CONTAINER HANDLING EQUIPMENT
description
Transcript of CONTAINER HANDLING EQUIPMENT
1
CONTAINER HANDLING CONTAINER HANDLING EQUIPMENTEQUIPMENT
►SHIP/SHORE CRANESHIP/SHORE CRANE►TUGMASTER/CHASSIS TUGMASTER/CHASSIS ►FORK LIFT TRUCKFORK LIFT TRUCK►REACH STACKERREACH STACKER►STRADDLE CARRIERSTRADDLE CARRIER►RUBBER TYRED GANTRY (RTG)RUBBER TYRED GANTRY (RTG)►RAIL MOUNTED GANTRY (RMG)RAIL MOUNTED GANTRY (RMG)►OVERHEAD BRIDGE CRANE (OHBC)OVERHEAD BRIDGE CRANE (OHBC)
2
3
4
5
JIB CRANEJIB CRANE
6
7
8
9
10
11
12
13
14
15
CONTAINER CRANECONTAINER CRANE
►(PORTAINER*)(PORTAINER*)►Panamax - Post - Super PostPanamax - Post - Super Post►Capacity: Capacity: 35 - 65 tons35 - 65 tons►Outreach:Outreach: 35 - 55 mtrs35 - 55 mtrs►Railgauge:Railgauge: 20 - 30 mtrs20 - 30 mtrs►Backreach:Backreach: 15 - 22 mtrs 15 - 22 mtrs
16
CONTAINER CRANECONTAINER CRANE
►Hoist Speed:Hoist Speed: 50/160 m/min50/160 m/min►Lift above rail: 25 - 36 mtrsLift above rail: 25 - 36 mtrs►Length:Length: 27 mtrs27 mtrs►Productivity:Productivity: 25 - 35 ctrs/hr25 - 35 ctrs/hr►Single Hoist - Double HoistSingle Hoist - Double Hoist►Spreader: Fixed - Telescopic - TwinliftSpreader: Fixed - Telescopic - Twinlift► Investment:Investment: > $ 5.0 mio > $ 5.0 mio
17
18
19
PLUS SHIP’S GANTRYPLUS SHIP’S GANTRY
20
21
22
23
Double Hoist Crane + Multi Trailer System Double Hoist Crane + Multi Trailer System
24
25 GIAIO TAUROGIAIO TAURO
26
27
28
29
BACK REACHBACK REACH
30 OVERHEIGHT SPREADER - FIXED OVERHEIGHT SPREADER - FIXED
31
SPREADERSPREADER
32
SPREADERSPREADER
33
SPREADERSPREADER
34
SPREADERSPREADER
35
CONTAINER CRANECONTAINER CRANE
►Containership future development:Containership future development:8000/10.000/15.000 TEU8000/10.000/15.000 TEU
►Now: 6690 TEU Ship: 17 rows acrossNow: 6690 TEU Ship: 17 rows across►Future: 18/20/22 rows acrossFuture: 18/20/22 rows across►Port turn around time not to be extended:Port turn around time not to be extended:►Mega crane (Supertainer)Mega crane (Supertainer)►Ship in a slip (recess dock) - handling Ship in a slip (recess dock) - handling
both sides both sides
36
CONTAINER CRANECONTAINER CRANE
►Mega crane - Supertainer*Mega crane - Supertainer*►Capacity:Capacity: 65 tons65 tons►Outreach:Outreach: up to 61 mtrsup to 61 mtrs►Railgauge:Railgauge: 30 - 45 mtrs30 - 45 mtrs►Backreach:Backreach: 15 - 23 mtrs15 - 23 mtrs►Hoist Speed:Hoist Speed: 100/200 m/min100/200 m/min
37
CONTAINER CRANECONTAINER CRANE
►Lift above rail:Lift above rail: 40 mtrs40 mtrs►Length:Length: 27 mtrs27 mtrs►Productivity:Productivity: 65 - 85 ctrs/hr65 - 85 ctrs/hr
38
39
CONTAINER CRANECONTAINER CRANEDOCKDOCK
►Ship in a slip/recess dockShip in a slip/recess dock►ECT - Rotterdam;ECT - Rotterdam; 19921992►FCT - Zeebrugge:FCT - Zeebrugge: 19941994►CMTI - Amsterdam:CMTI - Amsterdam: 1998 1998 ►Not (yet) realisedNot (yet) realised
40
41
42
CONTAINER CRANECONTAINER CRANEDOCKDOCK
►Design:Design:►Length:Length: 390 mtrs390 mtrs►Width:Width: 55 mtrs 55 mtrs►Operated by:Operated by: 5 + 4 = 9 (Super) Post 5 + 4 = 9 (Super) Post
Panamax Panamax cranescranes
►Total productivity:Total productivity: 300 ctrs/hr 300 ctrs/hr
43
44
45
