Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides...

54
4 (2010) Report Construction Projects 1 of 54 American Chamber of Commerce in Egypt - Business Information Center Construction Projects Sector - Q4 2010 Report

Transcript of Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides...

Page 1: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

4 (2010) Report

Construction Projects

1 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 2: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Copyright ©2010, American Chamber Of Commerce in Egypt (AmCham). All rights reserved. Neither the content of the Tenders Alert Service (TAS) nor any part of it may be reproduced, sorted in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of the American Chamber of Commerce in Egypt.In no event shall AmCham be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits.

Non-Tenders Section

Special RemarksThe Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders, big projects and important news.

- Business News - Projects Awards - Projects in Pre-Tendering Phase - Privatization and Investments - Published Co. Performance - Loans & Grants - Fairs and Exhibitions

Copyright Notice

List of sub-sectors Page

Administrative Buildings 3Airports 5Bridges 6Cultural Buildings & Clubs 7Earthmoving Works 8Hospitals 10Hotels & Tourist Development 11Integrated works 22Irrigation & Drainage Canals 32Parks & Landscaping 29Renovation, Treatment & Paints 31Residential Buildings 34River Ports 42Roads Construction 42Schools & Other Educational Buildings 46Sea Ports 47Steel Structure, Possible Prefab 48

This report includes tenders with bid bond greater than L.E. 50,000 and valuable tenders without bid bond

Tenders may be posted under more than one sub-sector

- Client

- Generating Sector

- Supply Jobs

(the sector of the client who issued the tender and who would pay for the goods & services ordered)

- Client

- Generating Sector

- Integrated Jobs (Having a certain engineering component) - sorted by

Tenders Section

2 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 3: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Administrative Buildings - Tenders SectionIntegrated JobsGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Banking, Finance & Insurance

Alexandria Governorate, Alexandria West District Administration, The CashierElevation of industrial blocks at different locations within the craftsmanship complex in New Minshiya District.

50,000 LE

Dec 25, 2010 Jan 10, 2011

BDH - Bank for Development & Housing, Technical Affairs Div., The Cashier,Construction of five (residential) towers at the Bank's Al Noqrashi Residential Towers Project in Zagazig City each comprising of a ground floor, eleven repeated floors apart from services rooms.

750,000 LE

Oct 01, 2010 Oct 18, 2010

Benha University, the Engineering Dept., The CashierConstruction of (a) an educational & administrative building (phase 1) on the University's land in Kafr Saad, also (b) painting of the Social Science Faculties Building in Benha.

280,000 & 18,000 LE

Nov 24, 2010 Dec 02, 2010

EEAA - Egyptian Environment Affairs AgencyCompletion of fences & administrative buildings at the so called Rock Forest Natural Protectorate. 50,000 LE

Dec 26, 2010 Jan 10, 2011

Egyptian Takaful Insurance Co. SAE, The CashierRevamping & equipping of the company's head office at the Engineers Administrative Tower on Gameet El Dowal St. as per specs & drawings.

50,000 LE

Dec 15, 2010 Jan 11, 2011

General Authority for New Urban Societies, New Salheyya City Development AgencyConstruction of a residential building for the City Development Agency & of other two residences for the Districts Mayors.

75,000 LE

Nov 08, 2010 Dec 09, 2010

3 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 4: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Administrative Buildings - Tenders SectionIntegrated JobsGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Banking, Finance & Insurance

Matrouh Governorate, the Housing DirectorateConstruction of the Educational Directorate's building in Matrouh. 120,000 LE

Nov 02, 2010 Nov 14, 2010

National Org. for Social Insurance, the Government Sector Employees Fund, the Supplies Dept.Conducting the required (a) revamping of West Alexandria Social Insurance Zone Administration, (b) Edfou Pensions Dispensing Outlet in Asswan Governorate & (c) construction of a Social Insurance Complex in Al Obour City in Kalioubiya Governorate. Deadlines 11/28, 11/29 & 11/30/2010.

12,000 & 15,000 & 80,000

LE

Oct 17, 2010 Nov 30, 2010

Administrative Buildings - Non Tenders Section Type Description Date Published

Projects in Pre-Tendering PhaseRed Sea Ports Authority has pledged L.E. 30 million budget for the revamping of Safaga & Hurghada Sea Ports. That was reported in the media indicating that L.E. 15 million of the figure will back the extension of Safaga Port by adding 65,000 M2 area thereto, also construction of a 12,000 M2 passengers terminal & VIP lounge. Project also provides for the building of a 44 meters high guidance tower, a double floor administrative building & a 300 meters long road to link the port with the main roads. The other L.E. 15 million will back the revamping of Hurghada port. It provides for a 230 meters prolongation of the port dock of 10 meters depth to enable receiving long tourist vessels.

Nov 19, 2010

4 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 5: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Airports - Non Tenders Section Type Description Date Published

Loans & GrantsEgypt is getting close to obtain approval of the ADB - African Development Bank on a $ 300 million soft loan to part finance a third passengers terminal project at Sharm El Sheikh Airport. That was announced by Mrs. Fayza Abul Naga, Minister of State for International Cooperation, after its meeting with a high ranking delegation of the Bank during their recent visit to Cairo.

Oct 01, 2010

Three loans valued $ 307 million were extended by AFESD - Arab Fund for Economic & Social Development to part finance three large sized projects. That was reported in the media indicating that they include $ 170 million to part finance Benha power station for repayment over 19.5 years including six years grace & bearing 3 % annual interest. They also include another $ 87 million loan to part finance a natural gas pressure control station in Dahshour serving Upper Egypt gas pipeline for repayment over 25.5 years including 5 years grace & bearing 3 % annual interest. They also include a $ 50 million loan to part finance the revamping & extension of Hurghada International Airport for repayment over 20.5 years including 5 years grace.

Dec 10, 2010

Two banking consortia have extended two syndicated loans valued L.E. 1.7 billion to part finance the extension of Hurghada airport & the revamping of terminal building No. 2 at Cairo airport. The first loan worth L.E. 850 million, for repayment over 12 years, was arranged by a consortium grouping Banque Misr as lead manager, NBE - National Bank of Egypt & NSGB - National Societe Generale Bank. Contributions were put at L.E. 350 million, L.E. 350 million & L.E. 150 million respectively. Loan will part finance a new passengers terminal at Hurghada Port involving L.E. 2 billion investments. The second loan of equal value was extended equally by NBE & Banque Misr for repayment over 12 years & is allocated to revamp Terminal II at Cairo Airport involving L.E. 2.4 billion investments to raise the terminal capacity to handle annually 7.5 million passengers up from 3.5 million at present. Worth indicating is that the World Bank has earlier extended $ 280 million for the later project.

Nov 28, 2010

Projects in Pre-Tendering PhaseEgyptian Armed Forces revealing impressive civil contribution to the country's forthcoming socio-economic development over the next few years worth almost L.E. 4.7 billion (not to overlook other billions pumped in other civil sectors known to each Egyptian extending from bread to health care & from sports infrastructure to vocational training a.o.) The figure involves L.E. 1.5 billion for the reclamation & plantation of 100,000 feddans in Toshki at L.E. 15,000 per feddans development cost including the construction of 1,000 housing units for the employees accommodation, L.E. 1 billion to extend electricity to the project, L.E. 1.8 billion for the Upper Egypt Highway & L.E. 400 million for Sohag Airport. On top comes the construction of ten Cancer Treatment Centers in the different governorates.

Oct 31, 2010

5 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 6: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Bridges - Tenders SectionIntegrated JobsGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Airports & Ports

Alexandria & Dekheila Port Authority, The CashierMaintenance & raising efficiency of two lighthouses in El Mex (including the high one & the low one), also of the so called blind lighthouse & the bridge leading thereto at Alexandria Port.

50,000 LE

Nov 29, 2010 Jan 27, 2011

Assuit Governorate, the Housing DirectorateConstruction of two flyover bridges for pedestrians including (a) one across El Galaa St. & El Geish St. & (b) another across El Mallah Canal & the Ring Road within El Arbe'in District.

40,000 & 50,000 LE

Oct 23, 2010 Nov 08, 2010

General Dept. for Horizontal Expansion & Irrigation Projects in Central EgyptConstruction of (a) a protective dam on Faqira Valley within Beni Oqba Village in Markaz Beba, in Beni Suif Governorate & (b) a bridge for pedestrians at Kilo 303.600 across Bahr Yousef Canal in Fayyoum Governorate.

50,000 & 25,000 LE

Oct 13, 2010 Oct 27, 2010

General Dept. for Port Said Drainage in Ismaileyya, The CashierConstruction of an overhead concrete bridge on piles across Bahr El Baqar old drainage canal at Kilo 7.800.

100,000 LE

Oct 10, 2010 Oct 25, 2010

Ministry of Water Resources & Irrigation, the Grand Reservoirs & Barrages Div.Request of offers from specialized companies for the rehabilitation/ replacement of the bridge's roof & the maintenance of Al Bustan Barrage at Kilo 28.500 on Noubariya Canal.

60,000 LE

Oct 17, 2010 Nov 03, 2010

Bridges - Non Tenders Section Type Description Date Published

Projects in Pre-Tendering PhaseL.E. 460 million overhead bridge project launched in Kalabsha, in Asswan Governorate. That was announced by Asswan Governor, General Mustafa El Sayyed, indicating the scheme will link villages on both sides of the Nile. It will be located to the north of Komombo City. Meanwhile the Governor has inaugurated two ferries to also ease Nile crossing built by Alex Shipyard.

Dec 11, 2010

L.E. 60 million flyover bridge project was launched in Al Qanater Al Khayriya to reduce traffic jam at Al Salam Square & the city entrances. That was announced by the City Mayor, Mr. Mustafa Bayyoumi, indicating that the scheme was endorsed by both Kalioubiya Governor & Minister of Transport. Implementing agency is GARBLT - General Authority for Roads, Bridges & Land Transport. The bridge will be 500 meters long. Works on the project is scheduled to start by the end of 2011.

Dec 24, 2010

Cultural Buildings & Clubs - Tenders SectionIntegrated JobsGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Local Administration Authorities

Damietta Governorate, Youth & Sports Directorate

6 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 7: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Damietta Governorate, Youth & Sports DirectorateRevamping of the indoors sports hall in Ras El Barr. 50,000 LE

Oct 13, 2010 Oct 25, 2010

Cultural Buildings & Clubs - Non Tenders Section Type Description Date Published

Privatization and InvestmentsAn unnamed entity has offered for sale or lease a luxurious sports/ social club occupying 21,000 M2 area at a most distinguished location at the second tourist village in 6th October Governorate. Interested parties are to contact Tel. 02- 38365872, or Mobile 010 - 2202853 / 6866917.

Nov 05, 2010

Projects Awards Four companies and consortia were declared winner of contracts to implement phase 3 of Egypt's Grand Museum, one of the largest museums worldwide. That was reported in the media indicating that offers were evaluated by Hill/ Ehaf consultancy alliance under Jaica guidelines (of Japan). Winners include B - Six of Belgium in alliance with OCI, Acciona of Spain in alliance with CCC (of Greece), Ritani of Italy in alliance with ARABCO - Arab Contractors (of Egypt) and Bouygues of France. The works are scheduled for completion in 24 months after which the Museum would be ready for inauguration. Regretfully no mention was given to values or alliances' structures.

Nov 03, 2010

Projects in Pre-Tendering PhaseFour international & Egyptian companies are now on the final short list of bidders to implement phase three of Egypt's Grand Museum in Giza for completion in 26 months. That includes Arabco - Arab Contractors & OCI - Orascom Construction Industries. Final award of the $ 600 million contract is expected in December 2010 next. That was announced by Mr. Farouk Hosni, Egypt's Minister of Culture. Project was earlier identified as that of the Century. It occupies 117 feddans land in Giza.

Oct 24, 2010

L.E. 24 million budget funds endorsed in the 2011/ 2012 plan by Eng. Hassan Saqr, Head of the National Sports Council, for the construction of El Arish Sports Stadium. That excludes the cost of a large sized plasma screen & cost of the construction of a school for sports talented. That was announced by Mr. Mustafa Head of the Central Investment Dept. at the Council indicating that Eng. Saqr has requested the preparation of a feasibility study to build a sports unions' complex in El Arish City.

Nov 23, 2010

Earthmoving Works - Tenders SectionIntegrated JobsGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Airports & Ports

Damietta Port Authority, Central Dept. for Finance & AdministrationConducting the required (a) construction & pavement of the yard behind dock No. 15 of 16,000 M2 area and (b) dredging, excavation & deepening of the aquatic area opposite the extension of the offshore services' dock.

75,000 & 15,000 LE

Oct 29, 2010 Nov 22, 2010

Egyptian General Authority for Coastal ProtectionProtection of Port Said City Beach, to the east of El Gamil Airport. 250,000 LE

Oct 20, 2010 Nov 08, 2010

General Authority for New Urban Societies, New Qena City Development Agency, The CashierProtecting the City from flood risks by building 4 stopper dams & one directing dam. 200,000 LE

Oct 12, 2010 Nov 21, 2010

General Authority for the High & Asswan Dam, the Contracts & Purchases Dept.Completion of phase II of the deepening of a 6,885 meters long section of Toshki floods overflow path (canal) between Kilo 3.265 & Kilo 10.150.

200,000 LE

Dec 12, 2010 Jan 04, 2011

7 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 8: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Completion of phase II of the deepening of a 6,885 meters long section of Toshki floods overflow path (canal) between Kilo 3.265 & Kilo 10.150.

200,000 LE

Dec 12, 2010 Jan 04, 2011

General Dept. for Asswan IrrigationConducting the required (a) covering of a 120 meters long section of Sheikh Mahmoud Canal within Edfou West Irrigation Engineering Dept., (b) widening & deepening of a 2,650 meters long section of Wadi El Sa'ayda Main Canal within Wadi El Sa'ayda Irrigation Engineering Dept.

15,000 & 60,000 LE

Oct 25, 2010 Nov 04, 2010

General Dept. for Horizontal Expansion & Irrigation Projects in Central EgyptConstruction of (a) a protective dam on Faqira Valley within Beni Oqba Village in Markaz Beba, in Beni Suif Governorate & (b) a bridge for pedestrians at Kilo 303.600 across Bahr Yousef Canal in Fayyoum Governorate.

50,000 & 25,000 LE

Oct 13, 2010 Oct 27, 2010

General Dept. for Irrigation Development Projects in Central Delta, The CashierRevamping of mesqas within Mit Yazid Zone at the catchment area of Kafr El Sheikh Irrigation Engineering Dept. along sections of (a) El Shamarqa New Canal, (b) Kom El Rozz Old Canal & (c) revamping of mesqas' intakes along El Shamarqa New Canal, El Sharfa Canal & Mubasher El Zawya Canal under funding from the World Bank. Deadlines 1/29, 1/30 & 1/31/2011.

90,000 & 120,000 & 20,000

LE

Dec 18, 2010 Jan 31, 2011 Job goes under funding from the

World Bank.

General Dept. for Irrigation Development Projects in Central Egypt, MinyaRevamping of mesqas (small irrigation canals) at Al Kheyari First Zone serving 776 feddans within Markaz Abu Qorqas in Menia Governorate.

60,000 LE

Dec 18, 2010 Jan 02, 2011

General Dept. for Port Said Drainage in Ismaileyya, The CashierDredging & purging of a 12.1 Km long section of Bahr El Baqar Old Drainage Canal using suction units & dredgers during FY 2010/ 2011 & 2011/ 2012.

60,000 LE

Nov 21, 2010 Dec 04, 2010

General Dept. for Qalioubeyya DrainageMechanical dredging & purging of canals at subordinated locations also removal of aquatic weeds from them.

100,000 LE

Oct 15, 2010 Oct 21, 2010

General Dept. for Underground Water in Southern SinaiConstruction of three flood stopper dams in (a) Om Sheiba Valley, (b) Tiba Valley & (c) Slaf Valley. Deadlines 1/2, 1/3 & 1/4/2011.

27,000 & 28,000 & 57,000

LE

Dec 23, 2010 Jan 04, 2011

General Dept. for Underground Water Resources in Northern SinaiRenovation of the path of El Arish Valley in the section from its crossing with Ali Ibn Abi Taleb St. till its crossing with the Ring Road inside El Arish City.

97,000 LE

Oct 14, 2010 Nov 01, 2010

Port Said Governorate, the Finance DepartmentConducting the required (a) revamping of Port Said beach, also (b) repaving of roads within Al Zohour District.

150,000 & 23,000 LE

Dec 26, 2010 Jan 09, 2011

Potable Water Co. of Greater Cairo, Contracts & Purchases Dept.Purging & maintenance of water intakes & sludge outlets serving subordinated potable water stations along the River Nile, Ismailiya Canal & El Sharkawiya Canal.

70,000 LE

Nov 06, 2010 Nov 22, 2010

8 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 9: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Earthmoving Works - Non Tenders Section Type Description Date Published

Loans & GrantsKD 300,000 grant (about $ 1million) extended by the KFESD - Kuwait Fund for Economic & Social Development to finance a comprehensive study for the revamping of Ngee Hamadi Eastern Canal, its branches & hydraulic structures along it. An agreement on the above was recently signed in Cairo by Mrs. Fayza Abul Naga, Minister of State for International Cooperation & representatives of the KFESD.

Dec 23, 2010

Projects in Pre-Tendering PhaseA 100 % Egyptian company is now under establishment to involve with gold exploration & exploitation capitalized at L.E. 300 million. That was announced by Mr. Wasfi Amin Wasef, Head of the General Branch for Jewels (and Precious Stones) at the Federation of the Chambers of Commerce indicating that relevant constitution drafts were already prepared & submitted to the Chamber for legal endorsement. Mr. Wasef revealed that the company will be supported by the Islamic Chamber of Commerce & Industry (Chaired by Sheikh Saleh Kamel) via its recent established affiliate, Foras Co. He noted that upon completion of the project's feasibility study, an application for a license will be submitted to the General Authority for Mineral Wealth, reporting to the Ministry of Petroleum & Mining. Meanwhile Mr. Wasef revealed that all nine companies involved with gold exploration & exploitation in the country are foreigners.

Nov 04, 2010

After having increased its area by 67.7 Km2 area & supply of the required pumps, Sebeika Salt Pond in El Arish, in North Sinai, would increase its annual production to 2 million tons. That was reported in the media indicating that North Sinai Governor, accompanied with high ranking Governorate's Executives, have attended the operations' start of six feeding pumps at the pond to serve salt precipitation basins at Zera'ee Al Deeb Zone of 1,000 M3/ hour discharge capacity each. Report noted that the recovered salt is of the highest product purity & quality since the pond depends on direct natural water feeding from the Mediterranean. The Governorate has further inaugurated 8 (new) salt packaging lines. The Governor noted that he would communicate with the Minister of State for Environment to endorse further extension of the pond since they are located within Al Zaraniq natural protectorate. Meanwhile the Governorate is trying to get approval of the concerned authorities to (exclusively) allocate an offshore dock at El Arish Sea Port to export the recovered salt to Arab & European markets.

Nov 08, 2010

9 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 10: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Hospitals - Tenders SectionIntegrated JobsGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Health Care

Mansoura University Hospitals, the Stores Dept.Renovation of (a) the Hospital's front side walls, also (b) the Accidents & Knees Surgeries Divisions. 50,000 & 100,000 LE

Dec 14, 2010 Dec 26, 2010

Mansoura University, the Internal Medicine Specialist HospitalImplementing of the extension building of the Internal Medicine Specialist Hospital during FY 2010/ 2011.

500,000 LE

Nov 04, 2010 Nov 21, 2010

Ministry of Endowment, Al Doat HospitalRevamping of four floors of the Hospital's building. 50,000 LE

Oct 11, 2010 Oct 24, 2010

Hospitals - Non Tenders Section Type Description Date Published

Loans & GrantsEgypt is negotiating with the World Bank on a $ 1.3 billion package of loans & credits to back projects in the different sectors during the next 5 years 2011 to 2015. That was announced by Mrs. Fayza Abul Naga, Minister of State for International Cooperation, indicating the said facilities will be allocated to projects in the energy, agriculture, health care, irrigation & education sectors. Meanwhile media reports noted that Egypt & the World Bank have signed, a week earlier, agreements valued $ 820 million to extend soft loans in the energy sector including $ 600 million for North Giza power station project & $ 220 million for a wind energy recovery project on the Suez Gulf.

