Construction Technologies Career Field Structural Coverings and Finishes Subject Code 178004 Paul KrausWashington Local Jason VidaPenta Career Center

Transcript of Construction Technologies Career Field Coverings and ... · Construction Technologies Career Field...

ConstructionTechnologiesCareerField

StructuralCoveringsandFinishes

SubjectCode178004PaulKraus‐WashingtonLocal

JasonVida‐PentaCareerCenter

Rigorous Assessment Items Aligned to the Four Depth of Knowledge Levels for Ohio CT Courses in

Agricultural and Environmental Systems

Construction Technologies

Human Services

Health Science

Transportation Systems

Sponsored by Northwest Ohio Tech Prep, Northwest Ohio HSTW, The University of Toledo CTE Teacher Prep Program, and Ohio ACTE

TeachersandadministratorsfromfiveschoolsthroughoutNorthwestOhioengagedinathreedayworkshop focusing on the creation of rigorous assessment items aligned to the four Depth ofKnowledge(DOK)LevelsasdefinedbyOhio’sCareerFieldTechnicalContentStandardsforatleastonecourseintheircareerfield.Rigorousassessmentitemsweredevelopedtoassistteachersinthecreationofstudentassessmentsalignedtothestatestandards,thusensuringanincreaseinstudentperformanceonthecorrelatingWebXams.

Schoolsengagedintheinitiative:

PentaCareerCenter,Perrysburg,OhioChristinaKerns,SupervisorofCurriculumandInstruction,WorkshopFacilitator

NicoleCostello,SmallAnimalCareTeacherEricEisel,AutoCollisionTeacherTracyGraf,HairDesignTeacher

ShelleyRogers,MedicalTechnologiesTeacherDavidStacklin,AgricultureTeacher

PhilStockwell,SupervisorofAgricultureandTransportationJasonVida,ConstructionCarpentryTeacher

OregonCitySchools,Oregon,Ohio

SteveBialorucki,Director,Career&TechnologyEducationJodiEckman,CosmetologyTeacherMeredithWolfe,AgricultureTeacher

SylvaniaCitySchools,Sylvania,Ohio

HollyFair,CosmetologyTeacherJulieSanford,Secondary/CTEAssistantDirector

BryanSmith,AgBusinessTeacher

ToledoPublicSchools,Toledo,OhioBryanEllis,UrbanAgricultureTeacher

SteveOswanski,SmallAnimalManagementTeacher

WashingtonLocalSchools,Toledo,OhioKimberleeFarnham,CosmetologyTeacher

LeslieFish,CosmetologyTeacherPhilKraus,ConstructionCarpentryTechnologyTeacherDebHeban,Director,Career&TechnicalEducation

Post‐SecondarySupport:

KathleenCrates,TheUniversityofFindlayPaulHubaker,NorthwestOhioTechPrepEricLandversicht,TheUniversityofToledoKathyWilson,NorthwestOhioTechPrep

CoursesAlignedtotheFourDOKLevels:AgriculturalandEnvironmentalSystemsCareerField

1. Agriculture,FoodandNaturalResources010105(A0,A1,A2,A3,A5,andA6Pathways)DavidStacklin,PentaCareerCenter,AgricultureTeacherandMeredithWolfe,OregonCitySchools,AgricultureTeacher

2. Greenhouse&NurseryManagement010610(A0andA5Pathways)BryanEllis,ToledoPublicSchools,UrbanAgricultureTeacherandBryanSmith,SylvaniaCitySchools,AgBusinessTeacher

3. ZooandAquarium010940(A2Pathway)NicoleCostello,PentaCareerCenter,SmallAnimalCareTeacherandSteveOswanski,ToledoPublicSchools,SmallAnimalManagementTeacher

ConstructionTechnologiesCareerField1. StructuralCoveringsandFinishes178004(StructuralSystemsDDPathway)

PhilKraus,WashingtonLocalSchools,ConstructionCarpentryTechnologyTeacherandJasonVida,PentaCareerCenter,ConstructionCarpentryTeacher

HumanServicesCareerField1. AdvancedHairCuttingandStyling174130(CosmetologyM1Pathway)

TracyGraf,PentaCareerCenter,HairDesignTeacher,KimberleeFarnham,WashingtonLocalSchools,CosmetologyTeacher,andSteveBialorucki,OregonCitySchools,Director,Career&TechnologyEducation