TUGMASTERTUGMASTER(TRACTOR)(TRACTOR)
►Horizontal TransportHorizontal Transport►Easy (dis)connecting ChassisEasy (dis)connecting Chassis►Easy manoeuvrableEasy manoeuvrable►Pulling force > 80 tonsPulling force > 80 tons►4 x 4 Wheel Drive for Ro-Ro’s4 x 4 Wheel Drive for Ro-Ro’s►With Gooseneck -> slavetrailers for Ro-RoWith Gooseneck -> slavetrailers for Ro-Ro►Reversable steering system Reversable steering system ► Investment:Investment: $ 100.000$ 100.000
46
47
48
49
50
MULTI - TRAILER SYSTEMMULTI - TRAILER SYSTEM
51
52
53
54
55
TERMINAL CHASSISTERMINAL CHASSIS
►Horizontal Transport - Storage Horizontal Transport - Storage specified containersspecified containers
►Extremely strong/sturdy constructionExtremely strong/sturdy construction►Guiding devices for easy loadingGuiding devices for easy loading►Suitable for 2 x 20’Suitable for 2 x 20’►Two - high ?Two - high ?► Investment:Investment: $ 10.000$ 10.000
56
57
58
59
60
61
62
ROAD CHASSISROAD CHASSIS
►Brakes - Lights - RegulationsBrakes - Lights - Regulations►Storage:Storage: USAUSA►Advantage: No additional yardhandling Advantage: No additional yardhandling
equipment -Easy access for equipment -Easy access for roadtruckersroadtruckers
►Disadvantage: Extremely area Disadvantage: Extremely area consumingconsuming (up to 45 m2/TEU) - (up to 45 m2/TEU) - Availability of chassis from Container Availability of chassis from Container Operator Operator
63
64
65
STRADDLE CARRIERSTRADDLE CARRIER
►Straddling one container rowStraddling one container row►Stacking 1 over 2/3Stacking 1 over 2/3►Storage:Storage: 14/16 m2/TEU14/16 m2/TEU►Productivity:Productivity: 10 - 15 ctrs/hr10 - 15 ctrs/hr►Weight:Weight: 55 tons (+container)55 tons (+container)►Wheelloads:Wheelloads: 10 tons10 tons► Investment:Investment: $ 0.6 mio$ 0.6 mio
66
STRADDLE CARRIERSTRADDLE CARRIER
►Systems:Systems:►All Straddle Carrier: Transport and All Straddle Carrier: Transport and
StackingStacking►Straddle Carrier/Chassis: Stacking only Straddle Carrier/Chassis: Stacking only
67
STRADDLE CARRIERSTRADDLE CARRIER
►Advantages:Advantages:►Flexibility - Relatively low wheelloads Flexibility - Relatively low wheelloads ►Disadvantages:Disadvantages:►Flexibility (Safety) - Long travel Flexibility (Safety) - Long travel
distances - Damage sensitivity - Less distances - Damage sensitivity - Less suitable for automation - (Reliability) suitable for automation - (Reliability)
68
69
70
71
72
73
74
75
76
RUBBER TYRED GANTRYRUBBER TYRED GANTRY
►Straddling 6 - 8 containers plus Straddling 6 - 8 containers plus trucklanetrucklane
►Stacking:Stacking: 1 over 3/4/5 1 over 3/4/5►Storage:Storage: 10 - 12 m2/TEU10 - 12 m2/TEU►Productivity:Productivity: 20 - 25 ctrs/hr20 - 25 ctrs/hr►Weight:Weight: >110 tons>110 tons►Wheelloads:Wheelloads: up to 40 tons (8 wheels)up to 40 tons (8 wheels)► Investment:Investment: $ 1.3 mio$ 1.3 mio
77
78
79
80
81
RUBBER TYRED GANTRYRUBBER TYRED GANTRY
►Advantages:Advantages:►Ample flexibility (transferable from Ample flexibility (transferable from
stack to stack by turning wheels 90 stack to stack by turning wheels 90 degrees)degrees)