Nov 10, 2010

The Employees Housing Fund of the Ministry of Petroleum is negotiating with several banks to get finance for its so called Sky Medical Complex located behind Gasco building in New Cairo City to serve the Sector's employees. Main contractor for the project, involving more than L.E. 500 million investments, is Odelga of Austria. The fund has initially requested L.E. 500 million loans & media reports predicted both NBE - National Bank of Egypt & Banque Misr have expressed interest to review the issue. N.B. More details may be searched at www.odelga.at

Oct 24, 2010

Privatization and InvestmentsGeneral Syndicate of Land Transport Workers has requested best offers & proposals in a public auction for the leasing & exploitation, for 9 years, a hospital complete with all related equipment & installations, identified as 1st May specialist Hospital. Hospital occupies 855 M2 area & located on the Cotton Ginnery St., next to the Military Secondary School in Benha. It comprises a basement, a ground floor, also four repeated upper floors. Detailed conditions are to get from Auctioneers' Office Ahmed Hanafi Mahmoud & Abdel Ra'ouf Ibrahim, 2 Sherif St., Al Liwaa Building, Cairo, Tel. 02 - 23962625/ 7 or Fax. 02 - 23953781 against L.E. 250. Auction will be held on 12/29/2010 at 1 p.m. & L.E. 50,000 cash deposit is requested for participation.

Dec 23, 2010

Hotels & Tourist Development - Tenders SectionIntegrated JobsGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Cooperative Societies

Fayyoum Governorate, the General Secretariat

10 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 11: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Request of best offers & proposals in a public auction for the leasing & exploitation of the Oasis Motel viewing Qaroun Lake.

50,000 LE

Dec 11, 2010 Jan 05, 2011

Housing Cooperative Society for Banks Employees, The CashierRequest of offers from companies, investors & real estate development companies for the co-exploitation, financing & construction of a tourist village on the North West Coast between Kilo 73.500 to Kilo 73.750.

300,000 LE

Dec 12, 2010 Jan 01, 2011

Matrouh Governorate, the General SecretariatConducting the required (a) completion of the decorative fence at the City's eastern entrance of 3 Km length, (b) construction of a shopping complex for sheep on El Salloum Road, (c) completion of El Hana Resort on El Cornish Road & (d) paving of Al Obayyed Road & the entrance of Al Qasr Beach. Deadlines 1/12, 1/13, 1/16 & 1/18/2011.

27,000 & 10,000 & 17,000 & 100,000

LE

Dec 30, 2010 Jan 18, 2011

Minya Governorate, the General SecretariatRequest of best offers & proposals in public auctions for the leasing & exploitation, for 25 years of two public parks including (a) an 18 feddans public park on the east side of the Nile with direct Nile view, also (b) another 5,250 M2 park directly viewing the Nile within the Local Municipality of Markaz & City of Maghagha.

250,000 & 100,000 LE

Oct 09, 2010 Nov 01, 2010

Construction of 50 chalets, one swimming pool & related annexes. 200,000 LE

Dec 31, 2010 Jan 06, 2011

North Sinai Governorate, the General Secretariat, the Finance Dept., El ArishRequest of best offers & proposals in a public auction for the leasing & exploitation, for 99 years, of a land lot in Al Qarantina Land in El Arish City to build & operate a services, commercial & recreational project on it.

100,000 LE

Dec 31, 2010 Jan 20, 2011

Suez Governorate, the Contracts & Purchases Dept.Request for prequalification applications regarding forthcoming public auctions for the leasing & exploitation, for 25 years, of (a) Samar Palace Hotel, Casino & Chalets in Port Tawfik & (b) the Sand Beach Plaje on Suez/ Sukhna Road.

N/A LE

Nov 03, 2010 Dec 02, 2010

11 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 12: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Hotels & Tourist Development - Non Tenders Section Type Description Date Published

Business News A Qatari source, quoted in the media, has revealed some details on Egyptian companies & Egyptian Qatari Joint ventures now operating in the Emirate. They are said to include ARABCO - Arab Contractors, Hassan Dorra Group, Ebeid Group for Contracting, OCI - Orascom Construction Industries, the Qatari Development Co. for Contracting, Egybel Co. for Aluminum & the Doha Cables Co. On the other hand the source noted that Qatari investors have acquired several hotels in Sharm El Sheikh & Hurghada. He further revealed that Barwa Co. (of Qatar) has acquired 1,950 feddans land in New Cairo City for development while Al Deyar Co. is now building a hotel project on the Nile Cornish in Cairo. N.B. Earlier media reports indicated that Qatari investments in Egypt are estimated at $ 454 million.

Dec 12, 2010

Egypt's Minister of Tourism has predicted UK tourists to Egypt to increase by 50% in 2011. That was announced by the Egyptian Official after attending the 31st session of the WTM - World Tourist Market held recently in London indicating that UK tourists to Egypt rank second after Russian tourists. Meanwhile the Egyptian official stressed the fact that the UK is the third largest recipient of Egyptian Exports after Germany & Italy. The Egyptian Minister noted that UK investments in Egypt at present exceed $ 20 billion. N. B. It is greatly hoped that the UK government abolish an earlier applied fee on UK tourists heading towards Egypt (obviously applied in favor of alternative destinations). To which extent the development may persuade hotels & restaurants to review & revamp their menus to better match UK tastes & food patterns, that remains to be seen.

Nov 12, 2010

Egypt's Minister of Tourism, Mr. Zoheir Garana, has predicted tourists visiting Egypt in 2010 to reach 15 million & to generate $ 13 billion revenues. While no mention was given to tourist nights, the Minister noted that the number of tourists involves a 15 % growth above its level in 2009. Meanwhile Mr. Garana revealed that the main challenge now facing the sector is the availability of skilled manpower & that drove the Ministry to allocate $ 160 million funds to train the Sector's employees.

Nov 30, 2010

Hotels occupancy rate in Luxor reached 99 % in the high season while getting closer to Christmas & New Year Holidays. That was announced by Luxor Governor, Dr. Samir Farag, indicating that Luxor airport is receiving tenth of flights each day full with tourists. The governor noted that number of tourists to the historic city from East Europe, the Americas, China & India has been tangibly increasing above their levels in previous years. Other traditional tourists visiting the City originate from France, the UK, Germany, Spain, Italy, Japan & Scandinavia.

Nov 21, 2010

Mr. Montaser Abu Ghali seems in agreement with Savita Co. for Tourist Investments to sell his Savita Hotel in Sharm El Sheikh, now under mortgage in favor of NBE - National Bank of Egypt against L.E. 500 million to settle his indebtedness to both NBE & Banque Misr estimated at L.E. 470 million. That was reported in the media indicating that the NBE is financing the sale deal in favor of Savita Egypt. Media reports noted that Mr. Montaser Abu Ghali has finalized since two years phase 1 of his debts restructuring with NBE valued then at L.E. 400 million.

Nov 07, 2010

Semiramis Hotels Co. SAE has placed an IPO to acquire 100 % of the shares of the Arab Investments Co. for Development SAE involving 2.3 million shares at $ 38 per share. Deal is valued $ 87.4 million & the IPO is valid till 12/28/2010. Deal is financed by $ 35.48 million own resources of Semiramis Hotels Co & $ 52 million loan from CIB - Commercial International Bank which would affect the financial structure of the targeted company.

Nov 29, 2010

Tourists having visited Egypt (till date) in 2010 have reached 14 million and are projected to reach 15 million by the end of the year marking 18 % growth above their level in 2009.That was announced, low tone, by Egypt's Minister of Tourism indicating the development is mainly backed by a 70 % increase of Russian tourists above their level in the comparison period in 2009. The Minister noted that during the first half of 2010 some 1.5 million Russian tourists have visited Egypt. The Minister has further revealed that during the first half of 2010 some 6.9 million tourists have visited the country and that compares with 5.7 million tourists received during the same half of 2009. The period witnessed also a 21 % increase of European tourists. Meanwhile the Minister disclosed that during the first 8 months Japanese tourists increased by 36 % above their level in the comparison period and the increase reached ( for the same period) 46 % for Chinese tourists with reports predicting Chinese tourists to reach 100,000 by the end of 2010. Meanwhile media reports noted that tourist revenues in 2009 totaled $ 11 billion.

Nov 03, 2010

Week after Arabtec of the UAE has forged an (unexclusive) alliance with Amer Group, giant Emaar of the UAE announced it has entered into cooperation agreements with both (giants) OCI - Orascom Construction Industries & ARABCO - Arab Contractors. The later was announced by highly seen Mr. Mohamed Al Abbar, Chairman & CEO of Emaar Real Estate (of UAE & Egypt) indicating that the company's (actual) investments in Egypt at present reached L.E. 7.2 billion, part of total estimated planned investments in the country put at the equivalent of $ 5 billion. N.B. Observers and business circles expect more of such alliances and marriages between Egyptian and Gulf Groups to be reached in the next stage documenting a strong future potential for such alliances to benefit all parties involved. Present visit of Eng. Mohamed Rashid, Egypt's Minister of Trade & Industry, to both Qatar & the UAE, represents a strong constructive contribution to strengthen such a trend. N.B. Interesting were Mr. Al Abbar statements on Emaar readiness to participate on forth coming PPP (Public Private Partnership) projects in the next stage.

Nov 03, 2010

12 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 13: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Hotels & Tourist Development - Non Tenders Section Type Description Date Published

Loans & GrantsAn alliance grouping NBE - National Bank of Egypt & Banque Misr seems competing with the CIB on a deal to arrange an L.E. 600 million syndicated loan in favor of SECON - Saudi Egyptian Construction Co. The loan will fiancé a tourist residential project planned by the company on Maadi Cornish comprising two high rise towers, 23 floors each, of which one to host a suites' hotel and the other designed as a luxurious residential hotel tower. Worth indicating is that SECON is a 50 / 50 joint venture between the Egyptian & the Saudi Government.

Nov 07, 2010

NBE - National Bank of Egypt giving initial approval to extend L.E. 150 million loan to the Eastern Company for Tourist Establishments to complete its 5 stars Al Baron Hotel in Sahl Hashish on the Red Sea. The hotel, comprising 200 rooms & suites. Is scheduled for completion in 2011. Worth indicating is that the company owns other two (Baron) hotels in Heliopolis, Cairo, and in Sharm El Sheikh.

Nov 21, 2010

NBE - National Bank of Egypt has endorsed L.E. 150 million loan in favor of Misr Hotels to part finance the revamping of the Ritz Carlton Nile Hotel (Ex Nile Hilton) The loan is for repayment over 8 years & complements an earlier released L.E. 350 million for the same project. Revamping provides for the construction of an underground cars park to host up to 280 vehicles, also of a 13 floors extension of the hotel comprising 327 rooms.

Nov 28, 2010

13 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 14: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Hotels & Tourist Development - Non Tenders Section Type Description Date Published

Privatization and InvestmentsA housing cooperative society has offered for sale a 623,795 M2 empty land lot duly registered & located at kilo 59 to 61 on the North Coast with 170 meters sea view. Lot is divisible in four lots all duly licensed and equipped with public utilities. The Society is identified as Rowwad Riviera Village Society for Cooperative Housing. Detailed conditions are to get from the Society's Offices at 8 (A), Block No. 3, Cinema buildings, Youssef Abbass St., Nasr City, Cairo, Tel. 02 - 22618279/ 24051203. Auctioneers Office in charge is that of Mr. Ibrahim Hassan, 22 Khairat St., Lazoughly Cairo, Tel. 02 - 27953008, Mobile 010 - 1736260, Mobile 011 - 3060686. Auction will be held on 10/20/2010 at the Society's Offices. Bid bond requested is L.E. 1 million, alternatively L.E. 250,000 for each lot.

Oct 08, 2010

After having acquired 68.4% of shares in IFO - Arab Investment Co. for Reconstruction, owner of Sheraton Montaza Hotel (among other lucrative assets), Semiramis Hotels Co. is said to be trying to buy out the remaining 31.6% stake in IFO under $ 87.4 million deal. That was reported in the media indicating that Semiramis Hotels has already submitted its offer to the FCA - Financial Control Authority for evaluation & endorsement prior to its publishing in the media (during the next two days). N.B. Deal seams falling under prompt time restrictions, particularly considering the coming (pretty long) Bairam Feast holidays. To which extent the deal is, low tone, linked to other deals, now also in the final conclusion phase on the domestic market that remains to be seen.

Nov 08, 2010

Amer Group placing 20% capital increase shares in IPO on the Stock Exchange worth L.E. 1.4 billion. That was announced by the Chairman of Beltone, Mr. Alaa Sab'e , acting as advisor to the offering, indicating that the increase represents 20% of the Group's actual capital (obviously put at L.E. 7 billion). Offering aims at financing the group's investment expansions at home and abroad. Measure comprises an 80% prime offering targeting financial institutions & mega investors worth L.E. 930 million. Chairman of Amer Group, Mr. Mansour Amer predicted share price to range L.E. 2.6 to L.E. 3.6, while revealing the group's intentions to soon penetrate the Chinese market & open branches of the Group therein.

Nov 07, 2010

An unnamed entity has offered for sale in Dahab City a 51 rooms 4 stars hotel with direct sea view completely equipped and has its own diving center. The hotel is said to be operating efficiently and holds a license for the construction of annexed villas. Payment facilities are offered. Interested parties may contact Mobile 012 - 5109007.

Dec 16, 2010

An unnamed entity is offering for sale 200,000 M2 land lot in Ein Al Sukhna having direct sea view. For inquiries interested parties may contact Mobile 011 - 2151475. Dec 31, 2010

An unnamed entity is offering to lease, for 11 years, a 4 stars tourist yacht, exclusively licensed to operate along the Suez Canal path. Yacht comprises two floors & a sun deck, an internal air conditioned restaurant of 100 seats, Yacht is a main attraction of Port Said visitors. For site visit & submission of offers contact Tel. 066 - 3333707, Mobile 016 - 0408408, E Mail [email protected] & web site www.canalcruiseportsaid.com Deadline to submit offers is set for 12/20/2010.

Dec 09, 2010

Egyptian Arab Land Bank has offered for sale two land lots in Dhabaa (on the North Coast) & in Hurghada on the Red Sea. The first lot involves about 35 feddans area in Markaz El Dhabaa at Kilo 181 on Alex/ Matrouh Coastal road with 250 meters Sea view. It is registered property. The second lot involves about 6,150 M2 area in Hurghada on the Airport Road, corner of Al Higaz St. next to the Police Buildings & opposite Mubarak (Housing) projects 5 & 8. Detailed conditions are to get from the Bank's branch in Mohandesin, Giza, 78 Gameet El Dowal St., alternatively from Hurghada branch or from the Bank's Real Estate Finance Services Center at 11 Al Mashhadi St., off Kasr El Nile St., Cairo (Tel 02 - 33389214 or Mobile 010 - 7711175), against L.E. 250. Conditions are also available from Auctioneers Office of Mr. Nader Khozam, 80 Mosaddak St., Dokki, Giza, Tel. 02 - 33383266, Fax. 02 - 33370347 or Mobile 010 - 9990009.

Dec 17, 2010

Fayyoum Governorate, the General Secretariat, has offered for lease & tourist revamping & exploitation, for 25 years, the New Panorama Hotel on Qaroun Lake. Detailed conditions are to get from the General Secretariat's offices against L.E. 550. Deadline to put offers & a bid bond of L.E. 50,000 is set for 11/30/2010. Applicants should evidence past performance with 4 stars tourist establishments. N.B. Lots of industrial, mining & tourist investments are planned in Fayyoum which may reasonably support the above lead.

Nov 08, 2010

In execution of a judgment of Cairo Economic Court a compulsory auction was announced to sell Joy Village Hotel of the Arab Co. for Hotels in Giza under a base price of L.E. 40 million. Judgment is executed in favor of the Egyptian Arab Lands Bank against the Arab Hotels Co. Hotel occupies 2,105.5 M2 area & comprises a basement, a ground floor & five repeated upper floors. Detailed conditions are to get from the concerned real estate agent, Chartered Accountant Mohamed Mohamed El Sayyed, Tel. 03 - 5457830 or Mobile 012 - 3111418. Auction will be held on 1/2/2011 (i.e. subject to 10 days notice) & an L.E. 0.5 million bid bond is requested for participation.

Dec 23, 2010

Suez Governorate has extended the deadlines given to investors to qualify for auctions to lease & exploit (a) Samar Palace Hotel, Casino & Chalets & (b) Sand Beach Plage on Sukhna road to now become 1 / 2 & 1/3/2011 instead of 12 /1 & 12/2/2010. Specs fees are L.E. 2,000 & L.E. 1,000. For inquiries contact Tel. 062 - 3331041/ 3.

Nov 30, 2010

The Arab Center for Consultancy Projects' evaluation and promotion has offered for co exploitation or sale a hotel of a distinguished location now under construction in Southern Sinai. A techno economical project study is said to be available. For inquires contact the Center offices at 43 Al Montana St., Eliopoulos, Cairo, Tel. 02 - 26322818, Mobile 011 - 3779212 or 014 - 4437078 or E Mail [email protected].

Nov 28, 2010

Upon a judgment of Ismailiya Economic Appeal Court in favor of PBDAC against heirs of Mr. Ali Hassan Khalil, Nobia Tourist Village occupying 3,000 M2 area in Dahab, in South Sinai is offered for compulsory sale in a public auction. Auction base price is L.E. 8,350,000. Auction will be held 1/5/2010 at the court premises & L.E. 400,000 cash deposit is requested for participation. For inquiries contact the Real Estate Agent in Charge Mr. Hani Abu Ahmed with offices at 40 Sherif St., Cairo, Mobile 012 - 3245313.

Dec 21, 2010

14 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 15: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Hotels & Tourist Development - Non Tenders Section Type Description Date Published

Projects Awards Hilton International has signed an agreement to manage Hilton Makadi Resort in Hurghada (its fourth Hotel in Hurghada) as of the second quarter of 2012. The resort, to comprise 676 hotel rooms, is owned & built by. Afaq for Tourist Development, affiliated to the Egyptian Engineers Group. The resort is strategically located on Makadi bay, 30 Km to the south of Hurghada & 35 Km from Hurghada airport. Resort disposes on a unique 400 meters long sandy beach.

Dec 23, 2010

Rocco Forte Collection Chain of the UK was awarded the management contract of Luxor historic hotel viewing the Pharaonic Luxor Temple. That was reported in the media indicating that the hotel is now being revamped under L.E. 150 million investments. Owner is EGOTH, reporting to HOTEC. The hotel was built in 1880 & hosted most antiquities exploration missions.

Dec 23, 2010

15 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 16: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Hotels & Tourist Development - Non Tenders Section Type Description Date Published

Projects in Pre-Tendering Phase$ 65 million project was announced for the revamping of the old Meriden Hotel in Garden City, Cairo. That was reported in the media quoting Mr. Abdel Aziz Al Shahil, Chief Advisor to the Saudi owner indicating that works involve new & modern internal designs, also increasing the number of rooms to 1,000.

Dec 25, 2010

A 3,000 M2 rest house at Kilo 120 on Cairo/ Alex Desert Road offered for lease. Property comprises 24 hotel rooms & employees living quarters. Interested parties may contact Mobile 010- 6000021/ 1711010/ 1711011.

Nov 05, 2010

A 45/ 55 Egyptian UAE strategic alliance was announced between Mansour Amer Group and Arabtec Construction capitalized initially at L.E. 100 million to involve with mega projects in Egypt. That was reported in the media indicating that the new company will start works immediately on an L.E. 300 million tourist development project in Sukhna for completion in 9 months. The new entity is identified as Arabtec Egypt for Contracting. Worth indicating is that Arabtec Holding is one of the largest construction contractors in the UAE where it has completed mega projects including the Dubai Tower (the tallest in the world), Emirates Palace Hotel & Abu Dhabi Center for Exhibitions.

Oct 18, 2010

Al Ta'amir Al Seyahi Co., reporting to HOTAC - Holding Co. for Tourism & Cinema has launched a highly valued plan to extend its 5 stars Moevenpick Pyramids Hotel to increase its capacity from 240 rooms at present to 650 rooms over the n ext few years. That was announced by General Fouad Sanad, Chairman & Managing Director of the company, indicating that first phase of the said extensions provide for the construction of 148 new rooms & suites, a swimming pool, a main restaurant & a kitchen to go under L.E. 90 million investments for completion in 2012. Meanwhile the company has renewed its management contract with Moevenpick International Chain for seven years.

Nov 09, 2010

Amer Group announced it would soon start works on Porto Matrouh project with its first phase scheduled for inauguration in summer 2011. Project provides for the implementation of an international summer resort on the Mediterranean coasts similar to those now existing in Cyprus. Meanwhile Chairman of the group, Mr. Mansour Amer, revealed another unique university project capitalized at L.E. 5.5 billion to be built in Al Alamein in cooperation with California University to host up to 10,000 students .This is the first involvement of the California University in the Middle East. The project will start with 3 faculties for engineering, for arts and for economics. Mr. Amer has further revealed that his group will exploit distinguished locations of its projects along the Mediterranean to involve with wind energy recovery farms.

Dec 14, 2010

Amer Group, a leading real estate firm, said it won a bid for a 2.8 million M2 land to the south of Cairo to implement its Porto Fayyoum Project on it. Deal on the land was concluded with the TDA - Tourism Development Authority. That was reported in the media quoting a statement of the company. Media noted that an IPO placed by the company on the Stock Exchange in November 2010 last was heavily oversubscribed.

