    Project: Time and Motion Study

    Sr. No. Activity Duration (in minutes)A Floor Operations

    1 Truck docks at loading bay 1 min 5 secs

    2 Seal checked and broken 5 min

    3 HPT moves till truck 15 secs

    4 HPT moved to Inbound Staging Area 45 secs

    5 Segregating and Checking of SKUs 11.5 mins

    6 HPT brought to pallet for put-away 30 secs

    7 Pallet moved till Rack 30 secs

    8 Writing Location on boxes 15 secs

    9 Put-away using Reach Truck 1 min 30 secs

    Total 21.3

    B System Process

    10 Uploading of Locations in CIEL 10 mins

    Total 31.3

  • 7/30/2019 Copy of Time

    2/5

    (Grohe: Inbound Process)

    Duration (in secs) Manpower

    65 1

    300 1

    15 1

    45 1

    690 1

    30 1

    30 1

    15 1

    90 1

    1280

    600 1

    1880

  • 7/30/2019 Copy of Time

    3/5

    Sr. No.

    A

    1

    2

    3

    4

    5

    6

    B

    7

    8

    9

    C

    10

    11

    D

    1

    23

    E

    1

    2

    3

    4

    5

  • 7/30/2019 Copy of Time

    4/5

    Activity Total Time (IManpower

    Floor OperationsPicking

    Pallet fixing 1 1

    Movement for checking Box No. 4 1

    Checking Box No. and moving to pallet 16 1

    Taping incase the box is open 55 sec 1

    Moving to Picking Staging Area 2 1

    Writing Store Name and Order No. and pasting the sticker 4 1

    Checking

    Checking quantity and MRP label 12 1

    MRP Label printing & Sticking 1440 1

    Scanning of all pieces in excel (in case damage piece or short or excess) 4 1

    Packing

    Packing 7

    Plastic wrapping & Strapping 4

    System Process

    System Process

    CIEL entry and Celio WMS entry 10

    EAN upload 10Checking Order Summary and other details if status reverts to 35 10

    Floor Operations

    Despatch

    Stock Transfer Note( SAS) 2

    Packing List generation 2

    Stamp and Signature on LR 1

    Filling details by transporter and stamp on sticker 10

    Putting billing rolls in a box and taping it

  • 7/30/2019 Copy of Time

    5/5

    TITLE: TIME AND MOTION STUDY LOCATION:

    FLOOR OPERATIONS

    A PICKING

    1 Pallet fixing 60 1 0.79%

    2 Movement for checking box no 240 1 3.16%

    3 Checking box no & moving to pallet 960 1 12.64%

    4 Taping in case the box is open 55 1 0.72%

    5 Moving to picking staging area 120 1 1.58%

    6 Writing store name & order no; pasting sticker 240 1 3.16%

    1675

    B CHECKING

    7 Checking quantity and MRP label 720 1 9.48%

    8 MRP Label printing & Sticking 1440 1 18.97%

    9 Scanning of all pieces in excel (in case damage piece or

    short or excess) 240 1 3.16%

    2400

    C PACKING

    10 Packing 420 1 5.53%

    11 Plastic wrapping & Strapping 240 1 3.16%

    SYSTEM PROCESS

    D SYSTEM PROCESS

    1 CIEL entry and Celio WMS entry 600 1 7.90%

    2 EAN upload 600 1 7.90%3 Checking Order Summary and other details if status

    reverts to 35 600 1 7.90%

    FLOOR OPERATIONS

    E DISPATCH

    1 Stock Transfer Note( SAS) 120 1 1.58%

    2 Packing List generation 120 1 1.58%

    3 Stamp and Signature on LR 60 1 0.79%

    4 Filling details by transporter and stamp on sticker 600 1 7.90%

    5 Putting billing rolls in a box and taping it 24 1 0.31%

    6 Opening gate on the Bay 53 1 0.69%7 Moving the pallet to the truck 57 1 0.75%

    8 Mounting the box on truck 20 1 0.26%

    1054

    TOTAL 7589

    KUEHNE+NAGEL

    SR NO ACTIVITYTIME

    (IN SECS)MANPOWER %