    CONSTRUCTION MEASUREMENT III (SBQ3314)

    AIR CONDITIONING INSTALLATION: WINDOW & SPLIT UNIT

    DR. SARAJUL FIKRI MOHAMEDDepartment of Quantity SurveyingUniversiti Teknologi Malaysia

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    2/77

    Pre-cast and Pre-stressed ConcreteCIVIL WORKS

    Electrical Installations

    Fire Fighting Installations

    Air Conditioning Installations

    Window/Split Package/Central

    Landscape Works

    Single Phase Three Phase

    Gas Installations

    ELECTRICAL WORKS

    MECHANICAL WORKS

    LANDSCAPE WORKS

    Hard Landscape Soft Landscape

    MAIN COURSE COMPONENTS

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    3/77

    2009 Sarajul Fikri Mohamed

    1. Air conditioning installations: main components of window & split unit

    2. SMM2 measurement rules for air conditioning installations

    3. Taking off list for air conditioning installations

    4. Heading and description.

    5. Case study:

    6. Studio work

    Table of contents

    AIR CONDITIONING INSTALLATIONS: WINDOW & SPLIT UNIT

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    4/77

    2009 Sarajul Fikri Mohamed

    Main components

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    5/77

    2009 Sarajul Fikri Mohamed

    PREAMBLES

    EQUIPMENT: CONDENSING UNIT & FAN COIL UNIT ETC

    DUCTING: SUPPLY DUCT & RETURN DUCT

    DUCTING FITTING

    INSULATION TO DUCTWORK/PIPE

    Main components

    AIR CONDITIONING INSTALLATIONS

    DUCT WORK SUPPORT

    PIPEWORK

    EQUIPMENT/DIFFUSER/GRILLE/DAMPER

    BUILDERS WORK

    ELECTRICAL SYSTEM

    TESTING

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    6/77

    AIR CONDITIONING SYSTEM

    UNIT SYSTEM PACKAGE SYSTEM CENTRAL SYSTEM

    WINDOW UNITSPLIT UNIT

    UNIT KEMAS SIAPPENYEJUKAN

    UDARA

    UNIT KEMAS SIAPKESELURUHAN

    UNIT KEMAS SIAPKESELURUHAN

    UNIT KEMAS SIAPPENYEJUKAN

    UDARA

    SISTEM AIRDISEJUKKAN

    SISTEM LOGIPUSAT

    Main systems

    AIR CONDITIONING INSTALLATIONS

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    7/77

    Main components

    AIR CONDITIONING INSTALLATIONS

    CONDENSOR UNIT

    INSULATION

    FAN COIL UNIT

    ELECTRICAL APPLIANCES

    BUILDERS WORK

    TESTING

    PIPEWORK

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    8/77

    HOW AIR CONDITIONING WORKS

    Fakulti Alam Bina

    VIDEO PRESENTATION

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    9/77

    9

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    10/77

    INDOOR: FCU

    AIR COND

    SCHEDULE

    SCHEMATIC VIEW

    OUT DOOR : CONDENSOR UNIT

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    11/77

    INDOOR: FAN COIL UNIT

    OUT DOOR : CONDENSOR UNIT

    SUPPLY AIR PIPE

    RETURN AIR PIPE

    ARMFLEX

    INSULATION

    DRAIN PIPE

    ELECTRICALSYSTEM

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    12/77

    12

    Window unit

    AIR CONDITIONING INSTALLATIONS

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    13/77

    13

    Split unit

    AIR CONDITIONING INSTALLATIONS

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    14/77

    14

    Split unit: installation procedures

    AIR CONDITIONING INSTALLATIONS

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    15/77

    2009 Sarajul Fikri Mohamed

    SPLIT UNIT SYSTEM-:

    TYPE: Wall Mounted

    BTUIR: (9,500 - 25,000)

    Kw: (2.8 - 7.3)

