Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and...
Transcript of Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and...
![Page 1: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/1.jpg)
Contribution to AWAKE and HL-LHC WP8 and private and professional landmarks
Oliver BOETTCHER / EN-EA Coffee Meeting
![Page 2: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/2.jpg)
Why this Presentation?
New in EN-EA with contributions to different projects and 34 years of profession in the backpack (16 years before CERN + ~18 years at CERN):
- Share some personal information and experience
- Inform my mandate in EN-EA-PE
- Information about AWAKE and HL-LHC WP8
2
![Page 3: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/3.jpg)
My private Backpack• 53 years, German
• married – 2 boys: Susanne - Fritz (20) - Hans (13)
• Aeronautical Engineer
(University - UniBw Munich)
• Business Administration
(Highschool - AKAD Rendsburg)
- Cologne Carneval - - Fussball team - – Nature events – Outdoor sports –
3
![Page 4: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/4.jpg)
Passion1 – Motorbike Tours
4
![Page 5: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/5.jpg)
Passion2 – Upgrading my stuff
BMW R100GS - 1988 original 1st upgrade (2004) 2nd upgrade (2019)
5
![Page 6: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/6.jpg)
My professional Backpack
• Pre-acceleration in Germany
• Injected to CERN in 2001
6
![Page 7: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/7.jpg)
Backpack - Military career (1985 – 1994)
Pilot candidate class 11alpha (1986)
7
![Page 8: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/8.jpg)
Backpack – Pilot Candidate experience
24h propeller-driven 6h Alpha Jet (backseat)
13 h Trainer Jet T37
8
![Page 9: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/9.jpg)
Backpack – Technical Officer German Air ForceReconnaissance Fighter Scadron AG52 - Field Maintenance Unit
Winter Manoeuvre 1991 – Goosebay Canada (-30°C)
9
![Page 10: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/10.jpg)
Backpack – Business Administration - Marketing
Thesis – Product management study and
implementation “Cables from the Box” (1995)
10
![Page 11: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/11.jpg)
Backpack – Trainer + Consultant ExperienceQuality- and Prozess Management (1998 – 2000)
Training of 30 Technical engineers as supporting staff for Quality Management:
- 10 months training program (10 blocks of 2.5 days)
- Understanding and applying QM and tools for process improvement
11
![Page 12: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/12.jpg)
Process model: Central tool for process analysis and improvement
Backpack – Trainer + Consultant ExperienceQuality- and Prozessmanagement (1998 – 2000)
Important for Quality is the definition of the “Process-steering-inputs”
(Steps 9 – 10 – 11 – 12)
12
![Page 13: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/13.jpg)
Backpack – Trainer + Consultant ExperienceSystemic Consultancy (2000 – 2001)
Organization and moderation of Event Workshops up to 350 people:
New chefs introduce themselves to employees and ask for input about what
should be changed and what should not change. (very nice program, exceptional results)
13
![Page 14: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/14.jpg)
Injection to CERN – My Motivation
Need for Change:
1. Accompanying managers require knowing the
life of an manager (experience not sufficient)
2. An age of 35 years is very young to
concentrate on the consultancy branch
Curiosity: How far do I get introducing learned
methods in daily live as manager
Decision: “Become a manager, applying the
methods I learned and see how far I get …”
14
![Page 15: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/15.jpg)
Backpack – EN-HE-HM Mandates
• 2001 - 07: Maintenance manager for CERNs’ transport and handling equipment + Contract manager for maintenance service contracts
• 2002 - 07: Responsible for Rocla vehicles in SM18+SMA18
• 2007 - 12: Section leader EN-HE-HM
• Supervision of section activities (6 staff), supervision of Student programs, Budget management (av. 4.5 MCHF/year)
• 2009 - 13: Manager for the consolidation of handling equipment
• Setting conform over 200 overhead travelling cranes at CERN as part of the life cycle and asset management
• Realization of call for tenders for supply contracts and management of supply contracts (6 contracts between 2009 and 2014, all > 3 MCHF)
• 2014 : Consolidation of access to cranes and lifeline non-conformities
• 2014 : Responsible for other use of cranes (e.g. access means)
• 2013 - 2019: CERN Staff Association Delegate
15
![Page 16: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/16.jpg)
HM Lifting Equipment (in 2011)
TOTAL : 345 Overhead travelling cranes + 450 Hoists +
2000 Lifting beams (Value 82M€)
16
![Page 17: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/17.jpg)
HM Industrial Trucks (in 2011)
• 30 ICE Powered forklift trucks
• 150 Electrical elevators
• 100 Access and working platforms
• 1000 Manual handling equipment
• 60 Special magnet transport vehicles
• 180 Electrical tractors
TOTAL : 1500 equipment (Value 25M€)
17
![Page 18: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/18.jpg)
Replacement of PR4 and PR5 (150)
Installation of PR252 (prior to dismantling of PR4+5 )
Brunmech Single Girder 30m
18
![Page 19: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/19.jpg)
Replacement of PR4 and PR5 (150)
Dismantling old cranes (200t of steel structure)
19
![Page 20: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/20.jpg)
Thanks to all Contractors and HM Support
MESCA -E098/EN
Réel - Altéad - E097/EN
Bonfanti – B1304/EN
20
![Page 21: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/21.jpg)
Rocla - Cable Rupture Accident
21
![Page 22: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/22.jpg)
Special Access solutionsLifting platform on adaptable carrier platform to carry out work on roofs from inside.