Dec 15, 2010

Egyptian Arab Land Bank SAE has launched L.E. 100 million project to build a tourist resort in Hurghada on a land lot owned by Al Aqari Co. for Tourist Development which in turn is 98 % owned by the bank. Lot is located behind Hilton Long Beach Resort. That was reported in the media quoting Mr. Khaled El Shazli, Advisor to the Bank Chairman.

Dec 12, 2010

Emaar Group of the UAE is committed to raise its investments in Egypt real estate development sector, is now put at L.E. 5 billion. That was announced by Mohamed Al Abbar, Emaar Chairman, after his recent meeting with Egypt's Prime Minister, Dr. Ahmed Nazif, The executive noted the diversification of his company's projects in Egypt, including Up-town Cairo, on Moqattam Hill, Marasi on the North West Coast & in New Cairo City. The executive revealed plans to build a conferences center & a hotel in the Smart Village.

Oct 26, 2010

Matrouh Governorate has endorsed the constitution of six now projects to engage with hotels & tourist development involving L.E. 1.03 billion investments. That was reported in the media indicating they include an L.E. 375 million project in El Dhabaa to host 1,772 hotel rooms & another L.E. 320 million project in Sidi Abdel Rahman to host further 950 hotel rooms. Meanwhile the Governorate's Investment Committee has licensed other six investment projects involving further L.E. 279.5 million investments including four tourist development projects in Matrouh & along the North West Coast, an educational project & a service project.

Dec 18, 2010

Misr Hotels is to soon release tender documents for the third & last stage of the rehabilitation of Nile Ritz Carlton Hotel (Ex Nile Hilton) for completion by the first half of 2012. That was announced by Mr. Fathi Nour, Chairman of the Company indicating that relevant offers are requested to be submitted in two months time. Stage provides for final finishing works of the Hotel. The Executive revealed that an L.E. 87.8 million contract for the project's second stage was awarded to OCI - Orascom Construction Industries with works on it to start in the next seven weeks.

Nov 09, 2010

16 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 17: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Hotels & Tourist Development - Non Tenders Section Type Description Date Published

Published Co. PerformanceMisr Hotels Co., reporting to HOTAC - Holding Co. for Tourism & Cinema, capitalized at L.E. 49.5 million, fully paid up, has posted for FY 2009/ 2010 some L.E. 7.9 million net profits before taxes on L.E. 14.3 million gross operating revenues among other revenues. Figures compare with L.E. 107.3 million net profits before taxes posted in FY 2008/ 2009 on L.E. 73.1 million gross operating revenues among other revenues. Net working capital as at 6/30/2010 declined to L.E. 321.6 million down from L.E. 363.8 million a year ago. Misr Hotels Co., reporting to HOTAC - Holding Co. for Tourism & Cinema, Worth highlighting is that customers accounts, receivable notes & other debit balances as at 6/30/2010 increased sharply to L.E. 199.5 million up from L.E. 66.3 million a year ago while cash on hand & at banks declined also sharply to L.E. 147 million down from L.E. 365.9 million a year ago & that was obviously behind the decline of credit interests during FY 2009/ 2010 to L.E. 16.7 million down from L.E. 31.2 million in 2008/ 2009. Long term liabilities as at 6/30/2010 increased slightly to L.E. 17.7 million up from L.E. 16.7 million a year ago. With regards shareholders net equity as at the same day so it has also declined to L.E. 461.3 million down from L.E. 576.2 million a year ago. Chairman & Managing Director is Mr. Fathi Nour.

Oct 24, 2010

Palm Hills Co. SAE announced its consolidated financial statements for the third quarter of 2010 showed 15 % increase in net profits to reach L.E. 153.7 million backed by strong sales & service revenues. Sales of new housing units during the quarter reached L.E. 1.78 billion marking 53 % increase above their level in the same quarter of 2009. That was supported by strong sales of units on the North Cost during the quarter valued L.E. 1.3 billion. N.B. With both economy & tourism catching up the company stands reasonable future potential. N.B. More details may be searched at www.palmhillsdevelopments.com

Nov 11, 2010

Integrated works - Tenders SectionIntegrated JobsGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Airports & Ports

Al Azhar University, the Business & Engineering Consultancy CenterCompletion & finishing of (a) the administrative building of Al Shari'aa & Law Faculty for Male in Nasr City, (b) the Library building at the same faculty, also (c) the lecture halls building at the Faculty of Commerce for Male, also in Nasr City. Deadlines 11/8, 11/9 & 11/10/2010.

25,000 & 35,000 & 50,000

LE

Oct 23, 2010 Nov 10, 2010

Al Fath Co. for Contracting, Trade & Construction - Shetat & Co, affiliated to Al Fath Group, The CashierRequest of offers from specialized contractors for various works pertaining to Asfour Specialist Hospital Project including (a) insulation layers, (b) plastering works, (c) internal & external painting works, (d) flooring works by using ceramic tiles, porcelain tiles, marble & granite, also vinyl, also (e) walls cladding by using ceramics, marbles, granite, Corian & MDF (wood). Deadlines 1/2, 1/3, 1/4, 1/5 & 1/6/2011.

31,500 & 58,000 & 30,000 & 170,000 & 135,000

LE

Dec 17, 2010 Jan 06, 2011

Request of offers from specialized contractors for various works pertaining to Asfour Specialist Hospital Project including (a) false suspended ceilings, (b) aluminum works, (c) built separators, (d) doors works, (e) cretal works & (f) GRC works for front side walls. Deadlines 1/9, 1/10, 1/11, 1/12, 1/13 & 1/13/2011.

66,000 & 158,500 & 5,500 & 112,000 & 6,750 & 12,000

LE

Dec 17, 2010 Jan 13, 2011

Alexandria & Dekheila Port Authority, The CashierMaintenance & raising efficiency of two lighthouses in El Mex (including the high one & the low one), also of the so called blind lighthouse & the bridge leading thereto at Alexandria Port.

50,000 LE

Nov 29, 2010 Jan 27, 2011

Assuit University, the Establishments Dept.Implementing the infrastructure for Assuit University Extensions Project in New Assuit City including main roads works, sanitary drainage works, potable water networks & auxiliaries, also electrical & lighting works. Job is indivisible.

700,000 LE

Nov 01, 2010 Nov 29, 2010

Banque Misr, the Engineering Affairs Department

17 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 18: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Construction of (a) an alternative residence for El Wasta Branch & (b) warehouses & steel sheds at the Bank's warehousing yard in Beni Suif.

N/A LE

Oct 27, 2010 Nov 23, 2010

Dakahleyya Governorate, the Housing & Utilities DirectorateConstruction of a residential, commercial & administrative tower on Al Shennawi Land in Mansoura.

150,000 LE

Dec 29, 2010 Jan 24, 2011

Damietta Governorate, Youth & Sports DirectorateConstruction of an indoors sports hall within Damietta Sports Stadium. 250,000 LE

Dec 29, 2010 Jan 12, 2011

Dar El Maaref Est., The CashierConstruction of phase one of the Establishment's new print shop & warehouses building (foundations & concrete works) on lot No. 45 along the Central Industrial Corridor in 6th October City.

50,000 LE

Oct 25, 2010 Nov 09, 2010

East Delta Co. for Transport & Travel, the Projects Dept.Construction of an onshore port in Ismailiya. 50,000 LE

Dec 02, 2010 Dec 20, 2010

Egyptian General Authority for Coastal ProtectionProtection of Port Said City Beach, to the east of El Gamil Airport. 250,000 LE

Oct 20, 2010 Nov 08, 2010

El Tayaran [ Aviation ] Sports ClubRequest of offers to implement phase 1 of the Club's new branch in New Cairo City. 100,000 LE

Dec 24, 2010 Jan 15, 2011

GAEB - General Authority for Educational Buildings, Port Said Zone Administration, The CashierConstruction of a Technology Development Center in Port Said for completion in 12 months. 71,250 LE

Dec 02, 2010 Dec 13, 2010

GAEB - General Authority for Educational Buildings, Sohag Zone Administration, The CashierConstruction of a Technology Development Center at Al Kawthar District in Sohag. 50,000 LE

Dec 27, 2010 Jan 09, 2011

General Authority for New Urban Societies, New Qena City Development Agency, The CashierProtecting the City from flood risks by building 4 stopper dams & one directing dam. 200,000 LE

Oct 12, 2010 Nov 21, 2010

General Dept. for Horizontal Expansion & Irrigation Projects in Central EgyptConstruction of (a) a protective dam on Faqira Valley within Beni Oqba Village in Markaz Beba, in 50,000 & 25,000 LE Oct 13, 2010 Oct 27, 2010

18 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 19: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Beni Suif Governorate & (b) a bridge for pedestrians at Kilo 303.600 across Bahr Yousef Canal in Fayyoum Governorate.

General Dept. for Underground Water in Southern SinaiConstruction of three flood stopper dams in (a) Om Sheiba Valley, (b) Tiba Valley & (c) Slaf Valley. Deadlines 1/2, 1/3 & 1/4/2011.

27,000 & 28,000 & 57,000

LE

Dec 23, 2010 Jan 04, 2011

Gharbeyya Governorate, the Finance Dept.Construction of a car parks complex in Saberbay. This is a repeated tender. 170,000 LE

Dec 25, 2010 Jan 09, 2011

Housing Cooperative Society for Banks Employees, The CashierRequest of offers from companies, investors & real estate development companies for the co-exploitation, financing & construction of a tourist village on the North West Coast between Kilo 73.500 to Kilo 73.750.

300,000 LE

Dec 12, 2010 Jan 01, 2011

Mansoura University, Damietta Branch, The CashierImplementing phase one of the Educational Complex (civil works) within the University Branch Premises in New Damietta City.

500,000 LE

Oct 07, 2010 Oct 13, 2010

Mansoura University, General Dept. for Engineering AffairsConstruction of the new building to host the Faculty of Arts in Mansoura. 800,000 LE

Oct 17, 2010 Oct 28, 2010

Mansoura University, Scientific Computing Center, The CashierCompletion of the Center's extension building. 50,000 LE

Nov 04, 2010 Nov 25, 2010

MDEPC - Middle Delta Electricity Production Co. - Dakahliya Branch, The CashierRequest of offers from local & international contractors regarding the civil works package pertaining to Benha 750 MW combined cycle power station under funding from the SDF - Saudi Development Fund.

2,000,000 $

Dec 19, 2010 Mar 14, 2011 Job goes under funding from the

SDF - Saudi Development Fund

Ministry of Judicial Affairs, the Courtyards Building Fund,, The Cashier,Completion of Tamie El Amdid Courtyard Building. 200,000 LE

Nov 23, 2010 Dec 09, 2010

Minya Governorate, the General SecretariatCompletion of Mubarak Conferences & Celebrities Center, construction of chalets & buildings, also maintenance & revamping of the existing establishments.

350,000 LE

Oct 08, 2010 Oct 14, 2010

Conducting the required beautification & revamping of streets, also construction & maintenance of buildings within the Governorate.

280,000 LE

Oct 18, 2010 Oct 31, 2010

19 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 20: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Construction of 50 chalets & swimming pools among other works. 180,000 LE

Oct 18, 2010 Nov 03, 2010

Nile Co. for Pharmaceuticals & Chemical IndustriesConducting the required civil, electrical & air conditioning works pertaining to amendments of the first & second floor of the Blood Compensations Solutions Division.

50,000 LE

Nov 27, 2010 Dec 25, 2010

NOPWASD - National Org. for potable water & Sanitary Drainage, the Contracts & Purchases Dept.Request of offers from international specialized companies registered at the Contractors Federation (correspondent membership) to join an Egyptian contracting company (classified at ederation) to undertake the civil works for the extension of both Armant potable water plant in Luxor Governorate (from 34,000 to 68,000 M3/ day) & Kafr El Zayyat water treatment plant (from 26,000 to 60,000 M3/ day) under funding from AFESD - Arab Fund for Economic & Social Development under 2 contracts. < Giza >

200,000 each LE

Nov 06, 2010 Feb 20, 2011 Job goes under funding from AFESD

- Arab Fund for Economic & Social

Development.

North Sinai Governorate, the Housing DirectorateConstruction of three pilot villages within both Markaz El Arish & Markaz Beer El Abd under three contracts. Deadlines 10/21, 10/24 & 10/25/2010.

82,000 each LE

Oct 09, 2010 Oct 25, 2010

Potable Water Co. of Greater Cairo, Contracts & Purchases Dept.Purging & maintenance of water intakes & sludge outlets serving subordinated potable water stations along the River Nile, Ismailiya Canal & El Sharkawiya Canal.

70,000 LE

Nov 06, 2010 Nov 22, 2010

Sohag University,, General Dept. for Central PurchasesConstruction of the veterinary hospital building with related annexes. 200,000 LE

Dec 11, 2010 Dec 22, 2010

20 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 21: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Integrated works - Tenders SectionConsultancyGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Banking, Finance & Insurance

CIB - Commercial International Bank, Projects & Establishments Dept., The CashierRequest for registration of consultancy offices & general contractors regarding the bank's different projects in 2011.

N/A LE

Dec 17, 2010 Jan 09, 2011

Integrated works - Non Tenders Section Type Description Date Published

Business News A Qatari source, quoted in the media, has revealed some details on Egyptian companies & Egyptian Qatari Joint ventures now operating in the Emirate. They are said to include ARABCO - Arab Contractors, Hassan Dorra Group, Ebeid Group for Contracting, OCI - Orascom Construction Industries, the Qatari Development Co. for Contracting, Egybel Co. for Aluminum & the Doha Cables Co. On the other hand the source noted that Qatari investors have acquired several hotels in Sharm El Sheikh & Hurghada. He further revealed that Barwa Co. (of Qatar) has acquired 1,950 feddans land in New Cairo City for development while Al Deyar Co. is now building a hotel project on the Nile Cornish in Cairo. N.B. Earlier media reports indicated that Qatari investments in Egypt are estimated at $ 454 million.

Dec 12, 2010

Cairo Festival City, a % 550 million project of Al Futtaim Egypt, is to be soon inaugurated. That was announced by the Ministry of Trade & Industry assuring its full support to large malls & commercial chains projects in the country as part of its plan to raise total investments in the internal trade sector to the equivalent of $ 6.1 billion. On his side Head of the Internal Trade Development Authority noted that the government targets to double the sector annual growth rate from 6 % to 12 %. He stressed the above is going parallel to other government plans to boost annual commodity exports from L.E. 92 billion to L.E. 200 billion over the coming three or four years. He noted that Macro Cash & Carry Chain has opened its second outlet earlier in 2010 & it plans to open other 12 branches spread country wide in the next few years involving Euro 250 million investments.

Dec 06, 2010

Heliopolis Co. for Housing Reconstruction has announced the increase of its issued & paid up capital from L.E. 74,171,400 to L.E. 111,257,100 fully covered from brought forward profits. Measure will be activated by the issuance of 37,085,700 free shares to original shareholders at a rate of half a share for each existing one share. Issue was endorsed by the company's irregular shareholders meeting held 10/9/2010. Release of the new shares will be executed as of 12/2/2010.

Nov 14, 2010

In an attempt to intensify Egypt's commercial presence in Africa a plan was drawn to revamp 19 branches owned by El Nasr Co. for Import & Export at influential countries in the Continent. That was announced by General Mohamed Yousef, Chairman of the Holding Co. for Maritime & Land Transport, indicating that the plan also provides for selecting young & qualified executives to undertake the management of those branches.

Oct 26, 2010

Ten companies have so far drawn conditions for the steel rebars & billets' licenses released by the IDA - Industrial Development Authority & the deadline to apply is set for 11/25/2010. That was announced by Minister Eng. Mohamed Rashid indicating that the offered licenses involve L.E. 2 billion investments to annually produce 2 million tons of steel rebars & one million tons of billets. He noted that 30 % of relevant projects will be located in Upper Egypt with the remaining 70 % & in the Delta & Lower Egypt. The companies include (a) 6th October Co. for Light (Metallic) Sectors, (b) Al Marakebi Steel, (c) Ezz Factories, (d) IIC - Industrial Investments Co. for Managing Steel Factories, (e) Pyramids Co. for Steel Rolling, (f) Port Said National Steel, (g) El Nahda for Metallic Industries, (h) Rashed for Iron & Steel, (i) the Sponge Iron & Steel Co. & (j) National Steel.

Nov 17, 2010

Unprecedented increases are witnessed on land prices with sea view in Ras El Barr City, in Damietta Governorate. In a recent public auction held by the Governorate to sell 11 lots, all having sea view, a 217 M2 lot at the City's first zone on Street No. 24 was sold for L.E. 9.6 million & another lot of similar area in the same zone, on Street No. 12 was soled for L.E. 8.5 million marking prices ranging L.E. 39,000 to L.E. 44,200.

Nov 02, 2010

Week after Arabtec of the UAE has forged an (unexclusive) alliance with Amer Group, giant Emaar of the UAE announced it has entered into cooperation agreements with both (giants) OCI - Orascom Construction Industries & ARABCO - Arab Contractors. The later was announced by highly seen Mr. Mohamed Al Abbar, Chairman & CEO of Emaar Real Estate (of UAE & Egypt) indicating that the company's (actual) investments in Egypt at present reached L.E. 7.2 billion, part of total estimated planned investments in the country put at the equivalent of $ 5 billion. N.B. Observers and business circles expect more of such alliances and marriages between Egyptian and Gulf Groups to be reached in the next stage documenting a strong future potential for such alliances to benefit all parties involved. Present visit of Eng. Mohamed Rashid, Egypt's Minister of Trade & Industry, to both Qatar & the UAE, represents a strong constructive contribution to strengthen such a trend. N.B. Interesting were Mr. Al Abbar statements on Emaar readiness to participate on forth coming PPP (Public Private Partnership) projects in the next stage.

Nov 03, 2010

21 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 22: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Integrated works - Non Tenders Section Type Description Date Published

Loans & Grants$ 120 million soft loan extended by the Jeddah based Islamic Development Bank to part finance Benha 750 MW combined cycle power station. Implementing agency is CDEPC - Central Delta Electricity Production Co. Total estimated project costs are put at $ 806 million of which $ 527 million foreign currency component. That was fully covered by soft loans from AFESD - Arab Fund for Economic & Social Development ($167 million), KFESD - Kuwaiti Fund for Economic & Social Development ($100), SDF - Saudi Development Fund & ADD - Abu Dhabi Development Fund ($50 million each), also Opec Development Fund ($40 million) among others.

Oct 20, 2010

A consortium led by NBE - National Bank of Egypt has extended L.E. 1.1 billion loan to part finance the local manufacture component of Sukhna 2 x 650 MW steam fired power station built by EDEPC - East Delta Electricity Production Company. Other consortium members include the CIB - Commercial International Bank and the NSGB - National Socite Generale Bank. The loan is for repayment over 15 years including 5 years grace.

Oct 03, 2010

A consortium led by the Arab African International Bank has extended L.E. 1.1 billion loan to the Arab National Cement Company, affiliated to ASEC Company, part of the Citadel Group for Financial Investments. Members of the consortium include Alexandria Bank, Audi Bank, National Bank of Greece, United Bank, Faisal Islamic Bank and Banque Du Caire. The loan is for repayment over 9 years and it will be used to part finance a grey cement project in Menia to have an annual design capacity of 1.65 million tons. Total estimated project costs are put at L.E. 1.84 billion.

Oct 03, 2010

ADB - African Development Bank endorsing the equivalent of L.E. 550 million soft loan to part finance Suez 650 MW power station project. That was announced by Dr. Eng. Hassan Younis indicating that total estimated project costs are put at L.E. 5.4 billion. Months earlier the Jeddah based Islamic Development Bank extended $ 60 million soft loan for the same project. Implementing Agency is EDEPC - East Delta Electricity Production Co.

Oct 02, 2010

An alliance grouping NBE - National Bank of Egypt & Banque Misr seems competing with the CIB on a deal to arrange an L.E. 600 million syndicated loan in favor of SECON - Saudi Egyptian Construction Co. The loan will fiancé a tourist residential project planned by the company on Maadi Cornish comprising two high rise towers, 23 floors each, of which one to host a suites' hotel and the other designed as a luxurious residential hotel tower. Worth indicating is that SECON is a 50 / 50 joint venture between the Egyptian & the Saudi Government.

Nov 07, 2010

Banque Misr was selected as a lead manager for a $ 250 million syndicated loan to be raised in favor of OCI - Orascom Construction Industries. That was reported in the media indicating that the loan is for repayment over 5 years & that it will be used to finance the company's future extensions. The company is deemed among the largest contracting companies in Egypt & the Arab World and its consolidated statements for the first half of 2010 showed some 21.3 % growth. Reports noted that two months earlier OCI was extended a Euro 175 million loan from Rabo Bank of Holland to finance its acquisition of a Dutch nitrogen gas producer (obviously to consolidate its pretty strong fertilizers product mix). N.B. Stability of the OCI share price on the Cairo Stock Exchange over the past turbulent weeks is further proof to the company's strength & sustainability.