2. AdvancedChemicalServices174140(CosmetologyM1Pathway)TracyGraf,PentaCareerCenter,HairDesignTeacher,KimberleeFarnham,WashingtonLocalSchools,CosmetologyTeacher,andSteveBialorucki,OregonCitySchools,Director,Career&TechnologyEducation

3. MicrobiologyandInfectionControl174115(CosmetologyM1Pathway)JodiEckman,OregonCitySchools,CosmetologyTeacher,HollyFair,SylvaniaCitySchools,CosmetologyTeacherandLeslieFish,WashingtonLocalSchools,CosmetologyTeacher

HealthScienceCareerField1. PatientCenteredCare072050(AlliedHealthandNursingJMPathway)

DebHeban,WashingtonLocalSchools,Director,Career&TechnicalEducationandShelleyRogers,PentaCareerCenter,MedicalTechnologiesTeacher

TransportationSystemsCareerField

1. CollisionPainting&Refinishing177012(GroundTransportationT9Pathway)Eric Eisel, Penta Career Center, Auto Collision Teacher and Phil Stockwell, Penta CareerCenter,SupervisorofAgricultureandTransportation

CourseLevelDescriptorforeachDOKLevelStructuralCoveringsandFinishes

JasonVida&PhilKraus

CourseDescription:Thiscoursewilladdressapplicationsofinteriorandexteriorfinishwork.Studentswill identifymaterial properties and select for appropriate application. Students will install thermal andmoisture protection including roofing, siding, fascia and soffits, gutters, and louvers. Studentswill install drywall; trim‐joinery andmolding and apply wall, floor and ceiling coverings, andfinishes. Throughout the course, the safe handling ofmaterials, personal safety, prevention ofaccidents,andthemitigationofhazardsareemphasized.DOKLevel1Students identifyparts,materials,handandpower tools required fora givenproject. Studentssolve basic construction math. Students demonstrate safe material handling, tool use, andpersonalsafetypractices.DOKLevel2Studentsperformbasictasksandrecognizeorderofoperationstocompleteeachtask.Studentscompareandcontrasttools,materials,andmethodsofinstallation.DOKLevel3Students layout, cut,and installmaterials.Studentscreateprojectsbasedonspecificationsanddrawings,mostlyself‐directed.Studentscalculateandcreatematerialtake‐offs,clientproposals,andcostanalysis.DOKLevel4Students troubleshoot and problem‐solve real‐world, non‐routine jobsite issues. Studentsdevelop processes and procedures to handle different challenges faced in the constructionprocess. Students stretch their knowledge using research on tools, materials, and methodsdictatedbyspecificreal‐worldsituations.

Program:ConstructionTechnology Course:StructuralCoveringsandFinishes

Name(s):JasonVida&PhilKraus

Competency:2.1SiteSafety:2.1.1‐2.1.3,2.1.6‐2.1.11,2.1.14  

  

DepthofKnowledgeLevel(CheckOne): Level1 Level2 Level3 Level4 

RevisedBloom’sTaxonomyLevel(CheckOne): Level1 Level2 Level3 Level4 Level5 Level6 

DOKLEVEL1 RBTLEVEL_____Question__x__Activity_____Project_____

At what working height does OSHArequirefallprotection?

DOK LEVEL 2 RBTLEVEL_____Question_____Activity__x__Project_____

Givena jobsiteandproject scenario, listtheOSHAregulationsrequired.

DOKLEVEL3 RBTLEVEL_____Question____Activity_____Project__x___

Createa“toolbox”talkforagivenphaseofaprojectandpresentthattoagroupofworkers.

DOK LEVEL 4 RBTLEVEL_____Question_____Activity_____Project_x___

Createacompletesafetyplan foragivenresidentialconstructionproject.

 

 

Notes:   ResourcesNeeded:

Program:ConstructionTechnology Course:StructuralCoveringsandFinishes

Name(s):JasonVida&PhilKraus

Competency:2.2PersonalSafety:2.2.1‐2.2.6  

  

DepthofKnowledgeLevel(CheckOne): Level1 Level2 Level3 Level4 

RevisedBloom’sTaxonomyLevel(CheckOne): Level1 Level2 Level3 Level4 Level5 Level6 

DOKLEVEL1 RBTLEVEL_____Question__x__Activity_____Project_____

What PPE is required when operating aconcretesaw?

