer Accreditation
• Jointing and Termination Services
• System Testing
• System Commissioning
• Installation of Distributed Temperature Sensing
Preventative Maintenance ServicesNexans Olex can offer an ongoing service that has been developed to monitor the temperature of cable and joints providing critical predictive data that can avoid potential failures.
• PD Testing and reporting
• Distributed Temperature Sensing and condition reporting
• Inspection of Terminations
Pre-Construction – Design PhaseThis vital stage in your project sets the foundation for optimised long-term performance of your cable system:
• Joint selection
• Termination selection
• Earthing design and component selection
• Fault protection design and selection
• Losses study
• Trench design
• Back fill design
• Optic fibre for condition monitoring
Nexans Olex Engineering Support Services enable our customers to harness the best expertise at the earliest stage of design and during the installation of your major MV or HV project.
OUR SERVICES
SAFEGUARD WHOLE OF LIFE PERFORMANCE AT EVERY PHASE
SAND/SOILTHERMAL RESISTIVITY
ROCK/MECHANICAL IMPACTTHERMAL RESISTIVITY
CABLEJOINTS
OTHERSERVICES
TERMITEDAMAGE
BURIAL DEPTH OVERBURDEN
BURIAL DEPTH CROSSING
AMBIENT TEMPERATURE
WATER INGRESS
WHOLE OF LIFE OPTIMISATIONFOR MEDIUM AND HIGH VOLTAGE UNDERGROUND CABLE SYSTEMS
Introducing Nexans Olex
Whole of Life Cycle for a Cable System
Most cable system failures are the result of deficiencies in the project’s design and installation, often due to the lack of understanding, experience and familiarity with the specific local operating conditions.The Nexans Olex Engineering Support Services has been developed to assist our customers in achieving the Whole Of Life performance optimisation for medium and high voltage underground cable systems. Efficient and trouble free operation of the cable system is only possible following a careful and detailed consideration of electrical load characteristics along with the installation and operating environment parameters.
Cable System Design Optimise performance and minimise costs:
• Designing route section lengths and
configuration to best minimising jointing while
meeting induced current & voltage limits
• Designing for installation constraints and
special route requirements including road
crossings and under bores.
• Designing MV collector systems to optimise
ratings and cable sizing
• System Condition Monitoring Design
• TR Value Analysis
• Thermal Modelling
• Complex Multiple Circuits
Cable Design & Operating EnvironmentCable construction/designs to best meet operating environment and design life targets:
• Soil/Sand
• Rock/Mechanical Impact
• Cable Joints
• Seasonal Water Ingress
• Other Services and Circuits
• Termites and Rodents
• Direct Burial
• UV
• Lightning
• Ambient Temperature
Cable Standards and Specification Preparation and AdviceReview your needs and develop cable and accessory specifications to best satisfy relevant Australian and International standards, operation & whole of life targets.
• Cable and Accessory Specifications
• Third Party Specification compliance
• Review/recommend Type and Prequalification Test requirements for cable and accessories
25 YEARS +
DESIGN INSTALL OPERATION
Cable Installation DesignPreparation of site and detail drawings covering the essential requirements for effective installation.
• Trench design
• Joint Bay design
• Bridge Crossings
• Directional Bores
• Sleeve Bores
• Open Cut Excavation – Special Scenarios
• As-built Drawings and Specifications
Cable Installation Services• Site Supervision of cable installation
• Jointer Accreditation
• Jointing and Termination Services
• System Testing
• System Commissioning
• Installation of Distributed Temperature Sensing
Preventative Maintenance ServicesNexans Olex can offer an ongoing service that has been developed to monitor the temperature of cable and joints providing critical predictive data that can avoid potential failures.
• PD Testing and reporting
• Distributed Temperature Sensing and condition reporting
• Inspection of Terminations
Pre-Construction – Design PhaseThis vital stage in your project sets the foundation for optimised long-term performance of your cable system:
• Joint selection
• Termination selection
• Earthing design and component selection
• Fault protection design and selection
• Losses study
• Trench design
• Back fill design
• Optic fibre for condition monitoring
Nexans Olex Engineering Support Services enable our customers to harness the best expertise at the earliest stage of design and during the installation of your major MV or HV project.
OUR SERVICES
SAFEGUARD WHOLE OF LIFE PERFORMANCE AT EVERY PHASE
SAND/SOILTHERMAL RESISTIVITY
ROCK/MECHANICAL IMPACTTHERMAL RESISTIVITY
CABLEJOINTS
OTHERSERVICES
TERMITEDAMAGE
BURIAL DEPTH OVERBURDEN
BURIAL DEPTH CROSSING
AMBIENT TEMPERATURE
WATER INGRESS
WHOLE OF LIFE OPTIMISATIONFOR MEDIUM AND HIGH VOLTAGE UNDERGROUND CABLE SYSTEMS
Introducing Nexans Olex
Whole of Life Cycle for a Cable System
Most cable system failures are the result of deficiencies in the project’s design and installation, often due to the lack of understanding, experience and familiarity with the specific local operating conditions.The Nexans Olex Engineering Support Services has been developed to assist our customers in achieving the Whole Of Life performance optimisation for medium and high voltage underground cable systems. Efficient and trouble free operation of the cable system is only possible following a careful and detailed consideration of electrical load characteristics along with the installation and operating environment parameters.
Cable System Design Optimise performance and minimise costs:
• Designing route section lengths and
configuration to best minimising jointing while
meeting induced current & voltage limits
• Designing for installation constraints and
special route requirements including road
crossings and under bores.