Oct 31, 2010

Earlier reported negotiations of the Petrochemicals Holding Co. to arrange finance for its new affiliate, the Egyptian Co. for Ethylene, seems very close to a happy end. That was reported in the media indicating the company is expected to sign next week with a consortium of 4 banks a $ 925 million syndicated loan. The loan will part finance its $ 1.3 billion project in Alexandria to annually produce 400,000 tons of ethylene and polyethylene. Consortium groups the NBE - National Bank of Egypt, CIB - Commercial International Bank, AAIB - Arab African International Bank & NSGB - National Societe Generale Bank.

Oct 06, 2010

KFESD - Kuwaiti Fund for Economic & Social Development has extended $ 100 million soft loan to further back the foreign currency component of Benha 750 MW power station. That was announced by Dr. Eng. Indicating that the L.E. 4.5 billion project is scheduled for completion by May 2013.

Dec 21, 2010

L.E. 450 million loan was extended by NBE - National Bank of Egypt in cover of the down payment for the emergency energy plan to build two power stations of 1.500 MW capacity in Damietta & Ismailiya for completion before hot summer months in 2011. The project, awarded to Al Kharafi Group of Kuwait involves L.E. 5.5 billion investments.

Nov 13, 2010

Three banks have signed a final agreement to extend an L.E. 1.5 billion ($ 270 million) syndicated loan in favor of the Egyptian Co. for Hydro Carbons to part finance the company's new $ 400 million project to produce ammonia nitrate in Sukhna, in Suez Governorate. They include Banque Misr, the CIB - Commercial International Bank, and the National United Bank and they have subscribed equally to the loan, i.e. $ 90 million each. Project represents the 1st phase of a huge petrochemicals complex planned by the company to involve upon its final completion $ 3 billion investments.

Nov 24, 2010

22 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 23: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Integrated works - Non Tenders Section Type Description Date Published

Privatization and Investments15th May City Development Agency has offered for sale in a public auction building No. 11 at the City Center of multipurpose activities. Building comprises commercial outlets, a cinema, a cafeteria & a garage. Detailed conditions are to get from the City Development Agency against L.E. 200. Auction will be held on 11 / 25/ 2010, noon time, at the City Agency & L.E. 200,000 cash deposit is requested for participation. More details on web site www.urban-comm.gov.eg

Nov 07, 2010

Luxor Governorate has offered for sale in public auctions different size empty land lots in Al Tood City licensed to host residential & commercial projects. Detailed conditions are to get from the Governorate's Purchases Dept. against L.E. 2,000. Deadline to submit offers & L.E. 50,000 bid bond is set for 11/24/2010. For inquiries contact Tel. 095 - 2359862.

Oct 29, 2010

New Urban Societies Authority has offered for sale in a public auction a 185 feddans lot equipped with all public utilities to implement an integrated urban society on it (buildings) at Southern EL Wahat Zone in 6th October City. Applicants need be exclusively existing companies or under companies establishment. Detailed conditions are to get from the City Development Agency against L.E. 20,000. Pre bid meeting is set for 12/27/2010 at 10 a.m. at the meeting hall of the Ministry of Housing, 1 Ismail Abaza St., off Kasr El Eini St., Cairo & may be attended only by those who bought documents. Deadline to submit technical offers & the requested bid bond to the City Agency is bid set for 1/24/2011. Award will be effected to the highest offered price per meter square technically accepted & on cash basis. 10 % of the land value need be settled within a month from award (obviously after reducing the value of the bid bond). The remaining 90 % is payable over 10 years via equal quarterly installments plus Central Bank interest. The map showing the location of the lot is published on web site www.urban-comm.gov.eg. For inquiries call the hot line 19388.

Dec 12, 2010

The Distinguished Fashion Co. Hano - Salon Vert has offered to lease a factory building to produce ready made garments on Ibrahim Al Awal St. in El Labban, in Alexandria. Building comprises a basement, a mezzanine, four upper floors, a garage & a cargo elevator. Building occupies 452 M2 land & involves 2,700 M2 built area. Detailed conditions are to get from the company's offices, 11 Adly St., Cairo against L.E. 2,000. Deadline to submit offers is set for 12/26/2010 at 11 a.m. Auction will be held at the Company's Employees Social Club Building, 9 26th July St., Cairo. For inquiries contact Tel. 02 - 23910484/ 23960063 or Fax. 02 - 23957219.

Dec 15, 2010

The Housing Cooperative Society for Employees at the General Authority for Agrarian Reform has offered for sale in a public auction a 171,367 M2 empty land lot in El Marj. Lot is located on the Trolley St. next & behind Al Kawthar Flour Mill. Detailed conditions are to get from the Society's offices, 1 Nadi El Seid St., Dokki, Giza, Mobile 012 - 9299134. Auctioneers Office in charge is that of Mr. Ibrahim Hassan, 22 Khayrat St., Lazoghly, Cairo, Tel. 27953008. Auction will be held on 10/26/2010 at the offices of the Regional Federation of the Civil Societies in Giza, 529 Pyramids Road, Next Giza Female Secondary School, Giza & an L.E. 1 million bid bond is requested for participation.

Oct 14, 2010

Projects Awards ECG - Engineering Consultants Group in joint venture with Pharma Consult of Germany were awarded a contract for extending the required engineering services for two new pharmaceuticals' factories In 6th October City. Client is Holdipharma & the project provides for the relocation of the factories of both CID Co. & Cairo Co. for Pharmaceuticals out of the residential area in El Amiriya, Cairo.

Dec 31, 2010

Long established ECG - Engineering Consultants Group selected as consultant for a project involving the relocation of pharmaceutical factories of two state owned companies from Cairo to 6th October City to go under L.E. 739 million investments. That was reported in the media indicating that Holdipharma - Holding Co. for Pharmaceutical Industries has selected ECG as winner of its earlier released tender to solicit a consultant for the project to relocate factories of both CID & Cairo Co. for Pharmaceuticals from their present locations in Cairo to a land lot owned by Holdipharma in 6th October City of 140,000 M2 area. Contract provides for the preparation of basic, initial & final designs (for both factories), tender document & specs. The project is scheduled for completion in 3 years. Project provides for the construction of the CID factory on 75,000 M2 land under L.E. 374 million investments & of Cairo Co. factory on 65,000 M2 land under L.E. 365 million investments. Reports assured that both factories are designed to match FDA codes of the Us & AMEA standards of the EU.

Nov 06, 2010

Media has reported on awarding an L.E. 3.3 billion contract to a state owned Chinese Co. to execute the long announced Expo City Complex in Nasr City, Cairo. Reports quoted Eng. Sherif Salem, Head of the International Trade Fairs & Exhibitions Authority indicating that the project provides for the construction of 9 exhibition halls, a 5 - stars hotel & a huge conferences hall apart from an overhead bridge to link Cairo Fairs Ground with Cairo International Conference Center. N.B. Project sounds in need of further confirmation from the concerned entities.

Nov 11, 2010

OCI - Orascom Construction Industries SAE said it has signed an agreement with Palm Hills Development SAE to implement several infrastructure & commercial projects over the next 2 to 4 years worth L.E. 600 million. Projects are said to be located in Greater Cairo, Sukhna and the North Coast. OCI said options exist to be awarded other projects from Palm Hills including commercial malls, hotels and administrative buildings.

Nov 25, 2010

23 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 24: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Integrated works - Non Tenders Section Type Description Date Published

Projects in Pre-Tendering PhaseA $ 53 million Egyptian Indian project was launched to produce electric household appliances at Suez Free Zone. Project owner is a joint venture grouping Goobi Co. of India & Sheifer Co. of Egypt. That was announced by Mr. Medhat Sabri, Chairman of the Egyptian Co. indicating the project would enter the production phase in a year time.

Dec 08, 2010

A 45/ 55 Egyptian UAE strategic alliance was announced between Mansour Amer Group and Arabtec Construction capitalized initially at L.E. 100 million to involve with mega projects in Egypt. That was reported in the media indicating that the new company will start works immediately on an L.E. 300 million tourist development project in Sukhna for completion in 9 months. The new entity is identified as Arabtec Egypt for Contracting. Worth indicating is that Arabtec Holding is one of the largest construction contractors in the UAE where it has completed mega projects including the Dubai Tower (the tallest in the world), Emirates Palace Hotel & Abu Dhabi Center for Exhibitions.

Oct 18, 2010

A Euro 30 million project was launched by Knauf Co. of Germany to produce gypsum plates on 135,000 M2 land at North West Suez Economic Zone. That was announced by Eng. Amr Assal, head of the IDA - Industrial Development Authority, indicating the project will have an annual design capacity of 15 million M2 of gypsum plates. Project is scheduled to start production during the 4th quarter of 2012. Project will also produce gypsum paste & gypsum profiles. Media reports indicated that Knauf, established since the thirties of the last century operates 250 factories spread around the globe & it owns 70 gypsum quarries in more than 60 countries. N.B. For more details visit web site www.knauf.com

Dec 19, 2010

An L.E. 20 million new slaughterhouse is now being built in Quesna to also serve Markaz Shebin El Kom. That was announced by Mr. Sami Emara, Menoufiya Governor, indicating that works are also progressing on other two slaughterhouses in Al Bagour & Ashmoun under L.E. 4 million investments. The Official praised the efficient control on slaughterhouses in the governorate practiced by the Veterinary Medicine Directorate.

Nov 16, 2010

An L.E. 30 million project was launched to build a social & sports complex for youth in Oyoun Moussa on the east side of the Suez Canal. That was announced by Suez Governor, Gen Seif El Din Galal, Indicating that the project will be financed by L.E. 10 million contribution from the Governorate with the remaining L.E. 20 million to be raised by the National Council for Sports. The project will occupy 10 feddans land & will comprise a glass made squash play court & swimming pools both duly equipped to host international sports championships.

Dec 17, 2010

An unnamed large sized investment company is searching for land lots for co-exploitation within Greater Cairo, in New Cities surrounding Cairo or along main roads leading to Cairo. Offers are to send to Fax. 02 - 26718823 or contact Mobile 012 - 7770097.

Dec 10, 2010

Citadel Plaza Co., affiliated to Alkan Holding, is to soon search finance for phase 1 of its project, identified as Cairo Financial and Tourist Center, to go under L.E. 1.1 billion investments. That was announced by Mr. Khaled Noseir, Chairman of Alkan Holding Group, indicating that Citadel Plaza capital was recently increased from L.E. 300 million to L.E. 450 million fully covered by the Group's own resources. He revealed that the project's feasibility study was prepared by Price Waterhouse & that the study will be forwarded to a number of banks to evaluate possible financing. Project occupies 65,000 M2 land at the beginning of Moqattam Road opposite Salah El Din Citadel. He further noted that the project will generate 15,000 employment opportunities during the construction phase & 5,000 opportunities upon operation start. Project will comprise a cultural complex for arts, administrative & office spaces, a 320 rooms 5 stars hotel, an international conferences & exhibition center, a commercial mall & an open air plaza, also car parks to host up to 7,000 vehicles.

Nov 30, 2010

Egyptian Federation of Building & Construction Contractors has invited its members interested in projects abroad (Arab & African Countries) to register their data. Applications must specify the contractors technical & financial capabilities, also their past performance during the past 5 years & their estimate to the size or volume of projects they can execute, also their capability to raise required bid & performance bonds. The Federation noted that it is on its way to open representative offices at same Arab & African Countries. Applications are to direct to the Federation's Office in Nasr City, 9th Zone, Artist Emad Hamdi St., off Mustafa El Nahhas St., Cairo, Tel. 02 - 24727256 / 7/ 8/ 9 , Fax. 02 - 24727260 (No mention was given to Email or web site).

Dec 18, 2010

Emaar Group of the UAE is committed to raise its investments in Egypt real estate development sector, is now put at L.E. 5 billion. That was announced by Mohamed Al Abbar, Emaar Chairman, after his recent meeting with Egypt's Prime Minister, Dr. Ahmed Nazif, The executive noted the diversification of his company's projects in Egypt, including Up-town Cairo, on Moqattam Hill, Marasi on the North West Coast & in New Cairo City. The executive revealed plans to build a conferences center & a hotel in the Smart Village.

Oct 26, 2010

EVA Pharma Company, for pharmaceuticals affiliated to Armanious Group has launched its L.E. 1 billion + project to produce pharmaceuticals in 6th October City. That was announced by Dr. Riad Armanious, Chairman of the Group indicating that the project, for completion early 2012, matches European specs EUGMP and generates 2000 employment opportunities.

Dec 28, 2010

24 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 25: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Integrated works - Non Tenders Section Type Description Date Published

Projects in Pre-Tendering PhaseFour Egyptian companies were declared front runners for four licenses to produce steel rebars & billets in 6th October, Port Said, Menia & Assuit Governorate. They include Al Marakebi Co. for Metallic Industries in 6th October City, Port Said National Steel Co., IIC (of Abu Hashima Group) in Menia & National Steel Co. in Assuit. That was recommended by the committee formed at the IDA - Industrial Development Authority to evaluate applications. Issue will most probably finalized during the next IDA board meeting scheduled for 1/5/2011. Licenses would generate L.E. 2 billion investments & almost 6,000 employment opportunities.

Dec 29, 2010

Four international & Egyptian companies are now on the final short list of bidders to implement phase three of Egypt's Grand Museum in Giza for completion in 26 months. That includes Arabco - Arab Contractors & OCI - Orascom Construction Industries. Final award of the $ 600 million contract is expected in December 2010 next. That was announced by Mr. Farouk Hosni, Egypt's Minister of Culture. Project was earlier identified as that of the Century. It occupies 117 feddans land in Giza.

Oct 24, 2010

In a most serious attempt to intensify investments & trade ties with Saudi Arabia, GAFI - General Authority for Investment is preparing a package of projects worth $ 20 billion to promote among Saudi investors over the next three years. That was announced by Egypt's Minister of Trade & Industry, Eng. Rashid Mohamed Rashid, after his recent meeting with Mr.Hesham Al Nazer, Saudi Ambassador to Cairo, Package comprises a wide variety of new & promising opportunities in the infrastructure, services & internal trade, also in the industry & tourism sectors. Meanwhile the Minister stressed the government is working hard to succeed in attracting, during FY 2010/ 2011, some $ 10 billion investments to be doubled to $ 20 billion over the following three years. Meanwhile Eng. Rashid revealed that bilateral foreign trade volume between both countries in 2010 reached $ 4 billion & that compares with $ 500 million in 2005. He further noted that Saudi investments in Egypt are now estimated at L.E. 20 billion (about $ 3.5 billion) divided on 2,268 companies involving with industry, tourism, banking & finance, agriculture, construction, services & ITC.

Dec 07, 2010

MIHC - Metallic Industries Holding Co. considering to apply for a license to implement a new steel mill project as part of those licenses launched recently by IDA - Industrial Development Authority. That was reported in the media quoting an (unnamed) official source at MIHC indicating that a study prepared earlier showed that relevant project's investments could reach up to L.E. 7 billion. With regards project finance, the source revealed that it will be partially covered by MIHC resources together with syndicated loans from banks and possible contribution of Gulf investors. The source assured that HADISOLB has nothing to do with the project. 7

Oct 13, 2010

New Urban Society's Authority, 10th Ramadan City Development Agency has offered for sale in public auction land lots of less than 5 feddans area each. Lots are licensed to host various investment & service activities such as showrooms, commercial & administrative buildings, also bank branches. All lots are completely equipped with public utilities. Detailed conditions are to get from the City Development Agency against L.E. 1,000. Pre bid meeting will be held 11/29/2010 (10 p.m.) at the meeting hall of the Ministry of Housing, Ismail Abaza St., off kasr Al Eini St., Cairo. Deadline to submit offers accompanied with the requested bid bond is 12/27/2010 noon time. Payment facilities are offered to pay 10% down, among other administrative expenses, within a month of the award date, with the remaining 90% to settle via equal quarterly installments over 4 years including applicable Central Bank interest. Owners must adhere to construction specs specified in the auction conditions.

Nov 14, 2010

Since long announced L.E. 116 billion project to develop 5,600 feddans (about 23.5 million M2) land in New Cairo city seems getting closer to implementation phase. A company was formed to execute the project identified as Al Wehda Company for Real Estate & Tourists Investments grouping the New Urban Societies Authority holding 22 % shares and Libya Investment Company holding the remaining 78 %. Project will be executed over 6 stages for completion in 20 years.

Dec 16, 2010

TCI Samnar Chemicals of India has laid the ground stone of its new $ 150 million (extension) project in Port Said to recover ethylene from agricultural materials, environment friendly, then convert it to EDC (Ethylene Dichloride) & then to VCM (Vinyl Chloride Monomer) & to PVC. Project would occupy 100,000 M2 land & is scheduled for completion in 24 months. It would have an annual design capacity to produce 185,000 tons of ethylene sufficient to produce annually some 400,000 tons of PVC getting the country to achieve self sufficiency there from. Project is part financed by the AAIB - Arab African International Bank among other 11 Indian banks. Project would generate 150 direct & 800 indirect employment opportunities. N.B. Two days later the company has announced in the daily Al Akhbar of 11/1/2010 (P. 6) that the deal will drive its total investments in the project to almost $ 1.3 billion. More details may be searched at www.samnargroup.com

Oct 29, 2010

Ten international companies & consortia short listed to bid for the first power station to be built in the country under B.O.O. That was announced by Dr. Eng. Hassan Younis, Minister of Electricity & Energy, indicating that it is of a thermal & combined cycle type & will have the capacity of 1,500 MW (2 x 750 MW). It will be located in Deirout Village within Beheira Governorate & is scheduled to enter the commercial operation phase by 2013. Final RFP will be issued by Mid December 2010 next. Project is part of the Ministry's plan to add during the years 2012/ 2017 about 58,000 MW new generation capacities, 77,000 MVA power transformers stations & extend 244,000 Km power transmission lines & cables under investments estimated at $ 110 billion.

Nov 17, 2010

Two new power station projects were announced by Dr. Eng. Hassan Younis of 1,500 MW capacity in West Damietta & in Motoubas, in Kafr El Sheikh Governorate to go under B.O.T. he Minister was addressing the annual general meeting of EEHC - Egyptian Electricity Holding Co. indicating that 3,650 MW new power generation capacities will be added to the grid during 2011 & 2012 to cope with the 9,000 MW target provided for in the 2007/ 2012 plan.

Oct 26, 2010

UEEPC - Upper Egypt Electricity Production Co. in cooperation with ECG - Engineering Consultants Group has invited the public to a meeting to review the environmental impact assessment report of the Southern Helwan 3 X 650 MW steam fired power station project. Meeting will be held on 11/24/2010 at the meetings hall of Kureimat I power station 11 a.m. For inquiries contact Tel. 02 - 22744740.

Nov 11, 2010

25 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 26: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Integrated works - Non Tenders Section Type Description Date Published

Projects in Pre-Tendering PhaseWorks are said to have started on an L.E. 384 million project to build a new cargo village at Cairo airport to cope with the fast increase in cargo volumes to handle by the village. That was announced by Eng. Ibrahim Manna'ee, Chairman of Egypt Air Holding Co. for Airports & Air Navigation, indicating the project is scheduled for completion in 24 months. Project comprises 26,000 M2 area for exports including 17,000 M2 for operations, 6,000 M2 for the offices of the forwarding companies & 3,000 M2 for the receipt of export shipments. Project further comprises 25,000 M2 area for imports including 17,000 M2 for operations & 2,500 M2 for customs clearing formalities.

Dec 09, 2010

Works on Cairo Metro 4th Line are set to start July 2011 under L.E. 18 billion estimated investments. That was announced by Egypt's Minister of Transport, Eng. Alaa Fahmy. Indicating the line will extend from Nasr City till the Egyptian Grand Museum & the Desert rood in Giza. Project goes in cooperation with 6th October Governorate & is scheduled for completion in 6 years. N.B. It is greatly hoped that after executing several metro lines some serious efforts are made to increase local manufacture component opening chances to relevant national feeder industries & sub contractors.

Dec 11, 2010

Published Co. PerformanceEgyptian Contracting Co. Moukhtar Ibrahim, reporting to the National (Holding) Co. for Construction & Development, capitalized at L.E. 60 million, fully paid up, has posted for FY 2009/ 2010 some L.E. 241.9 million net profits before taxes on L.E. 3,258 million gross operating revenues among other revenues. Figures compare with L.E. 163.2 million net profits before taxes posted for FY 2008/ 2009 on L.E. 2,850 million gross operating revenues among other revenues. Net working capital as at 6/30/2010 increased to L.E. 275 million up from L.E. 80.9 million a year ago. Long term liabilities as at the same date were put at L.E. 16.7 million against L.E. 15.8 million a year ago. Shareholders net equity as at the same date increased to L.E. 492.9 million up from L.E. 296.7 million a year ago. Chairman & Managing Director is Eng. Ali Ibrahim Ahmed Abu Halawa.

