Copy of Data 10 Alangad

377
Convevance of material by lorry 1 Rubble and brokenstone 36 Km 499.00 2 River sand 27 Km 400.00 3 Cement and steel 5 Km 234.00 4 Bitumen 50 Km 459.00 5 Brick 27 Km 518.00 6 Laterite 14 Km 257.00 7 Timber (Scantling) 46 Km 495.00 8 Earth for filling 14 Km 257.00 9 Lime 5Km 126.00

Transcript of Copy of Data 10 Alangad

Page 1: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 1/376

Convevance of material by lorry

1 Rubble and brokenstone 36 Km 499.00

2 River sand 27 Km 400.00

3 Cement and steel 5 Km 234.00

4 Bitumen 50 Km 459.00

5 Brick 27 Km 518.00

6 Laterite 14 Km 257.00

7 Timber (Scantling) 46 Km 495.00

8 Earth for filling 14 Km 257.00

9 Lime 5Km 126.00

Page 2: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 2/376

Part I

RATES FOR LABOUR

Sl No Name of Item Unit Rate

1 Blacksmith Each Per Day 325.00

2 Blaster or Quarryman ,, 270.00

Boy (=0.75 Man) ,, 180.00

8 Carpenter ,, 325.00

11 Cleaner Lift Irrigation ,, 270.00

15 Driver pump driver/Operator ,, 270.00

18 Fitter ,, 300.00

19 Hammerman for helping Blaster ,, 225.00

24 Mason - Brick or Laterite ,, 325.00

25 Mason - Rubble ,, 325.00

26 Mason - Stone Mason or Stone cutter ,, 325.00

27 Mazdoor - Man ,, 240.00

28 Mazdoor - Special mazdoor for Surveyi ,, 255.00

29 Mazdoor - Heavy load mazdoor ,, 270.00

30 Mazdoor - Woman mazdoor ,, 240.00

38 Painter ,, 270.0040 Plumber / Pipe fitter ,, 325.00

41 Sawyer ,, 300.00

42 Scavenger ,, 325.00

51,51aWelder - gas/arch welding ,, 325.00

HIRE CHARGES

68 Bulls (pair) with driver for grinding mortar per day 400.00

Road roller ,, 2060.00

Boiler ,, 35.65

Mini H M plant ,, 830.00

Wheel barrow ,, 5.75

Polishing machine ,, 60.00

Part II

Page 3: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 3/376

RATES FOR MATERIALS

Bricks and tiles

1 Wire cut bricks Ist class 19cmX9cmX9cm 1000 Nos 4050.00

2 Do traditional bricks 22.9cmX11.2cmX7cm ,, 4500.00

4 Country burnt bricks Ist class 19cmX9cmX ,, 2100.00

5 Do traditional bricks 22.9cmX11.2cmX7cm ,, 2400.00

8 Hollow Bricks 40cmX20cmX20cm 100 Nos 1200.00

9 M P Roofing tiles 340mm nominal size Ist 1000 Nos 6100.00

10 do 320mm do ,, 5400.00

11 M P Hip and Ridge tiles ,, ###

Stones including Road materials

20 Laterite stone 44X24X14cm roughly dress 100 Nos 1100.0024 Blasted Rubble at quarry (20 to 40 dm3 si m3 270.00

29 20mm nominal size as per I S S m3 600.00

31 40mm do ,, 420.00

28 15mm ,, 650.00

35 6mm m3 475.00

37 12mm ,, 675.00

43 36mm ,, 460.00

46 60mm ,, 370.00

52 River sand ,, 1750.00

52(a) Manufactured sand ,, 1750.00

53 Sea sand ,, 210.00

55 Shell lime quick ,, 2200.00

59 Red earth for blinding ,, 105.00

61 Quarry dust ,, 85.00

62 Cement (Portland) packed or bags of 50kg Tonne 4700.00

63 White cement kg 14.00 Timber and Roofing materials

2 Anjili or Ayani m3 ###

8 Mavu or Mango ,, 6300.00

13~14 Teak wood ,, ###

28 Vengai ,, ###

30 Bamboo Ist class 9m long Each 95.00

31 Coconut trees 6m to 9m long ,, 525.00

Hard Broken Stone (Granite)

Broken Stone (for road work)

Page 4: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 4/376

33 Arecanut trees 9m long ,, 225.00

34 Arecanut trees 1/3 split m 17.00

35 Plaited coconut cadjan madals 100 Nos 660.00

37 Ettamats m2 35.00

39 Bamboo reepers m 4.50

40 Arecanut reepers ,, 4.50Metal and Iron

1 M S Rounds and Squares Qtl 4670.00

2 M S Angles,Channels,Flats,Joists ,, 3291.00

3 Twisted bars (Tor steel) ,, 4750.00

4 M S Plate ,, 4447.50

5..17 Iron Bolts,Nuts kg 58.00

18 G I Hooks crank bolts and nuts metal fittin ,, 58.00

27 Butt Hinges 75 mm 10 Nos 38.00

28 do 100 mm ,, 76.00

34 Barrel tower bolt-Iron 100mm ,, 61.00

35 do 150 mm ,, 85.0047 Iron Screws 25mm (8) ,, 3.80

92 100mm Aluminium Door Handle ,, 260.00

97 200mm Aluminium Aldrop 16 mm dia ,, 950.00

98 Spike nails kg 47.00

99 Wire nails ,, 42.00

101 Iron wire for tying grill (22 gaug ,, 59.00

113 100mm Iron Hooks and Eyes 10 Nos 23.00

117 65mm Pad lock (7 lever) best quality Each 170.00

119 G I Fencing wire No 6 standard Qtl 3700.00

120 G I Barbed Wire ,, 3700.00

121 G I Staples ,, 4000.00140 G I Corrugated sheets 0.63mm thick Tonne ###

144 Copal Varnish Litre 105.00

145 Aluminium Paint ,, 150.00

146 Black Japan Paint ,, 57.00

148 Ready mixed paint colour best quality ,, 126.00

149 Plastic Emulsion paint ,, 180.00

150 Synthetic Enamel Paint ,, 162.00

151 Cement water proof paint kg 24.00

155 Iron primer Litre 85.00

157 Wood primer ,, 85.00

158 Epoxy coal tar Paint kg 150.00

162 Mansion Polish ,, 200.00

164 Cardinal polish red 400gm 90.00

166 Red oxide powder - Ist quality kg 81.00

167 Black oxide powder - Ist quality ,, 54.00

168 Water proofing compound ,, 28.00

Miscellaneous Items

Page 5: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 5/376

2 Asbestos Cement Sheet Corrugated or traf m2 125.00

3 Asbestos Cement Ridge Pair 125.00

5 Bitumen Washer 10 Nos 2.00

18 Charcoal Qtl 450.00

20 Glass Sheet Plain 3mm thick m2 205.00

25 Fiber glass corrugated or trafford ,, 945.0029 Well Pulley Cast Iron No:8 Each 40.00

32a Empty cement bag ,, 1.50

34 Country blasting Powder kg 35.00

35 Country Fine Fuse m 11.00

40 Asphalt (Bitumen) Tonne ###

41 Asphalt (Bitumen) with container ,, ###

43 Diesel Oil Litre 33.50

44 Kerosene ,, 20.00

49 Fire wood split Tonne 2700.00

52 Carborandom stone course, medium, or fi Each 120.00

53 Oxalic acid powder kg 80.0054 Marble white powder Ist quality 50 kg 90.00

59 Rolling shutter m2 1250.00

60 Top cover of shutter m 400.00

61 Collapsible gate m2 1250.00

62 Welding electrode 100 Nos 370.00

65 M S Rivets kg 60.00

Floor paving stones (20mm thick)9 Pink marble (Adanga) m2 563.00

25 Ceramic floor tiles (I S O / 1st quality) ,, 322.00

30 Marble chips of various colours Qtl 200.00

41(a) mosaic tiles (ISI 237/1959) gray colour 10m2 1170.00

Part III

RATES FOR WATER SUPPLY AND SANITARY ITEMS102 15 mm G M wheel walve Each 188.00

144 I W C with P or S trap 450mm ,, 383.00

145 I W C with P or S trap 500mm ,, 409.00

146 I W C with P or S trap 580mm ,, 484.00

147 Orissa pan W C 530X400mm (white) ,, 600.00

155 E W C with P or S trap 580mm (white) ,, 634.00

159 W H B without fittings 550X400mm ,, 480.00

167 Trap P or S ,, 98.00

168 15mm or nearest size C P pillar tap for W ,, 242.00

169 32mm C P waste with chain and plug ,, 6.00

171 Lipped urinal (430mmX230mmX50mm) ,, 368.00

172 Urinal flat - Large 510X400X380mm ,, 797.00

181 32mm dia lead trap ,, 165.00

184 450X450mm C I Manhole cover 15 kg ,, 495.00

Page 6: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 6/376

Page 7: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 7/376

Page 8: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 8/376

47040

Page 9: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 9/376

Page 10: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 10/376

Page 11: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 11/376

Page 12: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 12/376

Page 12

DATA OF WORKS

IN PARAVOOR TALUK BASED ON 2009 Schedule Of Rates

Quantity Description of works Unit RateAmount

Without CP With CP

CLEARING SITE

1 Clearing grass and over growth of vegitations

0.5 no man each 240.00 120.00 132.00

Say Rs. 120.00 /100m2 Rs. 132.00

2

1 no man each 240.00 240.00 264.00

Say Rs. 240.00 /100m2 Rs. 264.00

3

2 no man each 240.00 480.00 528.00

Say Rs. 480.00 /100m2 Rs. 528.00

4

groth 60 to120cms0.3 No wood cuter each 300.00 90.00 99.00

0.5 No man each 240.00 120.00 132.00

sudries LS 3.75 3.75

213.75 234.75

Say Rs. 214.00 /Each Rs. 235.00

DISMANTLING

6

0.7 no man each 240.00 168.00 184.80

Say Rs. 168.00 /m3 Rs. 185.00

7

0.7 no man each 240.00 168.00 184.80

Say Rs. 168.00 /m3 Rs. 185.00

8

1.15 no man each 240.00 276.00 303.60

Sl.No.

Clearing light jungles including uprooting of thickvegitations and small trees etc

Clearing thick and throny jungles and small trees of girth upto 30cm and rooting out including removal of rubbish etc.compete

Felling trees including cutting of trunks andbranches, removing the roots completely andstacking serviceable materialds

Dismantling clearing and carefully stacking reusablematerials for any thickness walls of brick, laterite,or rubble in mud morter 

Dismantling clearing and carefully stacking reusablematerials for any thickness of dry rubble masnory 

Dismantling clearing and carefully stacking reusablematerials for any thickness walls of brick, laterite,or rubble in lime morter 

Page 13: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 13/376

Page 13

Say Rs. 276.00 /m3 Rs. 304.00

9

1.6 no man each 240.00 384.00 422.40Say Rs. 384.00 /m3 Rs. 422

12

0.05 no mason each 325.00 16.25

0.05 no man each 240.00 12.00

28.25 31.08

Say Rs. 28 /m3 Rs. 31

13

0.25 no mason each 325.00 81.25

0.25 no man each 240.00 60.00

141.25 155.38Say Rs. 141 /m3 Rs. 155

14

0.5 no man each 240.00 120.00 132.00

Say Rs. 120 /10m2 132.00

15

1.0 no man each 240.00 240.00 264.00

Say Rs. 240.00 /m3 Rs. 264.00

16

0.01 no carpenter each 325.00 4.55

0.01 no man each 240.00 3.36

7.91 8.70

Say Rs. 7.91 /10dm3 Rs. 8.70

17

0.2 no mason each 325.00 65.00

0.18 no carpenter each 325.00 58.50

0.3 no man each 240.00 72.00

195.50 215.05

Say Rs. 196.00 /m3 Rs. 215

Dismantling clearing and carefully stacking reusablematerials for any thickness walls of brick, laterite,or rubble in cement morter 

Chipping and removing portions of existing RCC works and removing the debries with in a distance of 150m.

Lifting and removing tiles set in mortar in floorsincluding clearing and stacking materials andremoving the debries within a distance of 150m

Dismantling removing and stacking MP tiles over roof including ridge,hip and vally sheet

Dismantling removing and stacking pan or pot tilesover roof  

Dismantling removing and stacking wrought andframed timbers in roof  

Dismantling removing and stacking doors with or without ventilators including remoel of shutters,hinges,hold fast and other fittings

Page 14: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 14/376

Page 14

18

0.15 no mason each 325.00 48.75

0.1 no carpenter each 325.00 32.50

0.2 no man each 240.00 48.00129.25 142.18

Say Rs. 129 /Each Rs. 142

19

0.1 no mason each 325.00 32.50

0.05 no carpenter each 325.00 16.25

0.1 no man each 240.00 24.00

72.75 80.03

Say Rs. 73 /Each Rs. 80

20

0.35 no carpenter each 325.00 113.75

0.35 no man each 240.00 84.00

197.75 217.53

Say Rs. 198.00 /m3 Rs. 218.00

21

0.1 no carpenter each 325.00 32.50

0.1 no man each 240.00 24.0056.50 62.15

Say Rs. 57.00 /m2 Rs. 62

22

0.1 no carpenter each 325.00 32.50

0.05 no man each 240.00 12.00

44.50 48.95

Say Rs. 45.00 /m2 Rs. 49.00

23

0.05 no carpenter each 325.00 16.25

0.02 no man each 240.00 4.80

21.05 23.16

Say Rs. 21 /m2 Rs. 23

28

3.0 no man each 240.00 720.00 792.00

Say Rs. 720.00 /m3 Rs. 792.00

Dismantling removing and stacking windows withor without ventilators including remoel of shutters,hinges,hold fast and other fittings

Dismantling removing and stacking ventilators withor without ventilators including remoel of shutters,hinges,hold fast and other fittings

Dismantling, removing and stacking plankedsheeting,boarded floor, ceiling etc.

Taking down and stacking shutters of doors withor without ventilaorsincluding removel of all f ittings

Taking down and stacking shutters of windows with or without ventilaorsincluding removel of allfittings

Taking down and stacking shutters of ventilators with or without ventilaorsincluding removel of allfittings

Demolishing and clearing concete in cementmortar or RCC including stacking reinforcement

Page 15: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 15/376

Page 15

300.3 no man each 240.00 72.00 79.20

Say Rs. 72 /10m2 79

31

0.5 no man each 240.00 120.00 132.00

Say Rs. 120 /10m2 132.00

EARTH WORK

51

1.10 no. man each 240.00 264.00

3.00 no. boy each 180.00 540.00

Total 10m3 804.00 884.4

Say Rs. 804.00 /10m3 Rs. 884

52

4.00 no. man each 240.00 960.00

3.00 no. boy each 180.00 540.00

Total 10m3 1500.00 1650

Say Rs. 1,500 /10m3 Rs. 1,650

53

10.00 no. man each 240.00 2400.00

2.30 no. boy each 180.00 414.00

Total 10m3 2814.00 3095.4

Say Rs. 2,814 /10m3 Rs. 3,095

54

3.2 kg countey blasting powder  kg 35.00 112.009 m country fuse m 11.00 99.00

10.6 no quarry man for boring each 270.00 2862.00

1.2 no quarry man for charging holes and firi each 270.00 324.00

1.2 no hammer man for braking bolders each 225.00 270.00

4.5 no man for conveying rubbles each 240.00 1080.00

2.62 no man for stacking each 240.00 628.80

5375.80 5913.38

Say Rs. 5,376 /10m3 Rs. 5,913

54a

data for 10 nos (Observed Data)

Domolishing and removing old lime mortar plaster 

Domolishing and removing old cement mortar plaster 

Earth work excavation in ordinary soil anddepositing on the bank with initial leads and lift for  foundation

Earth work excavation in hard soil and depositingon the bank with initial leads and lift for foundation

Earth work excavation in ordinary rock anddepositing on the bank with initial leads and lift for foundation 

Granite rock blasting , measured in solid, includingbailing out water collecting aqnd stacking spoil for measurment within an initial lead of 50m and lift of 1.5m

Boring holes in granite rock to place thereinforcement at 45cm c/c, 45cm deep and 19 to

22mm dia

Page 16: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 16/376

Page 16

2.12 no quarry man for boring holes each 270.00 572.40 629.64

Say Rs. 572 /10nos Rs. 630

56

0.90 no. man each 240.00 216.00

2.75 no. boy each 180.00 495.00

Total 10m3 711.00 782.10

Say Rs. 711 /10m3 Rs. 782

57

(contractor's own earth)

3.60 no. man each 240.00 864.00

2.5 no. boy each 180.00 450.00

Total 10m3 1314.00 1445.4

Say Rs. 1,314 /10m3 Rs. 1,445

60

0.9 no man for excavation in ordinary soil each 240.00 216.00

2.75 boy 180.00 495.00

711.00

Add 20%on the above 142.20

Total 10m3 853.20 938.52Say Rs. 853 /10m3 Rs. 939

61

0.65 liter  Diesel lit 36.00 23.40 25.74

0.04 day hire of roller day 2080.00 83.20 83.20

LS Sundries LS 2.25 2.25

108.85 111.19

Say 109.00 /10m3 112.00

65

for initial depth up. to 1.5m 5375.80 5913.38

Say 5376 /10m3 Rs. 5,913

65a Additional depth for each 1.5m

1 no man for lifting, conveying, stacking, et each 240.00 240.00

0.031 no quarry man each 270.00 8.44

1.5 m extra for fuse m 11.00 16.50

264.94 291.43

Say 265.00 /10m3 291.43

67

Earth work excavation in ordinary soil and

depositing with leads upto 50m and lift upto1.5m for cutting and filling

Earth work excavation in hard soil and depositingwith leads upto 50m and lift upto1.5m for cuttingand filling

Earth work excavation in or under water or liquidmud for removing the stiff deposited in the channeland dumping the same at the place directed by theDeptl. Officers at site

Earth consolidation by Power Roller 

Granite rock blasting in wells, measured in solid,including bailing out water collecting aqnd stacking

spoil for measurment within an initial lead of 50mand lift of 1.5m

Consolidation by ramming in 15cm.layersincluding watering

Page 17: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 17/376

Page 17

0.7 nos man each 240.00 168.00 184.8

Say 168.00 /10m3 185.00

67a

10m310m3 711.00 711.00

10m3 conveyance m3 257.00 2570.00

Total 10m3 3281.00 3609.10

Say Rs. 3,281 /10m3 3610.00

67b Deduct extra one lead and lift over item No.67a 3281.00

2.1 no women each 240.00 504.00

2777.00 3054.70

Say Rs. 2,777 /10m3 3055.00

67c

10m3

10m3 711.00 711.00

10m310m3 108.85 108.85

10m3 conveyance m3 257.00 2570.00

Total 10m3 3389.85 3728.84

Say Rs. 2,624 /10m3

67d Deduct extra one lead and lift over item No.67c 3389.85

2.1 no women each 240.00 504.00

2885.85 3174.44

Say Rs. 2,886 /10m3 3174

67e

10m3

10m3 1314.00 1314.00

10m3 conveyance m3 257.00 2570.00

Total 10m3 3884.00 4272.4Say Rs. 3,884 /10m3 4272

67f  Deduct extra one lead and lift over item No.67c 3884.00

2.1 no women each 240.00 504.00

3380.00 3718.00

Say Rs. 3,380 /10m3 3718

67g

1.000 Hire of 5 Hp engine and pump set day 70.00 70.00 70.00

10.000 diesel lit 36.00 360.00 396LS lubricrating oil 5.00 5.00

 Earth filling with ordinary soil includingconsolidation by ramming in 150mm layers

including wateringexcavation of ordinary soil (vide itemno.56)

 Earth filling with ordinary soil includingconsolidation by Power Rolle in 150mm layersincluding watering

excavation of ordinary soil (vide itemno.56)

consolidation by Power Roller (videitem no.61)

 Earth filling with hard soil including consolidationby ramming in 150mm layers including watering

excavation of ordinary soil (vide itemno.57)

