CCSSMMS S
Contractor Safety Management System
By. Bambang Cahyono, SKM, MK3
Kultam D3 Hiperkes & KKUniversitas Negeri Sebelas Maret Surakarta
March 2011
CContractorontractor SSafetyafety MManagementanagement SSystemystem
References : •BPMIGAS KPTS-13/BP00000/2006-S8 – Contractor Safety Management System
•OGP 291/1999 HSE Management – Guidelines for Working Together in a Contract Environment
•Sistem kontrol terhadap aspek pengelolaan Keselamatan, Kesehatan Kerja dan Perlindungan Lingkungan bagi Kontraktor yang bekerja di seluruh daerah operasi kontraktor KKS(Kontrak Kerja sama)/JOB (Joint Operating Body)
•Part of bid process
CSMSCSMS OObjectivesbjectives::
• Meningkatkan performance HSE di lingkungan kerja oleh perusahaan/client dan contractor dengan pengelolaan HSE Management System yang effective
• Membantu Contractor dalam pengelolaan program – program HSE yang consistent sesuai dengan harapan dari perusahaan/Client
• Memfasilitasi gap antara HSE MS Contractor, sub-contractor dan contractor lain yang bekerja di area perusahaan/client.
CSMS BackgroundCSMS Background
Incident
Eventor
Near Miss
Immediate Causes
Substandard Acts/Practices
Substandard Conditions
Basic CausesPersonal Factors
Job/System Factors
Lack of Control
Inadequate
• System
• Standard
• Compliance
THRESHOLD
LIMIT
Loss
Unintended Harm
or
Damage
Measurement of Control
Measurement of Causes
Measurement of Consequence
Sistem diatas sangat penting untuk mengetahui penyebab – penyebab dasar ...
CSMS Background Continue…..CSMS Background Continue…..
3529
25
11
43
1521
80
104
87
62
9991
56
46
21
10
20
40
60
80
100
120
1995 1996 1997 1998 1999 2000 2001 2002 2003YTD
Client Contractor
TOTAL INJURY & TRAFFIC ACCIDENT TOTAL INJURY & TRAFFIC ACCIDENT DATA 1995-2003 YTD DATA 1995-2003 YTD
CSMS Background Continue…..CSMS Background Continue…..
DESCRIPTIONCOMPANY CONTRACTOR
2009 2010 2009 2010
Work Force 430 444 447 344
Man Hours 1,497,475 1,620,610 1,666,254 1,301,226
LTA 0 0 3 1
Medical Treatment 1 2 24 2
First Aid 4 6 12 9
Traffic Incident 8 12 8 2
Spillage 0 2 1 0
The Cause of InjuriesThe Cause of Injuries
98%of Accident is due to unsafe Acts.
CSMS Background Continue…..CSMS Background Continue…..
CSMS Structure
CSMS
Contracted Work
Data Bank
Pre-QualificationSelectionRisk Assessment
Administration Phase: Select A Qualified Contractor
Contract Award
Pre Job ActivityWork In ProgressFinal Evaluation
Field Implementation Phase: Ensure Field Safe WorkField
Admin
CSMS Distribution of Responsibility
Risk Assessment Pre-Qualification Selection
Client End User (Contract
Initiator) End user
Contractor None Prepare the
administrative Submit Bid Documents
Pre-Job Activity Work In Progress Final Evaluation
Client
Reviewer (End User) End User together
with contractor End User initiate
Contractor Preparation End User together
with contractor Review together with
Contractor
C&P Dept. andEnd User
Pekerjaan yg dikontrakkan
Penilaian Risiko
Pra_qualifikasi dibutuhkan?
Pra-kualifikasi
Dibutuhkan seleksi?
Seleksi
Penandatanganan kontrak
Tidak
ya
Tidak
ya
Aktivitas awal dibutuhkan?
Aktivitas Awal
Pekerjaanberlangsung dibutuhkan?