Nov 13, 2010

El Nasr Co. for Housing & Development, reporting to the National (Holding) Co. for Construction & Development, capitalized at L.E. 100 million, fully paid up, has posted for FY 2009/2010 some L.E. 94.6 million net profits before taxes on L.E. 230.3 million gross operating revenues among other revenues. Figures compare with L.E. 156.4 million net profits before taxes posted for FY 2008/2009 on L.E. 263 million gross operating revenues among other revenues. Net working capital as at 6/30/2010 increased to L.E. 248.2 million up from L.E. 232.7 million a year ago. Long term liabilities as at the same date stabilized at L.E. 4.6 million against L.E. 4.9 million a year ago. Shareholders net equity as at the same date increased to L.E. 264.1 million up from L.E. 249.3 million a year ago. Chairman & Managing Director is Eng. Mohamed Al Gendi Fouad Al Gendi.

Dec 21, 2010

El Seid General Co. for Contracting SAE, operating under the companies' law 159/ 1981 & capitalized at L.E. 216.7, fully paid up, has posted for FY 2009/ 2010 some L.E. 85.4 million net profits before taxes on L.E. 225.3 million gross operating revenues among other revenues. Figures compare with L.E. 58.8 million net profits before taxes posted for the same period of FY 2008/ 2009 on L.E. 168.5 million gross operating revenues among other revenues. Net working capital as at 6/30/2010 increased to L.E. 392.9 million up from L.E. 320.5 million a year ago. Long term liabilities as at the same date were negligible. Shareholders net equity as at the same date increased to L.E. 439 million up from L.E. 369.1 million a year ago. Chairman & Managing Director is Eng. Mokhtar Al Dahshouri.

Oct 28, 2010

Heliopolis Co. for Housing & Development Co., reporting to the National (Holding) Co. for Construction & Development, capitalized at L.E. 74.2 million, fully paid up, has posted for the FY 2009/ 2010 some L.E. 198.4 million net profits before taxes on L.E. 321 million gross operating revenues among other revenues. Figures compare with L.E. 126 million met profits before taxes posted for FY 2008/ 2009 on L.E. 143.4 million gross operating revenues among other revenues. Net working capital as at 6/30/2010 increased to L.E. 455.6 million up from L.E. 320 million a year ago. Long term liabilities as at the same date declined to L.E. 128 million down from L.E. 148.5 million a year ago. Shareholders net equity as at the same date, including the period profits, increased to L.E. 350.3 million up from L.E. 192.6 million a year ago (the later excluded the year profits). Chairman & Managing Director is Mr. Fadel Mohamed Al Shahawi. The company disposes on 33.2 million M2 land lots under development among other housing units & villas, also lands allocated for schools projects, shops & garages, medical, educational & social establishments, clubs & recreational units.

Oct 14, 2010

OCI - Orascom Construction Industries has announced its consolidated financial statements for the first nine months of 2010 showing L.E. 2.49 billion consolidated net profits marking 28.6 % increase above their level during the same period of 2009 put then at L.E. 2 billion. N.B. More details maybe searched at the company web site www.orascomci.com

Dec 28, 2010

OCI - Orascom Construction Industries SAE announcing its consolidated net profits during the third quarter of 2010 increased by 22.3 % to $ 147.6 million yet including $ 19.5 million capital gains Gains resulted from selling OCI 9.5 % of its 23 % stake in Netro Company of Nigeria involved with fertilizers production. Meanwhile the company revealed that its profits during the 1st nine months of 2010 increased to $ 408.4 million marking 24.3 % increase above their level during the same period of 2009.

Nov 24, 2010

Palm Hills Co. SAE announced its consolidated financial statements for the third quarter of 2010 showed 15 % increase in net profits to reach L.E. 153.7 million backed by strong sales & service revenues. Sales of new housing units during the quarter reached L.E. 1.78 billion marking 53 % increase above their level in the same quarter of 2009. That was supported by strong sales of units on the North Cost during the quarter valued L.E. 1.3 billion. N.B. With both economy & tourism catching up the company stands reasonable future potential. N.B. More details may be searched at www.palmhillsdevelopments.com

Nov 11, 2010

26 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 27: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Integrated works - Non Tenders Section Type Description Date Published

Published Co. PerformanceSODIC - 6th October Development & Investment Co. SAE announced its net profits during the third quarter of 2010 reached L.E. 107 million (about $ 18.4 million) posted on L.E. 197 million gross revenues. No comparison figures were given. New sales contracted already during the quarter were put at L.E. 271 million. Meanwhile the company said it has started delivery of sold units at its Algheria Housing Project consisting of 800 housing units predicting to complete delivery of all units during the next 12 months.

Nov 25, 2010

T.M.G. Talaat Mustafa Group Holding SAE, operating under the investment law 95/ 1992 & capitalized at L.E. 20.132 billion fully paid up, has posted for the first 9 months of 2010 some L.E. 1,070 million consolidated net profits before taxes on L.E. 4,544 million consolidated gross operating revenues among other revenues. Figures compare with L.E. 1,131 million net profits before taxes posted for the same period of 2009 on L.E. 4,355 million consolidated gross operating revenues among other revenues. Meanwhile consolidated net working capital as at 9/30/2010 increased to L.E. 11,119 million up from L.E. 10,432 million nine months ago. With regards consolidated long term liabilities as at the same date so they have increased to L.E. 6,321 million up from L.E. 5,438 million nine months ago. Concerning consolidated shareholders net equity as at the same date so they have increased to 25,085 million up from L.E. 24,828 million nine months ago. Chairman is Mr. Tarek Talaat Mustafa. This is just an indicative briefing on the statements and any conclusions require to refer to the full text of the statements & the auditors' reports.

Nov 11, 2010

Irrigation & Drainage Canals - Tenders SectionIntegrated JobsGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Water & Waste Water

General Authority for the High & Asswan Dam, the Contracts & Purchases Dept.Completion of phase II of the deepening of a 6,885 meters long section of Toshki floods overflow path (canal) between Kilo 3.265 & Kilo 10.150.

200,000 LE

Dec 12, 2010 Jan 04, 2011

General Dept. for Asswan IrrigationConducting the required (a) covering of a 120 meters long section of Sheikh Mahmoud Canal within Edfou West Irrigation Engineering Dept., (b) widening & deepening of a 2,650 meters long section of Wadi El Sa'ayda Main Canal within Wadi El Sa'ayda Irrigation Engineering Dept.

15,000 & 60,000 LE

Oct 25, 2010 Nov 04, 2010

General Dept. for Irrigation Development Projects in Central Delta, The CashierRequest of offers from eligible bidders for the revamping of mesqas (small irrigation canals) within Mit Yazid Zone at Kafr El Sheikh Irrigation Engineering Dept. including (a) 289 meters long section, right side, on Al Sharfa & Mobasher Al Zawya Canal & (b) 3,800 meters long section on Kom El Rozz Old canal under funding from the World Bank.

100,000 & 110,000 LE

Nov 10, 2010 Dec 30, 2010 Job goes under funding from the

World Bank.

Request of offers from eligible bidders for the supply & implementing of low voltage electric current connection works along the catchment area of Mares El Gamal Canal & El Zawya Canal including their branches within Kafr El Sheikh Governorate under funding from the World Bank.

170,000 LE

Dec 25, 2010 Jan 16, 2011 Job goes under funding from the

World Bank.

Revamping of mesqas within Mit Yazid Zone at the catchment area of Kafr El Sheikh Irrigation Engineering Dept. along sections of (a) El Shamarqa New Canal, (b) Kom El Rozz Old Canal & (c) revamping of mesqas' intakes along El Shamarqa New Canal, El Sharfa Canal & Mubasher El Zawya Canal under funding from the World Bank. Deadlines 1/29, 1/30 & 1/31/2011.

90,000 & 120,000 & 20,000

LE

Dec 18, 2010 Jan 31, 2011 Job goes under funding from the

World Bank.

General Dept. for Irrigation Development Projects in Central Egypt, MinyaRevamping of mesqas (small irrigation canals) at Al Kheyari First Zone serving 776 feddans within Markaz Abu Qorqas in Menia Governorate.

60,000 LE

Dec 18, 2010 Jan 02, 2011

27 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 28: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

General Dept. for Ismaileyya DrainageImplementing of the drainage related industrial & earthmoving works among other control facilities along Al Sandouk Drainage Canal.

60,000 LE

Dec 01, 2010 Dec 14, 2010

General Dept. for Port Said Drainage in Ismaileyya, The CashierDredging & purging of a 12.1 Km long section of Bahr El Baqar Old Drainage Canal using suction units & dredgers during FY 2010/ 2011 & 2011/ 2012.

60,000 LE

Nov 21, 2010 Dec 04, 2010

General Dept. for Qalioubeyya DrainageMechanical dredging & purging of canals at subordinated locations also removal of aquatic weeds from them.

100,000 LE

Oct 15, 2010 Oct 21, 2010

General Dept. for the Maintenance & Protection of Greater Reservoirs & BarragesRequest of offers from eligible contractors for the maintenance & consolidation of Ismailiya Canal Barrage & Lock.

50,000 LE

Dec 30, 2010 Jan 17, 2011

General Dept. for Underground Water Resources in Northern SinaiRenovation of the path of El Arish Valley in the section from its crossing with Ali Ibn Abi Taleb St. till its crossing with the Ring Road inside El Arish City.

97,000 LE

Oct 14, 2010 Nov 01, 2010

Ministry of Water Resources & Irrigation, the Grand Reservoirs & Barrages Div.Request of offers from specialized companies for the rehabilitation/ replacement of the bridge's roof & the maintenance of Al Bustan Barrage at Kilo 28.500 on Noubariya Canal.

60,000 LE

Oct 17, 2010 Nov 03, 2010

Potable Water Co. of Greater Cairo, Contracts & Purchases Dept.Purging & maintenance of water intakes & sludge outlets serving subordinated potable water stations along the River Nile, Ismailiya Canal & El Sharkawiya Canal.

70,000 LE

Nov 06, 2010 Nov 22, 2010

28 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 29: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Irrigation & Drainage Canals - Non Tenders Section Type Description Date Published

Loans & GrantsEgypt is negotiating with the World Bank on a $ 1.3 billion package of loans & credits to back projects in the different sectors during the next 5 years 2011 to 2015. That was announced by Mrs. Fayza Abul Naga, Minister of State for International Cooperation, indicating the said facilities will be allocated to projects in the energy, agriculture, health care, irrigation & education sectors. Meanwhile media reports noted that Egypt & the World Bank have signed, a week earlier, agreements valued $ 820 million to extend soft loans in the energy sector including $ 600 million for North Giza power station project & $ 220 million for a wind energy recovery project on the Suez Gulf.

Nov 10, 2010

KD 300,000 grant (about $ 1million) extended by the KFESD - Kuwait Fund for Economic & Social Development to finance a comprehensive study for the revamping of Ngee Hamadi Eastern Canal, its branches & hydraulic structures along it. An agreement on the above was recently signed in Cairo by Mrs. Fayza Abul Naga, Minister of State for International Cooperation & representatives of the KFESD.

Dec 23, 2010

Projects Awards State owned Arab Company for land reclamation was awarded an L.E. 152 million contract in Toshki. That was announced by Eng. Said Fathi, Projects Director at the company, indicating that the contract provides for excavations and earth moving works, also for the lining of aquatic paths using polyethylene film and concrete.

Nov 21, 2010

Parks & Landscaping - Tenders SectionIntegrated JobsGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Local Administration Authorities

GAFI - General Authority for Investment & Free ZonesRevamping of the administrative area at Alexandria Public Free Zone. 250,000 LE

Dec 15, 2010 Jan 16, 2011

General Authority for New Urban Societies, New Salheyya City Development AgencyConducting the required site coordination & landscaping works at the location of Build Your Own House Project & along surrounding roads within the City.

200,000 LE

Nov 24, 2010 Dec 27, 2010

General Authority for New Urban Societies, Tenth Ramadan City Development AgencyConducting the required site coordination & landscaping works at the location of Build Your Own House Scheme a t the City's 10th District.

250,000 LE

Oct 07, 2010 Oct 28, 2010

29 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 30: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Parks & Landscaping - Tenders SectionIntegrated JobsGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Local Administration Authorities

Matrouh Governorate, the General SecretariatConducting the required (a) completion of the decorative fence at the City's eastern entrance of 3 Km length, (b) construction of a shopping complex for sheep on El Salloum Road, (c) completion of El Hana Resort on El Cornish Road & (d) paving of Al Obayyed Road & the entrance of Al Qasr Beach. Deadlines 1/12, 1/13, 1/16 & 1/18/2011.

27,000 & 10,000 & 17,000 & 100,000

LE

Dec 30, 2010 Jan 18, 2011

Minya Governorate, the General SecretariatConducting the required beautification & revamping of streets, also construction & maintenance of buildings within the Governorate.

280,000 LE

Oct 18, 2010 Oct 31, 2010

New Urban Societies Authority, Tourist Villages Agency at Marina Al Alamein, The CashierConducting the required planning, site coordination, plantation & landscaping works along the front side of Marina El Alamein Tourist Center.

60,000 LE

Nov 01, 2010 Nov 25, 2010

Sohag Governorate, Local Municipality of Markaz & City Balyana, The CashierConducting the required (a) civil works for the river birth in El Balyana City, also (b) beautification & landscaping of El Balyana City entrance.

80,000 & 1,725 LE

Dec 12, 2010 Dec 28, 2010

Syndicate of Applied Arts Designers, The CashierFinishing & landscaping works for seven buildings at the Syndicate's service & recreational project in Om El Rokhm/ Agiba within Markaz & City of Matrouh.

50,000 LE

Oct 30, 2010 Nov 25, 2010

Parks & Landscaping - Non Tenders Section Type Description Date Published

Projects in Pre-Tendering PhaseL.E. 14 million project launched by Beheira Governor, Mr. Mohamed Sha'arawi, to build two shopping complexes for fish & vegetables in Rashid City on 1,700 M2 area outside the residential block. The Official indicated the project targets emptying the City's historic streets from freelance traders. He noted that according to the pre set time table, the project is scheduled for completion by the end of January 2011. The City stands huge future potential & is now witnessing the execution of several urban development & landscaping projects.

Nov 01, 2010

Renovation, Treatment & Paints - Tenders SectionIntegrated JobsGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Contracting

Al Fath Co. for Contracting, Trade & Construction - Shetat & Co, affiliated to Al Fath Group, The Cashier

30 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 31: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Request of offers from specialized contractors for various works pertaining to Asfour Specialist Hospital Project including (a) insulation layers, (b) plastering works, (c) internal & external painting works, (d) flooring works by using ceramic tiles, porcelain tiles, marble & granite, also vinyl, also (e) walls cladding by using ceramics, marbles, granite, Corian & MDF (wood). Deadlines 1/2, 1/3, 1/4, 1/5 & 1/6/2011.

31,500 & 58,000 & 30,000 & 170,000 & 135,000

LE

Dec 17, 2010 Jan 06, 2011

Alexandria Governorate, the Housing DirectorateRenovation & painting of the front side walls of all buildings along the Cornish road in all districts. 185,000 LE

Oct 16, 2010 Oct 18, 2010

Alexandria Governorate, the Housing Directorate, the Contracts & Purchases DeptPainting of the front side walls of buildings along the Cornish within (a) Al Jomrok District, (b) Alex East District, (c) Al Montaza District & (d) Alex Mid District.

40,000 & 50,000 & 30,000 & 45,000

LE

Dec 04, 2010 Dec 09, 2010

Alexandria University, the Faculty of Commerce, Damanhour Branch, The CashierRevamping of the so called Soteir Building on a turn key. Job is not divisible. 180,000 LE

Dec 11, 2010 Jan 02, 2011

El Mex Salines Co., The CashierConducting the annual maintenance & construction works for the company's buildings within Alexandria Governorate.

N/A LE

Dec 18, 2010 Jan 02, 2011

El Nasr Co. for Fertilizers & Chemical Industries, the Commercial Div.Renovation & rehabilitation of the ammonium nitrate packaging building, the sulfate packaging building & related silos in Ataqa, Suez.

50,000 LE

Dec 26, 2010 Feb 01, 2011

GAFI - General Authority for Investment & Free ZonesRevamping of the administrative area at Alexandria Public Free Zone. 250,000 LE

Dec 15, 2010 Jan 16, 2011

General Authority for New Urban Societies, Tenth Ramadan City Development AgencyConducting the required site coordination & landscaping works at the location of Build Your Own House Scheme a t the City's 10th District.

250,000 LE

Oct 07, 2010 Oct 28, 2010

H.I.O. Health Insurance Org., Cairo BranchConducting the annual maintenance works for the branch & other subordinated units, also revamping of pilot clinics reporting to the Branch's five zones.

170,000 LE

Nov 01, 2010 Nov 11, 2010

Mansoura University Hospitals, the Stores Dept.Renovation of (a) the Hospital's front side walls, also (b) the Accidents & Knees Surgeries Divisions.

50,000 & 100,000 LE

Dec 14, 2010 Dec 26, 2010

31 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 32: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Renovation, Treatment & Paints - Tenders SectionIntegrated JobsGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Contracting

Ministry of Endowment, Al Doat HospitalRevamping of four floors of the Hospital's building. 50,000 LE

Oct 11, 2010 Oct 24, 2010

Minya Governorate, the General SecretariatConducting the required beautification & revamping of streets, also construction & maintenance of buildings within the Governorate.

280,000 LE

Oct 18, 2010 Oct 31, 2010

National Org. for Social Insurance, the Government Sector Employees Fund, the Supplies Dept.Conducting the required (a) revamping of West Alexandria Social Insurance Zone Administration, (b) Edfou Pensions Dispensing Outlet in Asswan Governorate & (c) construction of a Social Insurance Complex in Al Obour City in Kalioubiya Governorate. Deadlines 11/28, 11/29 & 11/30/2010.

12,000 & 15,000 & 80,000

LE

Oct 17, 2010 Nov 30, 2010

Petroleum Research InstituteRevamping of the laboratories at the first & third floors serving both the applications & the petrochemicals divisions.

60,000 LE

Dec 17, 2010 Jan 10, 2011

32 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 33: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Renovation, Treatment & Paints - Tenders SectionIntegrated JobsGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Contracting

Potable Water Co. of Greater Cairo, Contracts & Purchases Dept.Purging & maintenance of water intakes & sludge outlets serving subordinated potable water stations along the River Nile, Ismailiya Canal & El Sharkawiya Canal.

70,000 LE

Nov 06, 2010 Nov 22, 2010

Construction of a fence & a guards' room at the location of Qal'eet El Kabsh water storage tank, conducting the site coordination works & renovation of the warehouse flooring below the tank, also furnishing of a security room & lavatories at the location.

55,000 LE

Nov 08, 2010 Dec 09, 2010

Sohag Governorate, Local Municipality of Markaz & City Balyana, The CashierConducting the required (a) civil works for the river birth in El Balyana City, also (b) beautification & landscaping of El Balyana City entrance.

80,000 & 1,725 LE

Dec 12, 2010 Dec 28, 2010

Renovation, Treatment & Paints - Non Tenders Section Type Description Date Published

Privatization and InvestmentsBanque Misr, in cooperation with Coldwell Banker, has offered for sale all assets of a cosmetics factory (ex owned by Mr. Mustafa Al Beleidy). It is located in 10th Ramadan City (Industrial Zone A - 1) & occupies 43,727 M2 land. Sale extends also to all machinery & equipment, also two apartments at Mogawra 31. Detailed conditions are to get from the Investment Trustees Division of the Bank at 153 Mohamed Farid St. Cairo, Tel- 02 - 23977835/ 27921856/ 23977829, or Mobile 010/ 0054493 / 6372020. Auction will be held on 12/16/2010 noon time.

Dec 04, 2010

Projects in Pre-Tendering PhaseL.E. 120 million project was launched for the renovation & revamping of the historic Salah El Din Citadel in Taba. That was reported in the media quoting Mayor of Noweibaa City, Mr. Al Arabi Al Husseini, indicating that works now are going for the renovation of the Citadel's external fence to detect defects in it & to protect it from strong waves during cold winter months. Project also provides for securing the access to the Citadel, fixing of guide signs & for a comprehensive lighting system enabling night visits.

Dec 27, 2010

L.E. 41 million project was recently endorsed by the Ministry of Culture to revamp Mit Rahina antiquities area in Cairo. According to Dr. Zahi Hawwas, Secretary General of the Supreme Council of Antiquities, the Antiquities Engineering & Environment Center at Cairo University was assigned to prepare a study on the underground water level & water table at the area to be implemented by the National Defense Council at L.E. 16 million. Project also provides for the building of fences around the antiquities area at L.E. 10 million costs & determining the path of visits to the temples area, also the construction of a visitors center to explain the explain the history of the area at L.E. 5 million cost. N.B. Project contains a tangible insulation & waterproofing component including related construction chemicals.