    FAN COIL UNIT CONDENSER UNIT

    Split unit

    AIR CONDITIONING INSTALLATIONS

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    16/77

    Multi split system

    AIR CONDITIONING INSTALLATIONS

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    17/77

    INSTALLATIONS OF OUTDOOR UNIT

    Fakulti Alam Bina

    VIDEO PRESENTATION

    P k i

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    18/77

    18

    Package unit

    AIR CONDITIONING INSTALLATIONS

    C t l t

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    19/77

    2009 Sarajul Fikri Mohamed

    COOLING TOWER Menara penyejuk

    Central system

    AIR CONDITIONING INSTALLATIONS

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    20/77

    2009 Sarajul Fikri Mohamed

    SMM2 measurement

    rules

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    21/77

    21

    AIR CONDITIONING ANDVENTILATION SYSTEM

    MEASUREMENT RULES

    SECTION QPLUMBING AND MECHANICALENGINEERING INSTALLATIONS

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    22/77

    2009 Sarajul Fikri Mohamed

    Q.1 Information

    Q.2 Classification Of Work

    Q.3 Location of works

    PIPEWORKS

    Q.7 Generally

    Q.8 Pipe and Fittings

    Q.9 Special Connection, etc

    Q.10 Labour

    Q.11 Sundries

    Q.12 Pipework Support

    Q.13 Connection

    Q 14 Ducting and fittings

    Q.16 Ductwork supports

    Q. 18 Ducting and ducting fittings

    EQUIPMENT AND ANCILLARIES

    Q.19 Generally

    BUILDERS WORK

    Q.31 Generally

    Q.32. Particularly

    Measurement rules: SECTION Q

    AIR CONDITIONING INSTALLATIONS

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    23/77

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    24/77

    24

    GENERALLYQ.1 INFORMATION

    AIR CONDITIONING SYSTEM AND INSTALLATION

    GenerallyQ.1. Information1 Particulars of the following shall be given :

    a) Regulation, etc.b) Kind and quality of material.

    c) Gauge, thickness or substance of material.d) Any tests, etc.

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    25/77

    ITEM DESCRIPTION UNIT QTY RATEAMOUNT

    (RM)

    AIR-COOLED MULTI SPLIT SYSTEM

    OUTDOOR UNIT

    a York' or other equal or approved air-cooled

    condensing unit with a cooling capacity

    48000 BTU/HR with type R22 refrigerant

    complete with fans, motors and allnecessary refrigerant piping (m/s) and

    connection and bolted to roof slab No 1 12,742.00

    b York' or other equal or approved air-cooled

    condensing unit with a cooling capacity

    48000 BTU/HR with type R22 refrigerant

    complete with fans, motors and all

    necessary refrigerant piping (m/s) and No 1 16,259.00

    connection and bolted to roof slab

    c York' or other equal or approved air-cooled

    condensing unit with a cooling capacity

    72000 BTU/HR with type R22 refrigerant

    complete with fans, motors and all

    necessary refrigerant piping (m/s) and

    connection and bolted to roof slab No 1 16,259.00

    d York' or other equal or approved air-cooled

    condensing unit with a cooling capacity

    78000 BTU/HR with type R22 refrigerant

    complete with fans, motors and all

    necessary refrigerant piping (m/s) and

    connection and bolted to roof slab No 1 16,259.00

    e York' or other equal or approved air-cooled

    condensing unit with a cooling capacity

    90000 BTU/HR with type R22 refrigerant

    complete with fans, motors and all

    necessary refrigerant piping (m/s) and

    connection and bolted to roof slab No 1 17,670.00

    TO COLLECTION:

    -

    CONDENSING UNIT

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    26/77

    Q.1.2 Assembling and jointing together the component parts ofcomposite units and providing any necessary connectingflanges and jointing materials shall be deemed to beincluded with the items concerned. Where composite unitsare supplied by the Employer, particulars shall be given ofthe assembly work involved.

    Q.1.3 Patterns, moulds, templets and the like shall be deemed tobe included with the items.

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    27/77

    Q.1.4 Priming and painting off-site and proprietary finishes orsurface treatment applied as part of the productionprocess shall be described stating whether applied

    before or after fabrication or assembly.