DOK LEVEL 2 RBTLEVEL_____Question_____Activity__x__Project_____

Listthetoolsrequiredandmatchthetoolwith the PPE needed to complete theconstructionoftheporch.

DOKLEVEL3 RBTLEVEL_____Question____Activity_____Project__x___

Research the dangers of installingfiberglass insulation and create apurchaseorderforthePPEthatwillneedtobepurchasedinorderforacrewoffiveto install insulation in a home. Citeevidencetosupportyourclaims.

DOK LEVEL 4 RBTLEVEL_____Question_____Activity_____Project_x___

Researchstudiesonlungdiseaseandhowit links to the workplace. Create aproposal to place additional regulationsonPPErequirementswhenperformingatask. Present your findings to the classandadvisorymembers.

 

 

Notes:   ResourcesNeeded:

Program:ConstructionTechnology Course:StructuralCoveringsandFinishes

Name(s):JasonVida&PhilKraus

Competency:3.6.10Installunderlayment  

  

DepthofKnowledgeLevel(CheckOne): Level1 Level2 Level3 Level4 

RevisedBloom’sTaxonomyLevel(CheckOne): Level1 Level2 Level3 Level4 Level5 Level6 

DOKLEVEL1 RBTLEVEL_____Question__x__Activity_____Project_____

Whatare two (2) typesofunderlaymentusedinresidentialroofing?

DOK LEVEL 2 RBTLEVEL_____Question_____Activity__x__Project_____

Match thedifferent typesof roofingwiththeunderlaymentrequired.

DOKLEVEL3 RBTLEVEL_____Question___Activity___x__Project_____

Installunderlaymentonaroofstructure.

DOK LEVEL 4 RBTLEVEL_____Question_____Activity_____Project_x___

Research underlayment choices andinstallationmethodsavailable.Chooseanunderlayment you would like to use foryour standard. Justify your decision andgiveashortpresentationtotheclass.

 

 

Notes:   ResourcesNeeded:

Program:ConstructionTechnology Course:StructuralCoveringsandFinishes

Name(s):JasonVida&PhilKraus

Competency:3.6.11Layoutandinstallshinglesandrooffinishes  

  

DepthofKnowledgeLevel(CheckOne): Level1 Level2 Level3 Level4 

RevisedBloom’sTaxonomyLevel(CheckOne): Level1 Level2 Level3 Level4 Level5 Level6 

DOKLEVEL1 RBTLEVEL_____Question__x__Activity_____Project_____

List three (3) common roofingmaterialsusedinresidentialconstruction.

DOK LEVEL 2 RBTLEVEL_____Question_____Activity__x__Project_____

Calculate the amount of shingles neededfor a given structure to a 10% wasteallowance.

DOKLEVEL3 RBTLEVEL_____Question____Activity__x___Project_____

Lay out, cut, and install asphalt shinglesonaroofstructure.

DOK LEVEL 4 RBTLEVEL_____Question_____Activity_____Project_x___

Createacompletebid foragivenprojectbased on prevailing wage rates. Analyzeyour bid and develop best practices thatcould reduce your bottom line. Presentyour bid to the class in order to sell thejob.

 

 

Notes:   ResourcesNeeded:

Program:ConstructionTechnology Course:StructuralCoveringsandFinishes

Name(s):JasonVida&PhilKraus

Competency:3.7.1Compareandcontrasttypesofdoorsandwindows,3.7.3Installwindowanddoor

hardware,3.7.4Installweatherstrippingcaulkingandsealant.3.7.5Installweatherstrippingcaulking

andsealant.3.7.10.Installdraftstopping.

DepthofKnowledgeLevel(CheckOne): Level1 Level2 Level3 Level4RevisedBloom’sTaxonomyLevel(CheckOne): Level1 Level2 Level3 Level4 Level5 Level6

DOKLEVEL1 RBTLEVEL_____Question__x__Activity_____Project_____

List three (3) types of windows used inresidentialconstruction.

DOK LEVEL 2 RBTLEVEL_____Question__x___Activity____Project_____

What type of window is most energyefficient?Listinorderfromleasttomostefficient.