 Bailing out water with 5 HP engine andpump set

Page 18: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 18/376

Page 19: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 19/376

Page 19

567.00

hence labour for 1m 567/3/7.5 25.20 /m

Hence rate for 1.0m, used for 2 times (25.56+25.20/2 25.38 /m

c) Clay soil

10m3 cutting charge (vide Sl. No.56) 10m3 711.00 711.000.2 20% extra for liquid 142.20

853.20

d)

3 no heavy load mazdoor each 270.00 810.00 891

3 no pile driver each 300.00 900.00 990

0.12 no carpenter each 325.00 39.00 42.9

plat form LS 62.5 62.50

rope , chain LS 62.5 62.50

wooden scffolding LS 25.00 25.001899.00 2073.90

Hence for 1.0m used for 2 times 1899/8/2 118.69 129.62

Main Data

1/2 split of cocunut post at 60cm c/c for 10m length

171 m

m 37.17 6355.50 6991.05

1/3split for (2x5x10=100m)

tie 5x3=15m

115 m vide sub data (b) used 2 times m 25.38 2918.44 3210.29

7.26 kg 6mm MS bar strap (6x5.5x.22kg/m=7. kg 29.00 210.54 231.59

100 m Araconut reepers (2x5x10=100m) m 4.00 400.00 440.00

45 mm 118.69 5340.94 5875.03

75m3 Earth clay vide sub data (c) 10m3 853.20 6399.00 7038.90

5 kg coir yarn kg 42.00 210.00 231.00

10no special man mazdoor for laying and fi each 180.00 1800.00 1980.00

5 noman mozdoor for dismantling each 168.00 840.00 924.00

27no cadjas 100no 580.00 156.60 172.26

31.5 m bamboo reeper m 4.00 126.00 138.60

1 no green cadjas each 5.00 5.00 5.50

0.3 no special man mazdoor each 180.00 54.00 59.40

50m2 screening 10m2 266.75 1333.75 1467.13

Dismantling thebnund after use

5 no spical man mazdoor each 180.00 900.00 990.00

5 no man mozdoor each 168.00 840.00 924.00

5 no women each 168.00 840.00 924.0045 m Drawing out piles half rate of driving d m 59.34 2670.47 2937.52

Driving down the coconut post(vide Sl. No.712) ,Details for 8 m and used for two times

1/2split coconut post for (45no.x3.5+0.3m=171m) vide subdata (a) used 2 times

1/3 split of cocunut horizontal at

50cm c/c for 10m length

Driving down 1/2 split coconut postvide sub data (d)

screening with double new coconutcadjas area 1/6 split bamboo reepers

Page 20: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 20/376

Page 20

Total for 10m 31400.24 34540.26

Hence for 1.0m 3140.02 3454.03

Say Rs. 3,141  /m Rs. 3,455

B

a

cost of 6m to 9m coconut post round m 525.00 525.00

for cuttingcharges Ls 100.00

conveyance Ls 100.00

725.00 /7.5m

Hence for 1/3 split Rs.690/7.5x3 32.22 /m

Hire charges for 1/3split coconut post using two times 16.11 m

b

3 no heavy load mazdoor each 270.00 810.00

3 no pile driver each 300.00 900.00

0.12 no carpenter each 325.00 39.00

1749.00

72.88 /m

c

43no cadjas 100no 580.00 249.40

conveyance LS 50.00

conveyance for coir &other sundries LS 10.00

0.5 no spical man mazdoor each 255.00 127.50

436.90 /10m2

d

1 m3 clay m3 90.00 90.00

1 m3 conveyance m3 65.00 65.00

0.35 no man for consolidation each 240.00 84.00

239.00 /m3

e 36.44 /m

 

groun eve an sp coconu cross es . mapart and wailing piceses at 50cm c to c and tide

with coir yarn cross ties to all vertical posts with 1/3split coconut wood , screening double coconutcadgan leaves, filling the inside with stiff clay

&consolidated includingmaintaining the bund fill thework is over and dismantling thesame of for use.

Driving down the coconut post(vide Sl. No.712) ,Details for 8 m and used for two times

Hence for 1.0m length 1/3 split1215.36/8/3

screening with double new coconutcadjas and tying with coiryarn tohorizontal and vertical posts

Pumping kayal clay inside the fund &consolidation etc.complete

Driving out piles of any descriptionallowing half rate driving Rs.72.88/2m

Dismantling and clearing awaythe

clay & other materials (10m3excavation chargesvide S.I.151

Page 21: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 21/376

Page 21

1.1 no man each 240.00 264.00

2.25 no man each 240.00 540.00

Add 20% for under water 160.80

964.80 /m3

Main data for 5m length of bund.

a Hire charges for 1/3split coconut post

2x9x2m 36 m

Horizontal 30 m

crossties2x9x1.50 27 m

93 m

Total (Rs.15.33/m) 1498.33

b

2x9x1.00 18 m

Total (Rs.72.88/m) 1311.75

c

side of bund 2x5x1.00 10 m2

Total (Rs.436.9/10m2) 436.90

d G.I.Wire for tying LS 2kg @44/kg 88.00

e Rate for coiryarn for tying LS [email protected]/kg 200.00

f 120.00

g

2987.50

h

327.94

@Rs.36.44/m

i

@964.8/10m3 1206

Driving down 1/3 split the coconut post(vide Sl.No.712) , Details for 8 m and used for two times

screening with double new coconutcadjas and tying with coiryarn tohorizontal and vertical posts

0.50 man.mazdoor for cuttinganjoining the [email protected]/E

Dumping the kayal clay inside the

bund1x5x1x(1.50+1.00)x1.00=12.50m3 @Rs.239/m3

Driving down 1/3 split the coconut post(vide Sl.No.712) , Details for 9 m and used for two times

Dismantling and clearing awaytheclay & other materials (10m3

excavation chargesvide S.I.151

Page 22: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 22/376

Page 22

Total for 5No. Length 8176.42

For 1m length 1635.28 1798.81

Say Rs. 1,635  /m Say 1799.00

238.00 No Empty cement bags 3.00 /each 714.00

12.50 m3 E W in Ordinary Soil 711.00 /10m3 888.75

10.00 No man for filling 240.00 /each 2400.00

3.00 No man for packing 240.00 /each 720.00

4.00No woman for assisting 240.00 /each 960.00

4.00 No man demolishing 240.00 /each 960.00

Total 6642.75 7307.03

Say Rs. 6,643 /10m Say 7308.00

1 m3 cost of mutty stone m3 110.00 110.00

1 m3 conveyance m3 386.75 386.75spreading gravel SI 656

0.35 no man each 168 58.80

Total 555.55

Say Rs 556 /m3

CONCRETE

110

0.95 m3 40mm broken stones m3 490.00 465.50

0.48 m3 sand m3 1750.00 840.00228 kg cement t 4700.00 1071.60

0.1 no mason each 325.00 32.50

1 no man each 240.00 240.00

1.4 no women c 240.00 336.00

0.95 m3 conveyance for 40mm broken stones 499.00 474.05

0.48 m3 do sand 400.00 192.00

228 kg do cement t 234.00 53.35

Total 3705.00

Say Rs. 3,705 /m3

Putting up ring bund 1/2(1.50+1.00) 1.00m sizeusing earth filled cement bags, packing tightly andremoving after completion of work.

Details for 10.00m. No. of cement bags - 2x17x7=238 Nos.

Quantity of earth filling -10.00x1/2(1.50+1.00)1.00=12.50m3

Packing with mutty stone in slushly portion of the road

Cement concrete 1:3:6 using 40mm broken stoneincluding cost& conveyance of all materials labour charges etc. complete

m3

m3

m3

Page 23: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 23/376

Page 23

111

0.95 m3 40mm broken stones m3 490.00 465.50

0.48 m3 sand m3 1750.00 840.00

171 kg cement t 4700.00 803.700.1 no mason each 325.00 32.50

1 no man each 240.00 240.00

1.4 no women each 240.00 336.00

0.95 m3 conveyance for 40mm broken stones m3 499.00 474.05

0.48 m3 do sand m3 400.00 192.00

171 kg do cement t 234.00 40.01

Total m3 3423.76

Say Rs. 3,424 /m3

122

0.01 m3 20mm broken stones m3 700.00 6.30

0 m3 sand m3 1750.00 7.88

3.3 kg cement t 4700.00 15.51

0 no mason each 325.00 0.65

0.01 no man each 240.00 2.40

0.035 no women each 240.00 8.40

0.009 m3 conveyance for 20mm broken stones m3 499.00 4.49

0.0045 m3 do sand m3 400.00 1.80

3.3 kg do cement t 234.00 0.77

Total 10dm3 48.20

Say Rs. 48 /10dm3

0.01 m3 20mm broken stones m3 700.00 6.30

0 m3 sand m3 1750.00 7.88

4.32 kg cement t 4700.00 20.30

0 no mason each 325.00 0.65

0.01 no man each 240.00 2.40

0.04 no women each 240.00 8.40

0.01 m3 conveyance for 20mm broken stones m3 499.00 4.490.0045 m3 do sand m3 400.00 1.80

4.32 kg do cement t 234.00 1.01

Total 10dm3 53.23

Say Rs. 53 /10dm3

123

0.01 m3 20mm broken stones m3 700.00 6.30

0 m3 sand m3 1750.00 7.88

2.16 kg cement t 4700.00 10.15

0 no mason each 325.00 0.650.01 no man each 240.00 2.40

Cement concrete 1:4:8 using 40mm broken stoneincluding cost& conveyance of all materials labour 

charges etc. complete

Cement concrete 1:2:4 using 20mm broken stone

including cost& conveyance of all materials labour charges etc. complete

122a Cement concrete 1:(1.5):3 using 20mm broken

stone including cost& conveyance of all materialslabour charges etc. complete

Cement concrete 1:3:6 using 20mm broken stone

Page 24: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 24/376

Page 24

0.04 no women each 240.00 8.40

0.01 m3 conveyance for 20mm broken stones m3 499.00 4.49

0.0045 m3 do sand m3 400.00 1.80

2.16 kg do cement t 234.00 0.51

Total 10dm3 42.57

Say Rs. 42.50 /10dm3

0.57 m3 40mm broken stone m3 490.00 279.30

0.36 m3 20mm broken stone m3 700.00 252.00

0.468 m3 sand m3 1750.00 819.00

223.2 kg Cement t 4700.00 1049.04

0.14 no mason each 325.00 45.50

1.0 no man each 240.00 240.002.24 no women each 240.00 537.60

0.93 m3 conveyance of broken stone m3 499.00 464.07

0.47 m3 do for sand m3 400.00 187.20

223.0 kg do for cement t 234.00 52.18

3925.89 4318.48

Say Rs. 3,926 /m3 Rs. 4,318

drain

1 m3 C.C 1:3:6 graded m3 3925.89 3925.89

5.71 m2 formwork 25% of slab 10m2 901.32 514.65

4440.55 4884.60Say Rs. 4,441 /m3 Rs. 4,885

0.48 m3 40mm broken stone m3 490.00 232.75

0.45 m3 20mm broken stone m3 700.00 315.00

0.47 m3 sand m3 1750.00 813.75

222.0 kg Cement t 4700.00 1043.400.14 no mason each 325.00 45.50

1.0 no man each 240.00 240.00

2.45 no women each 240.00 588.00

0.93 m3 conveyance of broken stone m3 499.00 461.58

0.47 m3 do for sand m3 400.00 186.00

222.0 kg do for cement t 234.00 51.95

3977.92 4375.72

Say Rs. 3,978 /m3 Rs. 4,376

130

1 q Tore steel q 4472.00 4472.000.45 kg iron wire kg 59.00 26.55

123a

Cement concrete 1:3:6 using graded matel (60%of 40mm and 40% of 20mm)for foundation includingcost and conveyance of all materials , curring etc

complete

123b Cement concrete 1:3:6 using graded matel in the

ratio of 50% 40mm and 50%,20mm including thecost and conveyance of all materials labour chargescuring etc, complete

Reinforcement for RCC works bent, tied andplaced in positiion using tore steel

Page 25: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 25/376

Page 25

1 no. blacksmith each 325.00 325.00

1.48 no. man each 240.00 355.20

1 q conveyance for MS rods q 234.000 234.00

Total qtl 5412.75 5954.03

Say 5413 /Qtl Rs. 5,954

FORM WORK

132 10m2

Sub data for scanteling 10dm3

14.4 dm3 mango wood log dm3 7200.00 103.68

0.02 no. man each 240.00 4.80

0.33 sawing (4.3 sawer/10m2) m2 300.00 42.57

3.8 deduct cost of outer slab(25%of log) dm3 1800.00 6.84

Total 144.21

320/4 dm3 mango wood scanteling 10dm3 144.21 1153.68

190/8 dm3 junglewood joist & cleats 10dm3 144.21 342.509./6 bamboos each 105.00 157.50

1 spike and wire nails kg 48.50 48.50

2.5 man each 240.00 600.00

4 carpenter each 325.00 1300.00

LS coir LS 3.10

Total 10m2 3605.28 3965.81

Say 3605 /10m2 3966

1.1 add 10% over the rate of slab 10m2 3605.28 3965.81 4362.39Say 3966 /10m2 4362

1.2 add 20% over the rate of slab 10m2 3605.28 4326.33 4758.97

Say 4326 /10m2 4759

RCC WORKS

133

10

dm3 10dm3 48.20 48.20

0.1 m2 form work 10m2 3605.28 36.05

Total 10dm3 84.25 92.68

Say Rs. 84.50 /10dm3 Rs. 92.50

Form work for RCC works in slabs

132a Form work for RCC works in ,beam

132c

Form work for RCC works incolumns

Reinforced cement concrete 1:2:4 using 20mm b.s for slabs including form work, watering curringetc.complete.butexcluding reinforcement.

cement concrete 1:2:4 using 20mmmetal (vide item no.122)

133a Reinforcemed Cement concrete 1:(1.5):3 using

20mm broken stone for slab including form work,

watering , curing etc, complete,but excluding thecost of reinforcement

Page 26: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 26/376

Page 26

10 dm3

10dm3 53.23 53.23

0.1 m2 form work 10m2 3605.28 36.05

Total 10dm3 89.28 98.21

Say Rs. 89.50 /10dm3 Rs. 98.00

10 dm310dm3 48.20 48.20

0.09 m2 form work 10m2 3015.93 25.94

74.14 81.55

Say Rs. 74.00 /10dm3 Rs. 81.50

10 dm310dm3 53.23 53.23

0.09 m2 form work 10m2 3015.93 25.94

79.17 87.08

Say Rs. 79 /10dm3 Rs. 87

10 dm310dm3 48.20 48.20

0.14 m2 form work 10m2 3015.93 43.43

Total 10dm3 91.63 100.79

Say Rs. 91.50 /10dm3 Rs. 101

10 dm3

10dm3 53.23 53.23

0.14 m2 form work 10m2 3015.93 43.43

Total 10dm3 96.66 106.33

Say Rs. 96.50 /10dm3 Rs. 106.50

cement concrete 1:1.5:3 using 20mmmetal (vide item no.122.a)

134b

Reinforced cement concrete 1:2:4 using 20mm b.s for lintel (23x15cm) including form work, wateringcurring etc.complete.but excluding reinforcement.

cement concrete 1:2:4 using 20mmmetal (vide item no.122)

134b Reinforced cement concrete 1:11/2:3 using 20mmb.s for lintel (23x15cm) including form work,watering curring etc.complete.but excludingreinforcement.

cement concrete 1:2:4 using 20mmmetal (vide item no.122)

134c Reinforced cement concrete 1:2:4 using 20mm b.s 

for sun shade(60x7.5cm) including form work,watering curring etc.complete .but excludingreinforcement.

cement concrete 1:2:4 using 20mmmetal (vide item no.122)

134c

Reinforced cement concrete 1:11/2:3 using 20mmb.s for sun shade(60x7.5cm) including form

work, watering curring etc.complete .but excludingreinforcement.

cement concrete 1:11/2:3 using20mm metal (vide item no.122)

134d Cement concrete 1:2:4 using 20mm b.s for belt

(45x10),on top of ruble masonry including form

work, watering curring etc.complete.

Page 27: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 27/376

Page 27

10 dm3

10dm3 48.20 48.20

form work 10m2 1.00

Total 10dm3 49.20 54.12

Say Rs. 49 /10dm3 Rs. 54

10 dm3

10dm3 48.20 48.20

form work 10m2 1.00

Total 10dm3 49.20 54.12

Say Rs. 49 /10dm3 Rs. 54

134f 

10 dm310dm3 48.20 48.20

0.01 m2 form work @ 50% of slab 10m2 1370.88 0.96

Total 10dm3 49.16 54.07

Say Rs. 49 /10dm3 Rs. 54

10 dm310dm3 48.20 48.20

0.15 m2 form work 10m2 3965.81 59.49

Total 10dm3 107.69 118.45

Say Rs. 107.50 /10dm3 Rs. 118.50

10 dm3

10dm3 53.23 53.23

0.15 m2 form work 10m2 3015.93 45.24

Total 10dm3 98.47 108.32

Say Rs. 98.50 /10dm3 Rs. 108.50

cement concrete 1:2:4 using 20mmmetal (vide item no.122)

134e Cement concrete 1:2:4 using 20mm b.s for 

precast slab including form work, wateringcurring etc.complete.

cement concrete 1:2:4 using 20mmmetal (vide item no.122)

Cement concrete 1:2:4 using 20mm b.s for column footing (120x120cm) including form work,watering curring etc.complete.

cement concrete 1:2:4 using 20mmmetal (vide item no.122)

134g

Reinforced cement concrete 1:2:4 using 20mm b.s for beam (20x20cm), including form work,

watering curring etc.complete.but excludingreinforcement.

cement concrete 1:2:4 using 20mmmetal (vide item no.122)

134g

Reinforced cement concrete 1:11/2:3 using 20mmb.s for beam (20x20cm), including form work,watering curring etc.complete.but excludingreinforcement.

cement concrete 1:11/2:3 using20mm metal (vide item no.122)

134h Reinforced cement concrete 1:2:4 using 20mm b.s 

for beam (20x30cm), including form work,watering curring etc.complete.but excluding

reinforcement.