• Fit to 6 cranes in 4 buildings (bldg. 180, 181, 183, 887)
• MEPL remains CE!
22
![Page 23: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/23.jpg)
AWAKE
Proj. Leader: Edda Gschwendtner with
EN-EA Project team, Ans Pardons,
Oliver Boettcher
HL-LHC WP8
WP Leader: F. Sanchez-Galan with Ans Pardons, Maria Luque Porras, Miguel Dos Santos, Oliver Boettcher
Design, prototyping, manufacturing & installation of
• TAXS
• TAXN
• TANB
• TAS removal
My Mandate in EN-EA-PE
Staff Association delegate (20% Nov. 2019)
• Health & Safety Commission Chairman
• Representative: SAPOCO
• Project Member: Benchmark Job Project, Stress Management Project
• Commission work: Informaction, Employment conditions
• ATLAS JFC
shielding machining
• TAXN + BRAN handling
• TAN removal
• Project Safety Officer
• Maintenance and
Operation follow-up
• Summer run 2019
• Run2 Studies
• CP Leader
23
![Page 24: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/24.jpg)
Run 2 Preparation at CERN
Slides realized by
Edda Gschwendtner, CERN
![Page 25: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/25.jpg)
AWAKE experimental setup
25
Edda Gschwendtner, CERN
![Page 26: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/26.jpg)
!"#$
%&&'(##)*
)+,
-#.,/
0#12314
35164#
#7 #!"#$ %&&'(#
8$ 9#: 9) ; 0 < 8=9. >#<=/ #?#8=/ , ) +#. ) $ , / ) #
! #<@ABC(D#(@EF@D(EG##HD(@&'F#I J FKL#
! #/ BM(B'#NOM%'BPO@#
#H'(@FBK#I J FK#BKKBGL#
r,m
m
1
0
2L=4m
r,m
m
1
0
2L=0m (a)
(b)
(c)
z, cm
r,m
m
-10.5-10.6-10.70.0
1.0
z, cm 0-10-30 -20
0OE#NOM%'BEFM#
Q%''G#DF'RANOM%'BEFM-#S!TSU?#VW#(@XFYPO@#
² UF#
² UFV6"5NN### ZUD##ROK#@FV2C61
6ZYN A4#
8(N%'BPO@#J G#+"#[OEOS#
400 GeV3x1011 p400ps
20 MeV4x109 e2ps
500mJ120fs
AWAKE Run 1
26
E. Adli et al. (AWAKE Collaboration), Phys. Rev. Lett. 122, 054802 (2019).M. Turner et al. (AWAKE Collaboration) PRL, 122, 054801 (2019).
E. Adli et al. (AWAKE Collaboration), Nature 561, 363–367 (2018)
Seeded self-modulation of the proton bunch:
SSM process is reproducible, reliable and stable.
Electrons accelerated to 2 GeV in 10m. Energy is as expected from simulations
AWAKE has demonstrated during Run 1 (2016-2018) that the seeded self-modulation is a reliable and robust process and that electrons can be accelerated with high gradients.
Edda Gschwendtner, CERN
![Page 27: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/27.jpg)
Status
27
AWAKE Run 1 accomplished.
CERN management fully supports AWAKE Run 2. AWAKE Run 2 is approved and included in MTP.
