Copyright @ 2009 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved..
Dave Roberts
NDIA PMSC IBR Guide Update
February 3-4, 2010
Copyright @ 2009 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved..
2
Guide Update Process/Timeline
Survey conducted in Spring 2009 indicated PMSC Guides require update
PMSC decision to tackle IBR guide first
PMSC Guides Update Team established; government and additional industry participation added in November
First draft revised IBR Guide released for public comment in early October
Feedback adjudication began in early November; team reached agreement on main body of guide
Significant update to Pre-Award IBR section in December
IBR Guide review draft distributed to industry and government for 30-day review and comment 1/5/10
Copyright @ 2009 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved..
3
Initial Guides Update Team
Bob Loop – Lockheed (Lead) Dale Gillam - SAIC Matt Pflieger - Battelle Dave Roberts - Navigant Scott Gring - Lockheed Mitzi Shepard - Lockheed Ruth Taylor - Lockheed Ed Silvia - Raytheon Marty Doucette – EVMS Services Todd Schulzetenberg - Raytheon Bill Mendelsohn - ITT Jim Brasell - Unisys
Copyright @ 2009 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved..
4
Expanded Team – IBR Guide
Matt Pflieger - Battelle
Marty Doucette – EVMS Services
Bill Mendelsohn - ITT
Scott Gring - Lockheed
Mitzi Shepard - Lockheed
Ruth Taylor – Lockheed
Dave Roberts – Navigant ( IBR Guide Lead)
Todd Schulzetenberg - Raytheon
Ed Silvia - Raytheon
Dale Gillam – SAIC
Jim Brasell – Unisys
Pam Brooker – Battelle
Pete Wynne – Lockheed
Gay Infanti – NGC (Guides Update Lead)
Evelyn Neely – Raytheon
Frank Malsbury – Raytheon
Richard Childress - Unisys
Fred Meyer – Air Force
Bob Loop - Air Force
Keith Samuels – Army
Mia Lasat – Army
Jesse Stewart – DAU
Robert Pratt – DAU
Roberta Tomasini - DAU
Dennis Chapman – DCMA EVMC
Brian Kong – DOE
Matt Gonzales – JPL
Ken Poole – NASA
Beau Willis – Navy
Anita Cukr – Navy
Ted Rogers – NAVAIR
Annette Junek - NAVAIR
David Driver – Navy
Aaron Risdal – Navy
Lt Col David Arrieta – OSD
Industry Participants Government Participants
Copyright @ 2009 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved..
Significant Changes
● Numerous changes intended to– Improve applicability and use for non-DOD agencies and for
in-house IBRs– Improve consistency of the IBR process across all
stakeholders
● Added content to address both types of IBRs, pre- and post-award
● Increased content and focus on risk/opportunity assessment and management
● Objectives of PM,CAM discussions for:
– Technical– Cost– Schedule– Resources– Management
5
Copyright @ 2009 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved..
Significant Changes
● IBR Preparation– Objectives, entrance/exit criteria– Training – Data requests
● IBR execution– Typical agenda
● Clarified that IBR is not an EVMS review– EVMS should be in connection with management system risk only,
along with other management systems– EVMS risk assessed by checking its status via coordination with
the applicable CFA responsible for EVMS surveillance
6
Copyright @ 2009 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved..
Additional Changes Based on PMSC Feedback
Additional material/guidance added regarding pre-award IBR– Now addressed in the Guide’s Foreword and Executive
Summary– Better-integrated into the document overall (no longer appears to
be an “afterthought”
Added pre-award IBR acquisition guidance to explain– When pre-award IBRs should be used– Mechanisms for applying and funding pre-award IBR
requirements
Inserted additional comments/questions received for further discussion/adjudication by the IBR Guide Update Team
7
Copyright @ 2009 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved..
Next Steps
Conduct IBR Team telecon(s) to discuss a few additional comments/questions received during 30-day comment period, as well as the new pre-award content, and agree on final revisions
Distribute final review draft for review/comment– Industry via PMSC members– Government via IBR Guide Team participants– Non-DOD agencies not represented in the team via CAIWG– OMB, OFPP since IBR Guide is a recommended reference for
all federal agencies
Approve and publish revised IBR Guide; PMSC vote tentatively scheduled for April NDIA PMSC meeting