• Designing MV collector systems to optimise
ratings and cable sizing
• System Condition Monitoring Design
• TR Value Analysis
• Thermal Modelling
• Complex Multiple Circuits
Cable Design & Operating EnvironmentCable construction/designs to best meet operating environment and design life targets:
• Soil/Sand
• Rock/Mechanical Impact
• Cable Joints
• Seasonal Water Ingress
• Other Services and Circuits
• Termites and Rodents
• Direct Burial
• UV
• Lightning
• Ambient Temperature
Cable Standards and Specification Preparation and AdviceReview your needs and develop cable and accessory specifications to best satisfy relevant Australian and International standards, operation & whole of life targets.
• Cable and Accessory Specifications
• Third Party Specification compliance
• Review/recommend Type and Prequalification Test requirements for cable and accessories
25 YEARS +
DESIGN INSTALL OPERATION
Cable Installation DesignPreparation of site and detail drawings covering the essential requirements for effective installation.
• Trench design
• Joint Bay design
• Bridge Crossings
• Directional Bores
• Sleeve Bores
• Open Cut Excavation – Special Scenarios
• As-built Drawings and Specifications
Cable Installation Services• Site Supervision of cable installation
• Jointer Accreditation
• Jointing and Termination Services
• System Testing
• System Commissioning
• Installation of Distributed Temperature Sensing
Preventative Maintenance ServicesNexans Olex can offer an ongoing service that has been developed to monitor the temperature of cable and joints providing critical predictive data that can avoid potential failures.
• PD Testing and reporting
• Distributed Temperature Sensing and condition reporting
• Inspection of Terminations
Pre-Construction – Design PhaseThis vital stage in your project sets the foundation for optimised long-term performance of your cable system:
• Joint selection
• Termination selection
• Earthing design and component selection
• Fault protection design and selection
• Losses study
• Trench design
• Back fill design
• Optic fibre for condition monitoring
Nexans Olex Engineering Support Services enable our customers to harness the best expertise at the earliest stage of design and during the installation of your major MV or HV project.
OUR SERVICES
SAFEGUARD WHOLE OF LIFE PERFORMANCE AT EVERY PHASE
SAND/SOILTHERMAL RESISTIVITY
ROCK/MECHANICAL IMPACTTHERMAL RESISTIVITY
CABLEJOINTS
OTHERSERVICES
TERMITEDAMAGE
BURIAL DEPTH OVERBURDEN
BURIAL DEPTH CROSSING
AMBIENT TEMPERATURE
WATER INGRESS
ENGINEERINGSUPPORTSERVICES
Joints are a primary cause of failureCause of Joint Failure• Incorrect design and or joint selection
• Poor quality joints
• Poor jointing workmanship/lack of skills
• External mechanical impact
Cost of joint Failure• Loss of transmission and related revenue
• Cost of rectification
• Penalty/damages costs
• Loss of reputation
Mitigating the Risk• Minimise/eliminate joints with longer drum lengths
• Connect point to point
• Engineer/select joints to eliminate failure
• Jointer training and accreditation
• Testing of joint design (and jointer skills)
Optimising whole of life reliability & performance of all MV & HV projects • Wind farm HV interconnector and MV collector systems
• Solar Farm HV interconnector, DC Feeder and AC Collector Systems
• Rail Electrification HV and MV Power Systems
• Resource Project main power and process MV and HV connections
• Mining Project main power connections
• Commercial and Industrial development HV Power connections
FAILURE IS NOT AN OPTIONCabling systems can represent as little as 2% of the project capital cost, whilst the cost of rectifying avoidable system failures can be as high as 15% of the operating cost.
No one else can match the specialised expertise, experience and understanding of the local operating environment factors as the Nexans Olex Engineering Support Services Team.
Preventing system failure can be as simple as managing the impact of the operating environment effect on ratings during design, installation and even the life of the system.
OPTIMISE YOUR INVESTMENT WITH THE UNPARALLELED EXPERIENCE AND EXPERTISE OF THE NEXANS OLEX ENGINEERING SUPPORT SERVICES TEAM.
CALL 1300 CABLES NOW TO ARRANGE A BRIEFING ON HOW TO OPTIMISE THE WHOLE OF LIFE OF YOUR CABLE INSTALLATION.
ENGINEERINGSUPPORTSERVICES
Joints are a primary cause of failureCause of Joint Failure• Incorrect design and or joint selection
• Poor quality joints
• Poor jointing workmanship/lack of skills
• External mechanical impact
Cost of joint Failure• Loss of transmission and related revenue
• Cost of rectification
• Penalty/damages costs
• Loss of reputation
Mitigating the Risk• Minimise/eliminate joints with longer drum lengths
• Connect point to point
• Engineer/select joints to eliminate failure
• Jointer training and accreditation
• Testing of joint design (and jointer skills)
Optimising whole of life reliability & performance of all MV & HV projects • Wind farm HV interconnector and MV collector systems
• Solar Farm HV interconnector, DC Feeder and AC Collector Systems
• Rail Electrification HV and MV Power Systems
• Resource Project main power and process MV and HV connections
• Mining Project main power connections
• Commercial and Industrial development HV Power connections
FAILURE IS NOT AN OPTIONCabling systems can represent as little as 2% of the project capital cost, whilst the cost of rectifying avoidable system failures can be as high as 15% of the operating cost.
No one else can match the specialised expertise, experience and understanding of the local operating environment factors as the Nexans Olex Engineering Support Services Team.
Preventing system failure can be as simple as managing the impact of the operating environment effect on ratings during design, installation and even the life of the system.
OPTIMISE YOUR INVESTMENT WITH THE UNPARALLELED EXPERIENCE AND EXPERTISE OF THE NEXANS OLEX ENGINEERING SUPPORT SERVICES TEAM.
CALL 1300 CABLES NOW TO ARRANGE A BRIEFING ON HOW TO OPTIMISE THE WHOLE OF LIFE OF YOUR CABLE INSTALLATION.