►High productivity: One RTG can match High productivity: One RTG can match one Ship/shore container craneone Ship/shore container crane
►Reliability - Less sensitive to damage - Reliability - Less sensitive to damage - Suitable for automation - Efficient Suitable for automation - Efficient stackingstacking
82
RUBBER TYRED GANTRYRUBBER TYRED GANTRY
►Disadvantages:Disadvantages:►High wheelloads ( to be reduced by High wheelloads ( to be reduced by
applying 16 wheels) applying 16 wheels)
83
RUBBER TYRED GANTRYRUBBER TYRED GANTRY
►Automated steering systems: Automated steering systems: Damage preventionDamage prevention
► Inductive loop in wheelpathInductive loop in wheelpath►OpticalOptical
84
85
RUBBER TYRED GANTRYRUBBER TYRED GANTRY
►Auto - steering plus Positioning:Auto - steering plus Positioning:►Magnetic platesMagnetic plates►Metal strips - sensorsMetal strips - sensors►DGPS - Satellite navigation/positioningDGPS - Satellite navigation/positioning
86
87
RAIL MOUNTED GANTRYRAIL MOUNTED GANTRY
►Straddling 15 + containers plus Straddling 15 + containers plus trucklane(s) (and railtrack)trucklane(s) (and railtrack)
►Stacking:Stacking: 1 over 5/61 over 5/6►Storage: Storage: 7 - 9 m2/TEU7 - 9 m2/TEU►Productivity:Productivity: 25 ctrs/hr25 ctrs/hr►RailtracksRailtracks► Investment: > $ 1.5 mioInvestment: > $ 1.5 mio
88
89
90
91
RAIL MOUNTED GANTRYRAIL MOUNTED GANTRY
►Advantages:Advantages:►Reliability - High productivity - Less Reliability - High productivity - Less
sensitive to damage - Suitable for sensitive to damage - Suitable for automation (ASC)automation (ASC)
92
RAIL MOUNTED GANTRYRAIL MOUNTED GANTRY
►Disadvantages:Disadvantages:►Not flexible - not transferable to other Not flexible - not transferable to other
stackstack►High investmentsHigh investments►High Throughput TerminalsHigh Throughput Terminals
93
RMGRMG
94
95
RAIL MOUNTED GANTRYRAIL MOUNTED GANTRY
►ECT - Delta Sea Land TerminalECT - Delta Sea Land Terminal►Double hoist Super Post Panamax Double hoist Super Post Panamax
ship-shore cranesship-shore cranes►Automated Guided Vehicles (AGV)Automated Guided Vehicles (AGV)►Automated Stacking cranes (ASC)Automated Stacking cranes (ASC)
(3-high/5 wide)(3-high/5 wide)
96
97
98
99
100
101
102
OVERHEAD BRIDGE CRANEOVERHEAD BRIDGE CRANE
►OHBCOHBC►Rigid constructionRigid construction►Fully automatedFully automated►Transfer area sea/land side served by Transfer area sea/land side served by
Straddle carrier - ? -Straddle carrier - ? -►High stacking capacity High stacking capacity
103
104
105
106
107
OVERHEAD BRIDGE CRANEOVERHEAD BRIDGE CRANE
►High Throughput Terminals:High Throughput Terminals: (Pasir (Pasir Panjang Terminal PSA - Design Panjang Terminal PSA - Design capacity: 35 mio TEU/yrcapacity: 35 mio TEU/yr
►(Mid 1980 constructed by Container (Mid 1980 constructed by Container Repair Company in Rotterdam for Repair Company in Rotterdam for servicing its MT depot) servicing its MT depot)
108
MISCELLANEOUSMISCELLANEOUS
►FLT + AttachmentsFLT + Attachments►Side stacker/loaderSide stacker/loader►Reach StackerReach Stacker►Container Freight Station (CFS)Container Freight Station (CFS)►MT Depot (Storage)MT Depot (Storage)