Pekerjaan berlangsung
Evaluasi Akhir
Bank Data
Tidak
ya
ya
Tidak
ya
MekanismeUmpan Balik
Tah
ap A
dm
inis
tras
i
Tah
ap P
elak
san
aan
Tahap AdministrasiTahap Administrasi
• Risk Assessment – Penilaian Risiko– Prosedur untuk meneliti risiko pekerjaan yang akan dikontrak-kan dan menentukan
kategorinya (Low/ medium/ High).– Menentukan perlu atau tidaknya langkah – langkah Pengelolaan K3LL– Client bertanggung jawab terhadap penilaian awal risiko K3LL
• Pra – Kualifikasi– Meneliti kualifikasi Contractor dalam hal K3LL– K3LL Questionnaire – Contractor assessment
• Pemilihan/Seleksi– Memilih Contractor terbaik diantara Contractor yang mengikuti tender
Risk Assessment in CSMS
CSMS
Contracted Work
Data Bank
Pre-QualificationSelectionRisk Assessment
Administration Phase: Select A Qualified Contractor
Contract Award
Pre Job ActivityWork In ProgressFinal Evaluation
Field Implementation Phase: Ensure Field Safe Work
Risk Assessment
Risk AssessmentRisk Assessment
• Nature of the work/Sifat Pekerjaan• Work location/Lokasi Pekerjaan• Equipment Using/perlengkapan yg digunakan• Potential Exposure to Work Site Hazards/paparan potensi bahaya thd
tempat kerja• Potential Exposure to Personnel Hazards/paparan bahaya thd pekerja• Simultaneous work by different/several contractors/pekerjaan yg
dilakukan secara simultan oleh beberapa Contractors di tempat yg sama
• Work duration / lamanya pekerjaan• Experience and competency of Contractors/pengalaman&keahlian
Contractor• Social and Environmental Negative Impacts/dampak negatif thd
masyarakat&lingkungan
Menentukan Persyaratan
Mengidentifkkasi Risiko dan mengisi
Form No.1
Pengesahan Formulir oleh Project Mgr
Menentukan Persyaratan
Diperlukan Verifikasi K3LL?
PersetujuanAsset Mgr
Disetujui?
Menyusun RekuisisiKontrak
Memeriksa Penilaian Risiko
Ya
Ya
Tidak
Risk Assessment PRocess
ASSESSED RISK OF WORKPHASE
LOW MEDIUM HIGH
RISK ASSESSMENT REQUIRED REQUIRED REQUIRED
PRE-QUALIFICATION OPTIONAL OPTIONAL REQUIRED
SELECTION OPTIONAL OPTIONAL REQUIRED
PRE-JOB ACTIVITIES OPTIONAL REQUIRED REQUIRED
WORK IN PROGRESS OPTIONAL REQUIRED REQUIRED
FINAL EVALUATION REQUIRED REQUIRED REQUIRED
Risk AssessmentRisk Assessment
No. Contracted Work Risk Level
1 Fuel Handling and Transporting Services H
2 Automobile Contracts – Jakarta M
3 Automobile Contracts – Field H
4 Heavy Equipment Contracts / Rentals H
5 Trucks / Heavy Vehicle Contracts / Rentals H*
6 Helicopter Charter Agreement H*
7 Fixed Wing Charter Agreement H*
8 Utility Vessel / Tug Boat / Anchor Handling Tug Supply H
9 Equipment Leasing Services – Crane H
10 Utility Crew boat (Incl. Operations and Maintenance Services) H
11 Sack Cutting, Bulk Storage & Handling Services H
12 Cementing Materials & Services H
13 Downhole Drilling Tools H
14 Casing Cutting & Fishing Tools H
15 Casing & Tubing Handling Tools & Services H
16 Drilling and Completion Fluid Materials and Engineering Services H
17 Downhole DST H
18 Directional Drilling & Downhole Survey H
19 Geotechnical Survey Work H
20 Rig Positioning and Hazard Survey Agreement H
21 Drilling Data Acquisition and Mud Logging Services H
22 Drilling Rig Contract H*
23 Drilling, Work over Specialist Services M
24 Geophysical Work – Route Survey H
25 Slick line Services H
26 Seismic Acquisition H
27 Seismic Reprocessing Services L
28 Coring Services H
29 Tape Storage & Services Agreement L
30 Geological Support Services – Jakarta Office L
31 Wellsite Geological Services – Field H
32 Diving Services H
33 ROV Services H
34 Engineering, Procurement Construction and Installation (EPCI) H*
35 Process Facilities (Plant) H
36 Welding & Pipe Fitting Services H
37 P/F, Ships, FPSO Refurbishment & Repair H
38 Pigging Contract H
39 Sub sea Flow line Flushing H
40 Sub sea Wellhead Work over H
No Contracted Work Risk Level
41 Chemical Cleaning Contract (Field) H
