Transcript of Construction of residential building summer training ppt
![Page 1: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/1.jpg)
RESIDENTIAL BUILDINGSUMIT SINGH ROLL NO:1309000107IEC-CET CIVIL ENGINEERING4TH YEAR
Summer training
on
from
Skyline engineering contracts (India) pvt. Ltd.
![Page 2: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/2.jpg)
START OF ANY PROJECT FOR BUILDING CONSTRUCTION▪ Land Acquisition
▪ Land Clearance
▪ Excavation & Compaction
▪ Leveling
▪ Demarcation Plan
▪ Layout , Shuttering And Footing
▪ Onward Construction Of Substructure & Super Structure
![Page 3: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/3.jpg)
ABOUT THE THE PROJECTProject: Assotech Blith
Group Housing Contract : Civil Work For
Assotech Blith ,Sector 99,gurgaon (Haryana)
Clint : Assotech Limited.Contractor: Skyline
Engineering Contracts (India)pvt.Ltd.
![Page 4: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/4.jpg)
ABOUT THE PROJECT
▪ Seven Towers (A,B,C,D,E&F)▪ Tower A- G+25▪ Tower B&b’ &C- G+22▪ Tower D&d’ –G+18▪ Tower E,F,G –G+22▪ 12 Acres
![Page 5: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/5.jpg)
AESTHETIC APPEARANCE
![Page 6: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/6.jpg)
FRONT VIEW
![Page 7: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/7.jpg)
MATERIALS USED
Spacers Fly ash bricks Chair
![Page 8: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/8.jpg)
MATERIALS USED
![Page 9: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/9.jpg)
MATERIALS USED
Tie rod sikanja Prop-jack
![Page 10: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/10.jpg)
MATERIALS USED
CHUCKNUT-USE WITH TIE ROD BELLER—SQUARE PIPES
![Page 11: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/11.jpg)
MACHINARY USED
Gemzen MachineBatching PlantElectric CraneJcbMechanical Pump ETC.
![Page 12: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/12.jpg)
ACTIVITIES I HAVE BEEM TRAINED ABOUT
Shuttering of stairReinforcement bar
placingShuttering of treads and
risersCasting of stairCuring of stair
STAIRCASE LayoutStarter
Brick wall MasonryFinishing
CuringPlastering
CuringPainting&
distempering
BRICKWORKLeveling
FormworkReinforcement
ConcretingFinishing
Curing
SLAB& BEAMS
LayoutStarter
ReinforcementFormwork
ConcretingCuring
COLOUMS & SHEAR-WALL
![Page 13: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/13.jpg)
•PLANNING•DESIGN•CONSTRUCTION•CHECKING•FINISHING
FOR EVERY PART
![Page 14: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/14.jpg)
COLUMN & SHEAR-WALL(LAYOUT)
With The Help Of Layout Plan ,We Do The Layout. For This Face Of Any Column Is Considered as Reference Distance Of Other Column Faces Is Measured To Fix Layout Marking --Thread Is Used
![Page 15: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/15.jpg)
COLUMN & SHEAR-WALL(STARTER)
• L –angles• 5-7.5cms height•High grade mortar
![Page 16: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/16.jpg)
STARTER MAKING
Checking starter height
Column starter formwork
Checking starter clear cover distances
![Page 17: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/17.jpg)
Column Kicker CastingIn case of column starter casting they maintained the mixing ratio about 1:1.5:3.
After kicker casting of column-2
![Page 18: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/18.jpg)
COLUMN & SHEAR-WALL(Reinforcement)
Reinforcement with the help of drawing given
![Page 19: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/19.jpg)
Reinforcement Placements of Column
Reinforcement Placements of Column according to design
![Page 20: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/20.jpg)
Tie bar spacing checking in column
end section Checking lapping length
Reinforcement Placements of Column
![Page 21: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/21.jpg)
SHUTTERING & CASTING
Column shuttering Column casting
![Page 22: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/22.jpg)
COLUMN CURING
wrapping column with jute fabric(hessian cloth) for Curing
![Page 23: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/23.jpg)
23
SHUTTERING OF BEAM AND SLAB
![Page 24: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/24.jpg)
SHUTTERING OF BEAM AND SLAB (CONTINUED)
24
Shuttering work of slab before and after placing steel sheet
![Page 25: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/25.jpg)
Fig 16: Beam Layout
From figure, this green marking beam (Beam-2) width and depth, I checked after beam shuttering.25
SHUTTERING OF BEAM AND SLAB (CONTINUED)
![Page 26: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/26.jpg)
CENTERING OF BEAM AND SLAB
26
Centering
![Page 27: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/27.jpg)
I Checked stirrup spacing and lapping distance of beam-2, In figure , it is showed by green marking.