Page 28: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 28/376

Page 28

10 dm310dm3 48.20 48.20

0.133 m2 form work 10m2 3965.81 52.75

Total 10dm3 100.94 111.04

Say 101 /10dm3 Rs. 111

10 dm3

10dm3 53.23 53.23

0.133 m2 form work 10m2 3015.93 40.11

Total 10dm3 93.34 102.68

Say 93.50 /10dm3 Rs. 102.50

134i

10 dm310dm3 48.20 48.20

0.13 m2 form work 10m2 3965.81 49.57

Total 10dm3 97.77 107.55

Say Rs. 98 /10dm3 Rs. 107.50

134i

10 dm3

10dm3 53.23 53.23

0.13 m2 form work 10m2 3015.93 37.70

Total 10dm3 90.93 100.02

Say Rs. 91 /10dm3 Rs. 100

135

10 dm310dm3 48.20 48.20

0.20 m2 form work 10m2 3290.10 65.80

Total 10dm3 114.00 125.40

Say Rs. 114.00 /10dm3 Rs. 125.50

cement concrete 1:2:4 using 20mmmetal (vide item no.122)

134h Reinforced cement concrete 1:11/2:3 using 20mm

b.s for beam (20x30cm), including form work,watering curring etc.complete.but excludingreinforcement.

cement concrete 1:11/2:3 using20mm metal (vide item no.122)

Reinforced cement concrete 1:2:4 using 20mm b.s for beam (20x40cm), including form work,watering curring etc.complete.but excludingreinforcement.

cement concrete 1:2:4 using 20mmmetal (vide item no.122.a)

Reinforced cement concrete 1:11/2:3 using 20mmb.s for beam (20x40cm), including form work,watering curring etc.complete.but excludingreinforcement.

cement concrete 1:11/2:3 using20mm metal (vide item no.122.a)

Reinforced cement concrete 1:2:4 using 20mm b.s for column(20x20cm) including form work,watering curring etc.complete.butexcludingreinforcement.

cement concrete 1:2:4 using 20mmmetal (vide item no.122)

Page 29: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 29/376

Page 29

135

10 dm3

10dm3 53.23 53.230.20 m2 form work 10m2 3290.10 65.80

Total 10dm3 119.03 130.94

Say Rs. 119 /10dm3 Rs. 131

10 dm310dm3 48.20 48.20

0.17 m2 form work 10m2 3290.10 54.94

Total 10dm3 103.14 113.46

Say Rs. 103 /10dm3 Rs. 113.50

10 dm3

10dm3 53.23 53.23

0.17 m2 form work 10m2 3290.10 54.94

Total 10dm3 108.18 118.99

Say Rs. 108 /10dm3 Rs. 119

1 dm310dm3 48.20 48.20

0.15 m2 form work 10m2 3290.10 49.35Total 10dm3 97.55 107.30

Say Rs. 97.50 /10dm3 Rs. 107.50

1 dm3

10dm3 53.23 53.23

0.15 m2 form work 10m2 3290.10 49.35

Reinforced cement concrete 1:11/2:3 using 20mmb.s for column(20x20cm) including form work,watering curring etc.complete.butexcludingreinforcement.

cement concrete 1:11/2:3 using

20mm metal (vide item no.122)

135a Reinforced cement concrete 1:2:4 using 20mm b.s 

for column(30x20cm) including form work,watering curring etc.complete.butexcludingreinforcement.

cement concrete 1:2:4 using 20mmmetal (vide item no.122)

135a

Reinforced cement concrete 1:11/2:3 using 20mmb.s for column(30x20cm) including form work,watering curring etc.complete.butexcludingreinforcement.

cement concrete 1:11/2:3 using20mm metal (vide item no.122)

135b Reinforced cement concrete 1:2:4 using 20mm b.s 

for column(40x20cm) including form work,watering curring etc.complete.butexcludingreinforcement.

cement concrete 1:1.5:3 using 20mmmetal (vide item no.122.a)

135b

Reinforced cement concrete 1:1.5:3 using 20mmb.s for column(40x20cm) including form work,watering curring etc.complete.butexcludingreinforcement.

cement concrete 1:1.5:3 using 20mmmetal (vide item no.122.a)

Page 30: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 30/376

Page 30

Total 10dm3 102.58 112.84

Say Rs. 102.50 /10dm3 Rs. 113

BRICK WORK

158

500 no. brick 1000n 2500.00 1250.00

0.24 m3 sand m3 1750.00 420.00

69 kg cement t 4700.00 324.30

0.7 no. mason each 325.00 227.50

0.35 no. man each 240.00 84.00

0.7 no. women each 240.00 168.00

500 no. conveyance for bricks 1000 518.00 259.00

0.24 m3 do sand m3 400.00 96.00

69 kg do cement t 234.00 16.15Total m3 2844.95 3129.44

Say Rs. 2,845 /m3 Rs. 3,129

163

1 m3 Brick work (vide item No.158) m3 2844.95 2844.95

0.07 no. mason each 325.00 22.75

0.04 no. man each 240.00 8.40

0.07 no. women each 240.00 16.80

LS hire for scaffolding LS 6.25

Total m3 2899.15 3189.06

Say Rs. 2,899 /m3 Rs. 3,189

460 no. brick 1000n 2800.00 1288.00

0.24 m3 sand m3 1750.00 420.00

69 kg cement t 4700.00 324.30

0.7 no. mason each 325.00 227.50

0.35 no. man each 240.00 84.00

0.7 no. women each 240.00 168.00

460 no. conveyance for bricks 1000 518.00 238.28

0.24 m3 do sand m3 400.00 96.00

69 kg do cement t 234.00 16.15

Total m3 2862.23 3148.45

Say Rs. 2,862 /m3 Rs. 3,148

1 m3 Brick work (vide item No.158a) m3 2862.23 2862.23

0.07 no. mason each 325.00 22.750.04 no. man each 240.00 8.40

Brick work in cement mortar 1:5 with country burnedbricks19x9x9cm for foundatioin and basement

Brick work in cement mortar 1:5 with country burnedbricks19x9x9cm for superstructure in Gfloor upto5m ht.

158a Brick work in cement mortar 1:5 with country burned

bricks 22.9x11.2x7cm for foundatioin andbasement

163a

Brick work in cement mortar 1:5 with country burnedbricks 22.9x11.2x7cm for superstructure in Gfloor upto 5m ht.

Page 31: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 31/376

Page 31

0.07 no. women each 240.00 16.80

LS hire for scaffolding LS 6.25

Total m3 2916.43 3208.07

Say Rs. 2,916 /m3 Rs. 3,208

159

500 no. brick 1000n 2500.00 1250.00

0.24 m3 sand m3 1750.00 420.00

58 kg cement t 4700.00 272.60

0.7 no. mason each 325.00 227.50

0.35 no. man each 240.00 84.00

0.7 no. women each 240.00 168.00

500 no. conveyance for bricks 1000 518.00 259.00

0.24 m3 do sand m3 400.00 96.00

58 kg do cement t 234.00 13.57

Total m3 2790.67 3069.74Say Rs. 2,791 /m3 Rs. 3,070

1 m3 Brick work (vide item No.159) m3 2790.67 2790.67

0.07 no. mason each 325.00 22.75

0.04 no. man each 240.00 8.40

0.07 no. women each 240.00 16.80

LS hire for scaffolding LS 6.25

Total m3 2844.87 3129.36Say Rs. 2,845 /m3 Rs. 3,129

460 no. brick 1000n 2800.00 1288.00

0.24 m3 sand m3 1750.00 420.00

58 kg cement t 4700.00 272.60

0.7 no. mason each 325.00 227.50

0.35 no. man each 240.00 84.00

0.7 no. women each 240.00 168.00

460 no. conveyance for bricks 1000 518.00 238.28

0.24 m3 do sand m3 400.00 96.00

58 kg do cement t 234.00 13.57

Total m3 2807.95 3088.75

Say Rs. 2,808 /m3 Rs. 3,089

1 m3 Brick work (vide item No.159a) m3 2807.95 2807.95

0.07 no. mason each 325.00 22.75

0.04 no. man each 240.00 8.400.07 no. women each 240.00 16.80

Brick work in cement mortar 1:6 with country burnedbricks19x9x9cm for foundatioin and basement

163b Brick work in cement mortar 1:6 with country burned

bricks19x9x9cm for superstructure in Gfloor upto5m ht.

159a

Brick work in cement mortar 1:6 with country burnedbricks 22.9x11.2x7cm for foundatioin andbasement

163c Brick work in cement mortar 1:6 with country burned

bricks 22.9x11.2x7cm for superstructure in Gfloor upto 5m ht.

Page 32: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 32/376

Page 32

LS hire for scaffolding LS 6.25

Total m3 2862.15 3148.37

Say Rs. 2,862 /m3 Rs. 3,148

CEMENT BRICK WORK

55no Hollow brick stone 100No 1500.00 825.00

0.16 m3 sand m3 1750.00 280.00

46 kgs cement t 4700.00 216.20

1.5 no mason each 325.00 487.50

0.35 no man each 240.00 84.00

0.5 no women each 240.00 120.00

0.84 m3 conveyance of stone m3 257.00 215.88

0.16 m3 do sand m3 400.00 64.00

46 kgs cement t 234.00 10.762303.34 2533.68

Say Rs. 2,303 /m3 Rs. 2,534

1 m3 Hollow Brick work for foundation m3 2303.34 2303.34

0.15 no mason each 325.00 48.75

0.04 no man each 240.00 8.40

0.05 no women each 240.00 12.00

LS hire for scaffolding LS 6.25

Total m3 2378.74 2616.62Say Rs. 2,379 /m3 Rs. 2,617

163f 

105 no Hollow brick stone 100No 1250.00 1312.50

0.16 m3 sand m3 1750.00 280.00

46 kgs cement t 4700.00 216.20

1.7 no mason each 325.00 552.50

0.35 no man each 240.00 84.00

1 no women each 240.00 240.00

0.84 m3 conveyance of stone m3 257.00 215.88

0.16 m3 do sand m3 400.00 64.0046 kgs cement t 234.00 10.76

2975.84 3273.43

Say Rs. 2,976 /m3 Rs. 3,273

1 m3 Hollow Brick work for foundation m3 2975.84 2975.84

0.15 no mason each 325.00 48.75

0.04 no man each 240.00 8.40

0.05 no women each 240.00 12.00

LS hire for scaffolding LS 6.25Total m3 3051.24 3356.37

163d

Hollow brick stone masonry of brick 40x20x20cm in cement mortar 1:5 for foundation and basement

163e

Hollow brick masonry of brick 40x20x20cm incement mortar 1:5 for superstructure

Hollow brick masonry of brick 40x20x10cm incement mortar 1:5 for foundation

Hollow brick masonry of brick 40x20x10cm incement mortar 1:5 for superstructure

Page 33: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 33/376

Page 33

Say Rs. 3,051 /m3 Rs. 3,356

70no Cement solid brick 100Nos 2100.00 1470.00

0.16 m3 sand m3 1750.00 280.0038 kg cement t 4700.00 178.60

0.70 no. mason each 325.00 227.50

0.35 no. man each 240.00 84.00

0.70 no. women each 240.00 168.00

0.84 no conveyance for brick m3 257.00 215.88

0.16 m3 do sand m3 400.00 64.00

38 kg do cement kg 234.00 8.89

Total m3 2696.87 2966.56

Say Rs. 2,697 /m3 Rs. 2,967

1 m3 solid brick work for foundation m3 2696.87 2696.87 3263.22

add 10% of labour 

0.07 no mason each 325.00 22.75 25.03

0.04 no. man each 240.00 8.40 9.24

0.07 no women each 240.00 16.80 18.48

LS hire for scaffolding LS 6.25 6.88

Total m3 2751.07 3322.84

Say Rs. 2,751 /m3 Rs. 3,323

164

add 10% of labour 

0.07 no mason each 325.00 22.75 25.03

0.04 no. man each 240.00 8.40 9.24

0.07 no women each 240.00 16.80 18.48

LS hire for scaffolding LS 6.25 6.25

54.20 59.00

Say Rs. 54 /m3 Rs. 59

LATERITE MASONRY

60no laterite stones 100n 1350.00 810.00

0.16 m3 sand m3 1750.00 280.00

38 kg cement t 4700.00 178.60

1.5 no. mason each 325.00 487.50

0.35 no. man each 240.00 84.00

0.5 no. women each 240.00 120.00

0.88 no conveyance for laterite m3 257.00 226.16

0.16 m3 do sand m3 400.00 64.0038 kg do cement t 234.00 8.89

163g

Cement Solid brick masonry of brick 40x20x15cm incement mortar 1:6 for foundation and basement

163

h Cement Solid brick masonry of brick 40x20x15cmin cement mortar 1:6 for superstructure

Cement Solid brick work for superstructure ineach sucessive floors add the extra labour to theprevious floor 

206a Laterite neatly dressed stones of size 35x20x14cm

in cement mortar 1:6 for foundatioin and basement

Page 34: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 34/376

Page 34

Total m3 2259.15 2485.07

Say Rs. 2,259 /m3 Rs. 2,485

1 m3 laterite work (vide item no.206a) m3 2259.15 2259.15 2485.070.15 no mason each 325.00 48.75 53.63

0.04 no man each 240.00 8.40 9.24

0.05 no women each 240.00 12.00 12.00

LS hire for scaffolding LS 6.25 6.88

Total m3 2334.55 2566.81

Say Rs. 2,335 /m3 Rs. 2,567

206

90no laterite stones 100n 1250.00 1125.00

0.16 m3 sand m3 1750.00 280.0046 kg cement ton 4700.00 216.20

1.5 no. mason each 325.00 487.50

0.35 no. man each 240.00 84.00

0.5 no. women each 240.00 120.00

0.88 no conveyance for laterite m3 257.00 226.16

0.16 m3 do sand m3 400.00 64.00

46 kg do cement ton 234.00 10.76

Total m3 2613.62 2874.99

Say Rs. 2,614 /m3 Rs. 2,875

207

1 m3 laterite work (vide item no.206) m3 2613.62 2613.62 2874.99

0.15 no mason each 325.00 48.75 53.63

0.04 no man each 240.00 8.40 9.24

0.05 no women each 240.00 12.00 13.20

LS hire for scaffolding LS 6.25 6.25

Total m3 2689.02 2957.30

Say Rs. 2,689 /m3 Rs. 2,957

90no laterite stones 100n 1250.00 1125.00

0.16 m3 sand m3 1750.00 280.00

38 kg cement ton 4700.00 178.60

1.5 no. mason each 325.00 487.50

0.35 no. man each 240.00 84.00

0.5 no. women each 240.00 120.00

0.88 no conveyance for laterite m3 257.00 226.16

0.16 m3 do sand m3 400.00 64.00

38 kg do cement ton 234.00 8.89

Total m3 2574.15 2831.57

Say Rs. 2,574 /m3 Rs. 2,832

207a

Laterite work in cement mortar 1:6 for superstructure in Gfloor upto 5m ht.

Laterite neatly dressed stones of size 29x24x14cmin cement mortar 1:5 for foundatioin and basement

Laterite work in cement mortar 1:5 for superstructure in Gfloor upto 5m ht.

206a Laterite neatly dressed stones of size 29x24x14cm

in cement mortar 1:6 for foundatioin and basement

Page 35: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 35/376

Page 35

1 m3 laterite work (vide item no.206a) m3 2574.15 2574.15 2831.57

0.15 no mason each 325.00 48.75 53.63

0.04 no man each 240.00 8.40 9.24

0.05 no women each 240.00 12.00 13.20LS hire for scaffolding LS 6.25 6.25

Total m3 2649.55 2913.88

Say Rs. 2,650 /m3 Rs. 2,914

208

0.15 no mason each 325.00 48.75 53.63

0.04 no man each 240.00 8.40 9.24

0.05 no women each 240.00 12.00 13.20

LS hire for scaffolding LS 6.25 6.25Total m3 75.40 82.32

Say Rs. 75 /m3 Rs. 82

RR MASONRY

274

1 m3 blasted rubble m3 270.00 270.00

0.3 m3 sand m3 1750.00 525.00

72 kg cement tonne 4700.00 338.40

0.7 no mason each 325.00 227.500.35 no man each 240.00 84.00

0.7 no women each 240.00 168.00

1 m3 conveyance for blasted rubble m3 499.00 499.00

0.3 m3 do sand m3 400.00 120.00

72 kg do cement kg 234.00 16.85

Total m3 2248.75 2473.62

Say Rs. 2,249 /m3 Rs. 2,474.00

275

1 m3 blasted rubble m3 270.00 270.000.3 m3 sand m3 1750.00 525.00

54 kg cement t 4700.00 253.80

0.7 no mason each 325.00 227.50

0.35 no man each 240.00 84.00

0.7 no women each 240.00 168.00

1 m3 conveyance for blasted rubble m3 499.00 499.00

0.3 m3 do sand m3 400.00 120.00

54 kg do cement kg 234.00 12.64

Total m3 2159.94 2375.93

Say Rs. 2,160 /m3 Rs. 2,376.00

207a Laterite work in cement mortar 1:6 for 

superstructure in Gfloor upto 5m ht.

Laterite work for superstructure in eachsucessive floors add the extra labour to theprevious floor 

Random rubble masonry in cement mortar 1:6 for foundation and basement

Random rubble masonry in cement mortar 1:8 for foundation and basement

Page 36: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 36/376

Page 36

0.3 m3 sand m3 270.00 81.00

72 kg cement t 1750.00 126.00

0.7 no mason each 4700.00 3290.00

0.35 no man each 325.00 113.75

0.7 no women each 240.00 168.00

0.3 m3 conveyance of sand m3 240.00 72.00

72 kg do cement kg 499.00 35.93

Total m3 3886.68 4275.35

Say Rs. 3,887 /m3 Rs. 4,275

277

1.05 m3 blasted rubble m3 270.00 283.50

1.05 m3 conveyance of blasted rubble m3 499.00 523.950.8 no rubble mason each 325.00 260.00

0.7 no man each 240.00 168.00

Total m3 1235.45 1359.00

Say Rs. 1,235 /m3 Rs. 1,359.00

0.8 no rubble mason each 325.00 260.00

0.7 no man each 240.00 168.00Total m3 428.00 470.80

Say Rs. 428.00 /m3 Rs. 471.00

278

1.05 m3 blasted rubble m3 270.00 283.50

1.05 m3 conveyance of blasted rubble m3 499.00 523.95

0.35 no mason each 325.00 113.75

0.70 noman each 240.00 168.00

0.70 no women each 240.00 168.00

Total m3 1257.20 1382.92

Say Rs. 1,257 /m3 Rs. 1,383.00

278

1.00 m3 blasted rubble m3 270.00 270.00

1.00 m3 conveyance of blasted rubble m3 499.00 499.00

0.70 no man each 240.00 168.00

0.70 no women each 240.00 168.00Total m3 1105.00 1215.50

275a Random rubble masonry wih Departmental stone 

in cement mortar 1:6 for foundation and basement

Dry stone masonry for retaining wall including thecost and conveyance of all materials and labour etc,complete

277a Dry stone masonry with Departmental stone for 

retaining wall including the cost and conveyance of all materials and labour etc, complete

 Rough stone dry packing for Aprons andrevetments including the cost and conveyance of all materials and labour etc, complete

 Rough stone dry packing for forming roadsurface including the cost and conveyance of all

materials and labour etc, complete

Page 37: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 37/376

Page 37

Say Rs. 1,105 /m3 Rs. 1,216.00

1 m3 cost of mutty stone m3 135.00 135.001 m3 conveyance m3 499.00 499.00

spreading gravel SI 656

0.35 no man each 240.00 84.00

Total 718.00 789.80

Say Rs. 718.00 /m3 Rs. 790.00

WOOD WORK

Anjily wood scantling 10dm3

14.4 dm3 Anjily wood log m3 25000.00 360.00

0.02 no man each 240.00 4.80

0.14 no 0.33m2 sawing(4.3 sawer for10m2) each 300.00 42.57

407.37

3.8 dm3 Deduct cost of outer slab(25%) m3 6250.00 23.75

383.62

14.4 dm3 conveyance of Anjily wood log m3 360.90 5.20

Total 10dm3 388.82 427.70

Say Rs. 389 /10dm3 Rs. 428

312 Anjily wood wrought and put up

10.5 dm3 Anjily wood scantling allowing 5% wa 10dm3 383.62 402.80

10.5 dm3 Conceyance of -do- m3 407.90 4.280.04 no carpenter each 325.00 13.00

0.04 no man each 240.00 9.60

Total 10dm3 429.68 472.65

Say Rs. 430 /10dm3 Rs. 473

DOORS AND WINDOWS

window size 150x150

hight of Aluminium plain section

2 ( 2x2x0.85) = 3.40 2 0.85 0.00

( 4 x 1.50 ) = 6.00 4 1.5 6.00

6.00

5% wastage 0.30

6.30

2 Area of glass(2x0.85x1.50) =2.55m2 0.85 1.50 2.55

Observed Data

9.87m 2x1 plain section m 150.00 1480.50 1628.55

2 1.5 2x1.5 top and bottom channel m 300.00 900.00 990.00

2.55 m2 4mm glass m2 260.00 663.00 729.30

9.87mrubber beading m 3.00 29.61 32.57

L.S conveyance 30.00 30.00

Packing with mutty stone in slushly portion of theroad

301a

Supplying and fixing Aluminium slinding window with plain glass

Page 38: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 38/376

Page 38

2 nos fitter each 210.00 420.00 462.00

2 nos man each 168.00 336.00 369.60

3859.11 4242.02

1.5 3687.21/(1.50x1.50) 1.5 3859.11 1715.16 1885.34

Say Rs. 1,715 /m2 Rs. 1,885

313

10.5 dm3 Anjily wood scanteling 10dm3 383.62 402.80

0.22 no carpenter each 325.00 71.50

0.1 no man each 240.00 24.00

10.5 dm3conveyance of Anjily wood scanteling m3 495.00 5.20

Total 10dm3 503.50 553.85

Say Rs. 503 /10dm3 Rs. 554

Sub Data(A)

Labour charges

0.2 no mason each 325.00 65.00

0.3 no man each 240.00 72.00

LS conveyance and sundries 9.00

146.00 160.60

Hence fixing charge for door/ window Say Rs. 105 /Each Rs. 116

(B)

Labour charges

0.1 no mason each 325.00 32.50 35.75

0.1 no man each 240.00 24.00 26.40

LS conveyance and sundries 7.50 7.50

64.00 69.65

Hence fixing charge for door/ window Say Rs. 47.00 /Each Rs. 51

Door 

1 m3 Cost of door frame @ /m2(MR) m2

Conveyance& fixing charges LS

Total

Say Rs. /m2 Rs.

