CONTROLLING GROUNDWATER ON CONSTRUCTION SITES
Dr Martin PreenePreene Groundwater ConsultingJune 2014
![Page 2: Controlling Water On Construction Sites](https://reader035.fdocuments.us/reader035/viewer/2022081418/5562b2ead8b42a7c4a8b56c8/html5/thumbnails/2.jpg)
www.preene.com
SYNOPSIS
• Good and bad examples of water management
• Surface water management
• Groundwater control
• Environmental impacts from water management
• Conclusion
![Page 3: Controlling Water On Construction Sites](https://reader035.fdocuments.us/reader035/viewer/2022081418/5562b2ead8b42a7c4a8b56c8/html5/thumbnails/3.jpg)
www.preene.com
PRACTICE PROFILE
Preene Groundwater Consulting is the Professional Practice of Dr Martin Preene and provides specialist advice and design services in the fields of dewatering, groundwater engineering and hydrogeology to clients worldwide
Dr Martin Preene has more than 25 years’ experience on projects worldwide in the investigation, design, installation and operation of groundwater control and dewatering systems. He is widely published on dewatering and groundwater control and is the author of the UK industry guidance on dewatering (CIRIA Report C515 Groundwater Control Design and Practice) as well as a dewatering text book (Groundwater Lowering in Construction: A Practical Guide to Dewatering)
![Page 4: Controlling Water On Construction Sites](https://reader035.fdocuments.us/reader035/viewer/2022081418/5562b2ead8b42a7c4a8b56c8/html5/thumbnails/4.jpg)
www.preene.com
GOOD CONTROL OF GROUNDWATER
![Page 5: Controlling Water On Construction Sites](https://reader035.fdocuments.us/reader035/viewer/2022081418/5562b2ead8b42a7c4a8b56c8/html5/thumbnails/5.jpg)
www.preene.com
POOR CONTROL OF GROUNDWATER
![Page 6: Controlling Water On Construction Sites](https://reader035.fdocuments.us/reader035/viewer/2022081418/5562b2ead8b42a7c4a8b56c8/html5/thumbnails/6.jpg)
www.preene.com
SURFACE WATER CONTROL
Groundwater control alone cannot keep an excavation dry. Surface water must also be controlled
![Page 7: Controlling Water On Construction Sites](https://reader035.fdocuments.us/reader035/viewer/2022081418/5562b2ead8b42a7c4a8b56c8/html5/thumbnails/7.jpg)
www.preene.com
SURFACE WATER CONTROL
• Source control- intercept run-off before it reaches the excavation- prevent unnecessary generation of water in the excavation- collect water as soon as it reaches the work area (or before!)
• Water collection - French drains to intercept run off- collector drains and sumps- pumping systems (keep it simple!)
• Water treatment- solids removal (settlement tanks, Siltbusters)
![Page 8: Controlling Water On Construction Sites](https://reader035.fdocuments.us/reader035/viewer/2022081418/5562b2ead8b42a7c4a8b56c8/html5/thumbnails/8.jpg)
www.preene.com
GROUNDWATER CONTROL BY EXCLUSION
Cut-off walls penetrate into underlying low permeability stratum
![Page 9: Controlling Water On Construction Sites](https://reader035.fdocuments.us/reader035/viewer/2022081418/5562b2ead8b42a7c4a8b56c8/html5/thumbnails/9.jpg)
www.preene.com
GROUNDWATER CONTROL BY PUMPING
Common Techniques
• Sump Pumping• Wellpoints• Deepwells• Ejector wells
![Page 10: Controlling Water On Construction Sites](https://reader035.fdocuments.us/reader035/viewer/2022081418/5562b2ead8b42a7c4a8b56c8/html5/thumbnails/10.jpg)
www.preene.com
SUMP PUMPING
![Page 11: Controlling Water On Construction Sites](https://reader035.fdocuments.us/reader035/viewer/2022081418/5562b2ead8b42a7c4a8b56c8/html5/thumbnails/11.jpg)
www.preene.com
WELLPOINTS
From CIRIA Report C515 (2000): Groundwater Control: Design and Practice
![Page 12: Controlling Water On Construction Sites](https://reader035.fdocuments.us/reader035/viewer/2022081418/5562b2ead8b42a7c4a8b56c8/html5/thumbnails/12.jpg)
www.preene.com
DEEPWELLS
From CIRIA Report C515 (2000): Groundwater Control: Design and Practice
![Page 13: Controlling Water On Construction Sites](https://reader035.fdocuments.us/reader035/viewer/2022081418/5562b2ead8b42a7c4a8b56c8/html5/thumbnails/13.jpg)
www.preene.com
EJECTOR WELLS
From CIRIA Report C515 (2000): Groundwater Control: Design and Practice
![Page 14: Controlling Water On Construction Sites](https://reader035.fdocuments.us/reader035/viewer/2022081418/5562b2ead8b42a7c4a8b56c8/html5/thumbnails/14.jpg)
www.preene.com
RANGE OF APPLICATION OF PUMPING METHODS
Amount of lowering of groundwater level
Low permeability (silts) High permeability (gravels)
From CIRIA Report C515 (2000): Groundwater Control: Design and Practice
![Page 15: Controlling Water On Construction Sites](https://reader035.fdocuments.us/reader035/viewer/2022081418/5562b2ead8b42a7c4a8b56c8/html5/thumbnails/15.jpg)
www.preene.com
Water management on construction sites can have a range of impacts:Impact 1: Abstraction
- e.g. settlement, impact on water sources and water quality
Impact 2: Pathways for groundwater flow- e.g. increased risk of aquifer pollution
Impact 3: Barriers to groundwater flow- e.g. changes in groundwater level
Impact 4: Discharges to groundwater- e.g. risk of fuel spills, etc
Impact 5: Discharge to surface water- e.g. risk of pollution of surface waters
ENVIRONMENTAL IMPACTS
![Page 16: Controlling Water On Construction Sites](https://reader035.fdocuments.us/reader035/viewer/2022081418/5562b2ead8b42a7c4a8b56c8/html5/thumbnails/16.jpg)
www.preene.com
IMPACTS FROM ABSTRACTION
Effect on groundwater quality• Pumping from dewatering systems changes natural hydraulic gradients
and velocities• This can cause the migration of plumes of polluted water associated with
contaminated sites
![Page 17: Controlling Water On Construction Sites](https://reader035.fdocuments.us/reader035/viewer/2022081418/5562b2ead8b42a7c4a8b56c8/html5/thumbnails/17.jpg)
www.preene.com
Distortion of structure in uniform soil conditions
IMPACTS FROM ABSTRACTION – SETTLEMENT
Distortion of structure due to change in soil conditions
![Page 18: Controlling Water On Construction Sites](https://reader035.fdocuments.us/reader035/viewer/2022081418/5562b2ead8b42a7c4a8b56c8/html5/thumbnails/18.jpg)
www.preene.com
CONCLUSION
• Effective management of surface water and groundwater can be crucial for construction projects
• Groundwater can be controlled by pumping methods and exclusion methods
• Technology needs to be carefully selected
• Environmental impacts including ground settlement and movement of contaminated groundwater
• With suitable planning and design these challenges can be overcome
![Page 19: Controlling Water On Construction Sites](https://reader035.fdocuments.us/reader035/viewer/2022081418/5562b2ead8b42a7c4a8b56c8/html5/thumbnails/19.jpg)
www.preene.com
CONTROLLING WATER ON CONSTRUCTION SITES
Dr Martin PreenePreene Groundwater ConsultingJune 2014