42 Chemical Cleaning Contract (Office) M
43 Insulation Contracts (heat, cold & weather insulation) M
44 Contract Agreement with Hospital for Medivac H
45 Civil Works & Land Clearing-Road Bridge Maintenance / Repair / Modification H
46 Housing / Camp Errection, Repair / Upgrade (depend on the large of the camp) H or M
47 General Maintenance & Light Construction Services H
48 Genset Lease and Overhaul M
49 Underwater Structural Inspection H
50 Explosive Formalities Services Agreement H
51 Batam Warehouse Facilities and Supporting Services H
52 Reservoir Fluids Analysis Services L
53 H2S Monitoring Services H
54 Subsurface Analysis Services M
55 Downhole Electronic Pressure Gauges M
56 Surface Readout Electronic Pressure Gauges H (M)
57 Surface Well Test Equipment & Services H
58 Completion Equipment & Services H
59 Camp Facilities Rental Services M
60 Heat Exchanger Rental Services H
61 Rental Equipment and Services – PC L
62 Equipment Leasing & Services – “Photo Copy Machine” L
63 Equipment Leasing & Services – PABX L
64 Satellite Terminal Equipment Leasing and Services L
65 Communications Tower Services H
66 Rental Equipment and Services Handy Talky & Base Station Radio Trunking System L
67 Office Cleaning Services M
68 Equipment Leasing and Services Agreement – Unix Machine L
69 Shipping and General Agency Services L
70 Network Equipment Rental and Services L
71 Rental Digital Radio Link Equipment & Services L
72 Travel and Services Agreement L
73 Carpet Cleaning Services M (L)
74 Equipment Storage Services M
75 Office Lease Agreement H
76 Residential Lease Agreement M
77 Housing Maintenance Contract M
78 Courier Services Agreement L
79 Pest Control Services Agreement M
80 Cargo Forwarding Services H
81 Temporary Local Moving M
82 Catering Services (Off shore) M
83 Catering Services (On Shore) M
TYPICAL JOB VS RISK ASSEMENT
Pre-Qualification in CSMS
CSMS
Contracted Work
Data Bank
Pre-QualificationSelectionRisk Assessment
Qualification Phase: Select A Qualified Contractor
Contract Award
Pre Job ActivityWork In ProgressFinal Evaluation
Field Implementation Phase: Ensure Field Safe Work
Administration
First Screen to allow only safe candidates follow tender
Unsafe Contractors:No !
Pre-QualificationPre-Qualification
Pre - QualificationPre - Qualification
5.10 HSE Contact 1%
5.20 HSE Policy 2%
5.30 HSE Management System 4%
5.40 Internal Audit 3%
5.50 HSE Inspections 4%
5.60 HSE Rules and Procedures 6%
5.70 Accident and Incident Reporting and Investigation 6%
5.80 Emergency Response Plans 5%
5.90 Environmental Management System 6%
5.10 Sub-Contractors HSE Standards 5%
5.11 Alcohol and Drug Abuse and Possession of Firearms 2%
5.12 Hazardous Substances Safety 4%
5.13 Personnel Competency, Training, Qualifications and Certification 6%
5.14 Personal Protective Equipment (PPE) 7%
5.15 Medical Suport 7%
5.16 Fire Protection 6%
5.17 Electrical Safety 4%
5.18 Heavy Lifting and Material Handling Safety 7%
5.19 Food Hygiene 3%
5.20 Potable Water 2%
5.21 Other HSE Related Equipment 5%
5.22 Survival at Sea 5%
1.00T O T A L S C O R E
WeightingGENERAL INFORMATION
Pre - QualificationPre - Qualification
Pre – Qualification :1.Document evaluation2.Site verification (Audit)
Contractor tidak perlu melalui tahap pre – qualification:– Low risk assessment– Medium risk assessment– Contractor yg sudah lulus pra – kualifikasi sebelumnya
Selection in CSMS
CSMS
Contracted Work
Data Bank
Pre-QualificationSelectionRisk Assessment
Qualification Phase: Select A Qualified Contractor
Contract Award
Pre Job ActivityWork In ProgressFinal Evaluation
Field Implementation Phase: Ensure Field Safe Work
Administration
SelectionSelection
SELECTED CONTRACTOR SHOULD BE BEST:
•Health safety and Environment•Technical•Commercial
Selection Continue…..Selection Continue…..
