Construction Waste Management Specifications · yWastecap Site Visit Report (May, 2006) Develop a...

23
The Evolution of The Evolution of Construction Waste Management Construction Waste Management Specifications Specifications A Personal Account Rick Levin, CSI, CCS, LEED AP Associate / Lead Specifier Kahler Slater Architects, Inc.

Transcript of Construction Waste Management Specifications · yWastecap Site Visit Report (May, 2006) Develop a...

Page 1: Construction Waste Management Specifications · yWastecap Site Visit Report (May, 2006) Develop a demolition waste material plan for reuse & recycling Recommend material-specific

The Evolution ofThe Evolution ofConstruction Waste Management Construction Waste Management SpecificationsSpecifications

A Personal Account

Rick Levin, CSI, CCS, LEED APAssociate / Lead SpecifierKahler Slater Architects, Inc.

Page 2: Construction Waste Management Specifications · yWastecap Site Visit Report (May, 2006) Develop a demolition waste material plan for reuse & recycling Recommend material-specific

The Journey BeginsThe Journey Begins1995: Pharmacia Laboratory Project, Skokie, IL – LEED Silver◦ Considered Wastespec, commercial master

specification for construction waste management (CWM)

Author: Triangle J Council of Governments & EPA Region VI, North Carolina

June, 1996 - Wastespec Presentation◦ At EPA Region V seminar in Chicago

Page 3: Construction Waste Management Specifications · yWastecap Site Visit Report (May, 2006) Develop a demolition waste material plan for reuse & recycling Recommend material-specific

CWM Spec Attributes CWM Spec Attributes

Provide specs language & tools to implement recycling, reuse, salvage & diversion from landfills

Construction Team: Foster teamwork & partnership

Identify strategies & opportunities

Page 4: Construction Waste Management Specifications · yWastecap Site Visit Report (May, 2006) Develop a demolition waste material plan for reuse & recycling Recommend material-specific

CWM Spec Attributes, contCWM Spec Attributes, cont’’ddTailored to Contract Documents:◦ Includes administrative, procedural & technical

requirements

Includes editor’s notes

Includes references & resources

Documents comparative costs of recycling vs. disposal◦ Recordkeeping is more costly – offset by recycling

savings, lower tipping fees

Page 5: Construction Waste Management Specifications · yWastecap Site Visit Report (May, 2006) Develop a demolition waste material plan for reuse & recycling Recommend material-specific

CWM Spec Attributes, contCWM Spec Attributes, cont’’dd

Identify different types of waste & estimate relative costs of recycling

Prequalify Contractors, Subcontractors, material suppliers for recycling & CWM experience

Page 6: Construction Waste Management Specifications · yWastecap Site Visit Report (May, 2006) Develop a demolition waste material plan for reuse & recycling Recommend material-specific

Strategy for PharmaciaStrategy for Pharmacia

Improve upon Wastespec

Develop our own CWM specs◦ Specification text to communicate

requirements◦ Standard forms & worksheets to determine

feasibility & costs

Educate, inform construction personnel to implement CWM practice

Page 7: Construction Waste Management Specifications · yWastecap Site Visit Report (May, 2006) Develop a demolition waste material plan for reuse & recycling Recommend material-specific

CWM SpecificationsCWM Specifications

Communicate CWM requirements in:◦ “General requirements” Specs sections◦Technical spec sections for each trade◦ Standardized forms & worksheets

Page 8: Construction Waste Management Specifications · yWastecap Site Visit Report (May, 2006) Develop a demolition waste material plan for reuse & recycling Recommend material-specific

CWM Specs, contCWM Specs, cont’’dd

Section 01094 - Definitions◦ Defines terminology used throughout

the documents

Section 01120 - Special Project Procedures◦ Specifies working restrictions in areas

having airborne pollutants

Page 9: Construction Waste Management Specifications · yWastecap Site Visit Report (May, 2006) Develop a demolition waste material plan for reuse & recycling Recommend material-specific

CWM Specs, contCWM Specs, cont’’ddSection 01505 - Construction Waste Management◦ Requirements for preparing CWM Plan◦ Analyze waste to be generated◦ Identify materials targeted for recycling & reuse◦ Materials handling & sorting◦ Select recycling service option:

Full-Service RecyclerWaste Hauler's Recycling ServiceIn-house RecyclingMake subcontractors responsible

Page 10: Construction Waste Management Specifications · yWastecap Site Visit Report (May, 2006) Develop a demolition waste material plan for reuse & recycling Recommend material-specific

CWM Specs, contCWM Specs, cont’’ddSection 01505 - Construction Waste Management◦ CWM Plan Implementation◦ Summarize waste generated: Quantities,

landfill names, tipping fee totals, and total disposal cost◦ Communications & Motivational Plans◦ Special Programs: Identify tax credits, rebates,

or other savings

Page 11: Construction Waste Management Specifications · yWastecap Site Visit Report (May, 2006) Develop a demolition waste material plan for reuse & recycling Recommend material-specific

Recycling Evaluation ToolsRecycling Evaluation ToolsTracks costs & quantities of recycled and/or disposed materials

Waste audits show cost-effectiveness of recycling & waste reduction◦ Record feedback on program success or failure◦ Short Audit: Conducted monthly, taking 15 minutes

each time◦ Full Audit: Conducted once during project, at

quarter or third points, taking approx. 1 hour

Page 12: Construction Waste Management Specifications · yWastecap Site Visit Report (May, 2006) Develop a demolition waste material plan for reuse & recycling Recommend material-specific

Pharmacia ResultsPharmacia ResultsBuilding Demolition◦ 35,000 sq. ft., one-story warehouse◦ Recycled: 72% of total demolition debris (included

