Control Phase
description
Transcript of Control Phase
CONTROL PHASECONTROL PHASE
PurposesPurposes
Maintain the changes that were Maintain the changes that were made in the X’s in order to made in the X’s in order to sustain the improvements in the sustain the improvements in the X’sX’s
The team must develop a control The team must develop a control plan, which consists of five basic plan, which consists of five basic parts: training plan, parts: training plan, documentation plan, monitoring documentation plan, monitoring plan, response plan, and plan, response plan, and institutionalization planinstitutionalization plan
Training PlanTraining Plan
Instructions for reading and Instructions for reading and interpreting control chartsinterpreting control charts
Guidance in understanding and Guidance in understanding and using all the documentation on using all the documentation on the improved processthe improved process
And knowing the contingency And knowing the contingency response plan and how to response plan and how to implement itimplement it
Documentation PlanDocumentation Plan
Ensure that improvements are Ensure that improvements are institutionalizedinstitutionalized
Ensure that all new process steps, Ensure that all new process steps, standards, and documentation are standards, and documentation are integrated into normal operationsintegrated into normal operations
Ensure that systems, procedures, Ensure that systems, procedures, policies, instructions, and budgets policies, instructions, and budgets are modified to sustain the gains are modified to sustain the gains that have been achieved.that have been achieved.
Monitoring PlanMonitoring Plan
Document and monitor the Document and monitor the process using the metrics defined process using the metrics defined in DMAIC in DMAIC
Evaluate the solutionEvaluate the solution Assess the capability of the Assess the capability of the
process over timeprocess over time Establish control systems to Establish control systems to
ensure that the solutions work for ensure that the solutions work for the long termthe long term
Response PlanResponse Plan
Establish checkpoints that will Establish checkpoints that will signal out-of-control conditionssignal out-of-control conditions
Define the actions to be takenDefine the actions to be taken
Institutionalization PlanInstitutionalization Plan
Align systems and structures in Align systems and structures in order to ensure that the changes order to ensure that the changes will continuewill continue
Develop standards and Develop standards and procedures and documents and procedures and documents and communicate them to all communicate them to all stakeholders, particularly to the stakeholders, particularly to the owners and operators of the owners and operators of the processprocess
End of the Control PhaseEnd of the Control Phase
The controller calculates, The controller calculates, verifies, and documents the verifies, and documents the financial gains of the projectfinancial gains of the project
Then the black belt and the Then the black belt and the champion close the control champion close the control Phase, and formally end the Phase, and formally end the project with the final phase-gate project with the final phase-gate review, handing over the process review, handing over the process to the process ownersto the process owners