Program now: Define a Run 2 program and baseline design
AWAKE Run 2 budget is included in MTP until 2029! However, Anticipate a Cost and Schedule review in 2020 to
get detailed and updated budget profile in MTP
Edda Gschwendtner, CERN
![Page 28: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/28.jpg)
AWAKE Run 2
28
Laserdump
Op mizedSPS
protons
>10mplasma
SSM Accelera on
Protonbeamdump
RFgunLaser
Protondiagnos csBTV,OTR,CTR
e-spectrometer
~8mplasma
e-beam(~100fs,~160MeV)e-emi ancemeasurement
E.Adli(AWAKECollabora on),IPAC2016proceedings,p.2557(WEPMY008)
Proposal: X-band electron source
Goal:
Accelerate an electron beam to high energy (gradient of 0.5-1GV/m)
Preserve electron beam quality as well as possible (emittance preservation at 10 mm mrad level)
Demonstrate scalable plasma source technology (e.g. helicon prototype)
Challenges:
Freeze the modulation with density step in first plasma cell
For emittance control: need to work in blow-out regime and do beam-loading
R&D on different plasma source technologies
Run 1 Run 2Preparation
Run 2
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 20272013 2014 2015
LS2 LS2 LS3
First applicationRun 1Preparation
Requirements on emittance are moderate for fixed target experiments and e/p collider experiments, so first experiments in not-too far future!
Edda Gschwendtner, CERN
2 new Rubidium plasma sources, new electron source & beam line, diagnostics, civil engineering, new integration, services.
Run 2: Approved in the MTP
![Page 29: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/29.jpg)
AWAKE Timeline
29
Run 1 – until LS2 of the LHC.
After LS2 – proposing Run 2 of AWAKE (during Run 3 of LHC)
After Run 2: kick off particle physics driven applications
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022/23/24
Proton and laser beam-
line
Experimentalarea
e- source and beam-line
Studies, design FabricationInstalla
tion
Co
mm
ission
ing
Co
mm
issio
nin
g
Installation
Modification, Civil Engineering and installation
Study, Design, Procurement, Component preparation
Study, Design, Procurement, Component preparation
Data taking Data taking
Phase 1
Phase 2
Long Shutdown 224 months RUN 2RUN 1
Run 1 Run 2Preparation
Run 2
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 20272013 2014 2015
LS2 LS2 LS3
First applicationRun 1Preparation
Edda Gschwendtner, CERN
![Page 30: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/30.jpg)
AWAKE Run 2
• New Electron Source Development for high energy electron beam (165MeV)• CLIC/CLEAR plans to build a prototype test stand same parameters as AWAKE synergy with AWAKE .
• Electron and Proton Beam Line Design• Modifications of the proton beam line to gain space• New high energy electron beam: match line and source parameters, study stability, reproducibility,
operability and civil engineering constraints. • Feasibility study of the new injection region into the 2nd plasma cell
• Laser beam line• Modifications of the laser beam layouts due to split of the plasma cell.• Study injection of two ionizing laser beams from opposite directions.• UV beam delivery to the new optional locations of the electron source, Generation of short UV pulses
• Many new Beam instrumentation
• Data Acquisition Infrastructure Studies• Integration of new equipment in the DAQ, Upgrade of DAQ, Timing/synchronization modifications
• Plasma source development• Rubidium vapour cell: 2 plasma cells: 1 for self-modulation of the proton beam, one for electron
acceleration Tests at upgraded laboratory space
• Simulation studies• Electron injection design for Run 2, Start-to-end simulations for Run 2 feedback to required
diagnostics, plasma design, beam parameters…
30
Edda Gschwendtner, CERN
![Page 31: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/31.jpg)
AWAKE Run 2
• Integration studies
• Study required modifications of AWAKE Run 1 area for AWAKE Run 2
• Equipment, service integration, infrastructure design studies
• New vapour cell test area
• Civil engineering studies to house the new electron source and electron beam line
• Study possibilities of area enlargement
31
Edda Gschwendtner, CERN
![Page 32: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/32.jpg)
AWAKE Summer Run 2019 – Experimental plans
32Spencer Jake Gessner, CERN
![Page 33: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/33.jpg)
AWAKE
Proj. Leader: Edda Gschwendtner with EN-EA Project team, Ans Pardons,
Oliver Boettcher
HL-LHC WP8
WP Leader: F. Sanchez-Galan with Ans Pardons, Maria Luque Porras, Miguel Dos Santos, Oliver Boettcher
Design, prototyping, manufacturing & installation of
• TAXS
• TAXN
• TANB
• TAS removal
My Mandate in EN-EA-PE
Staff Association delegate (20% Nov. 2019)
• Health & Safety Commission Chairman
• Representative: SAPOCO
• Project Member: Benchmark Job Project, Stress Management Project
• Commission work: Informaction, Employment conditions
• ATLAS JFC
shielding machining
• TAXN + BRAN handling
• TAN removal
• Project Safety Officer
• Maintenance and
Operation follow-up
• Summer run 2019
• Run2 Studies
• CP Leader
33
![Page 34: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/34.jpg)
A bright future for LHC :
the High Luminosity collider
Lucio Rossi – HL-LHC Project Leader
Talks fo the CERN guides – Globe – 26 February 2019
34
![Page 35: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/35.jpg)
High Luminosity: a bright future for the LHC
Generate more light machine upgrade
Better eyes to profit of higher luminosity detector upgrade
35
![Page 36: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/36.jpg)
Increase in Energy and Luminosity
At about 2024 we will reach a few limitations (that we knew since the design time of the LHC).
