Copy of Project Balanced Scorecard

download Copy of Project Balanced Scorecard

of 50

Transcript of Copy of Project Balanced Scorecard

  • 7/29/2019 Copy of Project Balanced Scorecard

    1/50

    ser gu e a p: www. us ness-

    rocess-it.com/ ro ect-scorecard.html

    BSC Perpectives Projects Portfolio Average

    Finances Results

    Selected KPI: PCO 14%

    Project Cost Overrun (%)

    KPI Definition:

    Difference (in percentage of Budget) between

    Estimated cost At Completion (EAC)

    and initial Budget

    Customer Satisfaction

    Selected KPI: OTD 57%On Time Delivery (%)

    KPI Definition:

    Percentage of Milestones Achieved in Time

    within a margin of days (floating line)

    Select the floating line (in days) here:

    5

    Internal Processes

    Selected KPI: RPA 71%Resources Planning Accuracy (%)

    KPI Definition:

    Deviation in percentage between

    initial budget of resources (B) and

    Estimated or real consumption (E)

    RPA = 100*SUM(Min(B,E))/SUM(Max(B,E))

    Learning & Growth

    Selected KPI: PMQ 29%

    Project Management Quality (%)

    KPI Definition:

    Level of application of PM best practices:

    Risk, Actions, Requirements, Schedule

    Identified, Managed & Communicated

    ...

    Balanced ScoreCard

  • 7/29/2019 Copy of Project Balanced Scorecard

    2/50

    Selected KPI: CRI

    Critical Risk Index (1-10)

    5.82

    KPI Definition:

    Index to measure how critical

    are the risks identified

    CRI = Severity + Severity * Probability/5

    Severity: 1-5Probability: 1-5

    More templates by Visual BPM available: http://www.business-proc

  • 7/29/2019 Copy of Project Balanced Scorecard

    3/50

    Selected Project ID 2

    5%

    67%

    67%

    83%

    for Project Portfolio

  • 7/29/2019 Copy of Project Balanced Scorecard

    4/50

    4.50

    0%

    ess-it.com

  • 7/29/2019 Copy of Project Balanced Scorecard

    5/50

    Average 4,880 5,555 14%

    Project ID Budget of costs (B) Forecast of costs (F) Cost Overrun (F-B)

