    Cost of Poor Quality

  • 7/24/2019 COQ - An Overview (Rev 01)

    2/25

    Content

    DefineCost of Poor

    Quality

    MeasureCOPQ Baseline

    AnalyzeCritical Factors

    ImproveCritical Factors

    ControlImprovement

    Plan

  • 7/24/2019 COQ - An Overview (Rev 01)

    3/25

    Define

    Cost of Quality (COQ)

    Joseph Juran - first discussed the cost of quality analysis in 1951

    is a means to quantify the total cost of:

    Quality-related efforts (Prevention + Appraisal)

    Deficiencies (Failure)

  • 7/24/2019 COQ - An Overview (Rev 01)

    4/25

    Define

    Categories of Cost of Quality (COQ)

  • 7/24/2019 COQ - An Overview (Rev 01)

    5/25

    Is Cost related to

    Prevention of Non-

    Conformance?

    Define

    Is Cost related to

    Inspection or testing?

    PREVENTION

    APPRAISAL

    Is Cost related to

    Failure?

    Is Failure identified

    internally?

    INTERNAL FAILURE

    EXTERNAL

    FAILURE

  • 7/24/2019 COQ - An Overview (Rev 01)

    6/25

    Define

    Focus on Cost of Poor Quality

  • 7/24/2019 COQ - An Overview (Rev 01)

    7/25

    Measure Baseline

    CurrentStatusof

    CostofPoorQualityinDescon

    Procedure available but is

    it implemented properly?

    NO.!!

  • 7/24/2019 COQ - An Overview (Rev 01)

    8/25

    Measure Baseline

    (inPak

    Rs.)

    Duration AppraisalCost* FailureCost*

    Jan Oct,2015 35,307,150 1,380,477

    *DataisforNKB,LMW,KMW,HMW,Borouge&Baraka

    DesconCOQStats

    CurrentStatus

    of

    Cost

    of

    Quality

    in

    Descon

    ProjectrelatedCARs(Jan Oct,2015)

    230*

    *DataisforNKB,LMW,KMW,HMW,Borouge&Baraka

    (inNumbers)

  • 7/24/2019 COQ - An Overview (Rev 01)

    9/25

  • 7/24/2019 COQ - An Overview (Rev 01)

    10/25

    In order to assess the right picture of Reworks / Repairs /

    Nonconformances, we must measure COPQ

    AretheiranyotherbenefitsofmeasuringCOPQ?

    Measure Baseline

    Yes.!!

  • 7/24/2019 COQ - An Overview (Rev 01)

    11/25

    Why measure COPQ?

    COPQ direct contribution in profit

    COPQ - identify quality improvement candidates;

    Identify all failures costs

    Detect root causes and eliminate them

    COPQ - measure of the success of projects

    COPQ - cost data for motivational purpose

  • 7/24/2019 COQ - An Overview (Rev 01)

    12/25

    In 2007, U.S. construction industry expenditures were $1.246 trillion and out

    of these, $62 billion (5%) were wasted on the direct cost ofreworkalone.

    (Bureau of Economic Analysis, 2009)

    Annual turnover of the Australian construction industry was estimated at

    $A32 billion per annum whereas the cost ofrework was approximated at

    $A4 billion per annum.

    (Construction Expert Group 1993)

    In a publication entitled Managing Construction Quality, an average contractor

    is estimated to spend between 5-10 percent of the project cost doing things

    wrong and rectifying them.

    (Construction Industry Development Board (CIBD))

    Why measure COPQ?

  • 7/24/2019 COQ - An Overview (Rev 01)

    13/25

    Why measure COPQ?

    Welded Pipe

    SpoolWelding Welding

    Site Space Site Space

    Site Space

    Value Added

    Non-Value Added

    Philip R. Thomas, Competitiveness

    Through Total Cycle Time. McGraw-Hill

    (1990)

    The Hidden Project

    Repair

    Fix

    Test

    Repair

    Fix

    Test

  • 7/24/2019 COQ - An Overview (Rev 01)

    14/25

    Why measure COPQ?

  • 7/24/2019 COQ - An Overview (Rev 01)

    15/25

    Measurement Started What next?

    Leakage Identified Now FIX it!

  • 7/24/2019 COQ - An Overview (Rev 01)

    16/25

    Analyze critical factors

    COPQ

    measured

    correctly

    (X = Rs. 36,470/-)

    (Y)

    High repair rate

    Higher rejection rate at receiving inspection

  • 7/24/2019 COQ - An Overview (Rev 01)

    17/25

    Analyze critical factors

  • 7/24/2019 COQ - An Overview (Rev 01)

    18/25

    (in US $)

    Analyze critical factors

    (H&S Motor Company, USA)

  • 7/24/2019 COQ - An Overview (Rev 01)

    19/25

    Analyze critical factors

    Taking the revision cloud too seriously Red-bull reinforced concrete

  • 7/24/2019 COQ - An Overview (Rev 01)

    20/25

    Analyze critical factors

    Light pole Argument Right FirstTime

  • 7/24/2019 COQ - An Overview (Rev 01)

    21/25

    All quality improvement occurs on a project-by-project basis

    - Juran

    Improve critical factors

    Only measuring COPQ will not resolve the problems of a company; Instead,

    it will only give a view on what activities that need to be done in order to

    improve the quality level of the company

  • 7/24/2019 COQ - An Overview (Rev 01)

    22/25

    Senior Management support is critical for implementing COPQ program

    Improve critical factors

  • 7/24/2019 COQ - An Overview (Rev 01)

    23/25

    Determine level of detail for COPQ measurement

    Start with Internal and External Failure costs only

    Improve critical factors

    Select any pilot project for measurement of COPQ

    Selection of project (preferably from start)

    Formation of COPQ team (preferably QA&QC + Planning)

    Mandate is given to COPQ team (for accurate measurement)

    Monthly reporting from COPQ team (Areas of improvement)

  • 7/24/2019 COQ - An Overview (Rev 01)

    24/25

    Once COPQ team identify improvement area;

    Perform root cause analysis and suggest corrective action

    Investment in Appraisal cost or Prevention cost

    Results will not be over-night

    Control improvement plans

  • 7/24/2019 COQ - An Overview (Rev 01)

    25/25

    Conclusion

    The goal of using COQ is to increase prevention activities in

    order to eliminate internal and external failures and to reduce

    appraisal activities.