CONTRACTOR’S WEEKLY UPDATEWEEK OF 2.16.15 SOUTH ORANGEWOOD-MONTEBELLO. 6 CONSTRUCTION NOTICE...
Transcript of CONTRACTOR’S WEEKLY UPDATEWEEK OF 2.16.15 SOUTH ORANGEWOOD-MONTEBELLO. 6 CONSTRUCTION NOTICE...
1
February 16th, 2015 Volume 2, Issue 109
CONTRACTOR’S WEEKLY UPDATE
DOUG’s CORNER
COURTEOUS
RESPONSIVE
DEPENDABLE
IN THIS ISSUE
Doug’s Corner
…………………….1-3
Traffic/Active Work
…………………… 4-5
Construction Notices
…………………….6-10
Project App
………………..……11
2
DOUG’s CORNER MY WEEK IN PICTURES
NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP
CONTRACTOR’S WEEKLY UPDATE
3
DOUG’s CORNER MY WEEK IN PICTURES
Doug St. Stevens
NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP
CONTRACTOR’S WEEKLY UPDATE
4
Dunlap / 19th Avenue Intersection
No restrictions
Dunlap Avenue to Butler
One (1) lane both northbound and southbound will be maintained.
Butler Drive /19th Avenue Intersection
Butler Drive track installation February 18th, 2015 to February
28th, 2015.
No thru traffic on Butler Drive at 19th Avenue Feb 18th
through Feb 28th.
Right turns only from Butler Drive eastbound and westbound
Feb 12 thru Feb 17.
Butler to Northern Avenue OCS, Paving, Catch Basins
One (1) lane northbound and southbound will be maintained.
Turns at the signalized intersections will be maintained.
Northern / 19th Ave Intersection
Water line removal, install traffic signal, demo, grade, paving
One lane both eastbound and westbound Northern Avenue Jan 26th thru March 9th. See map on page seven.
No left turns from Northern to 19th Ave in either direction from February 4th to February 22nd. See map on page six.
Northern to Orangewood
Duct bank, OCS, roadway widening, water line removal, grade/
form/pour curb returns, traffic signal work
Hayward closed west of 19th Ave Feb 18th through February 25th.
See map page eight.
Morten closed west of 19th Ave Feb 24th through March 5th.
See map page nine.
WEEK OF 2.16.15
NORTH
NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP
CONTRACTOR’S WEEKLY UPDATE
DUNLAP — ORANGEWOOD
WORK ACTIVITIES AND TRAFFIC CONTROL
5
WORK ACTIVITIES AND TRAFFIC CONTROL
Orangewood to Glendale
Pipe removal, install irrigation sleeve
One (1) lane both northbound and southbound will be maintained.
Turn lanes at the signalized intersections will be maintained.
Glendale / 19th Intersection
No restrictions
Glendale to Maryland
Construct track, install conduit, form and pour track, station work
One (1) lane both northbound and southbound will be maintained.
Turn lanes at the signalized intersections will be maintained.
Maryland to Bethany Home Road Construct track, duct bank, OCS, form and pour track
One (1) lane both northbound and southbound will be maintained.
Turn lanes at the signalized intersections will be maintained.
Bethany Home / 19th Intersection
Bethany Home Road track installation 8pm February 12th,
2015 to 5am February 17, 2015.
No thru traffic on Bethany Home Road at 19th Avenue 8pm
Feb 12th thru 5am Feb 17th.
Right turns only from Bethany Home Rd. eastbound and westbound 8pm Feb 12th thru 5am Feb 17. See map on
page 10.
Bethany Home Road to Montebello
Guideway curb, duct bank installation, OCS
One (1) lane both northbound and southbound will be maintained.
Turn lanes at signalized intersections will be maintained.
NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP
CONTRACTOR’S WEEKLY UPDATE
WEEK OF 2.16.15
SOUTH ORANGEWOOD
-MONTEBELLO
6
CONSTRUCTION NOTICE
NORTHWEST EXTENSION
Roadway Widening & Paving
Northern Ave
January 26, 2015 to March 9, 2015
QUESTIONS?
VALLEY METRO
Community Outreach
Coordinators
Carla Kahn (623) 261-2605
Lisa Saldin (602) 495-8213
SSWJV
Superintendent
Mike Howard
(602) 619-5813
STAY CONNECTED
Construction dates and restrictions may change. For the latest information, Visit the project website: www.valleymetro.org/northwest
facebook.com/valleymetro
24-Hour Project Hotline
602-254-RAIL (7245)
Roadway widening and paving.
