Construction S4 YORKSHIRE PSBP · CONSTRUCTION MAINTENANCE/CLEANING ... It is assumed that all...
Transcript of Construction S4 YORKSHIRE PSBP · CONSTRUCTION MAINTENANCE/CLEANING ... It is assumed that all...
FFL 165.100 m01
FFL 161.500 m00
12
FFL 168.700 m02
FFL 172.300 m03
FFL 173.200 mPARAPET HEIGHT
3456789101112131415
Student access to social areas
R10/110 Vandal resistant 150x150mm squarerainwater pipes with hoppers
Enclosed Stair to provide controlled access tothe roof
L10/670A Brise Soliel
FaçadePanels
Refer to LOR spec for further details
Access to kitchen
11a 10a 5a5b 3a13a
Movement joint
FFL 165.100 m01
FFL 161.500 m00
AB
FFL 168.700 m02
FFL 172.300 m03
FFL 173.200 mPARAPET HEIGHT
CDEFGHJKLMain car parkPedestrian access to main entrancesSports centre beyond
L30/580B Cantilevered self-supporting handrail
R10/110 Vandal resistant 150x150mm squarerainwater pipes with hoppers
FaçadePanels
Refer to LOR spec for further details
H20/150F Coloured infill panel
Enclosed Stair to provide controlled access tothe roof
L10/330A PPC top hung outward openingcasement windows with fixed centralpane and louvred panel above toconnect to ventilation system
Student access to social areas Student access to social areas Student access to social areasSecondary escape from sixth formsocial room
05_002
44
05_0023344
33
33
44
Fundermax Jade Green0662 NT
Fundermax Petrol Green0617 NT
Fundermax Dark Green0059 NT
SAFETY, HEALTH AND ENVIRONMENTALINFORMATION
In addition to the hazards/risks normally associated with the types of workdetailed on this drawing, note the following:
CONSTRUCTION
MAINTENANCE/CLEANING
DECOMMISSIONING/DEMOLITION
It is assumed that all works will be carried out by a competent contractorworking, where appropriate, to an approved method statement
Date
DesignedScale
Drawing Title
Project Title
Date Date Date
Drawn Checked Authorised
Original Size
Drawing Number Revision
Drawing Status
Client
Suitability
Rev. Date Description By Chk'd App'd
Milli
met
res
100
100
www.atkinsglobal.comCopyright © Atkins Limited (2013)
DO NOT SCALE
A1
Tel:Fax:
As indicated
GA Elevations Sheet 2of2
YORKSHIRE PSBPOakbank School
CD
Nov 2014
CD
03.03.2015
JE
22.05.15
PG
22.05.15
OS_ALA_Z1_XX_DR_A_05_002 C06
Construction S4Atkins Limited3100 Century WayThorpe ParkLeedsLS15 8ZB
+44 (0)113 306 6000+44 (0)113 306 6002
SCALE 1 : 15005_002
East Elevation3
SCALE 1 : 15005_002
North Elevation4
- 03.03.2015 Issued for CP review CD CD PG
P01 22.05.2015 Reissued for CP review ref to notes on drawing CD JE PG
C01 25.06.2015 Issued for approval CD JE PG
C02 31.07.2015 Lookalike glaing amended curtainwall updated in line with structure CD JE PG
C03 24.09.2015 Colour reference added to panels CD JE PG
C04 02.03.2015 Coloured panels updated RND LM JE
CO5 04.05.2016 LMMovement joint added JEJR
CO6 26.07.2016 RNDRoof top plant added. PGLM