8/13/2019 Cost Breakdown Sheet
1/4
Schedule of Values
School District
SFB Project Number
Architect Name SD
CM @ Risk Name DDCounty GMP
Grade Configuration
Square Footage sq.ft. (enter only thenumber in F11
Number of Buildings
Student Capacity
Acres of Land
Permitting (Name of County/City)
SFB Board Approved Budget AW-Y
Grand GMP (Total ofSFB Base Cost and District Cost)
$0.00 #DIV/0! AW-N
SFB Cost per SF #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Cost per Other On-Site
SFB Unit SFB District Funding Off-SiteQuantity (no markup) Base Cost Cost (Adjacent Ways, etc.) Adjacent Wa
Div 1 GENERAL CONDITIONS #DIV/0!
Div 2 SITE WORK
site demolition/removal #DIV/0!
survey #DIV/0!
dust control #DIV/0!
drywells #DIV/0!
track off pads #DIV/0!
earthwork/mass excavation #DIV/0!
unusal site conditions #DIV/0!
lift station #DIV/0!
retaining walls #DIV/0!import/export dirt #DIV/0!
stormwater/drainage #DIV/0!
asphalt/paving #DIV/0!
parking #DIV/0!
soil treatment #DIV/0!
site electrical #DIV/0!
striping/signage #DIV/0!
site concrete #DIV/0!
sidewalks #DIV/0!
site masonry #DIV/0!
site utilities #DIV/0!
septic system #DIV/0!
wells #DIV/0!
trash enclosures #DIV/0!
ballfield backstop #DIV/0!
site basketball courts #DIV/0!
sports fields #DIV/0!
chainlink fencing #DIV/0!
wrought iron fencing #DIV/0!
block fencing #DIV/0!
landscaping/irrigation #DIV/0!
#DIV/0! Division 2 total #DIV/0! $0.00 $0.00 $0.00 $0
Div 3 BUILDING CONCRETE
footings/walls #DIV/0!
slabs #DIV/0!
building #DIV/0!
rebar #DIV/0!
precast concrete #DIV/0!
Division 3 total #DIV/0! $0.00 $0.00 $0.00 $0
Div 4 BUILDING MASONRY
masonry walls #DIV/0!
masonry columns #DIV/0!
stonework #DIV/0!
rebar #DIV/0!
Division 4 total #DIV/0! $0.00 $0.00 $0.00 $0
District Funded SF:
Construction Schedule (number of days):
Prepared by:
Prepared by Company:
SCHOOL FACILITIES BOARD
SFB NC 600-06
NEW CONSTRUCT
SCHEDULE OF VALU
SFB Meeting Date:
Total GMP incld. SFB, District & Adj. Ways
-
8/13/2019 Cost Breakdown Sheet
2/4
Schedule of Values
SFB Cost per SF #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Cost per Other On-Site
SFB Unit SFB District Funding Off-Site
Quantity (no markup) Base Cost Cost (Adjacent Ways, etc.) Adjacent Ways
Div 5 METALS
structural steel #DIV/0!
stairs #DIV/0!
metal decking #DIV/0!
architectural steel #DIV/0!
miscellaneous steel #DIV/0!
Division 5 total #DIV/0! $0.00 $0.00 $0.00 $0.00
Div 6 CARPENTRY
rough carpentry structure #DIV/0!
wood decking #DIV/0!
finish carpentry #DIV/0!
millwork/casework #DIV/0!plastic/glass fiber #DIV/0!
Division 6 total #DIV/0! $0.00 $0.00 $0.00 $0.00
Div 7 THERMAL/MOISTURE
waterproofing/dampproofing #DIV/0!
building insulation #DIV/0!
membrane roofing #DIV/0!
foam roof #DIV/0!
metal roof #DIV/0!
roof shingles #DIV/0!
roof tiles #DIV/0!
general sheet metal #DIV/0!
roof accessories #DIV/0!
sprayed fireproofing #DIV/0!
firestopping #DIV/0!
roof expansion joint #DIV/0!
joint sealants #DIV/0!
Division 7 total #DIV/0! $0.00 $0.00 $0.00 $0.00
Div 8 DOORS/GLASS
doors & frames #DIV/0!
hardware #DIV/0!
storefronts #DIV/0!
automatic doors #DIV/0!
overhead doors #DIV/0!
windows #DIV/0!
skylights #DIV/0!
curtain walls #DIV/0!
glass & glazing #DIV/0!
