Contract, Construction Sequence 01 rev 00, 13,05,11 start date 23,05,11.PDF

1
St Andrews House 1 Dreadnought Street Greenwich London SE10 0PU 020 8858 9124 www.okeefe.co.uk title: drawing: date: scale: checked by: drawn by: J.B. A.S. O'KEEFE CONSTRUCTION (Greenwich) LTD 115 Ridgeway, Wimbledon INFORMATION TOWER CRANE SPAN = 43m 1 2 3 4 5 6 7 8 9 10 EXISTING GROUND LEVEL APPROX 54.300 PILING MATT 600mm APPROX 54.000 PILING MATT 600mm APPROX 53.000 EXISTING GROUND LEVEL APPROX 54.300 (VARIES) HOUSES 1-5 HOUSES 6-10 TREE PROTECTION ZONE TREE PROTECTION ZONE INDICATIVE CRANE POSITION 1 3 5 2 4 6 7 KEY DATES TYPICAL WORK SEQUENCE HOUSE No.10 TYPICAL WORK SEQUENCE OK-RW-TWS-01 NTS(A1) 13/05/2011

Transcript of Contract, Construction Sequence 01 rev 00, 13,05,11 start date 23,05,11.PDF

St Andrews House1 Dreadnought Street

GreenwichLondon

SE10 0PU020 8858 9124

www.okeefe.co.uktitle:

drawing:

date: scale:

checked by:drawn by:J.B.A.S.

O'KEEFECONSTRUCTION (Greenwich) LTD

115 Ridgeway, Wimbledon

INFORMATION

TOWER CRANESPAN = 43m

1 2 3 4

5

6

7

8

9

10

EXISTINGGROUND LEVELAPPROX 54.300 PILING MATT 600mm

APPROX 54.000 PILING MATT 600mmAPPROX 53.000

EXISTINGGROUND LEVELAPPROX 54.300

(VARIES)

HOUSES 1-5 HOUSES 6-10

TREE PROTECTIONZONE

TREE PROTECTIONZONE

INDICATIVECRANE POSITION

1 3 5

2 4 6

7

KEY DATES

TYPICAL WORK SEQUENCEHOUSE No.10

TYPICAL WORKSEQUENCE

OK-RW-TWS-01

NTS(A1)13/05/2011