LHC beyond 2020 Frank Zimmermann KEK Accelerator Seminar, July 2010.
Control systems in KEK accelerator complex
description
Transcript of Control systems in KEK accelerator complex
PCaPAC2000
Control systems in KEK accelerator complex
KEK Accelerator complex = Complexity of the control system
e/e+ injector LINAC,-factory storage ring,B-factory,
8GeV e- / 3.5GeV e+,12GeV Proton synchrotron,
40MeV LINAC,500MeV booster ring,12GeV main ring.
PCaPAC2000
Japan High-Intensity Proton Accelerator
PCaPAC2000 Control systems
e/e+ injector LINAC,UNIXPC System.
Photon factory storage ring,
EPICS
B-factory,EPICS
MS Wind.
12GeV Proton synchrotron,
MS Wind.Versa-Dos
JHF(high power proton accelerator)EPICS
PCaPAC2000Control system in LINAC
VME
Device
VME
Device
VME
Device
PLC
Console (PC)
G/W
UNIX
XKEK-B
EPICS CA
OLE
PCaPAC2000Control system in KEK-B
PCaPAC2000
PCaPAC2000Control Protocols
e/e+ injector LINAC, RPC/UDP
TCP/IP
Photon factory storage ring,
B-factory, TCP/IP
12GeV Proton synchrotron, OBJP (Multi-computer Programming Environment with MAP)
JHF(high power proton accelerator) TCP/IP
PCaPAC2000Control Hard wares, Interfaces.
e/e+ injector LINAC, PLC,VME,VXI
Photon factory storage ring,
B-factory, VME,VXI,CAMAC,
GPIB
12GeV Proton synchrotron, VME, PLC, WE7000
JHF(high power proton accelerator) VME,PLC, WE7000
PCaPAC2000 12GeV Proton synchrotron
From KEK to KAMIOMANDE, and Beijing………….
(K2K experiment)
K2K
to KAMIOKA
PCaPAC2000
PS control system is mainly based on the manual control.
However, it is gradually changed to the computer control system.
PCaPAC2000
Current control system in PS
SCADA soft
Old system
New system base on PCs
PCaPAC2000
Upgrade of PS control system
Difficulties for maintaining.
MAP & Versa-Dos,
Touch-panel, etc.
An implementation of New PC system aiming to:
Unification of the control presentation layer,
GUI environment not for control staff but for users,
Unification of the network level,
Ethernet
SYSNET
WENWT
Multi Platform,
PLC(for device control)
Fast data acquisition.
SCADA
WE API
PCaPAC2000
Example of the PC based PS control
Proton LINAC Control
PCaPAC2000
Example of the PC based PS control
Betatron tune meter
PCaPAC2000
Control system for Hadron machine
In contrast to the lepton accelerator,
Hadoron accelerator complex has a Rapid cycle accelerator.
KEK PS booster 20Hz,
JHF booster 50Hz (5MW).
to realize the high power proton beam.
Hadoron accelerator exposes the devices to high rate radiation
by high power proton beam.
High rate / high speed control & acquisition,
to achieve the low loss operation,
Large data acquisition,
to realize the high performance in
beam dynamics study.
PCaPAC2000
Beam
simulation
Application development
Logging
Requirement for Hadron machine control
Control Set-up of the equipment parameters. Adjustment of the equipment parameters.
Data acquisition and analysis Operation logging. Status watcher. Beam observation. Equipment feedback. Analyze the correlation of those data.
Data presentation Graphical data presentation.
Application development Objective coding. Visual interface builder. Beam simulation.
Accelerator
Control system
Status watcher
Data Display system
Data analysis
Data acquisition
PCaPAC2000
COACK in KEK PS control system
汎用化カーネル
database
GUI GUI GUI
IOCDevices
SCADAEquipments
Remote GUI Remote GUI
Internet clientsOperator’s console
Virtual machine
Kernel
component
As PC base Accelerator Control system.As Automated operation logging.As Unification of control&acquisition.As GUI/Component oriented application development.
PCaPAC2000
Time Schedule for system replacement
2000
2001
2002
2003
Test operation
of COACK.
System configuration.
Implementation of PLC
and WE in the COACK.
Network replacement.
Final goal.
Intensity doubler half
installation.
(Accumulator ring,
barrier bucket device)
The other half
installation.
Final goal.
Hannibal cross the Alps to Gran Sasso MINOS Start