Window

Say Rs. /m2 Rs.

Ventilator 

Supplying and fixing Anjily wood planed andframed work for frames of door window ventilator etc

Fixing in position precast cement concrete Door /Window

Fixing in position cement concreteVentilator 

313a

Suplying and fixing in position Cement ConcreteDoor/ window/ ventilator at different size withnominal reinforcement using 8mm tore steel etc.complete.

Page 39: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 39/376

Page 39

Say Rs. /10m2 Rs.

326

10m 2

sub data

304a

Anjily wood ceiling planks 12mm thick 10m2

183 dm3 Anjily wood log m3 25000.00 4575.00

0.55 no man each 240.00 132.00

4.64 no 10.8m2 sawing(4.3 sawer for10m2) each 300.00 1393.20

6100.20

45 dm3 Deduct cost of outer slab(25%) m3 6250.00 281.25

Total 5818.95

183 dm3 conveyance of Anjily wood planks m3 495.00 90.59

5909.54

Main Data10.5 m2 ceiling with 12mm Anjily wood planks, 10m2 5909.54 6205.01 6825.51

0.25 kg wire nail kg 42.00 10.50 11.55

1.1 no carpenter for fitting each 325.00 357.50 393.25

2.15 no carpenter for planing each 325.00 698.75 768.63

1.1 no man each 240.00 264.00 290.40

Scaffolding LS 6.25 6.25

7542.01 8295.59

Say Rs. 7,542 /10m2 Rs. 8,296

351

3.03 dm3 Anjily wood scanteling 10dm3 383.62 116.24

3.03 dm3 conveyanve of scantling m3 495.00 1.50

0.39 no carpenter each 325.00 125.45

0.03 no man each 240.00 6.72

Total 10dm2 249.91 274.90

Say Rs. 250.00 /10dm2 Rs. 275.00

2.07 dm3

10dm3 383.62 79.33 87.27

2.07 m3 conveyance of Anjily wood m3 495.00 1.02 1.13

0.09 m2 glass pan, 3mm thick m2 235.00 20.21 22.23

0.39 no carpenter each 325.00 125.45 138.00

0.03 noman each 240.00 6.72 7.39

LS nails, fillers, putty etc LS 1.25 1.38

Ceiling with 12mm Anjily woodplanks, planed, lap joined, and wirenailed to rafters and collors

Supplying and fixing Anjily wood fully panelledshutters to suit the door frames already fixed inposition,inclusive of all labour charges of all ironfittings,but excluding the cost of fittings

scanteling requires for 10dm2 is(50.303/168.56)10=3.03dm3

360a Supplying and fixing fully glazed Anjily wood 

shutters to suit the window frames already fixed,including all labour charges for fixing iron fittings, butexcluding the cost of iron fittings

Anjily wood scanteling (37.78dm3 for 190.44dm2 ie,0.198dm3 for 10dm2)

Page 40: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 40/376

Page 40

Total 10dm2 233.99 257.38

Say Rs. 234 /10dm2 Rs. 257

368

1 qtlMS rods

qtl3250.00 3250.00

1 no blacksmith each 325.00 325.00

2 no carpenter each 325.00 650.00

1 qtl conveyance of MS rods t 234.00 23.40

Total qtl 4248.40 4673.24

Say Rs. 4,248 /Qtl Rs. 4,673

369

1.00 qtl MS flat qtl 3800.00 3800.00 4180.00

10.00 kg charcoal qtl 550.00 55.00 60.50

LS sundries LS LS 3.10 3.10

5.00 no blacksmith each 325.00 1625.00 1787.500.66 no man (bellow boy) each 240.00 158.40 174.24

1.00 qtl conveyance of MS flat t 234.00 23.40 25.74

Total qtl 5664.90 6231.08

Say Rs. 5,665 /Qtl Rs. 6,231

13

a 100mm iron butt hinges 85.00 /10nos 93.50

b 75mm iron butt hinges 42.00 /10nos 46.20

c 100mm aluminium tower bolt 250.00 /10nos 275.00

d 150mm aluminium tower bolt 320.00 /10nos 352.00e 200mm aluminium tower bolt 360.00 /10nos 396.00

f 200mm aluminium aldrop 1100.00 /10nos 1210.00

g 75mm iron hooks and eyes 20.00 /10nos 22.00

h 100mm iron hooks and eyes 26.00 /10nos 28.60

i 200mm iron hooks and eyes 50.00 /10nos 55.00

 j 150mm aluminium door handle 250.00 /10nos 275.00

k 20*7mm steel screws 6.50 /10nos 7.15

l 25*8mm steel screws 7.50 /10nos 8.30

m 50mm pad lock-6 lever 120.00 /each 132.00

n 65mm pad lock-7 lever 185.00 /each 203.50

FLOORING

410

0.75 m3m3 3423.76 2567.82

10.0 m2

10m2 1315.14 1315.14

Total 10m2 3882.97 4271.26Say Rs 3883 /10m2 Rs. 4271

Providing MS rods for windows and windows andventilators

Providing MS flat ion works for hold fast to doorsand windows

Supplying and fixing iron fittings to doors andwindows

Flooring with cement concrete 1:4:8 75mmthickusing 40mm broken stone and plastyered over withcement mortar 1:3,12mm thick floated hard andtrowelled smooth

Cement concrete 1:4:8 using 40mmbroken stone (Sl.no.111)

Plastering in cement mortar 1:3,12mm thick one coat(Sl.no.506)

Page 41: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 41/376

Page 41

0.75 m3m3 3423.76 2567.82

10m2

10m2 1315.14 1315.14

10m2

10m2 271.05 271.05

Total 10m2 4154.02 4569.42

Say Rs 4154 /10m2 Rs. 4569

10m2

10.5 m2 ceramic floor tiles(add 5% wastage) m2 320.00 3360.00 3696.00

0.01 m3 sand m3 1750.00 17.50 19.25

23 kg cement t 4700.00 108.10 118.91

0.01 conveyance of sand m3 400.00 4.00 4.40

23 conveyance of cement t 234.00 5.38 5.92

10m2

10m2 1315.14 1315.14 1446.661.5 no mason each 325.00 487.50 536.25

0.9 no man each 240.00 216.00 237.60

117 no conveyance of tiles 1000no 518.00 60.43 66.48

LSLS 31.00 31.00

5605.06 6162.47

Say Rs 5605 /10m2 Rs. 6162

10m2

10.5 m2

m2 350.00 3675.00 4042.50

10m210m2 1315.14 1315.14 1446.66

1 no mason each 325.00 325.00 357.50

0.5 no man each 240.00 120.00 132.00

0.5 no boy each 180.00 90.00 99.00

52no conveyance of tiles 1000no 518.00 26.94 29.63

LS sundries for cutting machine etc LS 6.25 6.25

5558.33 6113.54Say Rs 5558 /10m2 Rs. 6114

410a Flooring with cement concrete 1:4:8 75mmthick

using 40mm broken stone and plastyered over withcement mortar 1:3,12mm thick and neat cementflushing coat

Cement concrete 1:4:8 using 40mmbroken stone(Sl.no.111)

Plastering in cement mortar 1:3,12mm thick one coat(Sl.no.506)

Cement flushing coat/second coatover cement plaster items(Sl.no.514)

409a

Flooring with ISO/ Ist quality ceramic floor tiles(30x30cm) laid in cement mortar 1:3,12mm thick inline and level as per specifications and directions

cement plaster 1:3,12mm thick

(Sl.506)

sundries for colour, cutting machineetc

409b Flooring with ISO/best quality rectified tiles (joint

free of size 45x45cm) laid in cement mortar 1:3,12mm thick in line and level as per specifications and directions

rectified joint free tiles(add 5%wastage)

cement plaster 1:3,12mm thick(Sl.506)

Page 42: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 42/376

Page 42

10m2

10.5 m2 victrified tiles(add 5% wastage) m2 570.00 5985.00 6583.50

10m2 10m2 1315.14 1315.14 1446.66

1 no mason each 325.00 325.00 357.50

0.5 no man each 240.00 120.00 132.00

0.5 no boy each 180.00 90.00 99.00

30no conveyance of tiles 1000no 518.00 15.54 17.09

LS sundries for cutting machine etc LS 6.25 6.25

7856.93 8642.00

Say Rs 7857 /10m2 Rs. 8642

10.5 m2 gray marble slab m2 520.00 5460.00 6006.00

10m210m2 1277.44 1277.44 1405.18

1 no carborandom stone each 120.00 120.00 132.00

2 no mason each 325.00 650.00 715.00

2 no man each 240.00 480.00 528.00

0.5 no boy each 180.00 90.00 99.00

4 no polisher each 198.00 792.00 871.20

2 no man each 240.00 480.00 528.00

1 day hire of cutting mechine day 50.00 50.00 50.00

2 day hire of polishing mechine day 50.00 100.00 100.00sundries for wax,current charge etc LS 25.00 25.00

9524.44 10459.38

Say Rs 9524 /10m2 Rs. 10459

10.5 m2m2 645.00 6772.50 7449.75

10m2

10m2 1277.44 1277.44 1405.18

1 no mason each 325.00 325.00 357.50

0.5 no man each 240.00 120.00 132.00

0.5 no boy each 180.00 90.00 99.00

57no conveyance of tiles 1000no 518.00 29.53 32.48

LS 20.00 20.00

8634.46 9495.91

Say Rs 8634 /10m2 Rs. 9496

409c

Flooring with ISO/best quality Vitrified tiles( 60x60cm) laid in cement mortar 1:3,12mm thick inline and level as per specifications and directions

cement plaster 1:3,12mm thick(Sl.506)

413a Flooring with gray marble slab over a bed of 

cement mortar 1:4,12mm thick including the cost of polishing and all laour charges etc. complete

cement mortar 1:4,12mm thick(Sl.No,507)

413b

Flooring with polished granite tiles (cat eye redtiles of size 2x1 ft,10mm thick) over a bed of cementmortar 1:4,12mm thick including all laour chargesetc. complete

granite tiles (cat eye red tiles of size2x1 ft,10mm thick)

cement mortar 1:4,12mm thick(Sl.No,507)

sundries for cutting machine, colour for pointing etc

Page 43: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 43/376

Page 43

536

25nos/

25 nos coloured glazed tiles 10nos 125.00 312.50 343.75

5% wastage 15.63 17.19

1 m210m2 1315.14 131.51 144.67

0 m3 sand m3 1750.00 1.75 1.93

0.48 kg cement tonne 4700.00 2.26 2.48

0 m3 conveyance of sand m3 400.00 0.40 0.44

0.48 kg conveyance of cement tonne 234.00 0.11 0.12

0.90 no mason each 325.00 292.50 321.75

0.50 no man each 240.00 120.00 132.00

LS colour LS 3.10 3.10

25 nos conveyance of tiles 3000nos 518.00 4.32 4.75

Total m2 884.07 972.17

Say Rs 884 /m2 Rs. 972

ROOFING

305

10dm2

15.00 dm3 Anjily wood log(33% log value) m3 8250.00 123.75

1.64 m2 3.82m2 sawing(4.3 sawer for10m2) each 300.00 492.78616.53 678.18

Say Rs 617 /10dm2 Rs. 678

318

10dm3

10 dm3 Anily wood reepers 10dm3 429.68 429.68

0.05 kg Wire nails kg 42.00 2.10

0.1 no carpenter each 325.00 32.50

0.1 no man each 240.00 24.00

488.28 537.11Say Rs 488 /10dm3 Rs. 537

328

10.5 dm3m2 429.68 4511.68

0.25 kg wire nails kg 42.00 10.50

1.1 no carpenter each 325.00 357.50

2.15 no carpenter for plaining each 325.00 698.75

1.1 no man each 240.00 264.00

sundies for scaffolding LS 6.25

5848.68 6433.55

Dadoing the walls with coloured glazed tiles of size 20x20cm, 7.5mm thick,in 12mm cement mortar 1:3 and pointed with coloured cement

Plastering CM 1:3,12mmthick(Sl.506)

Supplying and fixing Anjily wood reepers 50mmx25mm to 38mmx16mm

Supplying and fixing Anjily wood reepers with wirenails of sutable length

Ceiling with 12mm thick Anjily wood planks innecessary overlaps using wire nails

anjily wood planks includingconveyance

Page 44: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 44/376

Page 44

Say Rs 5849 /10m2 Rs. 6434

452

145 no MP tiles of 340mm size 1000no 7000.00 1015.00

0.35 no mason each 325.00 113.75

0.35 no man each 240.00 84.00

145 no conceyance of tiles 1000no 518.00 75.11

1287.86 1416.65

Say Rs 1288 /10m2 Rs. 1417

0.35 no mason each 325.00 113.75

0.35 no man each 240.00 84.00

0.3 no women for clean each 240.00 72.00

269.75 296.73

Say Rs 270 /10m2 Rs. 297

458

27 nos MP hip and ridge tiles 1000nos 16000.00 432.00

0.1 m3 cement mortar 1:3 m3 1094.16 109.42

0.75 nos mason each 325.00 243.75

0.3 nos man each 240.00 72.00

0.3 nos boy each 180.00 54.00

27 nos conveyance of MP tiles 340mm size 1000nos 518.00 13.99

925.15 1017.67

Say Rs 925 /10m Rs. 1018

10m

0.1 m3 cement mortar 1:3 m3 1094.16 109.42

0.75 nos mason each 325.00 243.75

0.3 nos man each 240.00 72.00

0.3 nos boy each 180.00 54.00

0.2 nos women for cleaning each 240.00 48.00

527.17 579.88

Say Rs 527 /10m Rs. 580

460

Details for 30m

174 kg 1mm thick GI plainsheet Tonne 42000 7308.00

0.25 kg wire nails kg 42.00 10.50

1.5 no carpenter each 325.00 487.50

1.5 no man each 240.00 360.00

174 kg conveyance of GI sheet T 234.00 40.72

8206.72

Hence for 10m 2735.57 3009.13Say Rs 2736 /10m Rs. 3009

Supplying and roofing with Ist class MP tiles 340mm size

452a

Roofing with Departmental MP roof tiles 340mmsize

Suplying and fixing MP hip and ridge tiles Ist classset in cement mortar 1:3 including finishing edges

458a

Fixing with Depatmental MP hip and ridge tiles setin cement mortar 1:3 including finishing the edges

Valleying with GI sheet 0.8mm thick 900mm widthwith over laps of 150mm at joints including nails etc.

Page 45: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 45/376

Page 45

453

11.5 m2 AC corrugated sheets m2 150.00 1725.001.05 kg

kg 50.00 52.50

11.5 m2

Tonne 234.00 40.37

1.60 no carpenter each 325.00 520.00

1.60 no man each 240.00 384.00

Total 10m2 2721.87 2994.05

Say Rs 2722 /10m2 Rs. 2994

454

Details for 30m

31 pair  plain AC ridge pair 120.00 3720.00

1.5 no carpenter each 325.00 487.50

1.5 no man each 240.00 360.00

31 pair Tonne 234.00 32.64

Total 4600.14

Hence 10m 1533.38 1686.72

Say Rs 1533 /10m Rs. 1687

455

86 kg GI corrugated sheet 1mm thick t 43000.00 3698.00

2.05 kg

kg 50.00 102.501.35 no carpenter each 325.00 438.75

1.35 no man each 240.00 324.00

86 kg conveyance of GI corrugated sheet t 234.00 20.12

4583.37 5041.71

Say Rs 4583 /10m2 Rs. 5042

Details for 30m

Roofing with AC corrugated sheets with GI boltsand nuts and bitumenus washers includingnecessary ocer laps of 150 mm at ends etccomplete

GI hooks and crank bolts and nutsincluding GI plain washers, bitumenwashersetc(14x0.15x0.62kg/m=1.30kg)

conveyance of 11.50m2 ACsheet(15kg/m2)

Providing and fitting AC ridge capping with GI nutand bolts and bitumen washers etc complete.

conveyance of plain AC ridge31x0.3=9.3m2 (15kg/m2)

Roofing with galvanised iron corugatede sheets 1mm thick with overlape of 150mm at ends and GIhooks or crank bolts and nuts including plainwashers and bitumen washers etc. complete

GI hooks or crank bolts and nutsincluding plain washers and bitumen

washers(22x0.15x0.62kg/m=2.05kg)

455(a

Providing and fitting 0.8mm GI plane ridge capping with GI nut and bolts and bitumen washers etccomplete.

Page 46: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 46/376

Page 46

99.9 kgT 42000.00 4195.80

11.44 kg

kg 50.00 572.001.35 no carpenter each 325.00 438.75

1.35 no man each 240.00 324.00

99.9 kg conveyance of plain GI ridge t 234.00 23.38

Total 5553.93

Hence 10m 1851.31 2036.44

Say Rs 1851 /10m Rs. 2036

10m2 fiber corrugated sheet 1mm thick m2 1100.00 11000.00 12100.00

2.05 kg

kg 50.00 102.50 112.75

1.35 no fitter each 300.00 405.00 445.50

1.35 no man each 240.00 324.00 356.40

10m2conveyance of fiber corrugated sheet LS 30.00 30.00

11861.50 13044.65

Say Rs 11862 /10m2 Rs. 13045

11.5 m2

m2 230.00 3888.15 3888.15

1.65 kg

kg 50.00 82.50 90.75

1.35 no carpenter each 325.00 438.75 482.63

1.35 no man each 240.00 324.00 356.40

16.91 Kg Conveyance of Alluminium sheet tonne 234.00 3.96 4.35

Total 10m2 4737.36 4822.28

Say Rs 4737 /10m2 Rs. 4822

11.3 kg

kg 230.00 2599.00 2599.000.5 no carpenter each 325.00 162.50 178.75

plain GI seet 0.8mm for ridge(6.66Kg/m2)

GI hook or nut and bolts of 100mmdia plain washers and bitumenwashers(123x0.15x0.62kg/m=11.44k

g)

455,b Roofing with fiber corugatede sheets 28gauge

with overlape of 150mm at ends and GI hooks or crank bolts and nuts including plain washers and

bitumen washers etc. complete

GI hooks or crank bolts and nutsincluding plain washers and bitumenwashers(22x0.15x0.62kg/m=2.05kg)

455,b

Roofing with alluminium corugatede sheets26gauge 0.46mm thick with overlape of 150mm atends and GI hooks or crank bolts and nuts includingplain washers and bitumen washers etc. complete

alluminium corrugated sheet [email protected]/[email protected]/Kg including GI plain washers, bitumenwashersetc(14x0.15x0.62kg/m=1.30kg)

457(a

Providing and fitting 1mm thick alluminium plane ridge capping with GI nut and bolts and bitumenwashers etc complete.

plain alluminiumsheet(10x0.225)@5.02Kg/[email protected]

30/Kg

Page 47: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 47/376

Page 47

0.5 no man each 240.00 120.00 132.00

11.30 Kg Conveyance of Alluminium sheet tonne 234.00 2.64 2.91

Total 2884.14 2912.66

Say Rs 2884 /10m Rs. 2913

c)

data for 6m

6 m PVC pipe,160mm dia (MR) m 130.00 780.00 858.00

7.8 kg 6x1m MS flat @1.3kg/m qtl 3800.00 296.40 326.04

sundries for conveyance,solvent etc LS 10.00 10.00

0.25 no plumber  each 325.00 81.25 89.38

0.15 no man each 240.00 36.00 39.60

1203.65 1323.02

Hence for 1m 200.61 220.50

Say Rs 201 /m Rs. 221

d)

Details for 30m.

