Construction S4 YORKSHIRE PSBP · CONSTRUCTION MAINTENANCE/CLEANING ... It is assumed that all...

1
FFL 165.100 m 01 FFL 161.500 m 00 1 2 FFL 168.700 m 02 FFL 172.300 m 03 FFL 173.200 m PARAPET HEIGHT 3 4 5 6 7 8 9 10 11 12 13 14 15 Student access to social areas R10/110 Vandal resistant 150x150mm square rainwater pipes with hoppers Enclosed Stair to provide controlled access to the roof L10/670A Brise Soliel Façade Panels Refer to LOR spec for further details Access to kitchen 11a 10a 5a 5b 3a 13a Movement joint FFL 165.100 m 01 FFL 161.500 m 00 A B FFL 168.700 m 02 FFL 172.300 m 03 FFL 173.200 m PARAPET HEIGHT C D E F G H J K L Main car park Pedestrian access to main entrances Sports centre beyond L30/580B Cantilevered self-supporting handrail R10/110 Vandal resistant 150x150mm square rainwater pipes with hoppers Façade Panels Refer to LOR spec for further details H20/150F Coloured infill panel Enclosed Stair to provide controlled access to the roof L10/330A PPC top hung outward opening casement windows with fixed central pane and louvred panel above to connect to ventilation system Student access to social areas Student access to social areas Student access to social areas Secondary escape from sixth form social room 05_002 05_002 3 4 Fundermax Jade Green 0662 NT Fundermax Petrol Green 0617 NT Fundermax Dark Green 0059 NT SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION In addition to the hazards/risks normally associated with the types of work detailed on this drawing, note the following: CONSTRUCTION MAINTENANCE/CLEANING DECOMMISSIONING/DEMOLITION It is assumed that all works will be carried out by a competent contractor working, where appropriate, to an approved method statement Date Designed Scale Drawing Title Project Title Date Date Date Drawn Checked Authorised Original Size Drawing Number Revision Drawing Status Client Suitability Rev. Date Description By Chk'd App'd Millimetres 100 10 0 www.atkinsglobal.com Copyright © Atkins Limited (2013) DO NOT SCALE A1 Tel: Fax: As indicated GA Elevations Sheet 2of2 YORKSHIRE PSBP Oakbank School CD Nov 2014 CD 03.03.2015 JE 22.05.15 PG 22.05.15 OS_ALA_Z1_XX_DR_A_05_002 C06 Construction S4 Atkins Limited 3100 Century Way Thorpe Park Leeds LS15 8ZB +44 (0)113 306 6000 +44 (0)113 306 6002 SCALE 1 : 150 05_002 East Elevation 3 SCALE 1 : 150 05_002 North Elevation 4 - 03.03.2015 Issued for CP review CD CD PG P01 22.05.2015 Reissued for CP review ref to notes on drawing CD JE PG C01 25.06.2015 Issued for approval CD JE PG C02 31.07.2015 Lookalike glaing amended curtainwall updated in line with structure CD JE PG C03 24.09.2015 Colour reference added to panels CD JE PG C04 02.03.2015 Coloured panels updated RND LM JE CO5 04.05.2016 LM Movement joint added JE JR CO6 26.07.2016 RND Roof top plant added. PG LM

Transcript of Construction S4 YORKSHIRE PSBP · CONSTRUCTION MAINTENANCE/CLEANING ... It is assumed that all...

Page 1: Construction S4 YORKSHIRE PSBP · CONSTRUCTION MAINTENANCE/CLEANING ... It is assumed that all works will be carried out by a ... to an approved method statement Date Scale Designed

FFL 165.100 m01

FFL 161.500 m00

12

FFL 168.700 m02

FFL 172.300 m03

FFL 173.200 mPARAPET HEIGHT

3456789101112131415

Student access to social areas

R10/110 Vandal resistant 150x150mm squarerainwater pipes with hoppers

Enclosed Stair to provide controlled access tothe roof

L10/670A Brise Soliel

FaçadePanels

Refer to LOR spec for further details

Access to kitchen

11a 10a 5a5b 3a13a

Movement joint

FFL 165.100 m01

FFL 161.500 m00

AB

FFL 168.700 m02

FFL 172.300 m03

FFL 173.200 mPARAPET HEIGHT

CDEFGHJKLMain car parkPedestrian access to main entrancesSports centre beyond

L30/580B Cantilevered self-supporting handrail

R10/110 Vandal resistant 150x150mm squarerainwater pipes with hoppers

FaçadePanels

Refer to LOR spec for further details

H20/150F Coloured infill panel

Enclosed Stair to provide controlled access tothe roof

L10/330A PPC top hung outward openingcasement windows with fixed centralpane and louvred panel above toconnect to ventilation system

Student access to social areas Student access to social areas Student access to social areasSecondary escape from sixth formsocial room

05_002

44

05_0023344

33

33

44

Fundermax Jade Green0662 NT

Fundermax Petrol Green0617 NT

Fundermax Dark Green0059 NT

SAFETY, HEALTH AND ENVIRONMENTALINFORMATION

In addition to the hazards/risks normally associated with the types of workdetailed on this drawing, note the following:

CONSTRUCTION

MAINTENANCE/CLEANING

DECOMMISSIONING/DEMOLITION

It is assumed that all works will be carried out by a competent contractorworking, where appropriate, to an approved method statement

Date

DesignedScale

Drawing Title

Project Title

Date Date Date

Drawn Checked Authorised

Original Size

Drawing Number Revision

Drawing Status

Client

Suitability

Rev. Date Description By Chk'd App'd

Milli

met

res

100

100

www.atkinsglobal.comCopyright © Atkins Limited (2013)

DO NOT SCALE

A1

Tel:Fax:

As indicated

GA Elevations Sheet 2of2

YORKSHIRE PSBPOakbank School

CD

Nov 2014

CD

03.03.2015

JE

22.05.15

PG

22.05.15

OS_ALA_Z1_XX_DR_A_05_002 C06

Construction S4Atkins Limited3100 Century WayThorpe ParkLeedsLS15 8ZB

+44 (0)113 306 6000+44 (0)113 306 6002

SCALE 1 : 15005_002

East Elevation3

SCALE 1 : 15005_002

North Elevation4

- 03.03.2015 Issued for CP review CD CD PG

P01 22.05.2015 Reissued for CP review ref to notes on drawing CD JE PG

C01 25.06.2015 Issued for approval CD JE PG

C02 31.07.2015 Lookalike glaing amended curtainwall updated in line with structure CD JE PG

C03 24.09.2015 Colour reference added to panels CD JE PG

C04 02.03.2015 Coloured panels updated RND LM JE

CO5 04.05.2016 LMMovement joint added JEJR

CO6 26.07.2016 RNDRoof top plant added. PGLM