MRP- CONSUMPTION BASED PLANNING IN MD02 T-code MRP is carried out

description

hi

Transcript of Consumption Based Planning

MRP- CONSUMPTION BASED PLANNING

IN MD02 T-code MRP is carried out

Based on the current stock level system has raised the purchase requisition for the remain qty left between Re order Point 100& Maximum stock level 1000.based on that system has raised.Purchase requisition for Rest of the qty 987