30 m 110mm PVC pipe (8kgf/cm2) m 204.00 6120.00 6732.00

add 10%for specials 612.00 673.20

LS clamp, cement ,paint etc LS 10.00 10.00

1.5 no. fitter each 300.00 450.00 495.00

1.5 no. man each 240.00 360.00 396.00

Total 7552.00 8306.20Hence m 251.73 276.87

Say Rs 252 /m Rs. 277

PLASTERING

506

0.14 m3 sand m3 1750.00 245.00

66 kg cement tonne 4700.00 310.20

0.9 no mason each 325.00 292.50

0.55 no man each 240.00 132.001.1 no women each 240.00 264.00

0.14 m3 conveyance of sand m3 400.00 56.00

66 kg do cement kg 234.00 15.44

Total 10m2 1315.14 1446.66

Say Rs 1315 /10m2 Rs. 1447

0.09 m3 sand m3 1750.00 157.50

43 kg cement kg 4700.00 202.100.9 no mason each 325.00 292.50

Supplying and fixing 160mm dia PVC rain water gutter semicircular section including fifing with32x5mm MS flat supporters at 1m intervals

Supplying and laying 110mm dia PVC down water pipe with fittings such as tees, elbows, bends,checknuts, etc. complete

Plastering in cement mortar 1:3,12mm thick onecoat

506a

Plastering in cement mortar 1:3,9mm thick onecoat floated hard and trowelled smooth etc.

complete

Page 48: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 48/376

Page 48

0.55 no man each 240.00 132.00

1.1 no women each 240.00 264.00

0.09 m3 conveyance of sand m3 400.00 36.00

43 kg do cement kg 234.00 10.06

Total 10m2 1094.16 1203.58

Say Rs 1094 /10m2 Rs. 1204

507

0.15 m3 sand m3 1750.00 262.50

54 kg cement tonne 4700.00 253.80

0.9 no mason each 325.00 292.50

0.55 no man each 240.00 132.00

1.1 no women each 240.00 264.00

0.15 m3 conveyance of sand m3 400.00 60.00

54 kg do cement kg 234.00 12.64

Total 10m2 1277.44 1405.18

Say Rs 1277 /10m2 Rs. 1405

511

0.17 m3 sand m3 1750.00 288.75

59 kg cement tonne 4700.00 277.30

0.9 no mason each 325.00 292.50

0.55 no man each 240.00 132.00

1.1 no women each 240.00 264.00

0.17 m3 conveyance of sand m3 400.00 66.00

59 kg do cement kg 234.00 13.81

Total 10m2 1334.36 1467.79

Say Rs 1334 /10m2 Rs. 1468

514

22 kg Cement tonne 4700.00 103.40

0.5 no mason each 325.00 162.50

22 kg conveyance of Cement t 234.00 5.15

Total 10m2 271.05 298.15

Say Rs 271  /10m2 Rs. 298

PAINTING

551

0 m3 quick lime m3 2200.00 6.60 7.26

0 m3 conveyance of lime m3 126.00 0.38 0.42

LS glue and other sundries LS 1.85 1.85

0.12 no special man each 255.00 30.60 33.66

0.12 no boy rach 180.00 21.60 23.76

Total 10m2 61.03 66.95

Say Rs 61  /10m2 Rs. 67

551

0 m3 quick lime m3 2200.00 6.60 7.260 m3 conveyance of lime m3 126.00 0.38 0.42

Plastering in cement mortar 1:4,12mm thick onecoat

Plastering in cement mortar 1:4,15mm thick onecoat

Cement flushing coat / second coat over cementplaster items

White washing two coats

Colour washing two coats

Page 49: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 49/376

Page 49

LS glue and other sundries LS 1.85 1.85

LS add rate fir colour LS 3.10 3.10

0.12 no special man each 255.00 30.60 33.66

0.12 no boy rach 180.00 21.60 23.76

Total 10m2 64.13 70.05

Say Rs 64  /10m2 Rs. 70

1.48 kg white Cement kg 15.00 22.20

sundries LS 0.60

0.12 n o special man each 255.00 30.60

0.12 boy each 180.00 21.60

1.48 kg conveyance of cement t 234.00 0.35

75.35 82.88

Say Rs 75.50 /10m2 Rs. 83

2.48 kg whiteCement kg 15.00 37.20

sundries LS 0.60

0.2 n o special man each 255.00 51.00

0.2 boy each 180.00 36.00

2.48 kg conveyance of cement t 234.00 0.58

125.38 137.92

Say Rs 125 /10m2 Rs. 138

557+558

1.5 kg oil bond distember kg 68.00 102.00

sundries for breshes etc LS 3.7

0.5 no painter each 270.00 135.00

240.70 264.77

Say Rs 241 /10m2 Rs. 265

559

0.6 kg oil bond distember kg 68.00 40.80

sundries for breshes etc LS 1.85

0.25 no painter each 270.00 67.50

110.15 121.17Say Rs 110 /10m2 Rs. 121

560

3.2 kg water proof cement paint kg 24.00 76.80

LS sundries LS 3.10

0.5 no painter each 270.00 135.00

0.7 no woman each 240.00 168.00

Total 10m2 382.90 421.19

Say Rs 383.00 /10m2 Rs. 421

555a White washing with white cement one coat to walls

555b White washing with white cement two coat to walls

Painting with oil bond distember two coat to newwall

Painting with oil bond distember one coat to oldwall

Painting with water proof cement paint two coats to the new walls

Page 50: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 50/376

Page 50

561

1.4 kg water proof cement paint kg 24.00 33.60

LS sundries LS 1.85

0.25 no painter each 270.00 67.50

0.25 no woman each 240.00 60.00

Total 10m2 162.95 179.25

Say Rs 163.00 /10m2 Rs. 179

PAINTING

601

1 no man each 240.00 240.00 264.00

sundries LS 1.85 1.85

241.85 265.85

Say Rs 242.00  /10m2 Rs. 266.00

603

0.85 ltr  wood primer ltr 85.00 72.25 79.48

LS sundries-bresh,sand paper,soap,putty etc LS 1.85 1.85

0.4 no painter each 270.00 108.00 118.80

Total 10m2 182.10 200.13

Say Rs 183.00  /10m2 Rs. 201.00

604

0.75 ltr  iron primer ltr 85.00 63.75 70.13

LS sundries-bresh,sand paper,soap,putty etc LS 2.50 2.50

0.4 no painter each 270.00 108.00 118.80

Total 10m2 174.25 191.43

Say Rs 175.00  /10m2 Rs. 191

1.65 ltr  ready mixed paint ltr 126.00 207.90 228.69

LS sundries-bresh,sand paper,soap,putty etc LS 1.25 1.250.45 no painter each 270.00 121.50 133.65

Total 10m2 330.65 363.59

Say Rs 331.00  /10m2 Rs. 364.00

10m2 priming coat (603) 10m2 182.10 182.10

10m2 Painting,two coat(607) 10m2 330.65 330.65

Total 10m2 512.75 564.03

Say Rs 513  /10m2 Rs. 564

Painting with water proof cement paint one coats to the old walls

Scraping and cleaning old painted surface withsand paper 

Painting priming coat on new wood work after rubbing with sand paper and cleaning the surface

Painting priming coat on new iron work after 

rubbing with emery paper and cleaning the surface

607&60

6

Painting with ready mixed paint of approved colour and quality as specified, two coat(over aprimingcoat already done) to new wood work

607a Painting with ready mixed paint of approved colour 

and quality as specified, two coat including a priming coat to new wood work

Page 51: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 51/376

Page 51

608

0.75 ltr  ready mixed paint ltr 126.00 94.50 103.95

LS sundries-bresh,sand paper,soap,putty etc LS 1.85 1.85

0.25 no painter each 270.00 67.50 74.25Total 10m2 163.85 180.05

Say Rs 164.00  /10m2 Rs. 181.00

1.75 ltr  alumunium paint ltr 150.00 262.50 288.75

LS sundries-bresh,sand paper,soap,putty etc LS 1.85 1.85

0.45 no painter each 270.00 121.50 133.65

Total 10m2 385.85 424.25

Say Rs 386 /10m2 Rs. 425.00

611

0.8 ltr  alumunium paint ltr 150.00 120.00 132.00

LS sundries-bresh,sand paper,soap,putty etc LS 1.50 1.50

0.25 no painter each 270.00 67.50 74.25

Total 10m2 189.00 207.75

Say Rs 189 /10m2 Rs. 208.00

1.15 ltr  synthetic enamal paint ltr 162.00 186.30 204.93

LS sundries-bresh,sand paper,soap,putty etc LS 3.35 3.35

1.1 no painter each 270.00 297.00 326.70

Total 10m2 486.65 534.98

Say Rs 487 /10m2 Rs. 535

614

0.5 ltr  synthetic enamal paint ltr 162.00 81.00 89.10

LS sundries-bresh,sand paper,soap,putty etc LS 1.85 1.85

0.5 no painter each 270.00 135.00 148.50

Total 10m2 217.85 239.45

Say Rs 218.00  /10m2 Rs. 239

10m2 priming coat (603) 10m2 182.10 182.10

10m2 Painting,two coat(612) 10m2 486.65 486.65Total 10m2 668.75 735.63

Painting with ready mixed paint of approved colour and quality as specified, for one coat to old wood work

609&61

0

Painting with Aluminium paint of approved colour and quality as specified, two coat(over aprimingcoat already done) to new iron work

Painting with Aluminium paint of approved colour and quality as specified, for one coat to old ironwork

612

$613 Painting with synthetic enamal paint of approvedcolour and quality as specified, two coat(over apriming coat already done) to new wood work

Painting with synyhetic enamal paint of approvedcolour and quality as specified, for one coat to old

wood work

612a Painting with synthetic enamal paint of approved

colour and quality as specified, two coat includinga priming coat to new wood work

Page 52: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 52/376

Page 52

Say Rs 669.00  /10m2 Rs. 736

612b

1.75 ltr  synthetic enamal paint ltr 162.00 283.50 311.85

LS sundries-bresh,sand paper,soap,putty etc LS 1.85 1.85

0.45 no painter each 270.00 121.50 133.65

Total 10m2 406.85 447.35

Say Rs 407 /10m2 Rs. 448.00

0.8 ltr  synthetic enamal paint ltr 162.00 129.60 142.56

LS sundries-bresh,sand paper,soap,putty etc LS 1.85 1.85

0.25 no painter each 270.00 67.50 74.25Total 10m2 198.95 218.66

Say Rs 199.00  /10m2 Rs. 219.00

10m2 priming coat (604) 10m2 174.25 174.25

10m2 Painting,two coat(612b) 10m2 406.85 406.85

Total 10m2 581.10 639.21

Say Rs 581 /10m2 Rs. 639.21

615

1.15 ltr  plastic emulsion paint including primin ltr 180.00 207.00 227.70

LS sundries-bresh,sand paper,soap,putty etc LS 3.10 3.10

1.15 no painter each 270.00 310.50 341.55

Total 10m2 520.60 572.35

Say Rs 521 /10m2 Rs. 572

0.4 ltr  plastic emulsion paint ltr 180.00 72.00 79.20

LS sundries-bresh,sand paper,soap,putty etc LS 1.85 1.85

0.4 no painter each 270.00 108.00 118.80

Total 10m2 181.85 199.85

Say Rs 182 /10m2 Rs. 200.00

0.8 ltr  copal varnish ltr 105.00 84.00 92.40

Painting with synthetic enamal paint of approvedcolour and quality as specified, two coat(over 

apriming coat already done) to new iron work

612c

Painting with synthetic enamal paint of approvedcolour and quality as specified, for one coat to oldiron work

612d Painting with synthetic enamal paint of approved

colour and quality as specified, two coat includinga priming coat to new iron work

Painting with plastic emulsion paint of approvedcolour and quality as specified, two coat includinga priming coat to new plastered surface

615a

Painting with plastic emulsion paint of approvedcolour and quality as specified, one coat to oldsurface

619a

Varnishing with Copal varnish two coat after rubbing with sand paper and cleaning the new wood

surface

Page 53: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 53/376

Page 53

LS sundries-bresh,sand paper,soap,putty etc LS 1.85 1.85

1 no painter each 270.00 270.00 297.00

Total 10m2 355.85 391.25

Say Rs 356 /10m2 Rs. 392.00

621

0.35 ltr  copal varnish ltr 105.00 36.75 40.43

LS sundries-bresh,sand paper,soap,putty etc LS 1.85 1.85

0.45 no painter each 270.00 121.50 133.65

Total 10m2 160.10 175.93

Say Rs 160 /10m2 Rs. 176

625

1.4 ltr  black japan paint ltr 57.00 79.80 87.78

LS sundries-bresh,sand paper,soap,putty etc LS 1.25 1.250.5 no painter each 270.00 135.00 148.50

Total 10m2 216.05 237.53

Say Rs 216 /10m2 Rs. 238

628

0.45 ltr synthetic enamel paint of approved qultr 162.00 72.9

Breshers LS 3.1

scaffolding LS 18.75

4.5 no painter each 270.00 1215

1.5 no man each 240.00 360

1669.75 1836.73

for average cost of each letters 16.7 18.37

Say Rs 17 /each Rs. 18

629

0.6 ltr synthetic enamel paint of approved qultr 162.00 97.2

Breshers LS 3.1

scaffolding LS 18.75

7 no painter each 270.00 18902 no man each 240.00 480

2489.05 2737.96

for average cost of each letters 24.89 27.38

Say Rs 25 /each Rs. 27

630

0.9 ltr ltr 162.00 145.8

Breshers LS 3.1

scaffolding LS 18.7510 no painter each 270.00 2700

Varnishing with Cpval varnish one coat after rubbing with sand paper and cleaning the old woodsurface

Painting with Black japan paint one coat to theexternal surface

Painting letters or figures 6.5, 8, 10cms height withany kind of paints. Detailsof cost of 100 letters

Painting letters or figures 13, 15, 18cms heightwith any kind of paints. Detailsof cost of 100 letters

Painting letters or figures 23, 25, 30cms heightwith any kind of paints. Detailsof cost of 100 letters

synthetic enamel paint of approvedquality

Page 54: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 54/376

Page 54

2 no man each 240.00 480

3347.65 3682.42

for average cost of each letters 33.48 36.82

Say Rs 33 /each Rs. 37

STEEL WORK

754

1.05 qtl cost of MS angles, plates, tees, channqtl 3800.00 3990.00

2 kgkg 60.00 120.00

3 m2 applying iron primer one coat 10m2 174.25 52.28

0.5 no blacksmith each 325.00 162.50

0.2 no heavy load mazdoor each 270.00 54.00

0.3 no fitter each 300.00 90.00

0.1 no heavy load mazdoor for cuttiung each 270.00 27.00

1.25 no blacksmith each 325.00 406.25

1.5 no heavy load mazdoor for punching holeeach 270.00 405.00

0.5 no blacksmith each 325.00 162.50

0.5 no heavy load mazdoor for revitting each 270.00 135.00

0.5 no blacksmith each 325.00 162.50

0.5 no heavy load mazdoor for revitting each 270.00 135.00

LS charcoal and hire for other appliances LS 5.00 15.00

LShoisting and errecting in position LS 37.50 37.50

1.05 qtl conveyance of MS steel T 234.00 24.57

Total T 5979.10 6577.00

Say Rs 5979 /Qtl 6578.00

63mm dia GI pipe for truss B class 1m

1 m 63mmGI pipe for truss m 230.00 230.00

L.S Labour for fabrication and errection L.S 40.00L.s Hire of machinery & current charges L.S 20.00

0.2 m2 Iron primer 10m2 85.00 1.70

L.s Scaffolding & welding roads etc LS 10.00

301.70 331.87

Say Rs 302 /m Rs. 332

1 m 50mm dia.GI pipe for truss m 185.00 185.00

L.S Labour for fabrication and errection L.S 30.00

L.s Hire of machinery & current charges L.S 15.000.16 m2 Iron primer 10m2 85.00 1.33

Steel work revetted or bolted in built up sections trusses and framed work with MS angles, ironplates, tees, etc. straightening, cutting, fabricating,and hoisting including applying a coat of iron priming

revets, nuts and bolts of sutable sizeand length

754a Providing tubular truss with 65mm GI pipe (B

class) including cost and conveyance of all materials, labour charges, scaffolding, errection charges, hireof tools and plants etc complete, including one coatof iron primer 

754b 50mm dia. GI pipe for purline B class 1m

Page 55: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 55/376

Page 55

L.s Scaffolding & welding roads etc L.S 6.00

237.33 261.07

Say Rs 237 /m Rs. 261

1 m 40 mm dia.GI pipe for truss m 154.00 154.00

L.S Labour for fabrication and errection L.S 25.00

L.s Hire of machinery & current charges L.S 12.00

0.13 m2 Iron primer 10m2 85.00 1.06

L.s Scaffolding & welding roads etc L.S 5.00

197.06 216.77

Say Rs 197 /m Rs. 217

1 m 25 mm dia.GI pipe for truss m 110.00 110.00

L.S Labour for fabrication and errection L.S 22.00L.s Hire of machinery & current charges L.S 10.00

0.1 m2 Iron primer 10m2 85.00 0.85

L.s Scaffolding & welding roads etc L.S 4.00

146.85 161.54

Say Rs 147 /m Rs. 162

755

1.05 qtl cost of MS square or round, qtl 3250.00 3412.50

100 no welding rods,8g 100no 420.00 420.00

5 m2 applying iron primer one coat 10m2 174.25 87.13

2.5 no blacksmith for leveling each 325.00 812.50

1.25 no blacksmith for cutting each 325.00 406.25

1.0 no heavy load man mazdoor for helping each 270.00 270.00

1.0 no welder each 325.00 325.00

1.0 no heavy load man mazdoor for welding each 270.00 270.00

2.5 no blacksmith for grinding each 325.00 812.50

1.05 qtl conveyance of steel t 234.00 24.57

currient charge, hire for welding plant LS 37.50

sundries LS 50.00

grinding stones LS 25.00

6952.95 7648.24

Say Rs 6953 /m Rs. 7648

763

10 dm2 rolling shutter m2 1400.00 140.000.03 no fitter each 300.00 9.00

754c 40 mm dia. GI pipe B class 1m

754d 25 mm dia. GI pipe B class 1m

Providing MS grills for window and compoundgates including all labour, hire charges for fabricating and cost of all materials and applying acoat of iron primer 

Supplying and fixing rolling shutters of appovedmake and painted with a priming coat of iron primer,made of 80x1.25mm MS laths interlocking together through their entire length and jointed together atthe end by end locks mounted on speciallydesigned pipe shaft with brackets, side guides andarrangements for inside and outside locking withpush and pull operation etc complete.

Page 56: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 56/376

Page 56

0.03 no man each 240.00 7.20

0.03 no mason each 325.00 9.75

Total 10dm2 165.95 182.55

Say Rs. 166 /10dm2 Rs. 183.00

Supplying and fixing top cover to rolling shutter 

1 m top cover m 450.00 450.00

LS for conveyance and fitting LS 10.00

Total m 460.00 506.00

Say 460.00 /m 506.00

10 dm2 collapsible grill m2 1400.00 140.00

0.03 no fitter each 300.00 9.00

0.03 no man each 240.00 7.20

0.03 no mason each 325.00 9.75

Total 10dm2 165.95 182.55

Say Rs. 166 /10dm2 Rs. 183.00

A

I. Material0.204 Qtl 75 x 75 x 6 mm Angle(3x6.8kg/m) Qtl 4087.00 833.75 917.12

Cutting Charges LS 20.00 20.000.134 Qtl MS Sheet(0.54m2x24.75kg/m2) Qtl 4087.00 547.66 602.42

0.091 m3 10m3 562.80 5.12 5.63

0.091 m3 CC 1:4:8 m3 2625.32 238.90 262.79

1.600 m2 Priming Coat 10m2 140.65 22.50 24.75

1.600 m2 Synthetic Enamel paint 10m2 369.05 59.05 64.95

LS 40.00 40.00

1766.98 1943.68

Say Rs 1767.00 /each Rs 1944.00

SANITARY

763a

763b Supplying and fixing steel collapsible grill of 

appoved make and painted with a priming coat of iron primer, interlocking together through their entire length and jointed together at the end by end

locks with brackets, side guides and arrangementsfor inside and outside locking with push and pulloperation etc complete.