    Q.1.5 Except where otherwise stated the method of fixing andthe provision of nails, bolts, nuts, holes, screws, plugs,shot-fired pins and the like shall be given in the

    description of the work.

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    28/77

    Q.1.6 The nature of the background to which work is to be fixed shall begiven in the description. Any necessary drilling of the backgroundsshall be deemed to be included. Backgrounds shall be classified asfollows :

    a) Building-board which shall be deemed to include hardboard,

    compressed cement sheet, plasterboard, fibreboard andsimilar materials which do not grip woodscrews.

    b) Timber which shall be deemed to include softwood,hardwood, blockboard, plywood and similar materials whichwill grip wood-screws when a lead-hole has been drilled.

    c) brickwork, concrete or stone work

    d) plain metal

    e) glass

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    29/77

    ITEM DESCRIPTION UNIT QTY RATEAMOUNT

    (RM)

    OUTDOOR UNIT(CONT'D)

    a York' or other equal or approved air-cooled

    condensing unit with a cooling capacity

    96000 BTU/HR with type R22 refrigerant

    complete with fans, motors and all

    necessary refrigerant piping (m/s) and

    connection and bolted to roof slab No 1

    INDOOR UNIT

    b York' or other equal and approved fan coil

    unit a cooling capacity of 12,000 BTU/HR,

    complete with electronic refrigerant

    control valve, mode selector cooling, self

    diagnosis remote controller and self

    diagnosis circuit with malfunction code

    display, and fixed to ceiling with approved

    accessories No 6

    c York' or other equal and approved fan coil

    unit a cooling capacity of 24,000 BTU/HR,

    complete with electronic refrigerant

    control valve, mode selector cooling, self

    diagnosis remote controller and self

    diagnosis circuit with malfunction code

    display, and fixed to ceiling with approved

    accessories No 8

    d York' or other equal and approved fan coil

    unit a cooling capacity of 30,000 BTU/HR,

    complete with electronic refrigerant

    control valve, mode selector cooling, self

    diagnosis remote controller and self

    diagnosis circuit with malfunction code

    display, and fixed to ceiling with approved

    accessories No 4

    TO COLLECTION:

    -

    FAN COIL UNIT

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    30/77

    Q.1.7. Temporary work shall be so described. Removingtemporary work and making good after shall be deemed tobe included with the item.

    Q.1.8. Connecting to existing services shall be described

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    31/77

    GENERALLY

    Q.2. CLASSIFICATION OF WORKQ.2.1 Work together with its metalwork, supports and the like

    (unless associated with more than one installation) shall beclassified as follows and given under an appropriateheading :

    t) Air handling installation, identifying whether ventilationsupply, ventilation extract, ventilation with heating (air

    heated centrally), ventilation with heating (air heatedlocally),air conditioning (air heated centrally), airconditioning (air heated locally), or foul air extract.

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    32/77

    Q.3. LOCATION OF WORK

    Location of works :

    a. Internallyb. Externally

    c. In plant rooms

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    33/77

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    34/77

    PIPE WORKSQ.7 GENERALLY1. Purpose-made pipes and purpose-made pipe fittings shall be

    described.

    2. Pipes and pipe fittings which are wrapped, coated or lined bythe manufacturer shall be so described stating the type oftreatment.

    3. Pipework required to be temporarily fixed in position,

    dismantled for chromium-plating or other special finishing andsubsequently refixed shall be so described.

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

    ITEM DESCRIPTION UNIT QTY RATEAMOUNT

    (RM)

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    35/77

    (RM)