DOKLEVEL3 RBTLEVEL_____Question__x__Activity_____Project_____

What installation methods andmanufacturer upgrades or features canincrease energy efficiency? Describe atleast three (3) installation methods andthree (3) manufacturer upgrades offeatures that can improve energyefficiency.

DOK LEVEL 4 RBTLEVEL_____Question_____Activity_____Project_x___

Install a window to manufacturerspecifications. Then install additionalinsulation, flashing, and caulk tomaximizeenergyefficiencyandeliminatemoistureintrusion.

Notes: ResourcesNeeded:

Program:ConstructionTechnology Course:StructuralCoveringsandFinishes

Name(s):JasonVida&PhilKraus

Competency:3.7.2Identify,describeandassemblematerialsforexteriorfinish,3.7.8Installexterior

sidingandcovering

   

DepthofKnowledgeLevel(CheckOne): Level1 Level2 Level3 Level4 

RevisedBloom’sTaxonomyLevel(CheckOne): Level1 Level2 Level3 Level4 Level5 Level6 

DOKLEVEL1 RBTLEVEL_____Question__x__Activity_____Project_____

Label all the siding parts on a givendrawing.

DOK LEVEL 2 RBTLEVEL_____Question_____Activity__x__Project_____

Cut and install j‐channel around awindow.

DOKLEVEL3 RBTLEVEL_____Question____Activity__x___Project_____

Completeamaterial estimate fora givensidingproject.

DOK LEVEL 4 RBTLEVEL_____Question_____Activity_____Project_x___

Analyze material and labor cost forinstallingtwo(2)typesofsidingmaterial.Choose thematerialyouwould likeyourcompanytospecializeinandjustifyyourchoice.

 

 

Notes:   ResourcesNeeded:    

Program:ConstructionTechnology Course:StructuralCoveringsandFinishes

Name(s):JasonVida&PhilKraus

Competency:3.7.5,3.7.6,3.7.7ExteriorTrim  

  

DepthofKnowledgeLevel(CheckOne): Level1 Level2 Level3 Level4 

RevisedBloom’sTaxonomyLevel(CheckOne): Level1 Level2 Level3 Level4 Level5 Level6 

DOKLEVEL1 RBTLEVEL_____Question__x__Activity_____Project_____

What are two (2) types of buildingmaterialusedforexteriortrim?

DOK LEVEL 2 RBTLEVEL_____Question_____Activity__x__Project_____

Calculate the amount of a specifiedmaterialneededtocase thewindowsforanentirehome.

DOKLEVEL3 RBTLEVEL_____Question____Activity_x____Project_____

Layout,cut,andinstallexteriortrimonaproject.

DOK LEVEL 4 RBTLEVEL_____Question_____Activity_____Project_x___

Install trim on a window using at leastthree (3)differentmethods. Create a listofprosandconstoeachmethod.Chooseastyleyouwouldliketomarketforyourcompany.

 

 

Notes:   ResourcesNeeded:    

 

Program:ConstructionTechnology Course:StructuralCoveringsandFinishes

Name(s):JasonVida&PhilKraus

Competency:3.7.9.Installexteriortrimaccessories(e.g.,gutters,downspouts,louvers,shutters,posts,railings,decorativemoldings).DepthofKnowledgeLevel(CheckOne): Level1 Level2 Level3 Level4

 

RevisedBloom’sTaxonomyLevel(CheckOne): Level1 Level2 Level3 Level4 Level5 Level6 

DOKLEVEL1 RBTLEVEL_____Question__x__Activity_____Project_____

What typeofwood is commonlyused toconstructadeck?Whenconstructingaguardrailtheheightshould be between ______” and ______”.Explainwhy.

DOK LEVEL 2 RBTLEVEL_____Question__x___Activity____Project_____

Prepare materials needed to install aporchordeckrailing?

DOKLEVEL3 RBTLEVEL_____Question__x__Activity_____Project_____

Layout, cut, and install a porch or deckrailing.

DOK LEVEL 4 RBTLEVEL_____Question_____Activity_____Project_x___

Designadeckthatmeetsresidentialcode.Order materials and organize a crew tocompletetheproject.