Supplying and Fixing Fabricated sign board of size90 X 60 triangle on the road way whereever necessarywith 16 gauge MS sheet in 75 x 75 x 6 mm frames andpost for supporting the board. Fixing the board with MSChannel using bolt and nut and fixing the board in cementconcrete 1:4:8 (using 40mm broken stone) blocks of size45 x 45, 40cm with bottom level of board at 180 cm aboveground level applying 2 coat of required paint over a coatof iron primer including all labour and hire charges for fabricating and cost of materil etc complete

Earth Work in ord. soil, 0.45 x 0.45 x45

Conveyance of Board to site andfixing position including 'U' Clamp

Page 57: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 57/376

Page 57

1.0 no. 550x400mm basin each 480.00 480.00

1.0 no. 15mmCP brass pillor tap each 242.00 242.00

1.0 no. 15mm GM wheel valve each 171.00 171.00

1.0 no. 15mm PVC connection with union(he each 44.00 44.00

1.0 no. CP brass chain with 32mm rubber plu each 117.00 117.00

1.0 no. 32mm PVC waste each 58.00 58.00

1.0 pair  CI brackets pair 55.00 55.00

sundies LS 11.25

2.0 kg cement t 4700.00 9.40

0.5 no. plumber each 325.00 162.50

1.0 man each 240.00 240.00

0.5 mason each 325.00 162.50

Total each 1752.65 1927.92

Say Rs. 1753 /Each Rs 1928.00

1 no

each 1606.00 1606.00

1.5 kg cement t 4700.00 7.05

0.25 no. plumber each 325.00 81.25

0.25 no. mason each 325.00 81.25

1775.55 1953.11

Say Rs. 1776 /Each Rs 1953

860

1 no. wihite glazed IWC with trap each 484.00 484.00

1 pair  foot rest pair 96.00 96.00

LSLS 30.00

7 kg cement T 4700.00 32.90

855a

Supplying and fixing 550x400mm or nearest size wash hand basin of white glazed eartherenware,

Indian make, bst quality with CI brackets paintedwhite ,one central 15mm CP brass pillar tap, 1 no.15mm PVC connection with brass union, 1 no.15mm GM wheel valve, rubber plug and CP brasschain 32mm, 32mm PVC waste pipe with accesscap, etc, complete including cutting and makingghood the walls, painting the brackets and wasteconnection with sutable paint two coats, etc comple

855

bSupplying and fixing Stainless steel sink (1mmthick sheet) of over all size 510x432x165mm withcuppling and stainer 

Stainless steel sink (1mm thicksheet) of over all size510x432x165mm

Supplying and fixing Indian type white glazedearthernware WC 580x400 mm or nearest siuzewith P ro S trap, embedding in brick jelly concrete,with a pair of porcelane foot rest and formingsquattiung platform 900x700mm plastered withcement mortar 1:3 with neat cement flushing coat ,including cutting and making good the wall, floors,etc complete

birick jelly concrete, and other sundries

Page 58: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 58/376

Page 58

0.6 no. mason each 325.00 195.00

0.6 no. man each 240.00 144.00

Total each 981.90 1080.09

Say Rs. 982 /Each Rs 1080

1 no. wihite glazed orissa pan IWC with trap each 600.00 600.00

LSLS 30.00

7 kg cement T 4700.00 32.90

0.6 no. mason each 325.00 195.00

0.6 no. man each 240.00 144.00

Total each 1001.90 1102.09

Say Rs. 1002 /Each Rs 1102

861

1 no glazed EWC with trap each 634.00 634.00

1 no seat cover each 232.00 232.00sundries for plug, screws etc, LS 7.50

2 kg cement kg 4.70 9.40

0.3 no mason each 325.00 97.50

0.3 no man each 240.00 72.00

1052.40 1157.64

Say Rs. 1052 /Each Rs 1158

1 no 5ltr PVC low level flush tank each 791.00 791.00

1 no 15mm GM wheel valve each 171.00 171.00

1 no 15mm PVC connection each 44.00 44.00

0.25 no fitter/plumber each 325.00 81.25

0.2 no man each 240.00 48.00

1135.25 1248.78

Say Rs. 1136.00 /Each Rs 1249.00

860a

Supplying and fixing Indian type white glazedearthernware WC orissa pan 530x400mm or nearest siuze with P ro S trap, embedding in brick jelly concrete and forming squattiung platform900x700mm plastered with cement mortar 1:3 withneat cement flushing coat , including cutting andmaking good the wall, floors, etc complete

birick jelly concrete, and other sundries

Supplying and fixing European type white glazedearthernware WC with P ro S trap, and plasticseatcover with hinges and rubber bufer ,includingcutting and making good the wall, floors, etccomplete

862a

Supplying and fixing high quality PVC automatic lowlevel flush tank with necessary screws and fittings,including 15mm GM wheel valve with 15mm PVCconnection etc complete

Page 59: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 59/376

Page 59

854

1 no flat back, lipped front urinal each 368.00 368.00

1 no 15mm GM wheel valve each 171.00 171.00

1 no 15mmPVC connection each 44.00 44.00

1 no 32mm PVC waste pipe each 58.00 58.00

sundries for conveyance,screws ,plugs etc. LS 7.50

2 kg cement kg 4.70 9.40

0.5 no mason each 228.00 114.00

0.5 no man each 168.00 84.00

855.90 941.49

Say Rs. 856.00 /Each Rs 941

WATER SUPPLY

883

Details for 30m.

30 m 20mm PVC threaded pipe (10kgf/cm2 m 11.00 330.00 363.00

add 15%for specials 49.50 54.45

LS clamp, cement ,paint etc LS 15.00 15.00

2 no. fitter each 210.00 420.00 462.00

2 no. man each 168.00 336.00 369.60Total 1150.50 1264.05

Hence m 38.35 42.14

Say Rs. 38.50 /m Rs. 42.00

Details for 30m.

30 m 25mm PVC threaded pipe (10kgf/cm2 m 15.00 450.00 495.00add 15%for specials 67.50 74.25

LS clamp, cement ,paint etc LS 15.00 15.00

2 no. fitter each 210.00 420.00 462.00

2 no. man each 168.00 336.00 369.60

Total 1288.50 1415.85

Hence m 42.95 47.20

Say Rs. 43 /m Rs. 47.00

884 30 m

Supplying and fixing white glazed earthernware flatback, lipped front, urinal of size 430x260x350mm ,15mm GM wheel valve with 15mm PVC connectionand 32mm PVC wastage pipe with brass union,including cutting and making good the wall

Supplying threading and jointing 20mm dia PVCpipe and specials such as tees, bends, elbows,checknuts etc, with clamps including cutting andmaking good the walls, painting with suitable painttwo coat, etc complete.(Internal)

883a Supplying threading and jointing 25mm dia PVC

pipe and specials such as tees, bends, elbows,checknuts etc, with clamps including cutting andmaking good the walls, painting with sutable painttwo coat, etc complete.(Internal)

Supplying and laying 40mm dia PVC pipe withfittings such as tees, elbows, bends, checknuts,

etc.including trenching to a minimum depth of 0.5m.And refilling etc, complete(External)

Page 60: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 60/376

Page 60

30 m 40mm PVCpipe (8kgf/cm2) m 28.00 840.00 924.00

add 5% specials 42.00 46.20

0.5 no. fitter each 210.00 105.00 115.50

0.5 no. man each 168.00 84.00 92.40

3 no. man for tnching each 168.00 504.00 554.40

L.S 3.75 3.75

Total 1578.75 1736.25

hence for 1m m 52.63 57.88

Say Rs. 52.50 /m Rs. 58.00

30 m

30 m 110mm PVCpipe (8kgf/cm2) m 204.00 6120.00

add 5% specials 306.00

0.5 no. fitter each 210.00 105.000.5 no. man each 168.00 84.00

3 no. man for tnching each 168.00 504.00

Total 7119.00

hence for 1m m 237.30 261.03

Say Rs. 237 /m Rs. 261

1 no. 25mm unbreakable PVC ball valve each 34.00 34.00 37.40

fitting charges, gum etc LS 7.50 7.50

41.50 44.90

Say Rs.41.50 /Each Rs.45

1 no. CP shower rose, adjustable type each 226.00 226.00 248.60

fitting charges, gum etc LS 10.00 10.00

236.00 258.60

Say Rs.236 /Each Rs.259

1 no. Brass and gun metal 15mm SDB tap each 148.00 148.00 162.80

fitting charges, gum etc LS 5.00 5.00

153.00 167.80

SayRs. 153.00 /Each Rs. 168

1 no.each 256.00 256.00 281.60

fitting charges, gum etc LS 5.00 5.00

261.00 286.60

Say Rs.261 /Each Rs.287

884a

Supplying and laying 110mm dia PVC pipe withfittings such as tees, elbows, bends, checknuts,etc.including trenching to a minimum depth of 0.5m.And refilling etc, complete(External)

884b

Supplying and fixing best quality 25mmunbreakable PVC ball valve

884b

Supplying and fixing best quality CP shower rose,adjustable type

884b

Supplying and fixing best quality Brass and gunmetal 15mm SDB tap

Supplying and fixing best quality Brass and gunmetal 20mm stop cock

Brass and gun metal 20mm stopcock

Page 61: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 61/376

Page 61

1 no. 110mm steel grating to toilet floor each 16.15 16.15 17.77

fitting charges, gum etc LS 3.00 3.00

19.15 20.77

Say Rs.19 /Each Rs.21

30 m

1 m 40mm PVCpipe (8kgf/cm2) m 28.00 28.00 30.80

add 5% specials 1.40 1.54

fitting charges, gum etc LS 2.00 2.00

Total 31.40 34.34

Say Rs.31.50 /m Rs.34.50

ROAD WORK (IRC Specification)

651

0.5 no. man each 240.00 120.00 132.00

Say Rs 120.00  /10m2 Rs. 132.00

652

0.25 no. man each 240.00 60.00 66.00

Say Rs 60.00  /10m2 Rs. 66

653

0.5 no. man each 240.00 120.00 132.00

Say Rs 120.00  /10m2 Rs. 132.00

659

1.40 M3 earth in hard soil 10m3 1314.00 183.96

1.40 M3 consolidation by ramming (Vide item no.67) 74.16 10.38

194.34 213.78Say Rs 194  /10m Rs. 214

Earth work

1.2 IRC Forming Embankment

10m3

0.027 Day Hire charges of roller day 2080.00 56.16

0.5 Liter  Diesel oil lit 36.00 18

74.16 81.58

Say Rs 75.00  /10m2 Rs. 82

1.3 IRC Preparation of subgrade

Supplying and fixing best quality 110mm steelgrating to toilet floor 

884.c Supplying and fixing 40mm dia PVC pipe with

specials for septic tank ventilator(External)

Sectioning upto150mm and forming the surface for new work

Sectioning upto150mm and forming the surface for old work

Picking 50mm to 100mm old matelled surface andsectioning

Forming and consolidatioin sides of the road 1mwide on either side of the road and gravelling to thesame sectioin

Extra charges for compaction with Power Roller 

Page 62: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 62/376

Page 62

0.027 Day Hire charges of roller day 2080.00 56.16

0.5 Liter  Diesel oil lit 36.00 18

74.16 81.58

Say Rs 75.00  /10m2 Rs. 82

a

0.7 m3 60mm broken stone m3 410.00 287.00

0.3 m3 36mm broken stone m3 510.00 153.00

1.0 m3 conveyance of metal m3 499.00 499.00

939.00 1032.90

Say Rs 939.00  /10m2 Rs. 1033

b

1.0 m3 36mm broken stone m3 510.00 510.00

1.0 m3 conveyance of metal m3 499.00 499.001009.00 1109.90

Say Rs 1009.00  /10m2 Rs. 1110

c

1.0 m3 12mm broken stone m3 740.00 740.00

1.0 m3 conveyance of metal m3 499.00 499.00

1239.00 1362.90

Say Rs 1239.00  /10m2 Rs. 1363

d

1.0 m3 6mm broken stone m3 520.00 520.00

1.0 m3 conveyance of metal m3 499.00 499.00

1019.00 1120.90

Say Rs 1019.00  /10m2 Rs. 1121

e

1.0 m3 red earth m3 125.00 125.00

1.0 m3 conveyance of red earth m3 257.00 257.00

382.00 420.20

Say Rs 382.00  /10m2 Rs. 420

2.1.2

0.67 no. man for spreading each 240.00 160.80 176.88

0.67 no. women for spreading each 240.00 160.80 176.88

0.67 no. boy for spreading each 180.00 120.60 132.66

0.01 day hire of roller day 2080.00 24.96 24.96

0.22 ltr  diesel ltr 36.00 7.92 8.71

sundries LS 1.85 1.85

476.93 521.94Say Rs 477  /10m2 Rs. 522

Supplying and stacking 60mm( 70% of 60mm and30%of 36mm) graded metal for measurements

Supplying and stacking 36mm metal for measurements

Supplying and stacking 12mm metal for measurements

Supplying and stacking 6mm metal for 

measurements

Supplying and stacking red earth blinding materialfor measurements

Sub base work:- Metalling the road way 100mmspreaded thickness compacted to 75mm usingdeptl. broken stones (graded in the ratio of 7:3 of 60mm and 36mm size)

Page 63: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 63/376

Page 63

2.2.2

0.67 no. man for spreading each 240.00 160.80 176.88

0.67 no. women for spreading each 240.00 160.80 176.88

0.67 no. boy for spreading each 180.00 120.60 132.66

0.01 day hire of roller day 2080.00 24.96 24.96

0.22 ltr  diesel ltr 36.00 7.92 8.71

sundries LS 1.85 1.85

476.93 521.94

Say Rs 477  /10m2 Rs. 522

2.3.2

0.5 no man for picking old matel each 240.00 120.00 132.000.35 no man for spreading matel each 240.00 84.00 92.40

0.35 no women for spreading matel each 240.00 84.00 92.40

0.35 no boy for spreading matel each 180.00 63.00 69.30

0.01 day hire of roller day 2080.00 24.96 24.96

0.22 ltr  diesel ltr 36.00 7.92 8.71

sundries LS 1.85 1.85

385.73 421.62

Say Rs 386.00  /10m2 Rs. 422.00

.1.1.2

0.03 day hire of boiler and sprayer day 100.00 3.00 3.00

0.03 day hire of mini hot mix plant day 830.00 24.90 24.90

0.09 day Hire for wheel barrows day 3.50 0.32 0.32

1 ltr  diesel for HM plant ltr 36.00 36.00 39.60

2.7 ltr  kerosene for heating aggregate ltr 26.00 70.20 77.22

2 ltr  kerosene for heating bitumen ltr 26.00 52.00 57.20

sundries LS 1.35 1.35

48 kg bitumen kg 35.927 1724.50 1724.50

48 kg conveyance of bitumen T 459.00 22.03 24.24

1.8 no spical man each 255.00 459.00 504.90

0.75 no women each 240.00 180.00 198.00sundries LS 1.35 1.35

2574.64 2656.57

Say Rs 2575  /m3 Rs. 2657

Except cost and conveyance of Bitumen

.1.1.2

0.03 day hire of boiler and sprayer day 100.00 3.00 3.00

0.03 day hire of mini hot mix plant day 830.00 24.90 24.90

0.09 day Hire for wheel barrows day 3.50 0.32 0.321 ltr  diesel for HM plant ltr 36.00 36.00 39.60

 Base course work:- Metalling the road way100mm spreaded thickness compacted to 75mmusing 36mm deptl. broken stones

Remetalling the road way with deptl broken stonesand blinding materials (new stones supplied at0.5m3 for 10m2 and blinding material at 0.12m3 for 10m2)

Leveling undulatioins less than 20mm with 12mm deptl broken stone, premixed with 48kg of bitumen

for 1m3 of matel including hire of all tools and plantsetc complete

Leveling undulatioins less than 20mm with 12mm deptl broken stone, premixed with 48kg of bitumenfor 1m3 of matel including hire of all tools and plantsetc complete

Page 64: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 64/376

Page 65: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 65/376

Page 65

3.2.2

Data for 100m2

0.12 day hire of boiler and sprayer day 100.00 12.00 12.000.12 day hire of roller day 2080.00 249.60 249.60

0.12 day hire of hot mix plant day 830.00 99.60 99.60

0.36 day Hire for wheel barrows day 3.50 1.26 1.26

2.2 ltr  diesel for roller ltr 36.00 79.20 87.12

4 ltr  diesel for HM plant ltr 36.00 144.00 158.40

10.8 ltr  kerosene for heating aggregate ltr 26.00 280.80 308.88

11.6 ltr  kerosene for heating bitumen ltr 26.00 301.60 331.76

291 kg bitumen kg 35.927 10454.76 10454.76

291 kg conveyance of bitumen T 459.00 133.57 146.93

7.5 no spical man each 255.00 1912.50 2103.75

3 no women each 240.00 720.00 792.00

sundries LS 5.00 5.0014393.89 14751.05

for 10m2 1439.39 1475.11

Say Rs 1440.00  /10m2 Rs. 1476.00

Except cost and conveyance of Bitumen

3.2.2

Data for 100m2

0.12 day hire of boiler and sprayer day 100.00 12.00 12.00

0.12 dayhire of roller day 2080.00 249.60 249.60

0.12 day hire of hot mix plant day 830.00 99.60 99.60

0.36 day Hire for wheel barrows day 3.50 1.26 1.26

2.2 ltr  diesel for roller ltr 36.00 79.20 87.12

4 ltr  diesel for HM plant ltr 36.00 144.00 158.40

10.8 ltr  kerosene for heating aggregate ltr 26.00 280.80 308.88

11.6 ltr  kerosene for heating bitumen ltr 26.00 301.60 331.76

7.5 no spical man each 255.00 1912.50 2103.75

3 no women each 240.00 720.00 792.00

sundries LS 5.00 5.00

3805.56 4149.37

for 10m2 380.56 414.94

Say Rs 381  /10m2 Rs. 415

3.2.2.a

Data for 100m2

0.12 day hire of boiler and sprayer day 100.00 12.00 12.00

0.12 day hire of roller day 2080.00 249.60 249.60

0.12 day hire of hot mix plant day 830.00 99.60 99.60

0.36 day Hire for wheel barrows day 3.50 1.26 1.26

2.2 ltr  diesel for roller ltr 36.00 79.20 87.12

4 ltr  diesel for HM plant ltr 36.00 144.00 158.40

Providing 20mm premixed chipping carpet over WBM surfacewith deptal. broken stone (Total usageof bitumen is 29.1kg/10m2)

Providing 20mm premixed chipping carpet over WBM surfacewith deptal. broken stone (Total usageof bitumen is 29.1kg/10m2)

Providing 20mm premixed chipping carpet over BT surface with deptal. broken stone (Total usage of bitumen is 26.6kg/10m2)

Page 66: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 66/376

Page 66

10.8 ltr  kerosene for heating aggregate ltr 26.00 280.80 308.88

10.6 ltr  kerosene for heating bitumen ltr 26.00 275.60 303.16

266 kg bitumen kg 35.927 9556.58 9556.58

266 kg conveyance of bitumen T 459.00 122.09 134.30

7.5 no spical man each 255.00 1912.50 2103.75

3 no women each 240.00 720.00 792.00

sundries LS 5.00 5.00

13458.24 13811.66

for 10m2 1345.82 1381.17

Say Rs 1346  /10m2 Rs. 1381

Except cost and conveyance of Bitumen

3.2.2.a

Data for 100m2

0.12 day hire of boiler and sprayer day 100.00 12.00 12.000.12 day hire of roller day 2080.00 249.60 249.60