109
110
111
112
113
114
115
116
117
118
119
120
121
COMMUNICATIONCOMMUNICATION
►Mobilophone SystemMobilophone System►Mobilophone: Yard Operator - Handling Mobilophone: Yard Operator - Handling
Equipment Equipment ►Portophone: Ass. Manager - Foreman - Portophone: Ass. Manager - Foreman -
CheckerChecker►Separate Portophones for Ship - Shore Separate Portophones for Ship - Shore
cranes (driver and radioman - safety) cranes (driver and radioman - safety)
122
COMMUNICATIONCOMMUNICATION
►Mobilophone System:Mobilophone System:►Disadvantage:Disadvantage:►Too many frequencies - external Too many frequencies - external
disturbances - hifg degree of discipline disturbances - hifg degree of discipline required - sensitive to mistakesrequired - sensitive to mistakes
123
CONTROLCONTROL
►Automated Container Terminal Control Automated Container Terminal Control SystemSystem
►NAVIS - SPARCS/EXPRESSNAVIS - SPARCS/EXPRESS►COSMOSCOSMOS►Radio Data TransmissionRadio Data Transmission► Instructions and confirmations via LCD Instructions and confirmations via LCD
screen/keyboard. Equipment: fixed units screen/keyboard. Equipment: fixed units - others mobile hand held terminals- others mobile hand held terminals
124
125
126
127
128
129
130
131
132
COMMUNICATIONCOMMUNICATION
►Mobilophone/Portophone Mobilophone/Portophone
►For “normal”verbal communication For “normal”verbal communication and safety reasonsand safety reasons
133
LABOURLABOUR
►Less physical functionsLess physical functions► Increasing need specialist/combi Increasing need specialist/combi
functionsfunctions►Flexibility/EmployabilityFlexibility/Employability►Automation: Automation:
Administration - Planning - Administration - Planning - OperationsOperations
134
135
136
LABOURLABOURCOMBI FUNCTIONSCOMBI FUNCTIONS
►MainfunctionMainfunction + A + A
TugmasterTugmaster CheckerCheckerRTGRTG ugmasterugmaster
CheckerChecker
Ctr. CraneCtr. Crane RTGRTGTugmasterTugmasterCheckerChecker
137
EQUIPMENT CAPACITY EQUIPMENT CAPACITY ANNUALANNUAL
►Ship-Shore Container Crane:Ship-Shore Container Crane:3-4000 hrs x 25 ctrs/hr = 75-100.000 3-4000 hrs x 25 ctrs/hr = 75-100.000 ctrs ctrs
►Straddle Carrier:Straddle Carrier:3000 hrs x 12 ctrs/hr = 36.000 ctrs3000 hrs x 12 ctrs/hr = 36.000 ctrs
►Rubber Tyred Gantry: Rubber Tyred Gantry: 3000 hrs x 20 ctrs/hr = 60.000 ctrs3000 hrs x 20 ctrs/hr = 60.000 ctrs
►Rail Mounted Gantry:Rail Mounted Gantry:3000 hrs x 25 ctrs/hr = 75.000 ctrs3000 hrs x 25 ctrs/hr = 75.000 ctrs
138
EQUIPMENT CAPACITYEQUIPMENT CAPACITYSTORAGESTORAGE
►Chassis:Chassis: 45 m2/TEU45 m2/TEU►Straddle CarrierStraddle Carrier 16 m2/TEU16 m2/TEU►RTGRTG 12 m2/TEU12 m2/TEU►RMGRMG 9 m2/TEU 9 m2/TEU►FLT (MT)FLT (MT) 7 m2/TEU 7 m2/TEU►FLT (Full)FLT (Full) 25 m2/TEU25 m2/TEU►ReachstackerReachstacker 15 m2/TEU15 m2/TEU
139
EQUIPMENT CAPACITYEQUIPMENT CAPACITY
►EQUIPMENT:EQUIPMENT:Containers/Moves per Hour/Shift/YearContainers/Moves per Hour/Shift/Year
►STORAGE:STORAGE: TEU’sTEU’s►SHIPS:SHIPS: TEU’sTEU’s►TEU = Twenty feet Equivalent UnitTEU = Twenty feet Equivalent Unit►FEU = Fourty feet Equivalent UnitFEU = Fourty feet Equivalent Unit