HSE Document in bid package :– HSE general requirements– Client HSE goals and objectives– HSE plan scope and potential hazard– HSE control procedure and compliance– Responsibilities, authorities and controlling between
Client and Contractors (e.g. Emergency Response Plan)– Training needs and competence of Contractors
Contract Award in CSMS
CSMS
Contracted Work
Data Bank
Pre-QualificationSelectionRisk Assessment
Administration Phase: Select A Qualified Contractor
Contract Award
Pre Job ActivityWork In ProgressFinal Evaluation
Field Implementation Phase: Ensure Field Safe Work
Contract Award
Pre Job Activity in CSMS
CSMS
Contracted Work
Data Bank
Pre-QualificationSelectionRisk Assessment
Administration Phase: Select A Qualified Contractor
Contract Award
Pre Job Activity Work In Progress Final Evaluation
Field Implementation Phase: Ensure Field Safe Work
Pre Job Activity
Pre-Job ActivityPre-Job ActivityTo open First Communication between
Client and Contractor among fieldwork level
Pre-Job Activity is not equal to Pre-Job Safety Meeting
Pre – Job ActivityPre – Job Activity
Pre – job Activity (Aktifitas Awal Pekerjaan) :• Tujuan
Memastikan aspek risk assessment & K3LL yang relevan dengan pekerjaan dikomunikasikan dan dipahami oleh semua pihak sebelum pelaksanaan kontrak/pekerjaan
• Terdiri – dari :– Pra – mobilisasi
• Rapat awal/Kick off meeting (potential hazards, HSE plan, personal competence, HSE objective & target, Hse general requirements, ERP, Incident Report Procedures etc)
• Inspeksi & audit lokasi Contractor (see form VIII)• Orientasi lokasi kerja (follow up of kick off meeting)• Peatihan K3LL (job planning, potential hazards review, HSE matters, inspection of PPE,
equipments and ERP alertness)– Mobilisasi (implementation of HSE Planning)
• Rapat awal lokal (all key persons must be attending in this meeting)• Mobilisasi staf & perlengkapan Contractor• Finalisasi rencana K3LL• Audit mobilisasi
Work In Progress in CSMS
CSMS
Contracted Work
Data Bank
Pre-QualificationSelectionRisk Assessment
Administration Phase: Select A Qualified Contractor
Contract Award
Pre Job Activity Work In Progress Final Evaluation
Field Implementation Phase: Ensure Field Safe Work
Work In Progress
Pekerjaan Berlangsung – Work in ProgressPekerjaan Berlangsung – Work in Progress
TujuanMenjamin pekerjaan yang dilaksanakan sesuai dengan rencana K3LL yang sudah disepakati
Work in Progress:• Periode dimana pekerjaan fisik dilaksanakan di lapangan.• Merupakan evaluasi sementara (interim Evaluation) regularly inspection• Menguji apakah semua K3LL didalam kontrak sudah dilaksanakan oleh Contractor• Client & Contractor bertanggung jawab thd pelaksanaan evaluasi sementara yg
dilakukan secara berkala• Client dapat melakukan inspeksi medadak
INTERIM EVALUATION CHECKLIST
SAFETY INSPECTION CHECKLIST
SAFETY PROGRAM CHECKLIST
Work In ProgressWork In Progress
INTERIM EVALUATION = CORRECTIVE ACTION
INTERIM CHECKLIST:SAFETY INSPECTION SAFETY PROGRAM
SHEP STANDARD
PERFORMANCECORRECTIVE ACTION
INTERIM CHECKLIST:SAFETY INSPECTION SAFETY PROGRAM
SHEP STANDARD
PERFORMANCECORRECTIVE ACTION
INTERIM CHECKLIST:SAFETY INSPECTION SAFETY PROGRAM
SHEP STANDARD
PERFORMANCECORRECTIVE ACTION
INTERIM CHECKLIST:SAFETY INSPECTIONSAFETY PROGRAM
HSE STANDARD
PERFORMANCECORRECTIVE ACTION
+HSE PERFORMANCE
Work In ProgressWork In Progress
Final Evaluation in CSMS
CSMS
Contracted Work
Data Bank
Pre-QualificationSelectionRisk Assessment