 

 

Notes:   ResourcesNeeded:  

Program:ConstructionTechnology Course:StructuralCoveringsandFinishes

Name(s):JasonVida&PhilKraus

Competency:3.9.1,3.9.2,3.9.5,3.9.6,3.9.12  

    

DepthofKnowledgeLevel(CheckOne): Level1 Level2 Level3 Level4 

RevisedBloom’sTaxonomyLevel(CheckOne): Level1 Level2 Level3 Level4 Level5 Level6 

DOKLEVEL1 RBTLEVEL_____Question__x___Activity____Project____

List three (3) different types of drywalland finish materials used to finishinteriorwallsurfaces.

DOK LEVEL 2 RBTLEVEL_____Question_____Activity__x__Project_____

Given a floor plan, calculate the numberofsheetsofdrywallrequiredtocompletethejob.

DOKLEVEL3 RBTLEVEL_____Question_____Activity_____Project__x__

Lay out, cut, and install drywall. Tape,mudandfinishtogivenspecifications.

DOK LEVEL 4 RBTLEVEL_____Question_____Activity_____Project__x__

Developaplan to finish the interiorwallsurface of a full bathroom. Providedifferent examples of different materialsyou can choose to use. Describe whatmakesoneinteriorwallfinishtechnologysuperior to another depending on thespecificareawithinthebathroom.

    

 

Notes:   ResourcesNeeded:    

Program:ConstructionTechnology Course:StructuralCoveringsandFinishes

Name(s):JasonVida&PhilKraus

Competency:3.9.3Describetheeffectsinsulation,vaporbarriers,andventilationcanhaveoncontrolling

moisture.3.9.4Installinsulationandvaporbarriersforwallandceilingfinishes.

   

DepthofKnowledgeLevel(CheckOne): Level1 Level2 Level3 Level4 

RevisedBloom’sTaxonomyLevel(CheckOne): Level1 Level2 Level3 Level4 Level5 Level6 

DOKLEVEL1 RBTLEVEL_____Question__x__Activity____Project_____

List anddefinedifferent types insulationusedinresidentialconstruction.

DOK LEVEL 2 RBTLEVEL_____Question_____Activity__x__Project_____

Compare and contrast different vaporbarrier options used for an insulationsysteminanexteriorwallstructure.

DOKLEVEL3 RBTLEVEL_____Question_____Activity_____Project__x__

Properly install fiberglass insulation,ventilation channel, and roof venting inthewallsandatticofyourmodule.

DOK LEVEL 4 RBTLEVEL_____Question_____Activity__x__Project_____

Given a scenario where an insulation/ventilation package has been installedincorrectly, investigate and drawconclusions as to the impact on the longtermintegrityofthestructure.

 

 

Notes:   ResourcesNeeded:    

Program:ConstructionTechnology Course:StructuralCoveringsandFinishes

Name(s):JasonVida&PhilKraus

Competency:3.9.7Layoutandinstallasuspendedceiling  

 

DepthofKnowledgeLevel(CheckOne): Level1 Level2 Level3 Level4 

RevisedBloom’sTaxonomyLevel(CheckOne): Level1 Level2 Level3 Level4 Level5 Level6 

DOKLEVEL1 RBTLEVEL_____Question__x___Activity____Project_____

List and define tools andmaterials usedinsuspendedceilings.

DOK LEVEL 2 RBTLEVEL_____Question_____Activity_x___Project_____

Calculate the required wall molding,hangers,wire,main tees,4’cross tees,2’crosstees,andceilingpanels, foragiven2x2gridceilingplan.

DOKLEVEL3 RBTLEVEL_____Question_____Activity____Project___x__

Properly install suspended ceilingaccordingtoagivenplan.

DOK LEVEL 4 RBTLEVEL_____Question_____Activity____Project_x____

Given one floor plan, draft two (2)different ceiling plans. Choose the mostefficient plan based on labor andmaterials.

 

 

Notes:   ResourcesNeeded:    

Program:ConstructionTechnology Course:StructuralCoveringsandFinishes

Name(s):JasonVida&PhilKraus

Competency:3.9.8Preparesubfloor,installbuildingpaper,andinstallunderlayment.  