140
141
EQUIPMENT COSTSEQUIPMENT COSTSEXAMPLEEXAMPLE
►CONTAINER CRANECONTAINER CRANE Investment:Investment:$ 6.0 mio$ 6.0 mio
►Annual:Annual:►Depreciation 25 yrsDepreciation 25 yrs $ 240.000$ 240.000
Interest Costs (8%)Interest Costs (8%) $ 260.000$ 260.000M&R 2.5% IM&R 2.5% I $ 150.000$ 150.000PowerPower $ 100.000$ 100.000TotalTotal $ 750.000$ 750.000
142
EQUIPMENT COSTSEQUIPMENT COSTSEXAMPLEEXAMPLE
►TOTAL PER YEAR:TOTAL PER YEAR: $ 750.000$ 750.000
►Running Hours:Running Hours: 30003000
►Per Hour:Per Hour: $ 250$ 250
143
144
EQUIPMENT COSTSEQUIPMENT COSTSEXAMPLEEXAMPLE
►RUBBER TYRED GANTRYRUBBER TYRED GANTRY► Investment:Investment: $ 1.3 mio$ 1.3 mio►Annual:Annual:►Depreciation 12 yrsDepreciation 12 yrs $ 108.500$ 108.500
Interestcosts 8%Interestcosts 8% $ 61.000$ 61.000 M&R M&R 7.5 % I7.5 % I $ 97.500$ 97.500 Fuel 20 Fuel 20 ltr/hrltr/hr $ 45.000$ 45.000 TotalTotal
$ 312.000$ 312.000
145
EQUIPMENT COSTSEQUIPMENT COSTSEXAMPLEEXAMPLE
►TOTAL PER YEAR:TOTAL PER YEAR: $ 312.000$ 312.000
►Running Hours:Running Hours: 30003000
►Per Hour:Per Hour: $ 104$ 104
146
147
EQUIPMENT COSTSEQUIPMENT COSTSEXAMPLEEXAMPLE
►TUGMASTERTUGMASTER► Investment:Investment: $ 100.000$ 100.000►Annual:Annual:►Depreciation 10 yrs:Depreciation 10 yrs: $ 10.000$ 10.000
Interestcosts 8 %Interestcosts 8 % $ 4.800$ 4.800M&R 15% I:M&R 15% I: $ 15.000$ 15.000Fuel 10 ltr/hr:Fuel 10 ltr/hr: $ $
22.50022.500 TotalTotal$ 52.300$ 52.300
148
EQUIPMENT COSTSEQUIPMENT COSTSEXAMPLEEXAMPLE
►TOTAL PER YEAR:TOTAL PER YEAR: $ 52.300$ 52.300
►Running Hours:Running Hours: 30003000
►Per Hour:Per Hour: $ 17.50$ 17.50
►Chassis:Chassis: $ 2.50$ 2.50
149
150
GANG COST STRUCTUREGANG COST STRUCTUREEXAMPLEEXAMPLE
►Per Gang/hr:Per Gang/hr:►a) Labour:a) Labour:
1 Foreman1 Foreman $ 50$ 502 Cranedrivers2 Cranedrivers $ 80$ 80
2 Checkers2 Checkers $ 60$ 605 Tugm. Drivers5 Tugm. Drivers $ 150$ 1501 RTG Driver1 RTG Driver $ 40$ 403 Lashers3 Lashers $ 60$ 60
TotalTotal Labour: Labour: $ 440 $ 440
151
GANG COST STRUCTUREGANG COST STRUCTUREEXAMPLEEXAMPLE
►b) Equipment:b) Equipment:1 Contr. Crane1 Contr. Crane $ $
250250 5 Tugmasters + Chassis5 Tugmasters + Chassis $ $ 100100 1 RTG1 RTG $ 104$ 104
Total EquipmentTotal Equipment $ 454$ 454►c) Working Area etc.c) Working Area etc. $ 106$ 106
TOTALTOTAL $ 1000$ 1000
152
RATE STRUCTURERATE STRUCTUREEXAMPLEEXAMPLE
►Total Gang CostsTotal Gang Costs $ 1000$ 1000Overhead 40%Overhead 40% $ 400$ 400
Total CostsTotal Costs $ 1400$ 1400Profit 20%Profit 20% $ 280$ 280
Grand TotalGrand Total $ 1680$ 1680 per Hourper Hour
153
154
RATE STRUCTURERATE STRUCTUREEXAMPLEEXAMPLE
►Total Gangcosts per hour:Total Gangcosts per hour: $ 1680$ 1680
Total Gangcosts per shift:Total Gangcosts per shift: $ $ 1344013440
►Productivity:Productivity:GrossGross 200 ctrs/shift200 ctrs/shiftLost Labour etc. 30%Lost Labour etc. 30% 60 60 ctrs/shift ctrs/shiftNetNet 140 ctrs/shift140 ctrs/shift
155
RATE STRUCTURERATE STRUCTUREEXAMPLEEXAMPLE
►Net productivity:Net productivity: 140 ctrs/shift140 ctrs/shift
►Rate per container/move:Rate per container/move:13440 : 140 =13440 : 140 = $ 96.- $ 96.-
156