    PIPEWORKS

    Piping

    a Supply Air Pipe

    18.80mm Galvanised steel tubing to

    BS 1387 refrigerant pipe fixed to concrete

    slab with and including mild steel clips m 218

    b Return Air Pipe

    37.60mm Galvanised steel tubing to

    BS 1387 refrigerant pipe fixed to concrete

    slab with and including mild steel clips m 218

    c Drain Pipe

    18.80 mm Diameter galvanised drain pipe

    to Bs 1387 fixed to concrete slab with

    and including mild steel clips. m 47

    e Extra Over for 18.80 mm x 18.80 mm

    Diameter Galvanised Iron bend including

    jointing and fixing in supply air pipe No 25

    f Extra Over for 37.60 mm x 37.60 mm

    Diameter ditto in return air pipe No 25

    g Extra Over for 18.80 mm x 18.80 mm

    Diameter ditto in drain pipe No 10

    h Extra Over for 18.80 mm x 18.80 mm x

    18.80 mm Diameter Galvanised Iron tee

    including jointing and fixing in supply airpipe No 11

    j Extra Over for 37.60 mm x 37.60 mm x

    37.60 mm Diameter Galvanised Iron bend

    including jointing and fixing in return air

    pipe No 11

    k Extra Over for 18.80 mm x 18.80 mm x

    18.80 mm Diameter Galvanised Iron bend

    including jointing and fixing in drain pipe No 14

    TO COLLECTION:

    -

    SUPPLY AIR PIPE

    RETURN AIR PIPE

    DRAIN PIPE

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    36/77

    a)Shall be supplied and installed:

    -all necessary interconnecting pipework between item of equipment

    -all vents and exhausts

    -all necessary pipe, valves, fittings, anchors, supports, brackets, insulation etc

    b) Type of piping

    i) Refrigerant pipe

    - up to and including 2 bore, pipes shall be seamless coppers to BS

    659.above 2 bore pipes shall be galvanised steel heavy gauges to BS1387

    ii) Drain pipe

    - drain pipes shall be seamless copper tubing for all size diameter andgalvanised steel.

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    37/77

    Q.8 PIPE AND FITTING

    1. Pipes (measured over all pipe fittings, short runninglengths and branches) shall be given in metres stating thetype and the normal size. (Q.8.1)

    Purpose-made pipe shall be so described and givenseparately. Curved pipes shall be so described stating themean radius.

    Joints in the running length shall be given in thedescription stating the method of jointing.

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    38/77

    Q.8 PIPE AND FITTING

    2. Flexible pipes and extensible pipes (measured as fullyextended) shall each be so described. (Q.8.3)

    3. Pipes laid or fixed in ducts, trenches and chases or embeddedin in-situ concrete or screeds shall each be so described.(Q.8.4)

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    39/77

    Q.9. SPECIAL CONNECTIONS, ETC.1. Special connections and special joints in pipes shall each be

    enumerated separately (except where given in thedescription of another enumerated item) stating the nominalsize and kind of pipe concerned and the method of jointing.

    Classification shall be as follows :a) Connections between pipes of differing materials and

    differing grades of the same material.b) Connections between pipes and appliances or

    equipment.

    c) Connections to existing pipes.

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    40/77

    Q.10. LABOURS

    Labours on pipes (e.g. made bends, made springs, madeoffsets, beaded ends, ornamental ends, etc.) shall be deemed

    to be included with the pipes on which they occur.

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

    M l

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    41/77

    Q.11 SUNDRIES

    6. Pipe-sleeves through walls, floors ceilings shall beenumerated stating the type, lengths, the nominal size andkind of pipe passing through and the type of packingrequired, and if to be supplied for fixing by other trades,this shall be so described.

    7. Wall, floor or ceiling plates shall be grouped together asplates and enumerated stating the type and size.

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

    M l

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    42/77

    Q.12 PIPEWORK SUPPORTS

    1. Components or assemblies of components (e.g. clips,saddles, pipe-hooks, holderbats, brackets, rollers, chairsand hangers or black-plates and girder-lugs) used to fixsupports for more than one pipe shall be enumeratedseparately stating the type and size of components.

    Spring compensated components shall be so describedstating the loading and movement to be accommodated.

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

    M t l

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    43/77

    EQUIPMENT AND ANCILLARIESQ.19 GENERALLY

    1. Unless otherwise stated, equipment such as boiler,generators, cylinder, pumps, cooling, air handling unit, fans,

    refrigerator equipment etcin numbers ( Q.19.1)

    Condenser Unit And Fan Coil, etc.