0.12 day hire of hot mix plant day 830.00 99.60 99.60

0.36 day Hire for wheel barrows day 3.50 1.26 1.26

2.2 ltr  diesel for roller ltr 36.00 79.20 87.12

4 ltr  diesel for HM plant ltr 36.00 144.00 158.40

10.8 ltr  kerosene for heating aggregate ltr 26.00 280.80 308.88

11.6 ltr  kerosene for heating bitumen ltr 26.00 301.60 331.76

7.5 no spical man each 255.00 1912.50 2103.75

3 no women each 240.00 720.00 792.00

sundries LS 5.00 5.00

3805.56 4149.37

for 10m2 380.56 414.94Say Rs 381  /10m2 Rs. 415

3.6.1.2

0.03 day hire of boiler and sprayer day 100.00 3.00 3.00

0.03 day hire of roller day 2080.00 62.40 62.40

0.09 day Hire for wheel barrows day 3.50 0.32 0.32

0.5 ltr  diesel for roller ltr 36.00 18.00 19.80

27.5 kg bitumen kg 35.927 987.99 987.99

11 kg fire wood T 3400.00 37.40 41.14

27.5 kg conveyance of bitumen T 459.00 12.62 13.88

1.75 no special man each 255.00 446.25 490.88

0.75 no man each 240.00 180.00 198.00

0.75 no women each 240.00 180.00 198.00

sundries LS 0.40 0.40

1928.38 2015.81

Providing 20mm premixed chipping carpet over BT surface with deptal. broken stone (Total usage of bitumen is 26.6kg/10m2)

Filling up pot holes (cut and formed to regular shapes And all loose and defective materialsremoved) after applying a priming coat of hotbitumen using 36mm deptl broken stone andcom,pacting with power roller to get a compactsurface and applying hot bitumen by sprayer including cost, hire and conveyance of all materials,hire of tools and plants (total usage of bitumen is

27.5kg/m3)

Page 67: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 67/376

Page 67

Say Rs 1928  /m3 Rs. 2016

3.6.1.2

0.03 day hire of boiler and sprayer day 100.00 3.00 3.00

0.03 day hire of roller day 2080.00 62.40 62.40

0.09 day Hire for wheel barrows day 3.50 0.32 0.32

0.5 ltr  diesel for roller ltr 36.00 18.00 19.80

11 kg fire wood T 3400.00 37.40 41.14

1.75 no special man each 255.00 446.25 490.88

0.75 no man each 240.00 180.00 198.000.75 no women each 240.00 180.00 198.00

sundries LS 0.40 0.40

927.77 1013.93

Say Rs 928.00  /m3 Rs. 1014

3.6.2.2

0.06 day hire of boiler and sprayer day 100.00 6.00 6.00

0.06 day hire of roller day 2080.00 124.80 124.80

0.18 day Hire for wheel barrows day 3.50 0.63 0.63

1 ltr  diesel for roller ltr 36.00 36.00 39.60

60 kg bitumen kg 35.927 2155.62 2371.18

24 kg fire wood T 3400.00 81.60 89.76

60 kg conveyance of bitumen T 459.00 27.54 30.29

5 no special man each 255.00 1275.00 1402.50

0.5 noman each 240.00 120.00 132.00

2 no women each 240.00 480.00 528.00

sundries LS 0.40 0.40

4307.59 4725.17

Say Rs 4308.00  /m3 Rs. 4725

Filling up pot holes (cut and formed to regular shapes And all loose and defective materialsremoved) after applying a priming coat of hot

bitumen using 36mm deptl broken stone andcom,pacting with power roller to get a compactsurface and applying hot bitumen by sprayer including cost, hire and conveyance of all materials,hire of tools and plants (total usage of bitumen is27.5kg/m3)

Filling up pot holes (cut and formed to regular shapes And all loose and defective materialsremoved) after applying a priming coat of hotbitumen using 12mm deptl broken stone premixed

with bitumen and compacting with power roller toget a compact surface and including cost andconveyance of all materials, hire of tools and plants(total usage of bitumen is 60kg/m3)

Page 68: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 68/376

Page 68

3.6.2.2

0.06 day hire of boiler and sprayer day 100.00 6.00 6.00

0.06 day hire of roller day 2080.00 124.80 124.80

0.18 day Hire for wheel barrows day 3.50 0.63 0.63

1 ltr  diesel for roller ltr 36.00 36.00 39.60

24 kg fire wood T 35.93 0.86 0.95

5 no special man each 255.00 1275.00 1402.50

0.5 no man each 240.00 120.00 132.00

2 no women each 240.00 480.00 528.00

sundries LS 0.40 0.402043.69 2234.88

Say Rs 2044.00  /m3 Rs. 2235

Deepening of well

63

1.10 no man each 168.00 184.80

3.00 no boy each 126.00 378.00

562.80 619.08

Say Rs. 563.00 /10m3 Rs. 620.00

a1.25 m3

10m3 562.80 703.50 773.85

Say Rs. 704.00 /10m3 Rs. 774.00

b1.25 m3 10m3 703.50 879.38 967.31

Say Rs. 880.00 /10m3 Rs. 968.00

c1.25 m3 10m3 879.38 1099.22 1209.14

Say Rs. 1100.00 /10m3 Rs. 1210.00

d1.25 m3 10m3 1099.22 1374.02 1511.43

Say Rs. 1375.00 /10m3 Rs. 1512.00

e1.25 m3 10m3 1374.02 1717.53 1889.28

Say Rs. 1718.00 /10m3 Rs. 1890.00

Filling up pot holes (cut and formed to regular shapes And all loose and defective materialsremoved) after applying a priming coat of hotbitumen using 12mm deptl broken stone premixed

with bitumen and compacting with power roller toget a compact surface and including cost andconveyance of all materials, hire of tools and plants(total usage of bitumen is 60kg/m3)

Earth work excavation in ordinary soil for deepeningthe well upto 2.5m dia.and depositing on the bankwith initial leads and lift of 1.5m 

Ist depth of 1.5-3.0m add 25% to the rate of initialdepth

2nd depth of 3.0-4.5m add 25% tothe rate of previus depth

3rd depth of 4.5-6 m add 25% to therate of previus depth

4th depth of 6-7.5m add 25% to therate of previus depth

5th depth of 7.5-9m add 25% to therate of previus depth

Page 69: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 69/376

Page 69

f 1.1 m3 10m3 1717.53 1889.28 2078.21

Say Rs. 1890.00 /10m3 Rs. 2079.00

Errcetion of RCC ring2a

Data for each ring

0.054 m3 concrete 10dm3 38.88 209.95

2.17 m2 form work-@50% of slab 10m2 1370.88 297.48

0.5 no man for errecting each 168.00 84.00

Total 591.43 650.58

Say Rs. 591 /each 651.00

b

Data for each ring

0.061 m3 concrete 10dm3 38.88 237.17

2.44 m2 form work-@50% of slab 10m2 1370.88 334.49

0.5 no man for errecting each 168.00 84.00

Total 655.66 721.23

Say Rs. 656.00 /each 721

c

0.068 m3 concrete 10dm3 38.88 264.38

2.73 m2 form work-@50% of slab 10m2 1370.88 374.25

0.5 no man for errecting each 168.00 84.00

Total 722.63 794.90

Say Rs. 723.00 /each 795.00

d

0.08 m3 concrete 10dm3 38.88 311.04

3.3 m2 form work-@50% of slab 10m2 1370.88 452.39

0.5 no man for errecting each 168.00 84.00

Total 847.43 932.17

Say Rs. 847 /each 932

e

0.15 m3 concrete 10dm3 38.88 583.203.72 m2 form work-@50% of slab 10m2 1370.88 509.97

6th depth of 9m-10.5 add 10% to therate of previus depth

Providing and errceting in well RCC ring of 1.2mdia, 0.05 thick and 0.3 height with 1:2:4 using 20mmbroken stone

Providing and errceting in well RCC ring of 1.35mdia, 0.05 thick and 0.3 height with 1:2:4 using 20mmbroken stone

Providing and errceting in well RCC ring of 1.5mdia, 0.05 thick and 0.3 height with 1:2:4 using 20mmbroken stone

Providing and errceting in well RCC ring of 1.8mdia, 0.05 thick and 0.3 height with 1:2:4 using 20mmbroken stone

Providing and errceting in well RCC ring of 2.1mdia, 0.075 thick and 0.3 height with 1:2:4 using20mm broken stone in 11m height

Page 70: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 70/376

Page 70

0.5 no man for errecting each 168.00 84.00

Total 1177.17 1294.88

Say Rs. 1177 /each 1295.00

e

0.17 m3 concrete 10dm3 38.88 660.96

4.38 m2 form work-@50% of slab 10m2 1370.88 600.44

0.5 no man for errecting each 168.00 84.00

Total 1345.40 1479.94

Say Rs. 1345 /each 1480.00

Providing and errceting in well RCC ring of 2.4m

dia, 0.075 thick and 0.3 height with 1:2:4 using20mm broken stone

Page 71: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 71/376

Page 71

 /100m2

 /100m2

 /100m2

 /Each

 /m3

 /m3

Page 72: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 72/376

Page 72

 /m3

 /m3

 /m3

 /m3

 /10m2

 /m3

 /10dm3

 /m3

Page 73: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 73/376

Page 73

 /Each

 /Each

 /m3

 /m2

 /m2

 /m2

 /m3

Page 74: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 74/376

Page 75: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 75/376

Page 75

 /10nos

 /10m3

 /10m3

 /10m3

 /10m3

 /10m3

 

 /10m3

Page 76: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 76/376

Page 76

 /10m3

 

/10m3

 

 /10m3

 /10m3

 /10m3

 /10m3

Page 77: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 77/376

Page 78: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 78/376

Page 78

Page 79: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 79/376

Page 79

/m

Page 80: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 80/376

Page 80

Page 81: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 81/376

Page 82: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 82/376

Page 82

Page 83: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 83/376

Page 83

 /m3

 /m3

 /m3

Page 84: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 84/376

Page 84

 /Qtl

 /10m2

 /10m2

 /10m2

 

 /10dm3

Page 85: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 85/376

Page 85

 /10dm3

 /10dm3

 /10dm3

 /10dm3

 /10dm3

Page 86: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 86/376

Page 87: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 87/376

Page 87

 /10dm3

 /10dm3

 /10dm3

 /10dm3

 /10dm3

Page 88: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 88/376

Page 89: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 89/376

Page 89

 /10dm3

 /m3

 /m3

 /m3

Page 90: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 90/376

Page 91: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 91/376

Page 91

 /m3

 /m3

 /m3

 /m3

Page 92: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 92/376

Page 92

 /m3

 /m3

 /m3

 /m3

Page 93: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 93/376

Page 93

 /m3

 /m3

 /m3

 /m3

 /m3

Page 94: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 94/376

Page 94

 /m3

 /m3

 /m3

 /m3

Page 95: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 95/376

Page 95

 /m3

 /m3

 /m3

 /m3

Page 96: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 96/376

Page 96

 /m3

 /m3

 /10dm3

 /10dm3

Page 97: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 97/376

Page 97

 /m2

 /10dm3

/Each

/Each

 /m2

 /m2

Page 98: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 98/376

Page 98

 /10m2

 /10m2

 

 /10dm2

Page 99: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 99/376

Page 99

 /10dm2

 /Qtl

 /Qtl

/10nos

/10nos

/10nos

/10nos/10nos

/10nos

/10nos

/10nos

/10nos

/10nos

/10nos

/10nos

/each

/each

 /10m2

Page 100: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 100/376

Page 100

 /10m2

 /10m2

941

225

#VALUE!

 /10m2

Page 101: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 101/376

Page 101

 /10m2

 /10m2

 

 /10m2

Page 102: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 102/376

Page 103: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 103/376

Page 103

 /10m2

 /10m2

 /10m2

 /10m

 /10m

 /10m

Page 104: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 104/376

Page 105: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 105/376

Page 105

 /10m

 /10m2

 /10m2

Page 106: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 106/376

Page 106

 /10m

 /m

 /m

 /10m2

Page 107: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 107/376

Page 107

 /10m2

 /10m2

 /10m2

 /10m2

 /10m2

Page 108: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 108/376

Page 108

 /10m2

 /10m2

 /10m2

 /10m2

 /10m2

 /10m2

Page 109: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 109/376

Page 109

 /10m2

 /10m2

 /10m2

 /10m2

 /10m2

 /10m2

Page 110: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 110/376

Page 110

 /10m2

 /10m2

 /10m2

 /10m2

 /10m2

Page 111: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 111/376

Page 111

 /10m2

 /10m2

 /10m2

 /10m2

 /10m2

 /10m2

Page 112: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 112/376

Page 112

 /10m2

 /10m2

 /10m2

 /each

 /each

Page 113: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 113/376

Page 113

 /each

 /Qtl

/m

Page 114: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 114/376

Page 114

/m

/m

/m

/m

Page 115: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 115/376

Page 115

 /10dm2

 /m

 /10dm2

 /each

Page 116: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 116/376

Page 116

 /Each

 /Each

Page 117: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 117/376

Page 117

 /Each

 /Each

 /Each

 /Each

Page 118: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 118/376

Page 118

 /Each

 /m

 /m

Page 119: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 119/376

Page 119

 /m

 /m

 /Each

 /Each

 /Each

 /Each

Page 120: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 120/376

Page 120

 /Each

 /m

 /10m2

 /10m2

 /10m2

 /10m

 /10m2

Page 121: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 121/376

Page 121

 /10m2

 /10m2

 /10m2

 /10m2

 /10m2

 /10m2

 /10m2

Page 122: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 122/376

Page 122

 /10m2

 /10m2

 /m3

Page 123: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 123/376

Page 123

 