Administration Phase: Select A Qualified Contractor
Contract Award
Pre Job Activity Work In Progress Final Evaluation
Field Implementation Phase: Ensure Field Safe Work
Final Evaluation
Final EvaluationFinal Evaluation
• HSE Contractor performance evaluation• Feed back to Contractor and Client for future job
• Based on :– HSE Contractual Obligation– Pre – job activity report– Interim evaluation report– Follow up Contractor toward conditional acceptance– Follow up Contractor toward corrective action in interim
evaluation
CSMS Reporting SystemsRisk Assessment
Contractor Safety Guidelines
PROJECT RISK ASSESSMENT RESUME
Date :……………………………………..…………………………………………….………………………….
Project Period :……………………………………..…………………………………………….………………………….
Job Title :……………………………………..…………………………………………….………………………….
Contract No :……………………………………..…………………………………………….………………………….
Work Location :……………………………………..…………………………………………….………………………….
Risk Category : L (Low) M (Medium) H (high)
Explanation :……………………………………..…………………………………………….………………………….
:……………………………………..…………………………………………….………………………….
:……………………………………..…………………………………………….………………………….
Assessed by: Approved by:
(…………………………………………) (………………………………………….)
Risk Assessment Contractor Safety Guidelines
______________________________________________________________________________5
SAFE
INDONESIAARCO
No SpecificCSMS Report
forSelection
No SpecificCSMS Report
forSelection
ARCO INDONESIA CONTRACTOR’S SAFETY PRE-QUALIFICATION FORM
GENERAL INFORMATION
1. Company Name Telephone :
S treet address : Mailing Address :
2. Officers Name Years With Company
President
Vice President
Treasurer
3. How many years has your organization been in business under your present firm name?
4. A. Parent Company name :
City : State : Zip :
Subsidiaries :
B. Principal Company name :
City : State : Zip :
5. Under Current Management Since (Date) :
6. Contact for Insurance Information :
Title : Telephone : Fax :
7. Insurance Carrier(s) :
Name Type of Coverage Telephone
8. Are you self insured for Worker’s Compensation Insurance ? Yes No
9. Contact for Requesting Bids :
Title : Telephone : Fax :
10. PQF Completed By :*)*) This PQF Form must be completed and signed by the Company’s authorized first level Management
Title : Telephone : Fax :
PRE-JOB ACTIVITY CHECKLIST
Date :……………………………………..…………………………………………….………………………….
Project Period :……………………………………..…………………………………………….………………………….
Job Title :……………………………………..…………………………………………….………………………….
Contract No :……………………………………..…………………………………………….………………………….
Work Location :……………………………………..…………………………………………….………………………….
Contractor’s Name :……………………………………..…………………………………………….………………………….
Address :……………………………………..…………………………………………….………………………….
Contractor Reps: _______________ ARCO Indonesia Reps: ________________(Name/Date)(Name/Date)____________________________________________________________________
1 of 1
SAFE
INDONESIAARCO
Pre Job Activities Contractor Safety Guidelines
Contractor Reps: _______________ ARCO Indonesia Reps: ________________(Name/Date)(Name/Date)____________________________________________________________________
1 of 1
SAFE
INDONESIAARCO
INTERIM EVALUATION CHECK LIST
Date : ……………………………………..…………………………….……………………………….
Period : ……………………………………..…………………………….……………………………….
Job Title : ……………………………………..…………………………….……………………………….
Contract No : ……………………………………..…………………………….……………………………….
Work Location : ……………………………………..…………………………….……………………………….