Nov 01, 2010

Residential Buildings - Tenders SectionIntegrated JobsGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Cooperative Societies

Beheira Governorate, the Housing DirectorateConstruction of 539 housing units to the south of the cars park in Damanhour under 4 contracts. Deadlines 11/25, 11/28, 11/29 & 11/30/2010.

65,000 & 80,000 & 80,000 & 80,000

LE

Nov 12, 2010 Nov 30, 2010

33 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 34: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Construction of 539 housing units to the south of the cars park in Damanhour under 4 contracts. Deadlines 11/25, 11/28, 11/29 & 11/30/2010.

65,000 & 80,000 & 80,000 & 80,000

LE

Nov 12, 2010 Nov 30, 2010

CDEPC - Central Delta Electricity Production Co. - Dakahliya Branch, The CashierConstruction of three residential buildings at the location of new Benha 750 MW power station. 250,000 LE

Dec 27, 2010 Jan 24, 2011

Dakahleyya Governorate, the Housing & Utilities DirectorateConstruction of a residential tower (142 housing units) & other 560 housing units in Marsoura, El Manzala, Nabaroh, El Matariya & Dekernes under 7 contracts. Deadlines 10/27, 10/28, 10/31, 11/1, 11/2, 11/3 & 11/4/2010.

150,000 & 120,000 & 40,000 & 60,000 & 150,000 & 130,000 & 40,000

LE

Oct 09, 2010 Nov 04, 2010

Egyptian Endowment AuthorityConstruction of 127 residential buildings comprising 2484 housing units for youth in 10th Ramadan City as part of the National Housing Project implemented in cooperation with the Ministry of Housing, that of Agriculture & that of Local Development under 4 contracts. Deadlines 11/28, 11/29, 11/30 & 12/1/2010.

1,000,000 & 800,000 & 800,000 & 850,000

LE

Oct 20, 2010 Dec 01, 2010

Request of offers from contractors with past performance on distinguished housing projects for the completion of the required works for 59 villas at Madinat Al Sohafiyyeen at New Cairo City First Complex.

1,000,000 LE

Dec 29, 2010 Feb 06, 2011

Fayyoum University, The CashierConstruction of the students living quarters building. 250,000 LE

Oct 30, 2010 Nov 22, 2010

General Authority for New Urban Societies, New Salheyya City Development AgencyConstruction of a residential building for the City Development Agency & of other two residences for the Districts Mayors.

75,000 LE

Nov 08, 2010 Dec 09, 2010

General Syndicate of Employees at ENR - Egyptiam National Railways Authority Request of offers from contractors & investors for the co-financing, construction & exploitation of resort type housing units.

500,000 LE

Nov 15, 2010 Dec 02, 2010

Giza Governorate, the Housing DirectorateCompletion of 288 housing units as part of the National Housing Project in Giza at the location of the 50 feddans lot in 6th October City.

180,000 LE

Oct 04, 2010 Oct 24, 2010

Housing Cooperative Society for Employees of Semadco, El Nasr Co. for Fertilizers & Chemical Industries, in TalkhaConstruction of two residential buildings on the Society's land in Talkha City. 50,000 LE

Dec 26, 2010 Jan 20, 2011

Housing Cooperative Society for Employees of Suez Governorate's General Secretariat, The CashierConstruction of three residential buildings on lots 20, 21 & 26 on Block No. 3 in Madinat Al Nour Complex.

75,000 LE

Oct 07, 2010 Oct 20, 2010

34 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 35: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Residential Buildings - Tenders SectionIntegrated JobsGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Cooperative Societies

Housing Cooperative Society for Members of Al Togareyyoun Syndicate in FayyoumConstruction of a residential complex on the Society's land at the Rice Mill Yard on El Nabawi Al Mohandes St. in Fayyoum City.

500,000 LE

Dec 11, 2010 Dec 28, 2010

Housing Cooperative Society for Teachers in Bandar Asswan, The CashierConstruction of seven residential buildings on the Society's Land on Al Seil Al Gedid opposite Aziz Ibrahim Preparatory School.

50,000 LE

Dec 18, 2010 Jan 17, 2011

Housing Cooperative Society of Employees at Heliopolis Co. for Housing & Development, The CashierConstruction of 14 residential buildings at New Heliopolis City under seven contracts. Deadlines 10/30, 10/31, 11/1, 11/2, 11/3, 11/4 & 11/6/2010.

190,000 each LE

Oct 07, 2010 Nov 06, 2010

Minya Governorate, the General SecretariatConstruction of 50 chalets, one swimming pool & related annexes. 200,000 LE

Dec 31, 2010 Jan 06, 2011

Red Sea Governorate, the General Secretariat, HurghadaCompletion of the construction of 1,000 housing units in Hurghada. 700,000 LE

Dec 14, 2010 Dec 28, 2010

Sohag Governorate, the Housing DirectorateConstruction 17 residential buildings at subordinated locations under 3 contracts. 120,000 & 100,000 &

85,000LE

Oct 18, 2010 Nov 07, 2010

Construction 15 residential buildings at subordinated locations under 3 contracts. 95,000 each LE

Oct 18, 2010 Nov 08, 2010

Construction 14 residential buildings at subordinated locations under 3 contracts. 95,000 & 95,000 & 80,000

LE

Oct 18, 2010 Nov 09, 2010

Syndicate of Applied Arts Designers, The CashierFinishing & landscaping works for seven buildings at the Syndicate's service & recreational project in Om El Rokhm/ Agiba within Markaz & City of Matrouh.

50,000 LE

Oct 30, 2010 Nov 25, 2010

35 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 36: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Residential Buildings - Tenders SectionIntegrated JobsGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Cooperative Societies

Talaee Al Mostaqbal Housing Cooperative Society, The CashierConstruction of six residential buildings at the Society's project at Farouk Corner in Helwan under three contracts.

50,000 each LE

Oct 16, 2010 Nov 04, 2010

Completion & finishing of buildings No. 35, 36 & 37 at the Society's project at Farouk Corner in Helwan.

50,000 LE

Dec 19, 2010 Jan 10, 2011

Residential Buildings - Non Tenders Section Type Description Date Published

Business News Development & Housing Bank has launched a regional expansion plan in neighboring countries including Syria, Sudan, Morocco, Iraq, Lebanon & Saudi Arabia. That was reported in the media indicating that stress in Iraq extends to both Kurdistan Al Iraq & Arbil regions, both enjoying relative security stability & huge investment opportunities in terms of infrastructural & housing projects. That was reported in the media indicating that contacts have been already initiated with several leading banking executives in those countries. Media reports indicated that the bank has offered several alternative scenarios for the said expansion including the establishing of an individual bank, of a real estate financing company, of a branch of the Egyptian Mother Bank or entering in joint venture with investors in those countries.

Dec 05, 2010

Heliopolis Co. for Housing Reconstruction has announced the increase of its issued & paid up capital from L.E. 74,171,400 to L.E. 111,257,100 fully covered from brought forward profits. Measure will be activated by the issuance of 37,085,700 free shares to original shareholders at a rate of half a share for each existing one share. Issue was endorsed by the company's irregular shareholders meeting held 10/9/2010. Release of the new shares will be executed as of 12/2/2010.

Nov 14, 2010

In a further commitment to transparency codes, informed sources, quoted in the media, have indicated the New Urban Societies Authority intends to sell its share of housing units at Madinati Project in public auctions. Sources noted that Minister Eng. Ahmed El Maghrabi supports the approach. They predicted that the said units, representing 7 % of the project's total units, could well generate up to L.E. 20 billion to the Ministry since they will be sold at market value.

Nov 21, 2010

Interesting figures & indicators were released on Egypt's real estate market & its future potential. In a brief reportage published recently in the media, leading executives of Egypt real estate industry expressed interesting views on the market & its future potential. Deputy Chairman of IGI, Mr. Khaled Sheta, believes the market is witnessing fierce competition particularly after the entrance of numerous Gulf groups at a time when relevant construction costs are fluctuating not to overlook that every body is awaiting the results of the People's Assembly election & the Presidential election. Mr. Sheta (Junior) noted that since the market started recovering in 2003, the number of real estate developers increased from 200 to almost 500 at present revealing that the number of real estate projects increased to 1,200 apart from housing projects executed in new cities involving 933,000 housing units of which 331,000 units executed by the Ministry of Housing & other 602,000 units implemented by the private sector. The executive predicted that the gap in medium level housing units is now said to range 200,000 to 300,000 units & that drove the industry to start adapting to such needs in new projects, still he expressed optimism for the year 2011. On his side Eng. Hussein Sabbour, Chairman of Al Ahli Real Estate Development, indicated that the country witnesses annually 600,000 marriages & that would generate demand for about 300,000 housing units apart from further 50,000 units demanded to replace old units driving total annual demand to 350,000 units excluding demand of foreigners. The executive stressed the shortage in land lots equipped with public utilities.

Nov 08, 2010

Unprecedented increases are witnessed on land prices with sea view in Ras El Barr City, in Damietta Governorate. In a recent public auction held by the Governorate to sell 11 lots, all having sea view, a 217 M2 lot at the City's first zone on Street No. 24 was sold for L.E. 9.6 million & another lot of similar area in the same zone, on Street No. 12 was soled for L.E. 8.5 million marking prices ranging L.E. 39,000 to L.E. 44,200.

Nov 02, 2010

Privatization and InvestmentsLuxor Governorate has offered for sale in public auctions different size empty land lots in Al Tood City licensed to host residential & commercial projects. Detailed conditions are to get from the Governorate's Purchases Dept. against L.E. 2,000. Deadline to submit offers & L.E. 50,000 bid bond is set for 11/24/2010. For inquiries contact Tel. 095 - 2359862.

Oct 29, 2010

36 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 37: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Residential Buildings - Non Tenders Section Type Description Date Published

Projects Awards ARABCO - Arab Contractors, Osman A Osman & Co. is to build one million housing units in Iraq. That was the front page title in the media quoting ARABCO Chairman, Eng. Ibrahim Mehlib, after his meetings with the Iraqi Prime Minister, the Iraqi Minister of Housing and with members of the board of Directors of the Iraqi National Businessmen Council. Eng. Mehlib has further revealed that ARABCO was also awarded the reconstruction of Al Rashid (Historic) St. in Baghdad. The executive noted that the Iraqi Prime Minister has directed to qualify ARABCO to bid, together with other 8 international companies, for the Baghdad underground metro project and for the revamping of the streets surrounding the (National) Conferences Hall to host the next Arab Summit in February 2011 next.

Nov 05, 2010

37 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 38: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Residential Buildings - Non Tenders Section Type Description Date Published

Projects in Pre-Tendering PhaseA 3,000 M2 rest house at Kilo 120 on Cairo/ Alex Desert Road offered for lease. Property comprises 24 hotel rooms & employees living quarters. Interested parties may contact Mobile 010- 6000021/ 1711010/ 1711011.

Nov 05, 2010

A large sized investment company expressing its intention to co-exploit alternatively acquire a 30 feddans land lot licensed to implement a residential compound thereon at New Cairo City 5th complex, 6th October City or Sheikh Zayed City. Brokers are to up stain. For inquiries contact Mobile 012 - 6836677 or Email [email protected]

Dec 05, 2010

An unnamed large sized investment company is searching for land lots for co-exploitation within Greater Cairo, in New Cities surrounding Cairo or along main roads leading to Cairo. Offers are to send to Fax. 02 - 26718823 or contact Mobile 012 - 7770097.

Dec 10, 2010

Egyptian Armed Forces revealing impressive civil contribution to the country's forthcoming socio-economic development over the next few years worth almost L.E. 4.7 billion (not to overlook other billions pumped in other civil sectors known to each Egyptian extending from bread to health care & from sports infrastructure to vocational training a.o.) The figure involves L.E. 1.5 billion for the reclamation & plantation of 100,000 feddans in Toshki at L.E. 15,000 per feddans development cost including the construction of 1,000 housing units for the employees accommodation, L.E. 1 billion to extend electricity to the project, L.E. 1.8 billion for the Upper Egypt Highway & L.E. 400 million for Sohag Airport. On top comes the construction of ten Cancer Treatment Centers in the different governorates.

Oct 31, 2010

Egyptian Federation of Building & Construction Contractors has invited its members interested in projects abroad (Arab & African Countries) to register their data. Applications must specify the contractors technical & financial capabilities, also their past performance during the past 5 years & their estimate to the size or volume of projects they can execute, also their capability to raise required bid & performance bonds. The Federation noted that it is on its way to open representative offices at same Arab & African Countries. Applications are to direct to the Federation's Office in Nasr City, 9th Zone, Artist Emad Hamdi St., off Mustafa El Nahhas St., Cairo, Tel. 02 - 24727256 / 7/ 8/ 9 , Fax. 02 - 24727260 (No mention was given to Email or web site).

Dec 18, 2010

Emaar Group of the UAE is committed to raise its investments in Egypt real estate development sector, is now put at L.E. 5 billion. That was announced by Mohamed Al Abbar, Emaar Chairman, after his recent meeting with Egypt's Prime Minister, Dr. Ahmed Nazif, The executive noted the diversification of his company's projects in Egypt, including Up-town Cairo, on Moqattam Hill, Marasi on the North West Coast & in New Cairo City. The executive revealed plans to build a conferences center & a hotel in the Smart Village.

Oct 26, 2010

Heliopolis Co. for Housing & Development announced that it has started works on two residential housing projects involving L.E. 47 million investments. That was announced by Eng. Mahmoud Hassan, Managing Director of the company, indicating that the 1st project, involving L.E. 40 million investments, provides for the construction of 175 housing units for completion in 30 months. As regards the 2nd project so it provides for a residential building on 4,000 M2 area to go under L.E. 7 million investments for completion in 18 months. Worth indicating is that the company has posted for the 1st quarter of 2010, 2011 some L.E. 37,4 million marking 29.4 % increase above its level in the comparison quarter in 2009.

Nov 07, 2010

Housing Cooperative Society for Employees at Damietta Supreme Court announcing its need to acquire one to four feddans land licensed for building within the Cordon of Ras El Barr City to implement a residential housing project thereon. Detailed conditions are to pick up from the Society's old offices, c/o the Old Courtyards Complex on Saad Zaghloul St., Damietta, against L.E. 50. Deadline to put offers accompanies with all property evidencing documents & an L.E. 5,000 bid bond valid for four months is set for 11/3/2010.

Oct 13, 2010

Housing Cooperative Society for Employees at Fayyoum City Local Municipality in need to acquire two land lots of 500 M2 to 2,000 M2 each at distinguished locations within Fayyoum City Cordon. Detailed conditions are to get from the Society's offices, c/o the Local Municipality premises, against L.E.100. Offers & L.E. 5,000 bid bond are to submit not later than 11/22/2010. For inquires contact Tel. 084 - 6332170/ 6332184/ 6333595.

Nov 05, 2010

Housing Cooperative Society of Employees at the People's Assembly announcing its need to procure about 4,000 M2 land lot licensed for construction in Al Marioutiya, in Pyramids, Giza. Land will be used to build housing units for its members. Detailed conditions are to get from the Society's offices, c/o the People's Assembly's Secretariat, against L.E. 50. Deadline to put offers supported with the property evidencing documents & L.E. 5,000 bid bond is set for 11/ 28/ 2010 noon time.

Nov 07, 2010

Upon the initiative of the Egyptian Federation of Investors Societies in coordination with the Egyptian Commercial Councilor in Morocco, arrangements are made for an Egyptian consortium to qualify for a project to build 54,000 housing units in Morocco. Consortium groups three leading public sector contractors including El Nasr Contracting - Hassan Allam, Egyco and Misr Concrete, together with Al Me'emari Group and Egymac.

Nov 24, 2010

38 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 39: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Residential Buildings - Non Tenders Section Type Description Date Published

Published Co. PerformanceEl Seid General Co. for Contracting SAE, operating under the companies' law 159/ 1981 & capitalized at L.E. 216.7, fully paid up, has posted for FY 2009/ 2010 some L.E. 85.4 million net profits before taxes on L.E. 225.3 million gross operating revenues among other revenues. Figures compare with L.E. 58.8 million net profits before taxes posted for the same period of FY 2008/ 2009 on L.E. 168.5 million gross operating revenues among other revenues. Net working capital as at 6/30/2010 increased to L.E. 392.9 million up from L.E. 320.5 million a year ago. Long term liabilities as at the same date were negligible. Shareholders net equity as at the same date increased to L.E. 439 million up from L.E. 369.1 million a year ago. Chairman & Managing Director is Eng. Mokhtar Al Dahshouri.

Oct 28, 2010

Heliopolis Co. for Housing & Development Co., reporting to the National (Holding) Co. for Construction & Development, capitalized at L.E. 74.2 million, fully paid up, has posted for the FY 2009/ 2010 some L.E. 198.4 million net profits before taxes on L.E. 321 million gross operating revenues among other revenues. Figures compare with L.E. 126 million met profits before taxes posted for FY 2008/ 2009 on L.E. 143.4 million gross operating revenues among other revenues. Net working capital as at 6/30/2010 increased to L.E. 455.6 million up from L.E. 320 million a year ago. Long term liabilities as at the same date declined to L.E. 128 million down from L.E. 148.5 million a year ago. Shareholders net equity as at the same date, including the period profits, increased to L.E. 350.3 million up from L.E. 192.6 million a year ago (the later excluded the year profits). Chairman & Managing Director is Mr. Fadel Mohamed Al Shahawi. The company disposes on 33.2 million M2 land lots under development among other housing units & villas, also lands allocated for schools projects, shops & garages, medical, educational & social establishments, clubs & recreational units.

Oct 14, 2010

SODIC - 6th October Development & Investment Co. SAE announced its net profits during the third quarter of 2010 reached L.E. 107 million (about $ 18.4 million) posted on L.E. 197 million gross revenues. No comparison figures were given. New sales contracted already during the quarter were put at L.E. 271 million. Meanwhile the company said it has started delivery of sold units at its Algheria Housing Project consisting of 800 housing units predicting to complete delivery of all units during the next 12 months.

Nov 25, 2010

River Ports - Tenders SectionIntegrated JobsGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Local Administration Authorities

Sohag Governorate, Local Municipality of Markaz & City Balyana, The CashierConducting the required (a) civil works for the river birth in El Balyana City, also (b) beautification & landscaping of El Balyana City entrance.

80,000 & 1,725 LE

Dec 12, 2010 Dec 28, 2010

River Ports - Non Tenders Section Type Description Date Published

Projects in Pre-Tendering PhaseNorth Sinai Governor has launched an L.E. 185 million project to build a fishing port & a fishermen village in El Arish City in North Sinai. Project is backed by foreign aid funds at the Ministry of State for International Cooperation & the equivalent of L.E. 85 million were already released to proceed with the project. Project provides for the construction of a dock for fishing vessels of reasonable capacities, a fishermen services complex, ice factories, fish freezing & canning facilities among other typical support facilities. Implementing Agency is the Red Sea Ports Authority.

Nov 02, 2010

Roads Construction - Tenders SectionIntegrated JobsGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Airports & Ports

Alexandria & Dekheila Port Authority, The Cashier

39 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 40: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Conducting the annual maintenance of roads, yards & networks at both Alexandria & Dekheila Ports.

60,000 LE

Nov 29, 2010 Jan 20, 2011

Assuit University, the Establishments Dept.Implementing the infrastructure for Assuit University Extensions Project in New Assuit City including main roads works, sanitary drainage works, potable water networks & auxiliaries, also electrical & lighting works. Job is indivisible.

700,000 LE

Nov 01, 2010 Nov 29, 2010

Cairo Governorate, Al Salam District Adm., The CashierPaving and repaving of roads and streets within the district during FY 2010/ 2011 under 2 contracts.

25,000 & 50,000 LE

Oct 16, 2010 Oct 28, 2010

Cairo Governorate, Menshat Nasser District Revamping Project,, The CashierRe-paving of streets within the district in the section from the inlet to King Khaled Bridge till Qayetbay St. opposite the District premises.

50,000 LE

Oct 10, 2010 Oct 20, 2010

Dakahleyya Governorate, the Roads & Transport DirectorateConstruction, paving, re-paving & renovation of roads at subordinated locations under 5 contracts. Deadlines 12/6, 12/6, 12/7, 12/7 & 12/8/2010.

70,000 & 50,000 & 60,000 & 22,000 & 50,000

LE

Nov 11, 2010 Dec 08, 2010

Construction, paving, re-paving & renovation of roads at subordinated locations under 5 contracts. Deadlines 12/8, 12/9, 12/9, 12/12 & 12/12/2010.

18,000 & 65,000 & 50,000 & 20,000 & 35,000

LE

Nov 11, 2010 Dec 12, 2010

Damietta Port Authority, Central Dept. for Finance & AdministrationConducting the required (a) construction & pavement of the yard behind dock No. 15 of 16,000 M2 area and (b) dredging, excavation & deepening of the aquatic area opposite the extension of the offshore services' dock.