 /m3

100

5.75

 /m3

Page 124: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 124/376

Page 124

 /10m2

 /10m2

Page 125: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 125/376

Page 125

 /10m2

 /10m2

Page 126: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 126/376

Page 126

 /m3

 /m3

 /m3

Page 127: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 127/376

Page 127

 /m3

 /10m3

 /10m3

 /10m3

 /10m3

 /10m3

 /10m3

Page 128: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 128/376

Page 128

 /10m3

 /each

 /each

 /each

 /each

Page 129: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 129/376

Page 129

 /each

 /each

Page 130: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 130/376

Page 130

Page 131: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 131/376

Page 131

Page 132: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 132/376

Page 132

Page 133: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 133/376

Page 133

Page 134: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 134/376

Page 135: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 135/376

Page 136: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 136/376

Page 136

Page 137: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 137/376

Page 137

Page 138: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 138/376

Page 138

Page 139: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 139/376

Page 139

Page 140: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 140/376

Page 140

Page 141: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 141/376

Page 141

Page 142: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 142/376

Page 142

Page 143: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 143/376

Page 143

Page 144: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 144/376

Page 144

Page 145: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 145/376

Page 145

Page 146: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 146/376

Page 146

Page 147: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 147/376

Page 147

Page 148: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 148/376

Page 148

Page 149: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 149/376

Page 149

Page 150: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 150/376

Page 150

Page 151: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 151/376

Page 151

Page 152: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 152/376

Page 152

Page 153: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 153/376

Page 153

Page 154: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 154/376

Page 154

Page 155: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 155/376

Page 155

Page 156: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 156/376

Page 156

Page 157: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 157/376

Page 157

Page 158: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 158/376

Page 158

Page 159: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 159/376

Page 160: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 160/376

Page 160

Page 161: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 161/376

Page 161

Page 162: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 162/376

Page 162

Page 163: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 163/376

Page 163

Page 164: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 164/376

Page 164

Page 165: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 165/376

Page 165

Page 166: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 166/376

Page 166

Page 167: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 167/376

Page 167

Page 168: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 168/376

Page 168

Page 169: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 169/376

Page 169

Page 170: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 170/376

Page 170

Page 171: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 171/376

Page 172: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 172/376

Page 172

Page 173: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 173/376

Page 173

Page 174: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 174/376

Page 174

Page 175: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 175/376

Page 175

Page 176: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 176/376

Page 177: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 177/376

Page 177

Page 178: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 178/376

Page 178

Page 179: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 179/376

Page 179

Page 180: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 180/376

Page 180

Page 181: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 181/376

Page 182: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 182/376

Page 182

Page 183: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 183/376

Page 183

Page 184: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 184/376

Page 184

Page 185: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 185/376

Page 185

Page 186: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 186/376

Page 186

Page 187: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 187/376

Page 187

Page 188: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 188/376

Page 188

Page 189: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 189/376

Page 189

Page 190: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 190/376

Page 190

Page 191: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 191/376

Page 191

Page 192: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 192/376

Page 192

Page 193: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 193/376

Page 193

Page 194: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 194/376

Page 194

Page 195: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 195/376

Page 195

Page 196: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 196/376

Page 196

Page 197: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 197/376

Page 197

Page 198: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 198/376

Page 198

Page 199: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 199/376

Page 199

0.00 /10m

Page 200: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 200/376

Page 200

Page 201: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 201/376

Page 201

Page 202: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 202/376

Page 202

Page 203: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 203/376

Page 203

Page 204: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 204/376

Page 204

Page 205: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 205/376

Page 205

Page 206: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 206/376

Page 206

Page 207: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 207/376

Page 207

Page 208: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 208/376

Page 208

Page 209: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 209/376

Page 209

Page 210: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 210/376

Page 210

Page 211: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 211/376

Page 211

Page 212: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 212/376

Page 212

Page 213: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 213/376

Page 213

Page 214: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 214/376

Page 215: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 215/376

Page 215

Page 216: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 216/376

Page 216

Page 217: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 217/376

Page 217

Page 218: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 218/376

Page 218

Page 219: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 219/376

Page 219

Page 220: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 220/376

Page 220

Page 221: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 221/376

Page 221

Page 222: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 222/376

Page 222

Page 223: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 223/376

Page 223

Page 224: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 224/376

Page 224

Page 225: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 225/376

Page 225

Page 226: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 226/376

Page 226

Page 227: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 227/376

Page 227

Page 228: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 228/376

Page 228

Page 229: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 229/376

Page 229

Page 230: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 230/376

Page 230

Page 231: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 231/376

Page 231

Page 232: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 232/376

Page 232

Page 233: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 233/376

Page 233

Page 234: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 234/376

Page 234

Page 235: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 235/376

Page 235

Page 236: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 236/376

Page 236

Page 237: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 237/376

Page 237

Page 238: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 238/376

Page 238

Page 239: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 239/376

Page 239

Page 240: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 240/376

Page 240

Page 241: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 241/376

Page 241

Page 242: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 242/376

Page 242

Page 243: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 243/376

Page 244: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 244/376

Page 244

Page 245: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 245/376

Page 245

Page 246: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 246/376

Page 246

Page 247: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 247/376

Page 247

Page 248: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 248/376

Page 248

Page 249: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 249/376

Page 249

Page 250: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 250/376

Page 250

Page 251: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 251/376

Page 251

Page 252: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 252/376

Page 252

Page 253: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 253/376

Page 253

Page 254: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 254/376

Page 254

Page 255: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 255/376

Page 255

Page 256: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 256/376

Page 256

Page 257: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 257/376

Page 257

Page 258: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 258/376

Page 258

Page 259: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 259/376

Page 259

Page 260: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 260/376

Page 260

Page 261: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 261/376

Page 261

Page 262: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 262/376

Page 263: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 263/376

Page 263

Page 264: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 264/376

Page 264

Page 265: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 265/376

Page 265

Page 266: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 266/376

Page 266

Page 267: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 267/376

Page 267

Page 268: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 268/376

Page 268

Page 269: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 269/376

Page 269

Page 270: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 270/376

Page 270

Page 271: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 271/376

Page 271

Page 272: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 272/376

Page 272

Page 273: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 273/376

Page 273

Page 274: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 274/376

Page 274

Page 275: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 275/376

Page 275

Page 276: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 276/376

Page 276

Page 277: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 277/376

Page 277

Page 278: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 278/376

Page 278

Page 279: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 279/376

Page 279

Page 280: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 280/376

Page 280

Page 281: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 281/376

Page 281

Page 282: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 282/376

Page 282

Page 283: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 283/376

Page 283

Page 284: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 284/376

Page 285: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 285/376

Page 286: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 286/376

Page 286

Page 287: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 287/376

Page 287

Page 288: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 288/376

Page 288

Page 289: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 289/376

Page 289

Page 290: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 290/376

Page 290

Page 291: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 291/376

Page 291

Page 292: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 292/376

Page 292

Page 293: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 293/376

Page 293

Page 294: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 294/376

Page 294

Page 295: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 295/376

Page 295

Page 296: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 296/376

Page 296

Page 297: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 297/376

Page 297

Page 298: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 298/376

Page 298

Page 299: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 299/376

Page 299

Page 300: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 300/376

Page 300

Page 301: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 301/376

Page 301

Page 302: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 302/376

Page 302

Page 303: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 303/376

Page 303

Page 304: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 304/376

Page 304

Page 305: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 305/376

Page 305

Page 306: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 306/376

Page 306

Page 307: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 307/376

Page 307

Page 308: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 308/376

Page 308

Page 309: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 309/376

Page 309

Page 310: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 310/376

Page 310

Page 311: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 311/376

Page 312: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 312/376

Page 312

Page 313: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 313/376

Page 313

Page 314: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 314/376

Page 314

Page 315: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 315/376

Page 315

Page 316: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 316/376

Page 316

Page 317: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 317/376

Page 317

Page 318: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 318/376

Page 318

Page 319: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 319/376

Page 319

Page 320: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 320/376

Page 320

Page 321: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 321/376

Page 321

Page 322: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 322/376

Page 322

Page 323: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 323/376

Page 323

Page 324: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 324/376

Page 324

Page 325: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 325/376

Page 325

Page 326: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 326/376

Page 326

Page 327: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 327/376

Page 327

Page 328: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 328/376

Page 328

Page 329: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 329/376

Page 329

Page 330: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 330/376

Page 330

Page 331: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 331/376

Page 331

Page 332: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 332/376

Page 332

Page 333: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 333/376

Page 333

Page 334: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 334/376

Page 334

Page 335: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 335/376

Page 335

Page 336: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 336/376

Page 336

Page 337: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 337/376

Page 337

Page 338: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 338/376

Page 338

Page 339: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 339/376

Page 339

Page 340: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 340/376

Page 340

Page 341: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 341/376

Page 341

Page 342: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 342/376

Page 342

Page 343: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 343/376

Page 343

Page 344: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 344/376

Page 344

Page 345: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 345/376

Page 345

Page 346: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 346/376

Page 346

Page 347: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 347/376

Page 348: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 348/376

Page 348

Page 349: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 349/376

Page 349

Page 350: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 350/376

Page 350

Page 351: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 351/376

Page 351

Page 352: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 352/376

Page 352

Page 353: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 353/376

Page 353

Page 354: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 354/376

Page 354

Page 355: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 355/376

Page 355

Page 356: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 356/376

Page 356

Page 357: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 357/376

Page 357

Page 358: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 358/376

Page 358

Page 359: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 359/376

Page 359

Page 360: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 360/376

Page 360

Page 361: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 361/376

Page 361

Page 362: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 362/376

Page 362

Page 363: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 363/376

Page 363

Page 364: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 364/376

Page 364

Page 365: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 365/376

Page 365

Page 366: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 366/376

Alangad Block

Sl.No. Materials Avg.lead Amount

1 Rubble and broken stone 36 Km 386.75

2 River sand 27 km 311.15

3 Cement and Steel 5 km 187.20

4 Bitumen 50 km 377.90

5 Brick 27 km 420.90

6 Laterite 14 km 201.95

7 Lime 5km 100.40

8 Timber(scantling) 46 km 407.90

9 Earth for filling 14 km 201.95

Assistant Executive Engineer 

Conveyance of materials by lorry - Average lead (Paravoor Taluk)

Certified that the distance noted in the data for conveyance of materialsexcept cement/steel and earth are the average Taluk wise conveyanceapproved by the Exe. Engineer, Building Division, Ernakulam and for cement /steel and earth are the minimum lead required

Page 367: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 367/376

Block Panchayath, Paravoor 

Page 368: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 368/376Page 368

ABSTRACT OF RATES

Description of works Rate with out C.P Rate with C.P

CLEARING SITE

1 Clearing grass and other growth of vegitations 120.00 /100m2 132.00 /100m2

2 Clearing light jungles 240.00 /100m2 264.00 /100m2

3 Clearing tick and throny jungles and small trees 480.00 /100m2 528.00 /100m2

4 Felling trees 60to120 girth 214.00 /Each 235.00 /Each

DESMANTLING

6 Dismantling brick, laterite,rubble masonry in mud 168.00/m3 185.00/m3

7 Do DR masonry 168.00 /m3 185.00 /m3

8 Do in lime mortar 276.00 /m3 304.00 /m3

9 Do in cement mortar 384.00 /m3 422 /m3

12 Dismantling or chipping RCC 28 /10dm3 31 /10dm3

13 Removing floor tiles 141 /10m2 155 /10m2

14 Do MP roof tiles 120.00 /10m2 132.00 /10m2

15 Do pan or pot roof tiles 240.00 /10m2 264.00 /10m2

16 Do wrought and framed timber from roof 7.91 /10dm3 8.70 /10dm3

17 Dismantling door with shutters 196.00 /Each 215 /Each

18 Do window with shutters 129 /Each 142 /Each

19 Do ventilator with shutters 73 /Each 80 /Each

20 Do ceiling 198.00 /10m2 218.00 /10m2

21 Taking down shutters of doors 57.00 /10m2 62.15 /10m2

22 Do shutters of windows 45.00 /10m2 49.00 /10m2

23 Do shutters of ventilator 21.05 /10m2 23.16 /10m2

28 Dismantling cement concrete/RCC 720.00 /m3 792.00 /m3

30 Do lime mortar 72.00 /10m2 79.20 /10m2

 IN PARAVOOR TALUK BASED ON 2010 SCHEDULE OF RATES

Sl.No.

Page 369: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 369/376Page 369

31 Do cement mortar 120.00 /10m2 132.00 /10m2

EARTH WORK

51 Earth work excavation in ordinary soil for foundati Rs. 804 /10m3 884 /10m3

52 Do - in hard soil for foundation Rs. 1,500 /10m3 1650 /10m3

53 Do - in ordinary rock for foundatio Rs. 2,814 /10m3 3095 /10m3

54 Do - in granite rock blasting Rs. 5,376 /10m3 5913 /10m3

56 Do - in ordinary soil for cutting and f Rs. 711 /10m3 782/10m3

57 Do - in hard soil for cutting and fil Rs. 1,314 /10m3 1445 /10m3

60 Do - in under water or liquid mud Rs. 853 /10m3 939 /10m3

61 Earth consolidation by Power Roller 109 /10m3 112 /10m3

65 Granite rock blasting in wells for initial deapth 5375.8 /10m3 5913 /10m3

65(a)Granite rock blasting in wells for additional deapth Rs. 265 /10m3 291 /10m3

67 Earth consolidation by ramming Rs. 168 /10m3 185 /10m3

67b Earth filling with ordinary soil,consolidation by ram Rs. 2,777 /10m3 3055 /10m3

67d Rs. 2,886 /10m3 3174 /10m3

67f Earth filling with hard soil,consolidation by rammin 3380 /10m3 3718 /10m3

67g Bailing out water Rs. 117 /Hr 128 /Hr  

67h Sand filling with sea sand Rs. 875 /m3 963 /m3

Rs 556 /m3 0 /m3

Rs. 67 /m3 Rs 74.00 /m3

67i Putting ring bunds Rs. 1,635 /m 1799 /m

67j Putting bunds with sand bags 6643 /10m 7308 /10m

CONCRETE

110 Cement Concrete 1:3:6,using 40mm matel Rs. 3,705 /m3 0 /m3

111 Do 1:4:8, 40mm Rs. 3,424 /m3 0 /m3

Earth filling with ordinary soil, consolidation bypower roller 

 road

Earth work excavation in hard soil extra additionallift 1.5m or part thereof over initial lift

Page 370: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 370/376Page 370

122 Do 1:2:4,using 20mm matel 48 /10dm3 0 /10dm3

122a Do 1:(1.5):3,using 20mm matel 53 /10dm3 0.00 /10dm3

123 Do 1:3:6,using 20mm matel 42.50 /10dm3 0 /10dm3

123a Do 1:3:6,using graded(60:40 %,40mm,20mm) Rs. 3,926 /m3 4318/m3

b Rs. 4,441 /m4 4885 /m4

123b Do 1:3:6,using graded(50:50 %,40mm,20mm) Rs. 3,978 /m3 4376/m3

130 Reinforcement for RCC works 5412.75 /Qtl 5954 /Qtl

FORM WORK

132 Form work for slab 3605 /10m2 3966 /10m2

132a Do for beam 3966 /10m2 4362 /10m2

132b Do for column 4326 /10m2 4759 /10m2

RCC WORK

133 Cement Concrete 1:2:4 for slab including form wor 84.50 /10dm3 92.50 /10dm3

133a Do 1:(1.5):3, for slab including form work 89.50 /10dm3 98.00/10dm3

134b Do 1:2:4 for lintel including form work 74.00 /10dm3 81.50 /10dm3

134c Do for sun shade including form work 91.50 /10dm3 100.79 /10dm3

134d Do for belt 45x10 on rubble including f 49 /10dm3 54/10dm3

134e Do for pre cast slab including form wor 49 /10dm3 54 /10dm3

134f Do for column footing including form w 49 /10dm3 54 /10dm3

134g Do for beam (20x20) including form wo 107.50/10dm3 118.50/10dm3

134h Do for beam(20x30) including form wo 101 /10dm3 111 /10dm3

134i Do 1:2:4 for beam (20x40) including form wor 98 /10dm3 107.50 /10dm3

135 Do 1:2:4 for column(20x20) including form 114.00 /10dm3 125.50/10dm3

135a Do 1:2:4 for column(30x20) including form 103 /10dm3 113.50/10dm3

135b Do 1:2:4or column(40x20) including form w 97.50 /10dm3 107.50 /10dm3

 %,40mm,20mm) matel including formwork for drains

Page 371: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 371/376Page 371

BRICK WORK

158 Brick work in 1:5 using 19x9x9cm for foundation Rs. 2,845 /m3 3129 /m3

163 Do do super struct Rs. 2,899 /m3 3189 /m3

158a Do using 22.9x11.2x7cm for foundati Rs. 2,862 /m3 3148 /m3

163a Do do super struct Rs. 2,916 /m3 3208 /m3

159 Brick work in 1:6 using 19x9x9cm for foundation Rs. 2,791 /m3 3070 /m3

163b Do do super struct Rs. 2,845 /m3 3129 /m3

159a Do using 22.9x11.2x7cm for foundati Rs. 2,808 /m3 3089 /m3

163c Do do super struct Rs. 2,862 /m3 3148 /m3

CEMENT BRICK WORK

163dHollow brick(40x20x20) work in 1:5 for foundation Rs. 2,303 /m3 2534 /m3

163e Do do super srructure Rs. 2,379 /m3 2617 /m3

163f Do (40x20x10) work in 1:5 for superstructu Rs. 3,051 /m3 3356 /m3

163gSolid brick(40x20x15) work in 1:6 for foundation Rs. 2,697 /m3 2967 /m3

163h Do do super srructure Rs. 2,751 /m3 3323 /m3

163j Do for additional floor 54 /m3 59.00 /m3

LATERITE WORK

206aLaterite work 1:6 for foundation (44x24x14cm) Rs. 2,259 /m3 2485 /m3

Do for superstructure Rs. 2,335 /m3 2567 /m3

206 Laterite work in 1:5 for foundation(29x24x14cm) Rs. 2,614 /m3 2875 /m3

207 Do for superstructure Rs. 2,689 /m3 2957 /m3

206a Do in 1:6 for foundation Rs. 2,574 /m3 2832 /m3

207a Do for superstructure Rs. 2,650 /m3 2914 /m3

208 Do for additional floor 75 /m3 82 /m3

STONE MASONRY274 RR masonry in 1:6 Rs. 2,249 /m3 2474 /m3

275 RR masonry in 1:8 Rs. 2,160 /m3 2376 /m3

Page 372: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 372/376

Page 373: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 373/376Page 373

g 75mm iron hooks and eyes 20.00 /10nos 22.00 /10nos

h 100mm iron hooks and eyes 26.00 /10nos 28.60 /10nos

i 200mm iron hooks and eyes 50.00 /10nos 55.00 /10nos

 j 150mm aluminium door handle 250.00 /10nos 275.00 /10nos

k 20*8mm steel screws 6.50 /10nos 7.15 /10nos

l 25*8mm steel screws 7.50 /10nos 8.30 /10nos

m 50mm pad lock-6 lever 120.00 /each 132.00 /each

B S/F Precast Cement Concrete door frame

S/F Precast Cement Concrete window/ventilator frame

FLOORING

410 CC 1:4:8-75mm thick, CM-1:3,12mm thick, one co 3883 /10m2 4271/10m2

410aCC 1:4:8-75mm thick, CM-1:3,12mm thick, flushin 4154 /10m2 4569 /10m2

409aFlooring with ceramic tiles(30x30) 5605 /10m2 6162 /10m2

b Do with rectified joint free tiles(45x45) 5558 /10m2 6114 /10m2

c Do with Vitrified tiles(60x60) 7857 /10m2 8642 /10m2

413a Do with gray marble slab 9524 /10m2 10459 /10m2

b Granite tiles (polished) 2 ftx1 ft 8634 /10m2 9496 /10m2

536 884 /m2 972 /m2

ROOFING

318 Supplying and fixing Anjily wood reepers 488 /10dm3 537 /10dm3

328 Ceiling with Anjily wood planks 5849 /10m2 6434 /10m2

452 Supplying and fixing MP tiles(340mm) 1288 /10m2 1417 /10m2

452aFixing with Deptl.MP tiles(340mm) 270 /10m2 297 /10m2

Dadoing walls with glazed tiles20x30mm, CM-1:3,12mm thick

Page 374: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 374/376Page 374

458 Supplying and fixing MP hip and ridge tiles 925 /10m 1018 /10m

458aFixing with Deptl.MP hip and ridge tiles 527 /10m 580 /10m

460 Valleying with GI sheet 2736 /10m 3009 /10m

453 Roofing with AC corrugated sheet 2722 /10m2 2994 /10m2

454 Roofing with AC ridge capping 1533 /10m 1687 /10m

455 Roofing with GI corrugated sheet 4583 /10m2 5042 /10m2

455aRoofing with GI ridge capping 1851 /10m 2036 /10m

455bRoofing with fiber corrugated sheet 11862 /10m2 13045 /10m2

506 Plastering with cement mortar 1:3, 12mm thick 1315 /10m2 1447 /10m2

506a Do 1:3, 9mm thick 1094 /10m2 1204 /10m2

507 Do 1:4, 12mm thick 1277 /10m2 1405 /10m2

511 Do 1:4, 15mm thick 1334 /10m2 1468 /10m2

514 Cement flushing coat/ second coat 271.05 /10m2 298 /10m2

536 Dadoing with glazed tiles20x30mm, CM-1:3, 12m 884 /m2 972/m2

PAINTING WALLS

551 White washing two coats 61 /10m2 67 /10m2

555aWhite cement washing one coat 75.50 /10m2 83 /10m2

b Do two coats 125 /10m2 138 /10m2

558 Oil bond distember two coat to new wall 241 /10m2 265 /10m2

559 Do one coat to old wall 110 /10m2 121 /10m2

560 Water proof cement paint,2 coat,new wall 383.00 /10m2 421 /10m2

561 Do one coat, old wall 163.00 /10m2 179 /10m2

PAINTING WOOD /IRON

601 Cleaning old painted surface 242.00 /10m2 266.00 /10m2

603 Painting with wood primer 183.00 /10m2 201.00 /10m2

604 Iron primer 175.00 /10m2 191 /10m2

607 Ready mixed paint 2 coat, new wood 331.00 /10m2 364.00 /10m2

Page 375: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 375/376Page 375

608 Do 1 coat, old wood 164.00 /10m2 181.00 /10m2

607a Do 2 coat, new wood including primer 513 /10m2 564 /10m2

609 Aluminium paint 2 coat, new iron 386 /10m2 425.00 /10m2

610 Do 1 coat, old iron 189 /10m2 208.00 /10m2

612 Synthetic enamal paint-2 coat,to new wood 487 /10m2 535 /10m2

612a Do 2 coat,including primer,to new wood 669 /10m2 736 /10m2

614 Do one coat to old wood 218 /10m2 239 /10m2

612b Do- 2 coat,to new iron 407 /10m2 448.00 /10m2

612c Do one coat to old iron 199 /10m2 219.00 /10m2

612d Do -2 coat,including primer,to new iron 581 /10m2 639 /10m2

615 Plastic emulsion-two coat, to new wall 521 /10m2 572 /10m2

615a Do one coat to old wall 182 /10m2 200.00 /10m2

619aVarnishing, 2 coat to new wood 356 /10m2 392.00 /10m2

621 Do one coat to old wood 160 /10m2 176 /10m2

625 Black Japan coat to rubble surface 216 /10m2 238 /10m2

628 Painting letters 6,5,8,10cm Ht 17 /Each 18 /Each

629 Painting letters 13, 15,18cm Ht 25 /Each 27 /Each

630 Painting letters 23,25,30cm Ht 33 /Each 37 /Each

STEEL WORKS

754 5979 /Qtl 6578 /Qtl

754aGI pipe truses using 65mm dia. Pipe 302 /m 332 /m

c Do 50mm dia. 237 /m 261 /m

d Do 40mm dia. 197 /m 217 /m

e Do 25mm dia. 147 /m 162 /m

755 MS grill for windows and gate 6953 /Qtl 7648 /Qtl

Steel work in MS angles for,trusses or framedwork, including iron primer 

Page 376: Copy of Data 10 Alangad

8/8/2019 Copy of Data 10 Alangad

http://slidepdf.com/reader/full/copy-of-data-10-alangad 376/376

763 Rolling shutters 166 /10dm2 183 /10dm2

763aTop cover for Rolling shutters 460 /m 506 /m

b MS steel collapsible grill 166 /10dm2 183 /10dm2

c Welded mesh 50x50, 10g With out frame /m2 /m2

d Welded mesh 50x50, 10g With MS flat frame /m2 /m2

f 1767 /each 1944 /each

SANITARY

855 Wash hand basin 1753 /Each 1928 /Each

855bStainless steel sink of size 510x432c165mm, 1mm 1776 /Each 1953 /Each

860 Indian type WC with foot rest 982 /Each 1080 /Each

860aIndian type WC orissa pan 1002 /Each 1102 /Each

861 Europian type WC 1052 /Each 1158 /Each

862aPVC low level flush tank 1136.00 /Each 1249 /Each

854 Urinal 856.00 /Each 941 /Each

WATER SUPPLY883 Laying 20mm PVC pipe(10kgf/cm2) for internal wo Rs. 38.50 /m 42/m

a Do 25mm(10kgf/cm2) Rs. 43 /m 47.00 /m

b Do 40mm (8kgf/cm2)for external wor Rs. 52.50 /m 58.00 /m

c Do 110mm(8kgf/cm2) for external w Rs. 237 /m 261 /m

d supplying and fixing 25mm PVC ball valve Rs.41.50 /Each Rs.45 /Each

e Do - CP shower rose Rs.236 /Each Rs.259 /Each

f Do - 15mm SDB tap 153.00 /Each 168.00 /Each

g Do - brass and gun matel 20mm stop cock Rs.261 /Each Rs.287 /Each

h Do - 110mm steel grating for toilet Rs.19 /Each Rs.21 /Each

Supplying and Fixing Fabricated sign boardof size 90 X 60