Contractor’s Name : ……………………………………..…………………………….……………………………….
Address : ……………………………………..……………………………………….…………………….
Work in Progress Contractor Safety Guidelines
Contractor Reps: _______________ ARCO Indonesia Reps: ________________(Name/Date)(Name/Date)____________________________________________________________________
1 of 1
SAFE
INDONESIAARCO
INTERIM EVALUATION CHECK LIST
Date : ……………………………………..…………………………….……………………………….
Period : ……………………………………..…………………………….……………………………….
Job Title : ……………………………………..…………………………….……………………………….
Contract No : ……………………………………..…………………………….……………………………….
Work Location : ……………………………………..…………………………….……………………………….
Contractor’s Name : ……………………………………..…………………………….……………………………….
Address : ……………………………………..……………………………………….…………………….
Work in Progress Contractor Safety Guidelines
Contractor Reps: _______________ ARCO Indonesia Reps: ________________(Name/Date)(Name/Date)____________________________________________________________________
1 of 1
SAFE
INDONESIAARCO
INTERIM EVALUATION CHECK LIST
Date : ……………………………………..…………………………….……………………………….
Period : ……………………………………..…………………………….……………………………….
Job Title : ……………………………………..…………………………….……………………………….
Contract No : ……………………………………..…………………………….……………………………….
Work Location : ……………………………………..…………………………….……………………………….
Contractor’s Name : ……………………………………..…………………………….……………………………….
Address : ……………………………………..……………………………………….…………………….
Work in Progress Contractor Safety Guidelines
Contractor Reps: _______________ ARCO Indonesia Reps: ________________(Name/Date)(Name/Date)____________________________________________________________________
1 of 1
SAFE
INDONESIAARCO
INTERIM EVALUATION CHECK LIST
Date : ……………………………………..…………………………….……………………………….
Period : ……………………………………..…………………………….……………………………….
Job Title : ……………………………………..…………………………….……………………………….
Contract No : ……………………………………..…………………………….……………………………….
Work Location : ……………………………………..…………………………….……………………………….
Contractor’s Name : ……………………………………..…………………………….……………………………….
Address : ……………………………………..……………………………………….…………………….
Work in Progress Contractor Safety Guidelines
Contractor Reps: _______________ ARCO Indonesia Reps: ________________(Name/Date)(Name/Date)____________________________________________________________________
1 of 1
SAFE
INDONESIAARCO
FINAL EVALUATION CHECKLIST
Date : ………………………………….…………………………..…………………………………….
Period : ………………………………….…………………………..…………………………………….
Job Title : ………………………………….…………………………..…………………………………….
Contract No : ………………………………….…………………………..…………………………………….
Work Location : ………………………………….…………………………..…………………………………….
Contractor’s Name : ………………………………….…………………………..…………………………………….
Address : ………………………………….…………………………..…………………………………….
Final Evaluation Contractor Safety Guidelines
Risk Assessment ResumeOffice Report
Pre-Qualification ReportOffice Report
Selection ReportOffice Report
Pre-Job Activity ReportOffice & Job Site
Work In Progress ReportJob Site
Final Evaluation ReportJob Site & Office
Part of Process Tender Procedures
Field / Job Site Inspection and Control
PRE-JOB ACTIVITY PRE-JOB ACTIVITY FINAL EVALUATIONFINAL EVALUATION
PRE-QUALIFICATION PRE-QUALIFICATION
RISK ASSESSMENTRISK ASSESSMENT
E
E
E
E
E E
E
INTERIM EVALUATIONINTERIM EVALUATION
E
CSMS Program Evaluation
Program Appraissal
Strengths, Weaknessesand Areas need
improvement
Short Term Evaluation(Yearly)
Performance Bench Marking
Compare RCIR with otherPSCs, other Industy Sectors (if possible)
Medium Term EvaluationBi-annually
Program Reformulation
Observed latest API RP, other Companies Systems,
ISO, MIGAS, etc.
Long Term Evaluationevery Three Years
Improved Program / Guidelineswhere deemed required:
• Strategy• Corrective Actions• Schedule• Resources
RCIR = Recordable Case Incident Rate API = American Petroleum Institute RP = Reformulation Program