    1 100 120 20%

    2 1,000 1,050 5%

    3 600 500 -17%

    4 2,000 2,250 13%

    5 30 25 -17%

    6 150 160 7%

    7 200 400 100%

    8 300 350 17%

    9 500 700 40%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

  • 7/29/2019 Copy of Project Balanced Scorecard

    6/50

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    2 1,000 1,050 5%

  • 7/29/2019 Copy of Project Balanced Scorecard

    7/50

  • 7/29/2019 Copy of Project Balanced Scorecard

    8/50

  • 7/29/2019 Copy of Project Balanced Scorecard

    9/50

  • 7/29/2019 Copy of Project Balanced Scorecard

    10/50

  • 7/29/2019 Copy of Project Balanced Scorecard

    11/50

  • 7/29/2019 Copy of Project Balanced Scorecard

    12/50

  • 7/29/2019 Copy of Project Balanced Scorecard

    13/50

  • 7/29/2019 Copy of Project Balanced Scorecard

    14/50

    Average 21 6754

    Project ID Milestone ID Description (Sales) Amount Contractual date

    1 11 1000 31-Jul-2008

    1 12 500 30-Sep-2008

    1 13 300 30-Nov-2008

    1 14 20 31-Dec-2008

    2 21 300 1-Jan-2008

    2 22 40 3-Mar-2008

    2 23 600 6-Jun-2008

    3 31 500 31-Jul-2008

    4 41 800 30-Sep-2008

    5 51 40 30-Nov-2008

    5 52 50 31-Dec-2008

    6 61 87 1-Jan-2008

    6 62 230 3-Mar-2008

    7 71 34 6-Jun-2008

    7 72 465 31-Jul-2008

    8 81 756 30-Sep-2008

    9 91 132 30-Nov-2008

    9 92 734 31-Dec-2008

    9 93 56 1-Jan-20089 94 75 3-Mar-2008

    9 95 35 6-Jun-2008

  • 7/29/2019 Copy of Project Balanced Scorecard

    15/50

    2 3

  • 7/29/2019 Copy of Project Balanced Scorecard

    16/50

    12 57%

    Delivery date Delay (Days) 5 Delivery date (Sales) Amount

    30-Sep-2008 61 0 9/30/2008 1000

    15-Oct-2008 15 0 10/15/2008 500

    30-Nov-2008 0 1 11/30/2008 300

    15-Dec-2008 -16 1 12/15/2008 20

    1-Jan-2008 0 1 1/1/2008 300

    1-Mar-2008 -2 1 3/1/2008 40

    30-Jun-2008 24 0 6/30/2008 600

    30-Sep-2008 61 0 9/30/2008 500

    15-Oct-2008 15 0 10/15/2008 800

    30-Nov-2008 0 1 11/30/2008 40

    15-Dec-2008 -16 1 12/15/2008 50

    1-Jan-2008 0 1 1/1/2008 87

    1-Mar-2008 -2 1 3/1/2008 230

    30-Jun-2008 24 0 6/30/2008 34

    30-Sep-2008 61 0 9/30/2008 465

    15-Oct-2008 15 0 10/15/2008 756

    30-Nov-2008 0 1 11/30/2008 132

    15-Dec-2008 -16 1 12/15/2008 734

    1-Jan-2008 0 1 1/1/2008 561-Mar-2008 -2 1 3/1/2008 75

    30-Jun-2008 24 0 6/30/2008 35

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 00 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

  • 7/29/2019 Copy of Project Balanced Scorecard

    17/50

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 00 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 00 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    0 0 0 0

    67% 2

  • 7/29/2019 Copy of Project Balanced Scorecard

    18/50

  • 7/29/2019 Copy of Project Balanced Scorecard

    19/50

  • 7/29/2019 Copy of Project Balanced Scorecard

    20/50

  • 7/29/2019 Copy of Project Balanced Scorecard

    21/50

    Project ID Resource Budget (B) Actuals (A) To complete (T) Estimate(E=A+T) Min (B,E)

    Average 4,210

    1 Engineering 100 20 80 100 100

    1 Manufacturing 50 75 75 50

    1 Test 100 50 150 200 100

    1 Quality 50 25 25 25

    2 Engineering 500 100 500 600 500

    2 Manufacturing 50 75 0 75 50

    2 Test 200 100 0 100 100

    2 Quality 100 200 50 250 100

    3 Engineering 100 50 50 100 100

    3 Manufacturing 500 700 700 500

    3 Test 100 200 200 100

    3 Quality 0 100 100 0

    4 Engineering 100 100 100 100

    4 Manufacturing 100 100 100 100

    4 Test 100 50 100 150 100

    4 Quality 40 25 25 25

    5 Engineering 100 10 90 100 100

    5 Manufacturing 50 100 100 50

    5 Test 100 150 150 1005 Quality 50 25 0 25 25

    6 Engineering 100 80 80 80

    6 Manufacturing 50 50 50 50

    6 Test 250 300 300 250

    6 Quality 50 250 250 50

    7 Engineering 100 100 100 100

    7 Manufacturing 50 40 40 40

    7 Test 400 500 500 400

    7 Quality 200 250 250 200

    8 Engineering 80 100 100 80

    8 Manufacturing 60 75 75 60

    8 Test 150 200 200 1508 Quality 50 25 25 25

    9 Engineering 120 100 100 100

    9 Manufacturing 75 75 75 75

    9 Test 200 200 200 200

    9 Quality 60 25 25 25

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

  • 7/29/2019 Copy of Project Balanced Scorecard

    22/50

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 00 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 00 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    2 750

  • 7/29/2019 Copy of Project Balanced Scorecard

    23/50

    Max(B,E) Min(B,E)/Max(B,E)

