Concession Overview

Garibaldi Power Plant

Installed capacity - 177.9 MW

Physical Guarantee - 83.3 average MWh

70% of energy sold

Concession rights: 35 years

Triunfo won the concession in July 2010

Capex to date R$452 million

Located at Abdon Batista and Cerro Negro, Santa

Catarina state, Southern Brazil.

Page 3: Construction update   rio canoas energia

3

February 2011 September 2012

Rapid Transformation of Greenfield Site

Page 4: Construction update   rio canoas energia

4

Rio Canoas Energia – Garibaldi Power Plant

GENERATION CIRCUIT

Page 5: Construction update   rio canoas energia

5

Rio Canoas Energia – Garibaldi Power Plant

THE POWER HOUSE ASSEMBLY

Page 6: Construction update   rio canoas energia

6

Rio Canoas Energia – Garibaldi Power Plant

THE RIGHT BANK OF THE DAM

Page 7: Construction update   rio canoas energia

7

Rio Canoas Energia – Garibaldi Power Plant

THE RIGHT BANK OF THE DAM

Page 8: Construction update   rio canoas energia

8

Rio Canoas Energia – Garibaldi Power Plant

THE RIGHT BANK OF THE DAM

Page 9: Construction update   rio canoas energia

Contact

Email: [email protected]

+55 11 2169 3999

Rua Olimpíadas, no 205, Conjunto 142/143 Vila Olímpia - São Paulo - CEP: 04551-000

www.triunfo.com/ir

9