75,000 & 15,000 LE

Oct 29, 2010 Nov 22, 2010

Egyco - El Nasr Co. for Buildings & Construction,, The CashierCompletion of the paving of roads within (a) the 5th residential district at New Beni Suif City & (b) the location of the Sanitary Drainage Station in Mahmoudiya City in Beheira.

100,000 & 25,000 LE

Oct 20, 2010 Nov 03, 2010

Egyptian Contracting Co. - Mokhtar Ibrahim, the Contracts Div.Construction of (a) internal & external roads serving Build Your Own House Scheme at New Sohag City, also (b) internal roads at El Gelawiya Village in Sohag Governorate.

120,000 & 10,000 LE

Dec 16, 2010 Dec 27, 2010

Gen. Authority for New Urban Societies, New Assuit City Development AgencyConducting the required base layers works for roads at the City's south east extensions. 300,000 LE

Oct 19, 2010 Nov 21, 2010

General Authority for New Urban Societies, New Fayyoum City Development Agency, The CashierSupply & fixing of base layers for roads within the City's third stage extension. 50,000 LE

Dec 30, 2010 Jan 26, 2011

40 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 41: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Roads Construction - Tenders SectionIntegrated JobsGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Airports & Ports

General Authority for New Urban Societies, New Minya City Development AgencyDouble tracking of an 8 Km long section of the Eastern Desert Road extending from Al Shoriani Main Road till El Safa Security Check Point.

50,000 LE

Oct 12, 2010 Nov 21, 2010

Paving of internal & external roads for the Build Your Own House Scheme within the City. 50,000 LE

Nov 08, 2010 Dec 13, 2010

General Authority for New Urban Societies, New Qena City Development Agency, The CashierProtecting the City from flood risks by building 4 stopper dams & one directing dam. 200,000 LE

Oct 12, 2010 Nov 21, 2010

General Authority for New Urban Societies, New Salheyya City Development AgencyConducting the required site coordination & landscaping works at the location of Build Your Own House Project & along surrounding roads within the City.

200,000 LE

Nov 24, 2010 Dec 27, 2010

General Authority for New Urban Societies, Tenth Ramadan City Development AgencyConducting the required site coordination & landscaping works at the location of Build Your Own House Scheme a t the City's 10th District.

250,000 LE

Oct 07, 2010 Oct 28, 2010

Matrouh Governorate, the General SecretariatPaving of roads at different subordinated villages under four contracts. Deadlines 10/25, 10/26, 10/27 & 10/28/2010.

50,000 & 50,000 & 18,000 & 40,000

LE

Oct 14, 2010 Oct 28, 2010

Conducting the required (a) completion of Al Obayyed Cornish Road & the construction of a road leading to Al Qasr Beach, also (b) phase one of Al Amal road extending from Al Andalusiya till Al Hashish Port.

100,000 & 25,000 LE

Nov 25, 2010 Dec 09, 2010

Conducting the required (a) completion of the decorative fence at the City's eastern entrance of 3 Km length, (b) construction of a shopping complex for sheep on El Salloum Road, (c) completion of El Hana Resort on El Cornish Road & (d) paving of Al Obayyed Road & the entrance of Al Qasr Beach. Deadlines 1/12, 1/13, 1/16 & 1/18/2011.

27,000 & 10,000 & 17,000 & 100,000

LE

Dec 30, 2010 Jan 18, 2011

New Urban Communities Authority, New Cairo City Development Agency, The CashierRepaving, using asphalt, to overcome defects of laying underground telephone cables executed by Telecom Egypt in the City.

50,000 LE

Nov 13, 2010 Dec 09, 2010

41 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 42: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Roads Construction - Tenders SectionIntegrated JobsGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Airports & Ports

Port Said Governorate, the Finance DepartmentConducting the required (a) revamping of Port Said beach, also (b) repaving of roads within Al Zohour District.

150,000 & 23,000 LE

Dec 26, 2010 Jan 09, 2011

42 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 43: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Roads Construction - Tenders SectionIntegrated JobsGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Airports & Ports

Sharkeyya Governorate, Administration of Markaz & City of Minya El QamhPaving of some streets within the City & at subordinated villages. 70,000 LE

Oct 10, 2010 Oct 24, 2010

43 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 44: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Roads Construction - Tenders SectionIntegrated JobsGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Airports & Ports

Southern Sinai Governorate, Local Municipality of Ras SidrConstruction & paving of internal roads in the City & at subordinated villages. 80,000 LE

Oct 30, 2010 Nov 10, 2010

44 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 45: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Roads Construction - Non Tenders Section Type Description Date Published

Projects Awards ARABCO - Arab Contractors, Osman A Osman & Co. is to build one million housing units in Iraq. That was the front page title in the media quoting ARABCO Chairman, Eng. Ibrahim Mehlib, after his meetings with the Iraqi Prime Minister, the Iraqi Minister of Housing and with members of the board of Directors of the Iraqi National Businessmen Council. Eng. Mehlib has further revealed that ARABCO was also awarded the reconstruction of Al Rashid (Historic) St. in Baghdad. The executive noted that the Iraqi Prime Minister has directed to qualify ARABCO to bid, together with other 8 international companies, for the Baghdad underground metro project and for the revamping of the streets surrounding the (National) Conferences Hall to host the next Arab Summit in February 2011 next.

Nov 05, 2010

Projects in Pre-Tendering PhaseCEO of EFG Hermes, Egypt's leading investment bank, predicting $ 45 billion investments are required to revamp the country's transport, energy & communications sectors the next 5 years. The Executive, Mr. Yasser Al Mallawani, was addressing a forum on the public Private Partnership initiative, held recently in Cairo. He praised the government efforts spent to consolidate the said partnership to convert it into solid & promising investment opportunities with reasonable options to get finance from the banking sector.

Dec 15, 2010

Egyptian Armed Forces revealing impressive civil contribution to the country's forthcoming socio-economic development over the next few years worth almost L.E. 4.7 billion (not to overlook other billions pumped in other civil sectors known to each Egyptian extending from bread to health care & from sports infrastructure to vocational training a.o.) The figure involves L.E. 1.5 billion for the reclamation & plantation of 100,000 feddans in Toshki at L.E. 15,000 per feddans development cost including the construction of 1,000 housing units for the employees accommodation, L.E. 1 billion to extend electricity to the project, L.E. 1.8 billion for the Upper Egypt Highway & L.E. 400 million for Sohag Airport. On top comes the construction of ten Cancer Treatment Centers in the different governorates.

Oct 31, 2010

Egyptian Federation of Building & Construction Contractors has invited its members interested in projects abroad (Arab & African Countries) to register their data. Applications must specify the contractors technical & financial capabilities, also their past performance during the past 5 years & their estimate to the size or volume of projects they can execute, also their capability to raise required bid & performance bonds. The Federation noted that it is on its way to open representative offices at same Arab & African Countries. Applications are to direct to the Federation's Office in Nasr City, 9th Zone, Artist Emad Hamdi St., off Mustafa El Nahhas St., Cairo, Tel. 02 - 24727256 / 7/ 8/ 9 , Fax. 02 - 24727260 (No mention was given to Email or web site).

Dec 18, 2010

L.E. 150 million project was launched to build a 16 Km long road between Fowa Bridge across the Nile in Dakahliya with Damanhour/ Mahmoudiya road in Beheira. That was announced by General Mohamed Sharawy, Governor of Beheira, indicating that site clearance procedures for 48 feddans land have been initiated by the concerned Local Administration Authorities to enable starting works on the project.

Dec 16, 2010

L.E. 180 million project was launched to revamp & double track a 40 Km long section of Qena / Safaga Road to overcome risky curves & limit accidents along it. That was reported in the media quoting Eng Alaa Fahmy, Minister of Transport, who indicated that the project is scheduled for completion in 18 months. The 160 Km long road is deemed the shortest horizontal road to link the Red Sea with Upper Egypt Governorates. The revamped section extends from the southern part of Safaga City till kilo 40.

Dec 05, 2010

L.E. 50 million budget funds were endorsed by the Ministry of Transport for the paving & double tracking of a 40 Km long section of Safaga/ Qena Road. That provides for the securing of dangerous curves along the road, starting with Safaga Security Point till the beginning of Sohag/ Safaga Road to smooth traffic density & address traffic accidents in that area & absorb increased traffic on Red Sea Corridors. That was announced by General Said Gabr, Secretary General of the Red Sea Governorate.

Oct 14, 2010

Minister of Transport, Eng. Alaa Fahmy, has launched a new Ring Road of 65 Km total length to link the existing ring road with the regional ring road to go under L.E. 800 million to L.E. 1 billion investments. The project, identified as the Eastern Arc, will start from the Autostrad, next to Shaqq Al Tho'oban area & end at Shoubra/ Benha highway to be built next year. Project will improve traffic between south east Cairo with east Cairo & Ismailiya.

Dec 06, 2010

Since long announced L.E. 116 billion project to develop 5,600 feddans (about 23.5 million M2) land in New Cairo city seems getting closer to implementation phase. A company was formed to execute the project identified as Al Wehda Company for Real Estate & Tourists Investments grouping the New Urban Societies Authority holding 22 % shares and Libya Investment Company holding the remaining 78 %. Project will be executed over 6 stages for completion in 20 years.

Dec 16, 2010

45 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 46: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Schools & Other Educational Buildings - Tenders SectionIntegrated JobsGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Education

Al Azhar University, the Business & Engineering Consultancy CenterCompletion & finishing of (a) the administrative building of Al Shari'aa & Law Faculty for Male in Nasr City, (b) the Library building at the same faculty, also (c) the lecture halls building at the Faculty of Commerce for Male, also in Nasr City. Deadlines 11/8, 11/9 & 11/10/2010.

25,000 & 35,000 & 50,000

LE

Oct 23, 2010 Nov 10, 2010

Benha University, the Engineering Dept., The CashierConstruction of (a) an educational & administrative building (phase 1) on the University's land in Kafr Saad, also (b) painting of the Social Science Faculties Building in Benha.

280,000 & 18,000 LE

Nov 24, 2010 Dec 02, 2010

GAEB - General Authority for Educational BuildingsConstruction of seven different level schools within Qena Governorate under funding from a German Grant & an Egyptian German Debt Swap deal under 7 contracts.

43,000 & 45,000 & 47,000 & 56,000 & 48,000 & 41,000 & 63,000

LE

Nov 04, 2010 Dec 20, 2010 Job goes under funding from a German Grant

Resala Charity Society, The CashierConstruction of the second phase of Resala school. 200,000 LE

Nov 24, 2010 Dec 19, 2010

Schools & Other Educational Buildings - Non Tenders Section Type Description Date Published

Business News An unnamed large sized entity has announced its interest to acquire private schools in all governorates country wide. For inquiries contact Mob. 014 - 1339938 daily 10 a.m. to 4 p.m. except Fridays.

Dec 07, 2010

Projects in Pre-Tendering Phase100 feddans land were allocated in Al Obour City to implement the Egyptian Italian University thereon. That was announced by Dr. Hani Hilal, Minister of Higher Education. On her side, Minister of State for International Cooperation, Mrs. Fayza Abul Naga, has discussed with her counter partner, Italian Minister of State for Foreign Affairs, the procedures for starting to implement the project & related equity formalities. N.B. Development marks tangible interest of Italy to further deepen & enhance relations with Egypt. It is also deemed, for Egypt, another milestone laid to revamp its higher & technical education sector.

Oct 21, 2010

Amer Group announced it would soon start works on Porto Matrouh project with its first phase scheduled for inauguration in summer 2011. Project provides for the implementation of an international summer resort on the Mediterranean coasts similar to those now existing in Cyprus. Meanwhile Chairman of the group, Mr. Mansour Amer, revealed another unique university project capitalized at L.E. 5.5 billion to be built in Al Alamein in cooperation with California University to host up to 10,000 students .This is the first involvement of the California University in the Middle East. The project will start with 3 faculties for engineering, for arts and for economics. Mr. Amer has further revealed that his group will exploit distinguished locations of its projects along the Mediterranean to involve with wind energy recovery farms.

Dec 14, 2010

Matrouh Governorate has endorsed the constitution of six now projects to engage with hotels & tourist development involving L.E. 1.03 billion investments. That was reported in the media indicating they include an L.E. 375 million project in El Dhabaa to host 1,772 hotel rooms & another L.E. 320 million project in Sidi Abdel Rahman to host further 950 hotel rooms. Meanwhile the Governorate's Investment Committee has licensed other six investment projects involving further L.E. 279.5 million investments including four tourist development projects in Matrouh & along the North West Coast, an educational project & a service project.

Dec 18, 2010

Sea Ports - Non Tenders Section

46 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 47: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Sea Ports - Non Tenders Section Type Description Date Published

Business News Commercial Councilor at the US Embassy in Cairo has predicted bilateral trade and investment ties between Egypt and the US will witness a real boom in the next stage. The official noted that the US Egyptian economic agenda is full of important economic events. She has revealed that negotiations are now ongoing between Egyptian and US companies paving the way for the later to penetrate the market with giant investments. Particularly targeted are fields related to infrastructure, sea ports, new and renewable energy with special stress on wind energy, also I.T. She has indicated that a trading and industrial delegation of mega US companies is expected in Cairo & Alexandria during March 2011 next targeting to increase US investments in Egypt, now put at 8.8 billion. The official praised the development of US annual exports to Egypt reaching $ 5.3 billion.

Oct 21, 2010

Projects in Pre-Tendering PhaseL.E. 100 million project was launched to extend the containers terminal at Damietta Port. That was announced by General Mohamed Saad Zaghloul, Chairman of Damietta Co. for Containers & Cargo Handling indicating the project provides for the procurement of gantry cranes and other containers handling equipment to move containers from vessels to warehousing yards. The Executive has further revealed that the project provides for a technical training component for the company employees to raise their efficiency and productivity.

Nov 25, 2010

Red Sea Ports Authority has pledged L.E. 30 million budget for the revamping of Safaga & Hurghada Sea Ports. That was reported in the media indicating that L.E. 15 million of the figure will back the extension of Safaga Port by adding 65,000 M2 area thereto, also construction of a 12,000 M2 passengers terminal & VIP lounge. Project also provides for the building of a 44 meters high guidance tower, a double floor administrative building & a 300 meters long road to link the port with the main roads. The other L.E. 15 million will back the revamping of Hurghada port. It provides for a 230 meters prolongation of the port dock of 10 meters depth to enable receiving long tourist vessels.

Nov 19, 2010

Steel Structure, Possible Prefab - Tenders SectionIntegrated JobsGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Airports & Ports

Al Fath Co. for Contracting, Trade & Construction - Shetat & Co, affiliated to Al Fath Group, The CashierRequest of offers from specialized contractors for various works pertaining to Asfour Specialist Hospital Project including (a) false suspended ceilings, (b) aluminum works, (c) built separators, (d) doors works, (e) cretal works & (f) GRC works for front side walls. Deadlines 1/9, 1/10, 1/11, 1/12, 1/13 & 1/13/2011.

66,000 & 158,500 & 5,500 & 112,000 & 6,750 & 12,000

LE

Dec 17, 2010 Jan 13, 2011

Alexandria & Dekheila Port Authority, The CashierConstruction of (a) two water storage tanks (an overhead tank & an underground tank) and linking them to the fire fighting network at Dekheila Port to increase the network's pressure, also (b) a warehouse for spare parts at Dekheila Port .

150,000 & 18,000 LE

Nov 29, 2010 Jan 24, 2011

Alexandria Governorate, Alexandria West District Administration, The CashierElevation of industrial blocks at different locations within the craftsmanship complex in New Minshiya District.

50,000 LE

Dec 25, 2010 Jan 10, 2011

Assuit Governorate, the Housing DirectorateConstruction of two flyover bridges for pedestrians including (a) one across El Galaa St. & El Geish St. & (b) another across El Mallah Canal & the Ring Road within El Arbe'in District.

40,000 & 50,000 LE

Oct 23, 2010 Nov 08, 2010

Banque Misr, the Engineering Affairs DepartmentConstruction of (a) an alternative residence for El Wasta Branch & (b) warehouses & steel sheds at the Bank's warehousing yard in Beni Suif.

N/A LE

Oct 27, 2010 Nov 23, 2010

47 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 48: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Beheira Governorate, the General SecretariatRequest of best offers & proposals in public auctions for the building & operation, under B.O.T., of wholesale complexes for cattle within (a) Markaz & City of Shubrakhit, (b) Markaz & City of Al Delingat & (c) Markaz & City of Abu Hommos. Deadlines 1/10, 1/12 & 1/13/2011.

100,000 each LE

Dec 18, 2010 Jan 13, 2011

CEPC - Cairo Electricity Production Co., The CashierRequest of offers from eligible bidders for the design, engineering, fabrication, furnishing, delivery to site, storing, installing, training, testing, start up, commissioning, including all required civil & electromechanical works, placing into successful operation & maintaining until issuance of the OAC - Operation Acceptance Certificate, prepared of detailed drawings & technical documents, preparing as built documents and putting into service of the 500 kV 220 KV insulated switchyard pertaining to North Giza 1,500 MW combined cycle power station. Job goes under funding from the World Bank & Opec Development Fund.

2,500,000 $

Nov 14, 2010 Jan 20, 2011 Job goes under funding from the

World Bank & Opec Development Fund

Damietta Governorate, Youth & Sports DirectorateRevamping of the indoors sports hall in Ras El Barr. 50,000 LE

Oct 13, 2010 Oct 25, 2010

Construction of an indoors sports hall within Damietta Sports Stadium. 250,000 LE

Dec 29, 2010 Jan 12, 2011

Damietta Potable Water Co., the Contracts & Purchases DepartmentSupply & erection of the required equipment & works for the equipping & & furnishing of the Training Center at Al Adliya potable water treatment plant.

50,000 LE

Oct 23, 2010 Nov 27, 2010

East Delta Co. for Transport & Travel, the Projects Dept.Construction of an onshore port in Ismailiya. 50,000 LE

Dec 02, 2010 Dec 20, 2010

EEAA - Egyptian Environment Affairs AgencyCompletion of fences & administrative buildings at the so called Rock Forest Natural Protectorate. 50,000 LE

Dec 26, 2010 Jan 10, 2011

El Tayaran [ Aviation ] Sports ClubRequest of offers to implement phase 1 of the Club's new branch in New Cairo City. 100,000 LE

Dec 24, 2010 Jan 15, 2011

General Authority for New Urban Societies, General Secretariat,, Central Stores and Purchases Dept.Supply of (a) 12 long chassi water tank lorries of 8 to 10 M3 size, (b) 12 dump truck with box of 8 to 10 M3 size, (c) one flat bed truck with 8 to 10 tons box, also (d) 12 trucks for garbage collection & compaction of 10 M3 size. Deadlines 11/9, 11/22, 11/23 & 11/28/2010.

48,000 & 50,000 & 5,250 & 83,000

LE

Oct 17, 2010 Nov 28, 2010

General Authority for the High & Asswan Dam, the Contracts & Purchases Dept.

48 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 49: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Consolidation & revamping of Asswan Dam gates. 250,000 LE

Dec 12, 2010 Jan 05, 2011

General Dept. for Drainage Projects in Central Egypt, Beni SwefCompletion of the construction of drainage pumping stations No. 1 & 2 on Makhar Seil Al Mansha No. 3 along Makhar Seil Ghammaza within Markaz El Saff in Helwan Governorate for completion in 14 months.

160,000 LE

Oct 01, 2010 Oct 16, 2010

General Dept. for Ismaileyya DrainageImplementing of the drainage related industrial & earthmoving works among other control facilities along Al Sandouk Drainage Canal.

60,000 LE

Dec 01, 2010 Dec 14, 2010

General Dept. for Port Said Drainage in Ismaileyya, The CashierConstruction of an overhead concrete bridge on piles across Bahr El Baqar old drainage canal at Kilo 7.800.

100,000 LE

Oct 10, 2010 Oct 25, 2010

General Dept. for the Maintenance & Protection of Greater Reservoirs & BarragesRequest of offers from eligible contractors for the maintenance & consolidation of Ismailiya Canal Barrage & Lock.

50,000 LE

Dec 30, 2010 Jan 17, 2011

Gharbeyya Governorate, the Finance Dept.Construction of a car parks complex in Saberbay. This is a repeated tender. 170,000 LE

Dec 25, 2010 Jan 09, 2011

Matrouh Governorate, the General SecretariatConducting the required (a) completion of the decorative fence at the City's eastern entrance of 3 Km length, (b) construction of a shopping complex for sheep on El Salloum Road, (c) completion of El Hana Resort on El Cornish Road & (d) paving of Al Obayyed Road & the entrance of Al Qasr Beach. Deadlines 1/12, 1/13, 1/16 & 1/18/2011.