- Radiation damage limit in the magnets near the experiments and inside the experiments (Inner Tracker especially)
- Cryogenic limit of the magnets near experiment, (IT quadrupoles), so we need to make different design to increase.
- Change triplets (and experiment IT) needs a very Long Shutdown we «profit» to substantially increase luminosity
Energy stays constant
Luminosity will saturate,
with marginal increase
36
![Page 37: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/37.jpg)
Goal of HL-LHC as fixed in 2010
37
The main objective of HiLumi LHC Design Study is to determine a hardware configuration and a set of beam parameters that will allow the LHC to reach the following targets:
A peak luminosity of Lpeak = 5×1034 cm-2s-1 with levelling, allowing:An integrated luminosity of 250 fb-1 per year, enabling the goal of Lint = 3000 fb-1 twelve years after the upgrade. This luminosity is more than ten times the luminosity reach of the first 10 years of the LHC lifetime.
From FP7 HiLumi LHC Design Study application
Ultimate performance established 2015-2016: with same hardware and same beam parameters: use of engineering margins:
Lpeak ult 7.5 1034 cm-2s-1 and Ultimate Integrated Lint ult 4000 fb-1
LHC should not be the limit, would Physics require more…
Project approved by CERN Council in June 2016
![Page 38: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/38.jpg)
Evolution of energy and luminosity in LHC
38
![Page 39: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/39.jpg)
39
EN-EA-PE
![Page 40: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/40.jpg)
The Insertion Region (till Q4)
40
Machine Interfaces WP8
Modules
![Page 41: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/41.jpg)
Access Q1 to TAS region (ATLAS)
41
![Page 42: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/42.jpg)
Access Q1 to TAS region (ATLAS)
42
![Page 43: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/43.jpg)
Access Q1 to TAS region (ATLAS)
43
![Page 44: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/44.jpg)
Scope – from TAS to TAXS @ P1& P5
To increase the aperture for the beam, TAXS will
replace TAS, which are embedded in the forward
shielding, at the limit of the experimental cavern and
LHC tunnel.
Functionality and design principles will be kept,
adapting to the he increased deposited energy.
VAX region will be optimized following the ALARA
principle.
44
![Page 45: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/45.jpg)
1 month cooling time, dose rates at contact of the cryostat
Total integrated luminosity
310 fb-1
Ultimate scenario
Representing any LS
after LS3
~5.6
~25
Am
bie
nt
Do
se E
qu
ival
en
t R
ates
Tim
e ev
olu
tio
nOverview of Radiation (EDMS 1434476)
45
![Page 46: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/46.jpg)
in short…
Depending on the operational scenarios, cooling time
and materials:
• Residual dose rate increase from LS1 until LS3 is
about a factor 4 to 6.
• The increase from LS1 to HL-LHC is a factor 15 to 30.
46
![Page 47: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/47.jpg)
VAX relocation-ATLAS
New support will host VAX modules, services re-
routed, shielding modified
47
![Page 48: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/48.jpg)
48
Goals of the LHC Injectors Upgrade project
Doubling protons & high brightness
Linac4
• 160 MeV H- charge
exchange injection
• Acceleration to 2
GeV with new main
power supply and
new RF systems
• Main RF system
(200 MHz) upgrade
• Longitudinal impedance
reduction & partial a-C
coating
• New beam dump and
protection devices
• Acceleration of H- to 160 MeV
• Nominal 40 mA within 0.4 mm, Run 3
target 25 mA within 0.3 mm
• 2 GeV injection
• New RF
equipment
including broad-
band feedback
![Page 49: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/49.jpg)
49
Technology landmarks
![Page 50: Contribution to AWAKE and HL-LHC WP8 and private and ...€¦ · HL-LHC WP8 and private and professional landmarks Oliver BOETTCHER / EN-EA Coffee Meeting. Why this Presentation?](https://reader036.fdocuments.us/reader036/viewer/2022071023/5fd7f82671c34432dc2ad747/html5/thumbnails/50.jpg)
Thanks!