3.9.9Layoutandinstallfinishedflooring 

DepthofKnowledgeLevel(CheckOne): Level1 Level2 Level3 Level4 

RevisedBloom’sTaxonomyLevel(CheckOne): Level1 Level2 Level3 Level4 Level5 Level6 

DOKLEVEL1 RBTLEVEL_____Question_x____Activity____Project_____

Listanddefine five (5)different typesoffinishedflooringmaterial.

DOK LEVEL 2 RBTLEVEL_____Question_____Activity__x__Project_____

Compare and contrast different types offinish flooring materials. Matchinstallation methods with differentflooringmaterials.

DOKLEVEL3 RBTLEVEL_____Question_____Activity____Project__x___

Givenaspecificscenario,choosethemostappropriate flooring material,underlayment,andinstallationmethod.

DOK LEVEL 4 RBTLEVEL_____Question_____Activity____Project__x___

Justify the need for use of properunderlayment for a sheet vinyl kitchenfloor. Explain what could happen in thefuture if the improper subflooringmaterialand installationmethod isused.What properties are important in aqualityunderlaymentandwhy?

 

 

Notes:   ResourcesNeeded:    

Program:ConstructionTechnology Course:StructuralCoveringsandFinishes

Name(s):JasonVida&PhilKraus

Competency:3.9.10Installinteriordoorunit,3.9.11Installinteriordoorandwindowtrim  

 

DepthofKnowledgeLevel(CheckOne): Level1 Level2 Level3 Level4 

RevisedBloom’sTaxonomyLevel(CheckOne): Level1 Level2 Level3 Level4 Level5 Level6 

DOKLEVEL1 RBTLEVEL_____Question__x__Activity_____Project_____

Label a drawing with correct termsrelatedtointeriordoorunits.

DOK LEVEL 2 RBTLEVEL_____Question_____Activity__x__Project_____

Givenspecs,developalistoftherequiredmaterials needed to properly install apre‐hung interior door including nails,shims, jamb extensions, casing andhardware.

DOKLEVEL3 RBTLEVEL_____Question_____Activity_____Project__x__

Properlyinstallapre‐hungdoorunitandbuilder’s hardware in a finished roughopeningthatisproperlyprepared.

DOK LEVEL 4 RBTLEVEL_____Question_____Activity_____Project__x__

You are facedwith installing a pre‐hungdoor in a rough opening that is notplumb, level or square. Analyze theproblem, and develop a process for theapproachyouwilltaketoinstallthedoorsothatitwilloperateproperly.

 

 

Notes:   ResourcesNeeded:     

   

Program:ConstructionTechnology Course:StructuralCoveringsandFinishes

Name(s):JasonVida&PhilKraus

Competency:3.9.13Applyfinishcoatings.  

  

DepthofKnowledgeLevel(CheckOne): Level1 Level2 Level3 Level4 

RevisedBloom’sTaxonomyLevel(CheckOne): Level1 Level2 Level3 Level4 Level5 Level6 

DOKLEVEL1 RBTLEVEL_____Question__x__Activity_____Project____

Whattypeoftextureisrecommendedonabathroomwall?

DOK LEVEL 2 RBTLEVEL_____Question_____Activity____Project__x__

Applyaknock‐downtextureandpaintaninteriorwall.

DOKLEVEL3 RBTLEVEL_____Question____Activity_____Project__x_

Prepareatleastthree(3)examplesofwallfinishesondrywallandpresentthemtoaclientverbally.

DOK LEVEL 4 RBTLEVEL_____Question_____Activity_____Project_x___

Research a given scenario of a building.Proposeasetofspecifications,coverings,andfinishes.Justifythereasoningforthefinishyouhaveproposed.

 

 

Notes:   ResourcesNeeded:    

Program:ConstructionTechnology Course:StructuralCoveringsandFinishes

Name(s):JasonVida&PhilKraus

Competency:3.9.15Installcabinetry,shelving,andrelatedhardware.  

  

DepthofKnowledgeLevel(CheckOne): Level1 Level2 Level3 Level4 

RevisedBloom’sTaxonomyLevel(CheckOne): Level1 Level2 Level3 Level4 Level5 Level6 

DOKLEVEL1 RBTLEVEL_____Question__x__Activity_____Project____

When hanging cabinets, screws aredriventhroughthesidesofthe____________whenattachingcabinetstogether.

