Construction Projects in Turkmenistan

Ashgabad Drainage – Communication Tunnel

2009 - 2012

Page 2: Construction Projects in Turkmenistan Ashgabad Drainage – Communication Tunnel 2009 - 2012.

Task

Lowering of groundwater level in most flooded areas of the city.

Collection and transport drainage water and sewage outside the boundaries of the city by gravity through the Karakum River

Installation of utilities – water pipes, electrical cables, low-voltage lines inside the tunnel.

Page 3: Construction Projects in Turkmenistan Ashgabad Drainage – Communication Tunnel 2009 - 2012.

General Information

Tunnel construction is carried out under complex hydro geological conditions in the city with already developed system of communication .

Seismicity of the area – up to 10 points The length of the tunnel with the outer

diameter of 6m – 16500km The length of the tunnel with the outer

diameter of 3.5m – 13820km There are 31 Construction Chamber which

were constructed by the method of “wall in the ground”

Page 4: Construction Projects in Turkmenistan Ashgabad Drainage – Communication Tunnel 2009 - 2012.

Construction of Drainage-communication tunnel

Page 5: Construction Projects in Turkmenistan Ashgabad Drainage – Communication Tunnel 2009 - 2012.

Fragments of construction chambers

Page 6: Construction Projects in Turkmenistan Ashgabad Drainage – Communication Tunnel 2009 - 2012.
Page 7: Construction Projects in Turkmenistan Ashgabad Drainage – Communication Tunnel 2009 - 2012.

Typical ChamberTotal 21

Page 8: Construction Projects in Turkmenistan Ashgabad Drainage – Communication Tunnel 2009 - 2012.

Karakum River Underground Passage

Page 9: Construction Projects in Turkmenistan Ashgabad Drainage – Communication Tunnel 2009 - 2012.

Construction Chamber

Page 10: Construction Projects in Turkmenistan Ashgabad Drainage – Communication Tunnel 2009 - 2012.

Impervius

Waterproofing & Anti-corrosion

Page 11: Construction Projects in Turkmenistan Ashgabad Drainage – Communication Tunnel 2009 - 2012.

Application Technique Impervius Anti-corrosion

Coatings

Page 12: Construction Projects in Turkmenistan Ashgabad Drainage – Communication Tunnel 2009 - 2012.

Work in Progress 2009

Page 13: Construction Projects in Turkmenistan Ashgabad Drainage – Communication Tunnel 2009 - 2012.

Training 2009

Page 14: Construction Projects in Turkmenistan Ashgabad Drainage – Communication Tunnel 2009 - 2012.