Copy of Final Presentation

download Copy of Final Presentation

of 12

Transcript of Copy of Final Presentation

  • 8/4/2019 Copy of Final Presentation

    1/12

    ToTo

    Presentation report onPresentation report on

    Hospital Management andHospital Management and

    Information SystemInformation System

    WelcomeWelcome

  • 8/4/2019 Copy of Final Presentation

    2/12

    IntroductionIntroduction Totally GUI based systemTotally GUI based system

    Composed of MSComposed of MS--Access and vbAccess and vb--6.06.0

    i.e. Database oriented by using DBMSi.e. Database oriented by using DBMSformatformat

    To all the hospitals and nursing homesTo all the hospitals and nursing homes

    Highly protected from unauthorized userHighly protected from unauthorized user Protection from external disasters andProtection from external disasters and

    Hardware malfunction.Hardware malfunction.

    i.e. excellent backup systemi.e. excellent backup system

  • 8/4/2019 Copy of Final Presentation

    3/12

    Information can be saved automaticallyInformation can be saved automaticallyin the database and are retrieve fromin the database and are retrieve fromthere directly by using this software.there directly by using this software.

    Simply nave user can be operate thisSimply nave user can be operate thissoftware because of simplicity andsoftware because of simplicity andreliability.reliability.

  • 8/4/2019 Copy of Final Presentation

    4/12

    ObjectivesObjectives

    Maintains totally secured database of patients and businessMaintains totally secured database of patients and businessinformation.information.

    Helps in improved healthcare delivery by providing medicalHelps in improved healthcare delivery by providing medicalpersonnel with better data access.personnel with better data access.

    Faster data retrieval, higher quality data and moreFaster data retrieval, higher quality data and more

    versatility in data display.versatility in data display. Improves efficiency, both on the cost and the clinical careImproves efficiency, both on the cost and the clinical care

    perspective.perspective. Achieved by avoiding duplications, repeatations, delays,Achieved by avoiding duplications, repeatations, delays,

    missing records and confusions.missing records and confusions. Maintains standard orderliness of the patient records.Maintains standard orderliness of the patient records. Helps as a good managerial tools.Helps as a good managerial tools. Gathers information to meet the management challenges.Gathers information to meet the management challenges. Fast, efficient and reliable.Fast, efficient and reliable. Easy accessibility of data.Easy accessibility of data.

  • 8/4/2019 Copy of Final Presentation

    5/12

    Feasibility AnalysisFeasibility Analysis

    The accuracy of any software is totally depend upon theThe accuracy of any software is totally depend upon theconcentration and approaches that are used in feasibilityconcentration and approaches that are used in feasibilitystudy.study.

    Following are the types :Following are the types :

    Feasibility study about cost,schedule,time etcFeasibility study about cost,schedule,time etc

  • 8/4/2019 Copy of Final Presentation

    6/12

    Technical Feasibility Analysis:Technical Feasibility Analysis:--

    Hardware:Hardware: -- Hardware requirementsHardware requirements

    Any Computer (Pentium PC, Laptop etc)Any Computer (Pentium PC, Laptop etc)

    RAM (at least 512 MB)RAM (at least 512 MB)

    HardHard--disk (at least 20 GB)disk (at least 20 GB) PrinterPrinter

    Output display i.e. monitors (LCD/CRT)Output display i.e. monitors (LCD/CRT)

    Microprocessor (at least 2.0GHz)Microprocessor (at least 2.0GHz)

    PeripheralsPeripherals

  • 8/4/2019 Copy of Final Presentation

    7/12

    Software:Software: -- other required additionalother required additionalsoftwaresoftware

    Operating System ( Windows XP or Later)Operating System ( Windows XP or Later)

    Visual Basic 6.0Visual Basic 6.0 Microsoft Office PackageMicrosoft Office Package

    PhotoshopPhotoshop

  • 8/4/2019 Copy of Final Presentation

    8/12

    Economical Feasibility Analysis: -

    CostCostS.S.

    NN DetailsDetails RsRs

    11 Computer Computer 20,00020,000

    22 InternetInternet 25002500

    33 Feasibility studyFeasibility study 1,0001,000

    44 Report and proposalReport and proposal 1,0001,000

    55 ElectricityElectricity 500500

    Total CostTotal Cost 25,00025,000

    Cost: -

  • 8/4/2019 Copy of Final Presentation

    9/12

    Schedule Feasibility

    Beginning of project- 16-9-2067

    Ending of project- 27-10-2067

    Operational Feasibility

    Feasibility analysis which is necessary to check the manpower viability.

    It helps to find whether the existing manpower can handle the newsystem effectively or not.

  • 8/4/2019 Copy of Final Presentation

    10/12

    Future EnhancementFuture Enhancement..

    We will make this projects GUI based by using anotherprogramming language. We will add multi-user application based on networking We will make more privacy by adding voice demo.

  • 8/4/2019 Copy of Final Presentation

    11/12

    ConclusionConclusion

    We developed a skill of programming andclarified the concept of programming anddatabase.

    We successfully complete this project .we have

    tried our best to make the program suitable forthe time and new generation of the users.

    We think some improvement must be needed inthis field therefore we attempted to give a

    present day glimpse.

    We think such type of project work have thestudent in building of there confidence andknowledge about software development

  • 8/4/2019 Copy of Final Presentation

    12/12

    Thank You.Thank You.