    Measured in nos (Q.19.1)

    2. Packaged itemshall be described in conjunction with amanufacturers detailed specification (Q.19.2)

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

    M t l

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    44/77

    EQUIPMENT AND ANCILLARIESQ.19 GENERALLY

    3. Any limiting dimensions on the size shall be given. (Q.19.3)

    4. Electrical connection shall be given in accordance withsection R . (Q.19.4)Section R.

    5. Platework, fuel hoppers dan supporting steelwork -

    accordance Section P.

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

    M t l

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    45/77

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

    ITEM DESCRIPTION UNIT QTY RATEAMOUNT

    (RM)

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    46/77

    INSULATION TO PIPEWORK

    a Supply Air Pipe

    25 mm thick close cell thermal insulation

    expanded rubber compound or approved

    equivalent to 18.8 mm Diameter

    galvanised steel tubing m 218

    b Drain Pipe

    12 mm thick Armaflex or flexible

    expanded rubber compound insulation to

    18.80 mm Diameter darin pipe m 47

    AIR CONDITIONING PANEL

    c 3 Phase 240 Volt air-conditioning

    electrical wiring installation to air-

    conditioning system including proving 10Nos switch, any items of control wiring

    and the like provision of all necessary

    copper cables, wiring material cocealed

    conduits fitting No 1

    ----------------------------------

    d Upon completion allowed for the testing

    the foregoing air-conditioning system,

    make good and defect and leave the

    whole fo the installation in perfect working

    order to the satisfaction of the engineerItem

    BUILDER'S WORK

    e 50 mm thick concrete Grade 15 as based

    300 mm wide m3 0.1

    TO COLLECTION:

    -

    BILLS OFQUANTITIES FOR:

    ELECTRICAL

    WIRING

    Measurement rules

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    47/77

    EQUIPMENT AND ANCILLLARIES

    Q.20 Anti-vibration and sound insulation

    Anti-vibration mountings for plant shall be enumerated stating thetype and the size. Anti-vibration material and sound-insulatingmaterial in plant bases shall be given in square metres stating thenature of the material and the thickness.

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

    Anti vibration

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    48/77

    Anti vibration

    AIR CONDITIONING INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    49/77

    EQUIPMENT AND ANCILLLARIES

    Q.21 Equipment supports

    1. Equipment supports shall be enumerated and described.

    2. Particulars of the method of fixing shall be given in thedescription in accordance with clauses Q.1.5-6.

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    50/77

    Q.22 JOINTING (PENYAMBUNGAN)

    1. Particulars of the method of jointing shall be given in thedescription of the equipment.

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    51/77

    EQUIPMENT AND ANCILLARIES

    Q.24 IDENTIFICATION PLATES

    Plates,discs and labels for identification plants shall be deemedto be included with the item concerned. (Q.24)

    Charts giving the keys shall be enumerated

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    52/77

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    53/77

    INSULATIONQ.25 GENERALLY

    1. Particulars of the following shall be given: (Q.25.1)

    Kind and quality of material Thickness of material Finish of material Method of fixing

    2. Includes smoothing the material and working aroundsupports.(Q.25.2)

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    54/77

    Q.26 INSULATION TO PIPEWORK

    1. Insulation to pipeworkmeter stating types and size of thepipe.

    2. Working insulation around ancillaries shall be enumeratedseparately in numbers extra over

    3. Working insulation over flanges and pipe fitting shall bedeemed.

    4. Insulation boxes shall be enumeratedseparately in numbers

    stating types of material and infill.

