Cost of Poor Quality
-
7/24/2019 COQ - An Overview (Rev 01)
2/25
Content
DefineCost of Poor
Quality
MeasureCOPQ Baseline
AnalyzeCritical Factors
ImproveCritical Factors
ControlImprovement
Plan
-
7/24/2019 COQ - An Overview (Rev 01)
3/25
Define
Cost of Quality (COQ)
Joseph Juran - first discussed the cost of quality analysis in 1951
is a means to quantify the total cost of:
Quality-related efforts (Prevention + Appraisal)
Deficiencies (Failure)
-
7/24/2019 COQ - An Overview (Rev 01)
4/25
Define
Categories of Cost of Quality (COQ)
-
7/24/2019 COQ - An Overview (Rev 01)
5/25
Is Cost related to
Prevention of Non-
Conformance?
Define
Is Cost related to
Inspection or testing?
PREVENTION
APPRAISAL
Is Cost related to
Failure?
Is Failure identified
internally?
INTERNAL FAILURE
EXTERNAL
FAILURE
-
7/24/2019 COQ - An Overview (Rev 01)
6/25
Define
Focus on Cost of Poor Quality
-
7/24/2019 COQ - An Overview (Rev 01)
7/25
Measure Baseline
CurrentStatusof
CostofPoorQualityinDescon
Procedure available but is
it implemented properly?
NO.!!
-
7/24/2019 COQ - An Overview (Rev 01)
8/25
Measure Baseline
(inPak
Rs.)
Duration AppraisalCost* FailureCost*
Jan Oct,2015 35,307,150 1,380,477
*DataisforNKB,LMW,KMW,HMW,Borouge&Baraka
DesconCOQStats
CurrentStatus
of
Cost
of
Quality
in
Descon
ProjectrelatedCARs(Jan Oct,2015)
230*
*DataisforNKB,LMW,KMW,HMW,Borouge&Baraka
(inNumbers)
-
7/24/2019 COQ - An Overview (Rev 01)
9/25
-
7/24/2019 COQ - An Overview (Rev 01)
10/25
In order to assess the right picture of Reworks / Repairs /
Nonconformances, we must measure COPQ
AretheiranyotherbenefitsofmeasuringCOPQ?
Measure Baseline
Yes.!!
-
7/24/2019 COQ - An Overview (Rev 01)
11/25
Why measure COPQ?
COPQ direct contribution in profit
COPQ - identify quality improvement candidates;
Identify all failures costs
Detect root causes and eliminate them
COPQ - measure of the success of projects
COPQ - cost data for motivational purpose
-
7/24/2019 COQ - An Overview (Rev 01)
12/25
In 2007, U.S. construction industry expenditures were $1.246 trillion and out
of these, $62 billion (5%) were wasted on the direct cost ofreworkalone.
(Bureau of Economic Analysis, 2009)
Annual turnover of the Australian construction industry was estimated at
$A32 billion per annum whereas the cost ofrework was approximated at
$A4 billion per annum.
(Construction Expert Group 1993)
In a publication entitled Managing Construction Quality, an average contractor
is estimated to spend between 5-10 percent of the project cost doing things
wrong and rectifying them.
(Construction Industry Development Board (CIBD))
Why measure COPQ?
-
7/24/2019 COQ - An Overview (Rev 01)
13/25
Why measure COPQ?
Welded Pipe
SpoolWelding Welding
Site Space Site Space
Site Space
Value Added
Non-Value Added
Philip R. Thomas, Competitiveness
Through Total Cycle Time. McGraw-Hill
(1990)
The Hidden Project
Repair
Fix
Test
Repair
Fix
Test
-
7/24/2019 COQ - An Overview (Rev 01)
14/25
Why measure COPQ?
-
7/24/2019 COQ - An Overview (Rev 01)
15/25
Measurement Started What next?
Leakage Identified Now FIX it!
-
7/24/2019 COQ - An Overview (Rev 01)
16/25
Analyze critical factors
COPQ
measured
correctly
(X = Rs. 36,470/-)
(Y)
High repair rate
Higher rejection rate at receiving inspection
-
7/24/2019 COQ - An Overview (Rev 01)
17/25
Analyze critical factors
-
7/24/2019 COQ - An Overview (Rev 01)
18/25
(in US $)
Analyze critical factors
(H&S Motor Company, USA)
-
7/24/2019 COQ - An Overview (Rev 01)
19/25
Analyze critical factors
Taking the revision cloud too seriously Red-bull reinforced concrete
-
7/24/2019 COQ - An Overview (Rev 01)
20/25
Analyze critical factors
Light pole Argument Right FirstTime
-
7/24/2019 COQ - An Overview (Rev 01)
21/25
All quality improvement occurs on a project-by-project basis
- Juran
Improve critical factors
Only measuring COPQ will not resolve the problems of a company; Instead,
it will only give a view on what activities that need to be done in order to
improve the quality level of the company
-
7/24/2019 COQ - An Overview (Rev 01)
22/25
Senior Management support is critical for implementing COPQ program
Improve critical factors
-
7/24/2019 COQ - An Overview (Rev 01)
23/25
Determine level of detail for COPQ measurement
Start with Internal and External Failure costs only
Improve critical factors
Select any pilot project for measurement of COPQ
Selection of project (preferably from start)
Formation of COPQ team (preferably QA&QC + Planning)
Mandate is given to COPQ team (for accurate measurement)
Monthly reporting from COPQ team (Areas of improvement)
-
7/24/2019 COQ - An Overview (Rev 01)
24/25
Once COPQ team identify improvement area;
Perform root cause analysis and suggest corrective action
Investment in Appraisal cost or Prevention cost
Results will not be over-night
Control improvement plans
-
7/24/2019 COQ - An Overview (Rev 01)
25/25
Conclusion
The goal of using COQ is to increase prevention activities in
order to eliminate internal and external failures and to reduce
appraisal activities.