27 Floor beam layout
REINFORCEMENT PLACEMENT OF BEAM (CONTINUED)
![Page 28: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/28.jpg)
REINFORCEMENT PLACEMENT OF BEAM (CONTINUED)
For beam-2 constriction:
3-16mmΦ bar in top
3-20mmΦ bar in bottom
2-20mmΦ extra bars in bottom
3-16mmΦ extra bars in top
For stirrup 10mmΦ bar
28
Floor beam-2 section
![Page 29: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/29.jpg)
REINFORCEMENT PLACEMENT OF SLAB
29
Placing Slab Reinforcement in long and short direction
Placing Crank, extra top & bottom Reinforcement in slab
![Page 30: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/30.jpg)
REINFORCEMENT PLACEMENT OF SLAB (CONTINUED)
Where I checked slab bar spacing, lapping length and clear distances, which I have showed in figure by red marking line.
30
Slab Layout Plan
![Page 31: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/31.jpg)
Reinforcement bar spacing given
6 c/c in short direction ʺ 5 c/c in long directionʺ
31
Checking the extra top bar length
REINFORCEMENT PLACEMENT OF SLAB (CONTINUED)
![Page 32: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/32.jpg)
CASTING OF BEAM AND SLAB
After finishing binding all reinforcement, it was time for casting. Slab, beam and stair were casting at a time. In my site was used cement, sand and bricks chips ratio ware 1:1.5:3.
32
![Page 33: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/33.jpg)
CASTING OF BEAM AND SLAB (CONTINUED)
33
concrete mixing in mixture machine
using crane for pulling up the concrete
Beam castingDuring slab casting, using vibrator & Steel runner.
![Page 34: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/34.jpg)
CURING OF BEAM AND SLAB
34
Fig 35: Curing of beam by moist jute fabric
Fig 36: Making border for pond Fig 37: Curing of slab by ponding of water
![Page 35: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/35.jpg)
CONSTRUCTION OF STAIR
The following works are followed at the time of stair construction:
Shuttering of stair Reinforcement bar placing Shuttering of treads and risers Casting of stair Curing of stair
35
![Page 36: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/36.jpg)
Shuttering of Stair
36shuttering of Stair
![Page 37: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/37.jpg)
SHUTTERING OF TREADS AND RISERSAfter placing all reinforcements, they placed wooden planks for making treads and risers.
37Checking tread width checking riser height
23-Dec-15
![Page 38: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/38.jpg)
CASTING & CURING OF STAIR
38
Using vibrator during stair casting Curing of stair by moist jute fabric23-Dec-15
![Page 39: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/39.jpg)
BRICK WORK Layout
![Page 40: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/40.jpg)
BRICK WORKBrick work MasonryFinishing
![Page 41: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/41.jpg)
BRICK WORKCuringPlasteringCuringPainting& distempering
![Page 42: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/42.jpg)
SAFETY REQUIREMENTS▪Need to wear helmet all the time ▪Proper fencing is done ▪First aid kit is available along with
safety engineer as well as doctor▪At height safety belts are also required
![Page 43: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/43.jpg)
CONCLUSION▪ Gained basic knowledge in the field of
construction.▪ Learned an importance of proper
communication between office and work site.▪ Learned wise use of available resources.▪ The training has revamped my confidence.▪ Learn about safety requirments at site.▪ I m happy that I choose civil engineering.
![Page 44: Construction of residential building summer training ppt](https://reader034.fdocuments.us/reader034/viewer/2022042421/587319111a28ab673e8b5ca5/html5/thumbnails/44.jpg)
BIBLIOGRAPHY▪ http://www.slideshare.net/sh.robin27/superstructural-construction-wo
rk-of-a-six-storied-residential-building-65669135?qid=3e2ebd50-ffe6-41f8-bcdb-73c103e3af25&v=&b=&from_search=2
▪ http://www.slideshare.net/AbhishekSingh892/an-internship-report-on-residential-building-construction?qid=ad32e196-5a77-4394-8500-7a2bb466e499&v=&b=&from_search=3
▪ Mentor’s notes.