Construction Projects in Turkmenistan
Ashgabad Drainage – Communication Tunnel
2009 - 2012
Task
Lowering of groundwater level in most flooded areas of the city.
Collection and transport drainage water and sewage outside the boundaries of the city by gravity through the Karakum River
Installation of utilities – water pipes, electrical cables, low-voltage lines inside the tunnel.
General Information
Tunnel construction is carried out under complex hydro geological conditions in the city with already developed system of communication .
Seismicity of the area – up to 10 points The length of the tunnel with the outer
diameter of 6m – 16500km The length of the tunnel with the outer
diameter of 3.5m – 13820km There are 31 Construction Chamber which
were constructed by the method of “wall in the ground”
Construction of Drainage-communication tunnel
Fragments of construction chambers
Typical ChamberTotal 21
Karakum River Underground Passage
Construction Chamber
Impervius
Waterproofing & Anti-corrosion
Application Technique Impervius Anti-corrosion
Coatings
Work in Progress 2009
Training 2009