Division 8 total #DIV/0! $0.00 $0.00 $0.00 $0.00
Div 9 FINISHESstucco/EIFS systems #DIV/0!
interior metal studs/gypsum board #DIV/0!
exterior metal stud framing #DIV/0!
decorative plaster #DIV/0!
acoustical ceilings #DIV/0!
ceramic tile #DIV/0!
resilient flooring #DIV/0!
carpet #DIV/0!
wood floors #DIV/0!
epoxy #DIV/0!
sealed floors #DIV/0!
sound panels #DIV/0!
painting #DIV/0!fiberglass reinforced panels #DIV/0!
Division 9 total #DIV/0! $0.00 $0.00 $0.00 $0.00
P 2 f 4
-
8/13/2019 Cost Breakdown Sheet
3/4
Schedule of Values
SFB Cost per SF #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Cost per Other On-Site
SFB Unit SFB District Funding Off-Site
Quantity (no markup) Base Cost Cost (Adjacent Ways, etc.) Adjacent Ways
Div 10 SPECIALTIES
visual display boards #DIV/0!
toilet partitions & accessories #DIV/0!
projection screens #DIV/0!
wall protection #DIV/0!
operable partitions/walls #DIV/0!
flagpoles #DIV/0!
cubicle track & curtain #DIV/0!
signage #DIV/0!
lockers #DIV/0!
fire exttinguishers & cabinets #DIV/0!
knox box #DIV/0!
awnings #DIV/0!
storage shelving #DIV/0!
Division 10 total #DIV/0! $0.00 $0.00 $0.00 $0.00
Div 11 EQUIPMENT
stage curtain/equipment #DIV/0!
library equipment #DIV/0!
audio/visual equipment #DIV/0!
kitchen equipment #DIV/0!
sports/PE equipment #DIV/0!
playground equipment #DIV/0!
canopy/ramada #DIV/0!
bike racks #DIV/0!
floor safe #DIV/0!
Division 11 total #DIV/0! $0.00 $0.00 $0.00 $0.00
Div 12 FURNISHINGS
metal casework #DIV/0!plastic laminate casework #DIV/0!
fume hoods #DIV/0!
auditorium seating #DIV/0!
window coverings #DIV/0!
Division 12 total #DIV/0! $0.00 $0.00 $0.00 $0.00
Div 13 SPECIAL CONST
shelters #DIV/0!
metal buildings #DIV/0!
bleachers #DIV/0!equipment/storage enclosures #DIV/0!
swimming pools #DIV/0!surveillance/alarm #DIV/0!
Division 13 total #DIV/0! $0.00 $0.00 $0.00 $0.00Div 14 CONVEYING
elevators #DIV/0!
wheelchair lifts #DIV/0!material handling #DIV/0!
Division 14 total #DIV/0! $0.00 $0.00 $0.00 $0.00
Div 15 MECHANICAL
mechanical insulation #DIV/0!
fire protection/sprinklers #DIV/0!
plumbing fixtures #DIV/0!
water treatment #DIV/0!
HVAC - central plant #DIV/0!
HVAC - package units #DIV/0!HVAC - split system #DIV/0!
HVAC - evaporative #DIV/0!
Division 15 total #DIV/0! $0.00 $0.00 $0.00 $0.00
Page 3 of 4
-
8/13/2019 Cost Breakdown Sheet
4/4
Schedule of Values
SFB Cost per SF #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Cost per Other On-Site
SFB Unit SFB District Funding Off-Site
Quantity (no markup) Base Cost Cost (Adjacent Ways, etc.) Adjacent Ways
Div 16 ELECTRICAL
electrical #DIV/0!
fire alarm system #DIV/0!security system #DIV/0!
data cabling #DIV/0!
intercom #DIV/0!
communications/phone #DIV/0!
TV cabling #DIV/0!
exterior lighting #DIV/0!
generators #DIV/0!
Division 16 total #DIV/0! $0.00 $0.00 $0.00 $0.00
Div 17 SPECIAL SYSTEMS
EMS #DIV/0!
Division 17 total #DIV/0! $0.00 $0.00 $0.00 $0.00
Subtotal $0.00 $0.00 $0.00 $0.00 $0.00Contractor Fee #DIV/0!
Contactor Contingency #DIV/0!
Builders Risk/Liability Insurance #DIV/0!
Performance & Payment Bonds #DIV/0!
Sales Tax #DIV/0!
Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Grand Guaranteed
Maximum Price (GMP)(Total of SFB Base Cost and District Cost)$0.00
Page 4 of 4