567 tons of metal)

Diverted from Landfills:◦ 690 tons of solid materials (e.g., concrete, brick)

Net Savings:◦ Approx. $53,000 savings (avoided disposal costs and

recycling revenue)

Page 13: Construction Waste Management Specifications · yWastecap Site Visit Report (May, 2006) Develop a demolition waste material plan for reuse & recycling Recommend material-specific

WastecapWastecap Ad Hoc CommitteeAd Hoc Committee

April, 2004:◦ Examine Wisconsin’s commercial C&D waste:◦ Seek ways to reduce, reuse & recycle

construction materials◦ Seek ways to divert construction waste from

landfills◦ Educate, inform , train & provide tools to

increase number of Contractors who recycle

Page 14: Construction Waste Management Specifications · yWastecap Site Visit Report (May, 2006) Develop a demolition waste material plan for reuse & recycling Recommend material-specific

WastecapWastecap Ad Hoc Committee, contAd Hoc Committee, cont’’dd

July, 2004:◦ Review & comment on U.S. EPA “Green

Construction Specs”◦ Create CWM specs for private sector

For posting on Wastecap’s websiteFor inclusion in Wastecap’s C&D toolkit & training programSeek inclusion in State of Wisconsin’s master specifications

Page 15: Construction Waste Management Specifications · yWastecap Site Visit Report (May, 2006) Develop a demolition waste material plan for reuse & recycling Recommend material-specific

WastespecWastespec CWM SpecCWM SpecUser-friendly organizational structure

Includes:◦ Specifications text & editor’s notes◦ Appendix:

GlossaryDescriptions of services & equipment, applications & markets resources & info

◦ Standardized forms & worksheets◦ References & resources

Page 16: Construction Waste Management Specifications · yWastecap Site Visit Report (May, 2006) Develop a demolition waste material plan for reuse & recycling Recommend material-specific

UW Green Bay Project, 2005UW Green Bay Project, 2005

Several DSF projects being bid concurrentlyEach required CWM provisionsInconsistent DSF approach◦ Confusing Bidders

Engaged several DSF Project Mgrs to:◦ Clarify inconsistencies◦ Move provisions from Bidding Documents

Page 17: Construction Waste Management Specifications · yWastecap Site Visit Report (May, 2006) Develop a demolition waste material plan for reuse & recycling Recommend material-specific

UW Whitewater COBE ProjectUW Whitewater COBE Project20062006

Project Scope:◦ Demolish 3 buildings◦ Construct new Business / Economics Building

DSF Project Requirements:◦ Maximize recycling of C&D waste during

demolition & construction phases◦ Seek model “success story” projects

Page 18: Construction Waste Management Specifications · yWastecap Site Visit Report (May, 2006) Develop a demolition waste material plan for reuse & recycling Recommend material-specific

UW Whitewater COBE, contUW Whitewater COBE, cont’’dd

◦ Collaboration: DSF, Kahler Slater,Wastecap:

Communicate Project recycling goalsDevelop CWM specs language & construction scheduleIncorporate Wastecap’s services into the Contract Documents:

Technical assistance, education, monitor & document results

Page 19: Construction Waste Management Specifications · yWastecap Site Visit Report (May, 2006) Develop a demolition waste material plan for reuse & recycling Recommend material-specific

UW Whitewater COBE, contUW Whitewater COBE, cont’’dd

Wastecap Site Visit Report (May, 2006)◦ Develop a demolition waste material plan for reuse &

recycling◦ Recommend material-specific recycling opportunities

(uses & markets)◦ Assist & educate in on-site recycling

Prepare Waste Management PlanSelect type of haulerDumpsters and waste receptaclesConduct waste auditsReferences & resources

Page 20: Construction Waste Management Specifications · yWastecap Site Visit Report (May, 2006) Develop a demolition waste material plan for reuse & recycling Recommend material-specific

UW Whitewater COBE, contUW Whitewater COBE, cont’’dd

EMC Asbestos Abatement Assessment:◦ Inspect asbestos data for buildings to be demolished◦ Prepare cost estimates for removing asbestos prior

to demolition

Wastecap: Prepare CWM Plan for new COBE Building to:◦ Identify materials & markets◦ Conduct waste audits & record results◦ Educate & instruct construction personnel

Page 21: Construction Waste Management Specifications · yWastecap Site Visit Report (May, 2006) Develop a demolition waste material plan for reuse & recycling Recommend material-specific

UW Whitewater COBE, contUW Whitewater COBE, cont’’dd

CWM Specifications: Kahler Slater –Wastecap collaboration◦ Included in DSF General Requirements◦ Compressed Wastecap’s CWM specs (from

21 pages to 2 pages)◦ Incorporated Wastecap’s preferred contract

language◦ Reviewed by DSF Project Manager

Page 22: Construction Waste Management Specifications · yWastecap Site Visit Report (May, 2006) Develop a demolition waste material plan for reuse & recycling Recommend material-specific

UW Whitewater COBE, contUW Whitewater COBE, cont’’dd

Indoor Air Quality (IAQ)◦ Kahler Slater’s IAQ provisions inserted in

DSF’s General Requirements (“Air Quality Management” Article)

Page 23: Construction Waste Management Specifications · yWastecap Site Visit Report (May, 2006) Develop a demolition waste material plan for reuse & recycling Recommend material-specific

WhatWhat’’s on the Horizon?s on the Horizon?Use UW COBE specs “model” language for future DSF construction projectsIncorporate Best CWM Management Practices provisions & specifications into the Wisconsin Sustainable Facilities Guidelines & DSF master specificationsContractors will gain CWM experienceMore markets for recycled & reused items

* * *