DOK LEVEL 2 RBTLEVEL_____Question_____Activity____Project__x__

Install shelving in a closet so that thecomponents are plumbed, level, andsquare.

DOKLEVEL3 RBTLEVEL_____Question____Activity_____Project__x_

Installkitchencabinetsandhardwareinastructure.

DOK LEVEL 4 RBTLEVEL_____Question_____Activity_____Project_x___

Create a plan and recommend aprocedureforhangingkitchencabinetsina kitchen where the walls are notplumbed.

 

 

Notes:   ResourcesNeeded:    

Program:ConstructionTechnology Course:StructuralCoveringsandFinishes

Name(s):JasonVida&PhilKraus

Competency:6.1Developandpresentadesign,proposal,orconcept:6.1.1‐6.1.4  

  

DepthofKnowledgeLevel(CheckOne): Level1 Level2 Level3 Level4 

RevisedBloom’sTaxonomyLevel(CheckOne): Level1 Level2 Level3 Level4 Level5 Level6 

DOKLEVEL1 RBTLEVEL_____Question__x__Activity_____Project___

What is the purpose of a RIF in theconstructionprocess?

DOK LEVEL 2 RBTLEVEL_____Question_____Activity____Project__x__

Match the appropriate constructiondocumentwiththegivenscenario.

DOKLEVEL3 RBTLEVEL_____Question____Activity_____Project__x_

Attend a pre‐bid meeting and create amateriallistbasedonclientrequest.

DOK LEVEL 4 RBTLEVEL_____Question_____Activity_____Project_x___

Create a set of specifications for a smallproject. Work with other programs andparticipate in a formal proposal processandpresenttoapotentialclient.

 

 

Notes:   ResourcesNeeded:    

Program:ConstructionTechnology Course:StructuralCoveringsandFinishes

Name(s):JasonVida&PhilKraus

Competency:6.5.1Findsurfaceareaandvolumeforthree‐dimensionalobjects,accuratetospecified

levelofprecision

DepthofKnowledgeLevel(CheckOne): Level1 Level2 Level3 Level4 

RevisedBloom’sTaxonomyLevel(CheckOne): Level1 Level2 Level3 Level4 Level5 Level6 

DOKLEVEL1 RBTLEVEL_____Question__x__Activity_____Project_____

Performthefollowingcalculation:30’‐8”x41’‐2”x8”=_______Ft3

DOK LEVEL 2 RBTLEVEL_____Question_____Activity__x__Project_____

Given a foundation plan, calculate theCubic yards of concrete needed to pourthefootingsforthebuilding.

DOKLEVEL3 RBTLEVEL_____Question____Activity_____Project__x_

Givenamaterial allowance, researchandselect floor coverings appropriate for amulti‐room structure. Each room shouldhaveadifferenttypeoffloorcovering.

DOK LEVEL 4 RBTLEVEL_____Question_____Activity_____Project_x___

Complete a bid to construct thefoundation of a structure. Follow asubmittalprocedureandcompletethebidprocess.

 

 

Notes:   ResourcesNeeded:    

Program:ConstructionTechnology Course:StructuralCoveringsandFinishes

Name(s):JasonVida&PhilKraus

Competency:6.5.2‐6.5.4Applymeasurements,math,andproportionalreasoning  

  

DepthofKnowledgeLevel(CheckOne): Level1 Level2 Level3 Level4 

RevisedBloom’sTaxonomyLevel(CheckOne): Level1 Level2 Level3 Level4 Level5 Level6 

DOKLEVEL1 RBTLEVEL_____Question__x__Activity_____Project____

The 3‐4‐5 method is based on whatmathematicalequation?

DOK LEVEL 2 RBTLEVEL_____Question_____Activity____Project__x__

Usea3‐4‐5or6‐8‐10triangletocheckaroomforsquare.Isitsquare?Ifnot,howfaroutofsquareisit?

DOKLEVEL3 RBTLEVEL_____Question____Activity_____Project__x_

Given a site plan, lay out and stakebuildingcornersonasite.

DOK LEVEL 4 RBTLEVEL_____Question_____Activity_____Project_x___

Researchmodern survey equipment andGPS tools. Create a proposal for acompany to purchase this equipment.Justify the additional cost for theequipmentwithmanhourssaved.

 

 

Notes:   ResourcesNeeded: