Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south...

download Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.

If you can't read please download the document

description

Magnetic Field Analysis Magnetic Field Plots for Step IV & VI Around South Shield Wall Area (V Bayliss CM33) Step IV Step VI Level requires 5 mm Fe / 1 mm mumetal shielding

Transcript of Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south...

Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services routing at west wall l Work involved Current Compressor Location Current Proposed Compressor Position Under South Mezzanine Water and power services already installed for compressors South shield wall Magnetic Field Analysis Magnetic Field Plots for Step IV & VI Around South Shield Wall Area (V Bayliss CM33) Step IV Step VI Level requires 5 mm Fe / 1 mm mumetal shielding Magnetic Shielding of Compressor Magnetic Shielding Cabinet for Compressor as South Shield Wall Location Labyrinth cable entry/exit 5 mm Iron + 1 mm mumetal Compressor Only suitable for Step IV at west end of the South Mezzanine, Step VI magnetic field too strong 11,500 13,000 each! 19 Compressors (IV) = 218k (~$350k) min. Current West Wall Layout Current West Wall Configuration West End Stairs Services Distribution Panel West Wall North Mezzanine Current West Wall Layout Area at West Wall for Device Assembly & Preparation Potterax Door Assembly & Preparation Area Installation Path Spectrometer Solenoid with Tandem Lifting Beam (at crane extent) Beam dump Proposed Compressor Layout Provisional West Wall Compressor Layout (J Webb) Compressor spacing allows transplant of existing services to west wall with minimum of reconfiguration or manufacture of new services runs Compressor Line Routing Different Routing Layouts l Cryomech 40 m (purple) / Sumitomo 30 m (yellow). Adv = Only 4 x Sumitomos crossing main assembly area. Disadv = 4 x Sumitomos crossing assembly area. Cryomechs at 40 m (30 m max w/o losses). Hoses connected on north side in way of moving platforms (hence alternative red hoses shown). l Cryomech 35 m (green) / Sumitomo 30 m (yellow). Adv = Cryomech hoses closer to 30 m. Disadv = Most hoses cross assembly area, require false floor. l Cryomech 30 m(black) / Sumitomo 30 m (white). Adv = Cryomech & Sumitomo at preferred length. They are not routed across the assembly area. Disadv = Cryomech hoses will have to form bridge over landing just inside Potterax door. Full West Mezzanine required to move 6 Step IV compressors to south side. Proposed Step IV Scheme Proposal for Step IV Compressor Layout at West Wall West wall mezzanine Sumitomo hose for Tracker cryo (max 28.5m) Services bridge Alternative position for stairs Cryomech hose for device cryo (max 28.5m) Proposed Step IV Scheme SPECTROMETER SOLENOID AND TANDEM LIFTING FRAME STAIRS NEED TO BE REMOVED TEMPORARILY WHEN DEVICES ARE TO BE MOVED INTO COOLING CHANNEL DEVICES WILL NEED TO BE ROLLED INTO HALL PAST SERVICES BRIDGE UPON DELIVERY BEAM DUMP To Do To Investigate l Ensure magnetic field is low enough not to affect compressors in west wall position l Can all cold heads / compressors accept an extra few metres of line temporarily, i.e. when devices pulled off-line on moving platforms (non operational keep cold e.g.