Installation of new sidewalk, curb and gutter.
WORK DESCRIPTION
Traffic Restrictions Shell access from 19th Ave will be closed. Enter Shell gas station
from Northern Ave..
Del Taco access from 19th Ave will be closed. Enter Del Taco from Northern Ave.
Restricted to one lane eastbound and westbound Northern Ave.
7
CONSTRUCTION NOTICE
NORTHWEST EXTENSION
Roadway Widening & Paving
Northern Ave
February 4th, 2015 to February 22nd, 2015
QUESTIONS?
VALLEY METRO
Community Outreach
Coordinators
Carla Kahn (623) 261-2605
Lisa Saldin (602) 495-8213
SSWJV
Superintendent
Mike Howard
(602) 619-5813
STAY CONNECTED
Construction dates and restrictions may change. For the latest information, Visit the project website: www.valleymetro.org/northwest
facebook.com/valleymetro
24-Hour Project Hotline
602-254-RAIL (7245)
Pipe removal, roadway widening and paving.
Installation of new sidewalk, curb and gutter.
WORK DESCRIPTION
Traffic Restrictions
One lane eastbound and westbound Northern Ave.
No left turns from Northern Ave to 19th Ave in either direction February 4th through Feb 22nd.
8
Demo, road widening, grading, curb return
CONSTRUCTION NOTICE
NORTHWEST EXTENSION
Hayward Avenue
Form and Pour Curb Return
Feb 18th thru Feb 25th, 2015
WORK DESCRIPTION
Road closed at Hayward Ave. west of 19th Avenue
Northern and Morten will remain open
Use 21st Ave as alternate access to Hayward
Hayward and Morten will not be closed simultaneously
TRAFFIC RESTRICTION
QUESTIONS?
VALLEY METRO
Community Outreach
Coordinators
Carla Kahn (623) 261-2605
Lisa Saldin (602) 495-8213
SSWJV-Superintendent
Mike Howard
(602) 619-5813
STAY CONNECTED
Construction dates and restrictions may change. For the latest information, Visit the project website: www.valleymetro.org/northwest
facebook.com/valleymetro
24-Hour Project Hotline
602-254-RAIL (7245)
9
Demo, road widening, grading, curb return
CONSTRUCTION NOTICE
NORTHWEST EXTENSION
Morten Avenue
Form and Pour Curb Return
Feb 24th thru March 5th, 2015
WORK DESCRIPTION
Road closed at Morten Ave. west of 19th Avenue
Hayward and Orangewood will remain open
Use 21st Ave as alternate access to Morten
Morten and Hayward will not be closed simultaneously
TRAFFIC RESTRICTION
QUESTIONS?
VALLEY METRO
Community Outreach
Coordinators
Carla Kahn (623) 261-2605
Lisa Saldin (602) 495-8213
SSWJV-Superintendent
Mike Howard
(602) 619-5813
STAY CONNECTED
Construction dates and restrictions may change. For the latest information, Visit the project website: www.valleymetro.org/northwest
facebook.com/valleymetro
24-Hour Project Hotline
602-254-RAIL (7245)
10
Constructing track and pouring concrete.
CONSTRUCTION NOTICE
NORTHWEST EXTENSION
STAY CONNECTED
Construction dates and restrictions may change. For the latest information, Visit the project website: www.valleymetro.org/northwest
facebook.com/valleymetro
24-Hour Project Hotline
602-254-RAIL (7245)
WORK DESCRIPTION
Bethany Home Road & 19th Ave
Track Guideway Construction
February 12th, 2015 (8pm) to February 17th, 2015 (5am)
No left turns from 19th Ave (northbound)
No left turns from 19th Ave (southbound)
Right only from Bethany Home Road (eastbound)
Right only from Bethany Home Road (westbound)
TRAFFIC RESTRICTION
QUESTIONS?
VALLEY METRO Community Outreach
Coordinators
Carla Kahn (623) 261-2605
Lisa Saldin (602) 495-8213 SSWJV Superintendent
Mike Howard
(602) 619-5813
11
NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP
CONTRACTOR’S WEEKLY UPDATE
PROJECT APP
City of Phoenix