    5,920 71%

    100 100%

    75 67%

    200 50%

    50 50%

    600 83%

    75 67%

    200 50%

    250 40%

    100 100%

    700 71%

    200 50%

    100 0%

    100 100%

    100 100%

    150 67%

    40 63%

    100 100%

    100 50%

    150 67%50 50%

    100 80%

    50 100%

    300 83%

    250 20%

    100 100%

    50 80%

    500 80%

    250 80%

    100 80%

    75 80%

    200 75%50 50%

    120 83%

    75 100%

    200 100%

    60 42%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

  • 7/29/2019 Copy of Project Balanced Scorecard

    24/50

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    0 100%

    1,125 67%

  • 7/29/2019 Copy of Project Balanced Scorecard

    25/50

  • 7/29/2019 Copy of Project Balanced Scorecard

    26/50

  • 7/29/2019 Copy of Project Balanced Scorecard

    27/50

  • 7/29/2019 Copy of Project Balanced Scorecard

    28/50

    Project ID Practice 1 Practice 2 Practice 3 Practice 4

    9 47% 39% 33% 25%

    1 50% 50% 100%

    2 100% 100% 100% 100%

    3 75% 50% 50% 50%

    4 25% 25% 25%

    5 25% 25%

    6 50%

    7 100% 100% 25% 50%

    8 25% 0% 0%

    9

  • 7/29/2019 Copy of Project Balanced Scorecard

    29/50

    2 100% 100% 100% 100%

  • 7/29/2019 Copy of Project Balanced Scorecard

    30/50

    Practice 5 Practice 6 PMQ

    17% 11% 29%

    33%

    100% 83%

    50% 46%

    13%

    50% 17%

    8%

    50% 54%

    0% 0% 4%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

  • 7/29/2019 Copy of Project Balanced Scorecard

    31/50

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    0%

    100% 0% 83%

  • 7/29/2019 Copy of Project Balanced Scorecard

    32/50

  • 7/29/2019 Copy of Project Balanced Scorecard

    33/50

  • 7/29/2019 Copy of Project Balanced Scorecard

    34/50

  • 7/29/2019 Copy of Project Balanced Scorecard

    35/50

    Risk ID Project ID Short Description

    7 Average

    1 2 Lack of competencies in Engineering

    2 2 Single source in Power supply

    2 4 Overload in Manufacturing area

    2 5

    3 4

    4 3

    5 5

  • 7/29/2019 Copy of Project Balanced Scorecard

    36/50

    2

  • 7/29/2019 Copy of Project Balanced Scorecard

    37/50

    Probability (1-5) Severity (1-5) Risk Index (S+S*P/5) Identification date Decision

    3 4 6

    1 4 4.8

    2 3 4.2

    3 5 8

    4 4 7.2

    5 4 8

    4 3 5.4

    3 2 3.2

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    00

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    00

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

  • 7/29/2019 Copy of Project Balanced Scorecard

    38/50

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    00

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    00

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    4.5

  • 7/29/2019 Copy of Project Balanced Scorecard

    39/50

    Comments

  • 7/29/2019 Copy of Project Balanced Scorecard

    40/50

  • 7/29/2019 Copy of Project Balanced Scorecard

    41/50

  • 7/29/2019 Copy of Project Balanced Scorecard

    42/50

  • 7/29/2019 Copy of Project Balanced Scorecard

    43/50

  • 7/29/2019 Copy of Project Balanced Scorecard

    44/50

  • 7/29/2019 Copy of Project Balanced Scorecard

    45/50

  • 7/29/2019 Copy of Project Balanced Scorecard

    46/50

    Project ID Description Project Manager Category 1 Category 2

    1 Moon John Export System

    2 Sun John Export Equipment

    3 Mercure John Domestic Sub-system

    4 Mars Carlos Agency System

    5 Venus Carlos Agency Equipment

    6 Jupiter Jean-Louis Agency Sub-system

    7 Saturn Jean-Louis Militar System

    8 Neptun Jean-Louis Militar Equipment

    9 Europe Jean-Louis Militar Sub-system

  • 7/29/2019 Copy of Project Balanced Scorecard

    47/50

    Category 3

    Observation

    Telecom

    Transport

    Transport

    Observation

    Telecom

    Transport

    Transport

    Transport

  • 7/29/2019 Copy of Project Balanced Scorecard

    48/50

  • 7/29/2019 Copy of Project Balanced Scorecard

    49/50

  • 7/29/2019 Copy of Project Balanced Scorecard

    50/50

    Action ID Project ID What Who When More