27,000 & 10,000 & 17,000 & 100,000

LE

Dec 30, 2010 Jan 18, 2011

MDEPC - Middle Delta Electricity Production Co. - Dakahliya Branch, The CashierRequest of offers from local & international contractors regarding the civil works package pertaining to Benha 750 MW combined cycle power station under funding from the SDF - Saudi Development Fund.

2,000,000 $

Dec 19, 2010 Mar 14, 2011 Job goes under funding from the

SDF - Saudi Development Fund

Ministry of Water Resources & Irrigation, the Grand Reservoirs & Barrages Div.Request of offers from specialized companies for the rehabilitation/ replacement of the bridge's roof & the maintenance of Al Bustan Barrage at Kilo 28.500 on Noubariya Canal.

60,000 LE

Oct 17, 2010 Nov 03, 2010

Minya Governorate, the General SecretariatCompletion of Mubarak Conferences & Celebrities Center, construction of chalets & buildings, also maintenance & revamping of the existing establishments.

350,000 LE

Oct 08, 2010 Oct 14, 2010

49 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 50: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Completion of Mubarak Conferences & Celebrities Center, construction of chalets & buildings, also maintenance & revamping of the existing establishments.

350,000 LE

Oct 08, 2010 Oct 14, 2010

Construction of 50 chalets & swimming pools among other works. 180,000 LE

Oct 18, 2010 Nov 03, 2010

Potable Water & Sanitary Drainage Co. in Assuit, The CashierRehabilitation/ replacement of (a) Al Berka sanitary drainage water lifting station in Assuit City, also (b) construction of fences around potable water stations in Manfalout, Al Qousiya & Deirout.

60,000 & 12,000 LE

Nov 24, 2010 Dec 15, 2010

Potable Water Co. of Alexandria, The CashierConducting the required (a) rehabilitation of establishments at the City's Eastern Sector & qualifying them for the ISO 9001/ 2008, (b) maintenance & renovation of other establishments at the same sector, (c) rehabilitation/ replacement of underground water tank no. 4 of 6,000 M3 capacity & (d) construction of the pumps house at Kilo 58 booster pump. Deadlines 12/9, 12/11, 12/13 & 12/15/2010.

20,000 & 30,000 & 200,000 & 20,000

LE

Nov 22, 2010 Dec 15, 2010

Potable Water Co. of Greater Cairo, Contracts & Purchases Dept.Construction of a fence & a guards' room at the location of Qal'eet El Kabsh water storage tank, conducting the site coordination works & renovation of the warehouse flooring below the tank, also furnishing of a security room & lavatories at the location.

55,000 LE

Nov 08, 2010 Dec 09, 2010

50 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 51: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Steel Structure, Possible Prefab - Tenders SectionSupply JobsGenerating Sector Subject Bid Bond Currency Publish Date Expiry Date Financing

Local Administration Authorities

Minya Governorate, the General SecretariatSupply, erection & commissioning of different shape public lighting rods & decorative rods. 260,000 LE

Oct 18, 2010 Nov 02, 2010

Steel Structure, Possible Prefab - Non Tenders Section Type Description Date Published

Business News Acrow Misr for Metallic Scaffoldings has invited its original shareholders to subscribe in capital increase shares worth L.E. 21,093,750 to become L.E. 63,281,250. Shares bear L.E. 10 nominal value each + L.E. 0.25 issuance premium. Subscribers are requested to pay the full value of shares. Offer is valid 1/18/2011 till 2/17/2011 and need be effective at Misr Iran Development Bank and its branches network. The company operates under the provisions of investment law 43/74 with factories and head offices located at Wadi Hof, Helwan. Chairman and Managing Director is Eng. Osama Kamal AL Garf. Shareholders in the company include ICON and Arab Contractors for Investments.

Dec 28, 2010

Media repots have revealed that GASC - General Authority Supply Commodities is trying to increase the country strategic inventory of wheat to the equivalent of 6 months consumption (rather than 3 months). Reports quoted a governmental source indicating that GASC is intensifying its orders placed to import wheat fearing possible wheat shortage on the world markets during the period March / June 2011. He added that GASC is now placing orders for wheat almost weekly rather than two to three orders monthly & that at a time when unfavorable climate is greatly contributing to the reduction of the world supply. This is obviously executed at tangible cost to the burden of the national economy, the state budget & the balance of trade. N.B. Neutral & serious observers are raising the two questions circulated since years concerning the rationalization of wheat consumption; bluntly by stopping the use of wheat as fodder & the prompt & immediate revamping of wheat warehousing silos whether at PBDAC warehousing yards or at the (state owned) flour milks. People need to feel that wheat consumption is a national security issue which could not afford unjustified delays in the construction of grain silos or inefficient controls of the flour distribution & bread waste to pump dirty cash in the pockets of private bakeries, poultry & other cattle growers, not to overview Tamiya outlets. N.B. The daily Al Wafd of the same day (P.1) indicated that annual wheat waste due to warehousing deficiency is estimated at 1 million tons & that annual wheat import bill is put at $ 2.2 billion.

Dec 20, 2010

Fairs and ExhibitionsBeem Egypt 2010 - International Exhibition for Construction Equipment, Concrete, Earthmoving Equipment & Infrastructure is now to be held December 23 to 26, 2010 at Cairo Fairs Ground. P. Event is held under the auspices of Cairo Governor, Dr. Abdel Azim Wazir. Exhibited are heavy duty machinery & equipment, concrete mixers & compactors, prefab buildings & caravans, manual tools, roads paving equipment, scaffoldings & metallic forms, survey instruments, drilling equipment, power generators, steel rebars & channels, ready mix concrete stations, production lines for bricks, steel benders & cutters, trucks & dump trucks, engines & pumps, production lines for concrete pipes, specialized engineering software, foundations & soil test instruments, also sanitary drainage pipes. Event is organized by AGD - Arabian Group for Development, Tel. 02 - 33037257/ 33016049, Fax. 02 - 33046007, E Mail [email protected] alternatively web site www.agd-exhibitions.net

Dec 08, 2010

51 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 52: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Steel Structure, Possible Prefab - Non Tenders Section Type Description Date Published

Loans & GrantsBanks are competing for extending Sumid a $ 200 million loan to finance its extensions & for extending EGPC an L.E. 500 million loan to finance a hospital project for the Petroleum Sector Employees. The first loan will part finance the construction of additional oil storage tanks in Ein Al Sukhna. An alliance grouping Banque Misr, NSGB - National Societe General Bank & CIB - Commercial International Bank is competing with NBE - National Bank of Egypt on the deal. Worth indicating is that Sumid is 50 % owned by Egypt, 15 % each by Saudi Arabia, Kuwait & the UAE and 5 % by Qatar. Sumid pipeline extends from Sukhna on the Suez Gulf till Sidi Kreir on the Mediterranean.

Dec 26, 2010

Banque Misr was declared winner of a deal to extend L.E. 1 billion loan (55 to 60 % of which in US $) in favor of Al Kharafi Group of Kuwait to part finance earlier awarded L.E. 3.52 billion contract to build two 500 MW power stations in Damietta & Ismailiya. Loan will be mainly used to issue the required letters of guarantees pertaining to the contracts. Client is EDEPC - East Delta Electricity Production Co. Banque Misr said it would later market & promote trenches of the loan among other banks operating in the country. N.B. Worth indicating that Al Kharafi Group has outbid both GE of the US & Ansaldo of Italy in winning the job, for completion & delivery in six months before entering the hot months of Summer 2011.

Oct 31, 2010

Banque Misr was selected as a lead manager for a $ 250 million syndicated loan to be raised in favor of OCI - Orascom Construction Industries. That was reported in the media indicating that the loan is for repayment over 5 years & that it will be used to finance the company's future extensions. The company is deemed among the largest contracting companies in Egypt & the Arab World and its consolidated statements for the first half of 2010 showed some 21.3 % growth. Reports noted that two months earlier OCI was extended a Euro 175 million loan from Rabo Bank of Holland to finance its acquisition of a Dutch nitrogen gas producer (obviously to consolidate its pretty strong fertilizers product mix). N.B. Stability of the OCI share price on the Cairo Stock Exchange over the past turbulent weeks is further proof to the company's strength & sustainability.

Oct 31, 2010

KD 300,000 grant (about $ 1million) extended by the KFESD - Kuwait Fund for Economic & Social Development to finance a comprehensive study for the revamping of Ngee Hamadi Eastern Canal, its branches & hydraulic structures along it. An agreement on the above was recently signed in Cairo by Mrs. Fayza Abul Naga, Minister of State for International Cooperation & representatives of the KFESD.

Dec 23, 2010

Privatization and InvestmentsAn unnamed entity has offered for sale or lease a luxurious sports/ social club occupying 21,000 M2 area at a most distinguished location at the second tourist village in 6th October Governorate. Interested parties are to contact Tel. 02- 38365872, or Mobile 010 - 2202853 / 6866917.

Nov 05, 2010

Damietta Port Authority has postponed the deadline of the public auction for a license to extend vessels fueling service at the Port's external vessels waiting zone to now become 1/24/2011 instead of 1/10/2011. Specs fees are L.E. 500 & bid bond requested is $ 5,000 . For inquires contact Tel. 057/ 5290936/ 7.

Dec 31, 2010

Ministry of Trade & Industry, the Internal Trade Development Authority has repeatedly postponed the deadline given to investors best offers & proposals in a public auction for the development, management & operation of internal trade zones in Mansoura, Tanta, Kafr El Dawar, Damanhour, Port Said, Beni Suif & Luxor to now become 1/30/2011 instead of 11/28/2010. Specs fees are L.E. 5,000. Pre bid meeting is now set for 12/20/2010 at noon time at ITDA Office. For inquiries visit web site www.itda.gov.eg or contact Tel. 02 - 22715040/ 22715268.

Nov 26, 2010

New Urban Societies Authority has finalized the sale of 37,566 M2 lands in ten lots to build vehicles fuelling stations thereon in new cities yielding the treasury some L.E. 67.6 million. Sold lots are located in 6th October City, 15th May City, Badr City, New Borgel Arab City, Al Shorouk City, New Beni Suif City, New Assuit City, New Fayyoum City, New Nubariya City & Gulf of Suez. The Authority noted that auctions for other 7 lots were postponed since prices offered did not match earlier preset values. N.B. Fact remains that the market for building & operation of vehicles fuelling stations is posed to witness a huge boom sending pretty promising news to suppliers & contractors for vehicles fuelling equipment, for fire alarm & fire fighting equipment, for steel structure, also for other relevant electromechanical, automation & process control equipment.

Oct 31, 2010

52 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 53: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Steel Structure, Possible Prefab - Non Tenders Section Type Description Date Published

Projects Awards Egyptian Contracting Co. - Mokhtar Ibrahim was declared holder of the best technical offer for an L.E. 300 million contract in the Sultanate of Oman to extend main potable water pipelines & build water tank trucks filling stations and water storage tanks in the Eastern Province for completion in 24 months. Competing for the job were 16 local & international companies. That was announced by Eng. Ali Abu Halawa, Chairman of the company indicating that the company has so far implemented in the Sultanate four potable water pumps & pipelines projects worth almost L.E. 1.3 billion. Client is the Omani Water & Electricity Authority.

Oct 14, 2010

Media has reported on awarding an L.E. 3.3 billion contract to a state owned Chinese Co. to execute the long announced Expo City Complex in Nasr City, Cairo. Reports quoted Eng. Sherif Salem, Head of the International Trade Fairs & Exhibitions Authority indicating that the project provides for the construction of 9 exhibition halls, a 5 - stars hotel & a huge conferences hall apart from an overhead bridge to link Cairo Fairs Ground with Cairo International Conference Center. N.B. Project sounds in need of further confirmation from the concerned entities.

Nov 11, 2010

Shipyard Division of ARABCO - Arab Contractors got an order to build 5 Nile ferries worth L.E. 23 million to serve 5 Upper Egypt Governorates. Client is the Ministry of Local Development & the ferries will be operated by Beni Suif, Menia, Assuit, Qena & Asswan Governorates. That was announced by General Abdel Salam Al Mahgoub indicating that ferries will meet all safety codes to secure trips across the Nile. General Mahgoub noted that the ferries are scheduled for delivery by the end of the FY 2010/ 2011. He revealed that so far 10 similar Nile Ferries worth L.E. 47 million were earlier delivered to Beni Suif, Menia, Assuit & Sohag. N.B. Worth indicating is that Egypt has a strong national vessels industry operating at a pretty high local manufacture component.

Dec 07, 2010

Projects in Pre-Tendering PhaseAn L.E. 30 million project was launched to build a social & sports complex for youth in Oyoun Moussa on the east side of the Suez Canal. That was announced by Suez Governor, Gen Seif El Din Galal, Indicating that the project will be financed by L.E. 10 million contribution from the Governorate with the remaining L.E. 20 million to be raised by the National Council for Sports. The project will occupy 10 feddans land & will comprise a glass made squash play court & swimming pools both duly equipped to host international sports championships.

Dec 17, 2010

Eight new investment projects were recently licensed at Ismailiya First Industrial Zone involving L.E. 15.6 million total estimated investments. That was announced by a high ranking executive at Ismailiya Governorate indicating the projects would generate 367 employment opportunities. They included, among others, an L.E. 4.3 million cold store project for food products, another L.E. 1.8 million project for the sorting, packaging & warehousing of food products & an L.E. 1.2 million project for the packaging of vegetables & fruits, also production of fruit juices. They further include an L.E. 333,000 project to produce packaging & wrapping materials.

Nov 01, 2010

Four new projects were licensed recently at Abu Khalifa Industrial Zone in Al Qantara Gharb involving L.E. 18 million investments, to generate 198 employment opportunities. That was announced by General Abdel Gelil Al Fakharani, Ismailiya Governor, indicating that they include an L.E. 7.5 million project to produce paints, another L.E. 2.2 million project to produce fodder, a third L.E. 5 million project for the forming of metals & an L.E. 3.3 million project to produce chemicals.

Nov 16, 2010

L.E. 14 million project launched by Beheira Governor, Mr. Mohamed Sha'arawi, to build two shopping complexes for fish & vegetables in Rashid City on 1,700 M2 area outside the residential block. The Official indicated the project targets emptying the City's historic streets from freelance traders. He noted that according to the pre set time table, the project is scheduled for completion by the end of January 2011. The City stands huge future potential & is now witnessing the execution of several urban development & landscaping projects.

Nov 01, 2010

L.E. 170 million budget funds were endorsed for the construction of 12 natural gas fuelling stations for the mass transport buses, also for extending credits to citizens to convert 12,000 passenger vehicles to operate with natural gas. That was announced by Eng. Same Foamy, Minister of Petroleum & Minerals, indicating that the new stations will be built in Alexandria, Suez, Menia, Shag, Cairo, Dakahliya & 6th October Governorates. Figure will increase total number of natural gas fuelling stations serving mass transport buses to 60 country wide.

Nov 23, 2010

L.E. 24 million budget funds endorsed in the 2011/ 2012 plan by Eng. Hassan Saqr, Head of the National Sports Council, for the construction of El Arish Sports Stadium. That excludes the cost of a large sized plasma screen & cost of the construction of a school for sports talented. That was announced by Mr. Mustafa Head of the Central Investment Dept. at the Council indicating that Eng. Saqr has requested the preparation of a feasibility study to build a sports unions' complex in El Arish City.

Nov 23, 2010

L.E. 41 million project was recently endorsed by the Ministry of Culture to revamp Mit Rahina antiquities area in Cairo. According to Dr. Zahi Hawwas, Secretary General of the Supreme Council of Antiquities, the Antiquities Engineering & Environment Center at Cairo University was assigned to prepare a study on the underground water level & water table at the area to be implemented by the National Defense Council at L.E. 16 million. Project also provides for the building of fences around the antiquities area at L.E. 10 million costs & determining the path of visits to the temples area, also the construction of a visitors center to explain the explain the history of the area at L.E. 5 million cost. N.B. Project contains a tangible insulation & waterproofing component including related construction chemicals.

Nov 01, 2010

L.E. 460 million overhead bridge project launched in Kalabsha, in Asswan Governorate. That was announced by Asswan Governor, General Mustafa El Sayyed, indicating the scheme will link villages on both sides of the Nile. It will be located to the north of Komombo City. Meanwhile the Governor has inaugurated two ferries to also ease Nile crossing built by Alex Shipyard.

Dec 11, 2010

53 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report

Page 54: Construction Projects - amcham-egypt.org€¦ · The Construction Projects Q4 2010 report provides a comprehensive overview of the Construction Projects sector with focus on top tenders,

Steel Structure, Possible Prefab - Non Tenders Section Type Description Date Published

Projects in Pre-Tendering PhaseL.E. 60 million flyover bridge project was launched in Al Qanater Al Khayriya to reduce traffic jam at Al Salam Square & the city entrances. That was announced by the City Mayor, Mr. Mustafa Bayyoumi, indicating that the scheme was endorsed by both Kalioubiya Governor & Minister of Transport. Implementing agency is GARBLT - General Authority for Roads, Bridges & Land Transport. The bridge will be 500 meters long. Works on the project is scheduled to start by the end of 2011.

Dec 24, 2010

Matrouh Governorate has endorsed the constitution of six now projects to engage with hotels & tourist development involving L.E. 1.03 billion investments. That was reported in the media indicating they include an L.E. 375 million project in El Dhabaa to host 1,772 hotel rooms & another L.E. 320 million project in Sidi Abdel Rahman to host further 950 hotel rooms. Meanwhile the Governorate's Investment Committee has licensed other six investment projects involving further L.E. 279.5 million investments including four tourist development projects in Matrouh & along the North West Coast, an educational project & a service project.

Dec 18, 2010

New Urban Society's Authority, 10th Ramadan City Development Agency has offered for sale in public auction land lots of less than 5 feddans area each. Lots are licensed to host various investment & service activities such as showrooms, commercial & administrative buildings, also bank branches. All lots are completely equipped with public utilities. Detailed conditions are to get from the City Development Agency against L.E. 1,000. Pre bid meeting will be held 11/29/2010 (10 p.m.) at the meeting hall of the Ministry of Housing, Ismail Abaza St., off kasr Al Eini St., Cairo. Deadline to submit offers accompanied with the requested bid bond is 12/27/2010 noon time. Payment facilities are offered to pay 10% down, among other administrative expenses, within a month of the award date, with the remaining 90% to settle via equal quarterly installments over 4 years including applicable Central Bank interest. Owners must adhere to construction specs specified in the auction conditions.

Nov 14, 2010

Red Sea Ports Authority has pledged L.E. 30 million budget for the revamping of Safaga & Hurghada Sea Ports. That was reported in the media indicating that L.E. 15 million of the figure will back the extension of Safaga Port by adding 65,000 M2 area thereto, also construction of a 12,000 M2 passengers terminal & VIP lounge. Project also provides for the building of a 44 meters high guidance tower, a double floor administrative building & a 300 meters long road to link the port with the main roads. The other L.E. 15 million will back the revamping of Hurghada port. It provides for a 230 meters prolongation of the port dock of 10 meters depth to enable receiving long tourist vessels.

Nov 19, 2010

Sources of the Ministry of Electricity & Energy indicating that tenders for the execution of the $ 1.5 billion Egyptian Saudi Interlink via a power transmission line are to be released early 2011. Project involves 1,200 Km long overhead. Project involves 1,200 Km long overhead power line, including 450 Km within Egyptian territories, and a 20 Km long underwater (marine) cable for which an offshore survey contract was signed with a specialized company. The remaining 750 Km line extends within Saudi territories. Each country will bear cost of installations within its territory. The project's feasibility is backed by the fact that peak hours differ in each country. N.B. Project involves tangible components for steel towers to carry the line, also cables, conductors & insulators, also for related automation & process control.

Oct 10, 2010

Two new projects were licensed recently in Ismailiya Governorate involving L.E. 18.3 million investments to involve with food sorting, packaging & warehousing. That was reported in the media indicating that the first project, with L.E. 16.65 million estimated investments, with involve with the packaging & warehousing of food commodities & will generate about 250 employment opportunities. The second project, with L.E. 1.66 million investments, will involve with the packaging, warehousing & distribution of food commodities & consumer products. It is identified as Al Reshedin Egypt for Trade. Both projects will be located at Ismailiya Industrial Zone.

Nov 30, 2010

Works are said to have started on an L.E. 384 million project to build a new cargo village at Cairo airport to cope with the fast increase in cargo volumes to handle by the village. That was announced by Eng. Ibrahim Manna'ee, Chairman of Egypt Air Holding Co. for Airports & Air Navigation, indicating the project is scheduled for completion in 24 months. Project comprises 26,000 M2 area for exports including 17,000 M2 for operations, 6,000 M2 for the offices of the forwarding companies & 3,000 M2 for the receipt of export shipments. Project further comprises 25,000 M2 area for imports including 17,000 M2 for operations & 2,500 M2 for customs clearing formalities.

Dec 09, 2010

54 of 54American Chamber of Commerce in Egypt - Business Information Center

Construction Projects Sector - Q4 2010 Report