Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.
-
Upload
kristina-stevens -
Category
Documents
-
view
224 -
download
3
Transcript of Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.
![Page 1: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/1.jpg)
Corporate Ecosystem Valuation (CEV)Corporate Ecosystem Valuation (CEV)
Road Test Case Study: Lafarge
May 3, 2011
![Page 2: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/2.jpg)
Suzanne Ozment, World Resources Institute
Amy Rosenthal, World Wildlife Fund
John Finisdore, The Nature Conservancy
The Presenters
![Page 3: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/3.jpg)
Lafarge Group
• Major positions in three product lines:– Cement– Aggregates and Concrete– Gypsum Wallboard
• Global manufacturing operations• Approx. 80,000 employees worldwide• Approx. 2,000 facilities worldwide• Approx. 720 quarries worldwide
![Page 4: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/4.jpg)
Assess the value of ecosystem services to enhance Lafarge’s land management planning for future quarry reclamation
Better understand ecosystem services, valuation, and how to incorporate ecosystem services into Lafarge business decision-making
The Objective & Partnership
![Page 5: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/5.jpg)
The Plan for Ecosystem Valuation
Tools:• Corporate Ecosystem Services Review
• Wildlife Habitat Benefits Estimation Toolkit
• Integrated Valuation of Ecosystem Services and Tradeoffs (InVEST)
![Page 6: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/6.jpg)
Ecosystem Valuation Partnership
• Major positions in three product lines:– Cement– Aggregates and Concrete– Gypsum Wallboard
• Global manufacturing operations• Approx. 80,000 employees worldwide• Approx. 2,000 facilities worldwide• Approx. 720 quarries worldwide
![Page 7: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/7.jpg)
www.wri.org/ecosystems/esr
![Page 8: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/8.jpg)
5. Develop strategies
4. Identify business risks and opportunities
3. Analyze trends in priority services
2. Identify priority ecosystem services
1. Select the scope
The Corporate Ecosystem Services Review
![Page 9: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/9.jpg)
Huron Watershed Land Use (1996)Forest 66%
Agriculture 22%
Residential/Industrial
10%
Other 2%
PIQ
![Page 10: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/10.jpg)
Step 2: Identify dependence & impacts
![Page 11: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/11.jpg)
Step 3. Trends analysis framework
Condition and trends in ecosystem service
Direct driversActivities
of others
Indirect drivers
Company activities
![Page 12: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/12.jpg)
Ecosystem Valuation Tools
• Corporate Ecosystem Services Review
• Wildlife Habitat Benefits Estimation Toolkit
• Integrated Valuation of Ecosystem Services and Tradeoffs (InVEST)
![Page 13: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/13.jpg)
Wildlife Habitat Benefits Estimation Toolkit
• Spreadsheet-based valuation models• Value databases & peer-reviewed studies of
ecosystems and species• Recreation use model• Technical reports & user’s manual
![Page 14: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/14.jpg)
The WHBE Toolkit
₊ Increases in property value from nearby open space
₊ Outdoor recreation associated with wildlife
₊ Conservation of threatened & endangered species
₊ Some ecosystem services, using ‘benefits transfer’
= Total conservation value
of a site for wildlife + habitat
![Page 15: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/15.jpg)
How the Toolkit works: pros & cons
Pros• Synthesizes information from many studies• Straightforward data needs• Useful for rapid assessment, cheaper than new studies
Cons• Requires some technical expertise • Not specifically designed for business applications• Values derived from other study sites can be inaccurate
![Page 16: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/16.jpg)
Toolkit is Best Used When
• Working in the US context• The area is a commonly
studied habitat type• Studies are available for
characteristics being evaluated
• Coarse estimates are needed
Benefit transfer
Single point
estimate
Avg value
Admin approved value
Use value estimate at site
![Page 17: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/17.jpg)
Natural Capital Project: InVEST
Integrated Valuation of Ecosystem Services and Tradeoffs
• Family of models that enables users to quantify, map and value the ecosystem service impacts of alternative decisions.
• Maps, tradeoff curves, balance sheets
![Page 18: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/18.jpg)
Lands and waters:CarbonHydropowerWater purificationAvoided sedimentationManaged timber productionCrop pollinationOceans and coasts:Wave energyCoastal hazardsAquacultureAesthetic viewsBiodiversity
Ecosystem Services
![Page 19: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/19.jpg)
Measures & Values
• Supply of service
• Delivery of service
• Value
Market valuationAvoided damage costsProduction Economics
![Page 20: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/20.jpg)
InVEST is Best Used When
• Addressing a specific business strategy, question or decision
• Comparing alternative options or scenarios
• Managing land, water or coastal resources
• Considering moderate resolution and scale
Land cover 2000
Conservation 2025 BAU 2025
or
![Page 21: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/21.jpg)
Pros• Spatially explicit results comparing options• Good for addressing multiple benefits & risks
Cons• Requires technical expertise, data & time• Not specifically designed for business
applications• Without reliable, precise input data, values
derived can be inaccurate
How InVEST works: pros & cons
![Page 22: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/22.jpg)
Project Work Flow
Project team• 3 technical team, 2 reporting team, 2 Lafarge
team, review & support from numerous othersTimeline • 6 months
1. kick-off & scoping, 2. planning & valuation,3. review & reporting
Tools• 4 models, 1 reportCost• ~ $60,000
![Page 23: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/23.jpg)
Results: Habitat Benefits
![Page 24: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/24.jpg)
Risks & Opportunities: Water contamination v. purification
Nitrogen pollutant loadPIQ Total: ~2,500 kg/year
Nitrogen regulation services
PIQ Total: over 3,300 kg/year
*In PIQ, nutrient exported goes through sediment settlement system*
![Page 25: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/25.jpg)
Value of Ecosystem Services
Valuation of Erosion Regulation Services PIQ Total: ~$2,000,000 per year
PIQ Total: over 145,000 metric tons retained annually
![Page 26: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/26.jpg)
Challenges & risks successes & opportunities
Complexity Uncertainty Landscape scale
Stakeholders
Data, techniques & costs
Defined business decision
Defined material risks and opportunities
Consistency, conservative, transparency, validation
Physical measurement
Strive for “necessary”
Economic valuation
Engage experts
Data, techniques & costs
Use sensitivity analysis
![Page 27: Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062803/56649f4a5503460f94c6bf9a/html5/thumbnails/27.jpg)
AcknowledgementsAcknowledgements
Lafarge: Harve Stocke & David Carroll
WRI: Susan Minnemeyer & Andrew Leach
Natural Capital Project: Nirmal Bhagabati, Emily McKenzie, Heather Tallis, Driss Enaanay, Sheri Willoughby