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

    ITEM DESCRIPTION UNIT QTY RATEAMOUNT

    (RM)

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    55/77

    INSULATION TO PIPEWORK

    a Supply Air Pipe

    25 mm thick close cell thermal insulation

    expanded rubber compound or approved

    equivalent to 18.8 mm Diameter

    galvanised steel tubing m 218

    b Drain Pipe

    12 mm thick Armaflex or flexible

    expanded rubber compound insulation to

    18.80 mm Diameter darin pipe m 47

    AIR CONDITIONING PANEL

    c 3 Phase 240 Volt air-conditioning

    electrical wiring installation to air-

    conditioning system including proving 10Nos switch, any items of control wiring

    and the like provision of all necessary

    copper cables, wiring material cocealed

    conduits fitting No 1

    ----------------------------------

    d Upon completion allowed for the testing

    the foregoing air-conditioning system,

    make good and defect and leave the

    whole fo the installation in perfect working

    order to the satisfaction of the engineer Item

    BUILDER'S WORK

    e 50 mm thick concrete Grade 15 as based

    300 mm wide m3 0.1

    TO COLLECTION:

    -

    BILLS OFQUANTITIES FOR:

    INSULATION

    Pipe insulation

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    56/77

    a)REFRIGERANT PIPE INSULATION-shall be insulated with two layer of 25 mm thickclose cell thermal insulation expanded rubbercompound or approved equivalent.

    b) RETURN REFRIGERENT PIPE INSULATION-shall be insulated with 12 mm thick Armaflex or

    flexible expanded rubber compound

    c) DRAIN PIPE- Shall be 15mm diameter PVC condensate drainpipe discharge to nearest drain

    Pipe insulation

    AIR CONDITIONING INSTALLATIONS

    Pipe insulation

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    57/77

    Refrigerant pipe for supply air

    Air filter

    Refrigerant pipefor return air

    Drain pipe

    Air filter

    Pipe insulation

    AIR CONDITIONING INSTALLATIONS

    Pipe fittings

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    58/77

    a) BENDS-in general, all bends used shall have radius of not less then5 times the diameter.

    b) TEESsteel piping

    -tees in pipes 2 and above shall be slipped on or otherapproved levelled end. In pipes under 2 1/2 diameter, teesmay be welded.

    Pipe fittings

    AIR CONDITIONING INSTALLATIONS

    Insulation to ductwork

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    59/77

    Q.27 INSULATION TO DUCTWORK

    1. Insulation to ductwork meter stating types and size of theducting.

    2. Working insulation around ducting fittings, special fittings andancillariesin numbers extra over

    Insulation to ductwork

    AIR CONDITIONING INSTALLATIONS

    Insulation to equipment

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    60/77

    60

    Q.28 INSULATION TO EQUIPMENT

    1. Insulation to equipment enumerated stating overall size ofthe unit. Particular shall be given of any protection to theinsulation.

    2. Providing detachable mattressesand working insulationaround special fittingsand ancillaries shall be deemed.

    Insulation to equipment

    AIR CONDITIONING INSTALLATIONS

    Sundry insulation

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    61/77

    Q.29 SUNDRY INSULATION

    1. Loose insulation in trench, ducts, tank casings and like - shallbe given separately in cubic metres stating nature of materials.

    2. Cellular concrete insulation in trench and ducts (groupedtogether) - shall be given in cubic metres stating mix of theconcrete.

    3. Special protection or finish at opening through wall, valvechambers and the like shall each be describedenumerated.

    Sundry insulation

    AIR CONDITIONING INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    62/77

    Q.30 SUNDRIES

    1. Testing each installation shall be given as an ITEM.

    stating any required qualifications, no of stage tests in addition

    to the final, purpose, instruments and appliances required,special insurances etc.

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    63/77

    Measurement rules

    AIR CONDITIONING INSTALLATIONS

    ITEM DESCRIPTION UNIT QTY RATEAMOUNT

    (RM)

    BILLS OF

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    64/77

    INSULATION TO PIPEWORK

    a Supply Air Pipe

    25 mm thick close cell thermal insulation

    expanded rubber compound or approved

    equivalent to 18.8 mm Diameter

    galvanised steel tubing m 218

    b Drain Pipe

    12 mm thick Armaflex or flexible

    expanded rubber compound insulation to

    18.80 mm Diameter darin pipe m 47

    AIR CONDITIONING PANEL

    c 3 Phase 240 Volt air-conditioning

    electrical wiring installation to air-

    conditioning system including proving 10

    Nos switch, any items of control wiring

    and the like provision of all necessary

    copper cables, wiring material cocealed

    conduits fitting No 1

    ----------------------------------

    d Upon completion allowed for the testing

    the foregoing air-conditioning system,

    make good and defect and leave the

    whole fo the installation in perfect working

    order to the satisfaction of the engineer Item

    BUILDER'S WORK

    e 50 mm thick concrete Grade 15 as based

    300 mm wide m3 0.1

    TO COLLECTION:

    -

    BILLS OFQUANTITIES FOR:

    TESTING

    Measurement rules

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    65/77

    AIR CONDITIONING INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    66/77

    BUILDERS WORK

    Q.31 GENERALLY

    1. Unless otherwise stated, all items of builders shall be given in

    accordance with theappropriate section.

    2. Builders works in connection with plumbing and mechanicalengineering installations shall be grouped together under an

    appropriate heading.

    AIR CONDITIONING INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    67/77

    BUILDERS WORK

    Q.32 PARTICULARLY

    1. Excavation works.

    2. Inspection chamber-V.6.

    3. Bedding and pointing equipments or unit of equipment.

    4. Cutting away for and making goods after the plumbing andmechanical installations.

    5. Etc

    AIR CONDITIONING INSTALLATIONS

    ITEM DESCRIPTION UNIT QTY RATEAMOUNT

    (RM)

    BILLS OF

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    68/77

    INSULATION TO PIPEWORK

    a Supply Air Pipe

    25 mm thick close cell thermal insulation

    expanded rubber compound or approved

    equivalent to 18.8 mm Diameter

    galvanised steel tubingm 218

    b Drain Pipe

    12 mm thick Armaflex or flexible

    expanded rubber compound insulation to

    18.80 mm Diameter darin pipe m 47

    AIR CONDITIONING PANEL

    c 3 Phase 240 Volt air-conditioning

    electrical wiring installation to air-

    conditioning system including proving 10

    Nos switch, any items of control wiring

    and the like provision of all necessary

    copper cables, wiring material cocealed

    conduits fitting No 1

    ----------------------------------

    d Upon completion allowed for the testing

    the foregoing air-conditioning system,

    make good and defect and leave the

    whole fo the installation in perfect working

    order to the satisfaction of the engineer Item

    BUILDER'S WORK

    e 50 mm thick concrete Grade 15 as based

    300 mm wide m3 0.1

    TO COLLECTION:

    -

    BILLS OFQUANTITIES FOR:

    BUILDERS WORK

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    69/77

    2009 Sarajul Fikri Mohamed

    Taking off list

    Project 1

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    70/77

    Project 1TAKING OFF LIST

    1) Preambles ( Note )

    2) Equipment

    Fan Coil Unit - NO.

    - Wall Mounted Split Unit

    - 10,000 BTUH

    - 12,000 BTUH

    - 20,000 BTUH- 25,000 BTUH

    - Ceiling Cassette Split Unit

    - 20,000 BTUH

    Condenser Unit - NO.

    - Multi Split Condenser- 30,000 BTUH

    - 40,000 BTUH

    - 35,000 BTUH

    - 45,000 BTUH

    Project 1

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    71/77

    - Split Condenser - 10,000 BTUH

    - 12,000 BTUH

    - 20,000 BTUH

    - 25,000 BTUH

    3) Hanger - NO

    4) Pipework - M

    - Refrigerant pipe

    - Condensate pipe

    5) Insulation of Pipework - M

    6) Electrical Wiring - ITEM

    7) Builders Work - ITEM8) Maintenance - ITEM

    9) Testing - ITEM

    Project 1TAKING OFF LIST

    Query list

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    72/77

    NO QUERY REMARK

    1 Brand of packaged unit not stated - York brand Model ACC 435

    2 Type of refrigerant - Refrigerant R-22

    3 Thickness and type of insulation-pipe - 50 mm Thick fibreglass

    4 Size of refrigerant pipe - 50 mm Diameter

    AIR CONDITIONING INSTALLATIONS

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    73/77

    2009 Sarajul Fikri Mohamed

    Case study

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    74/77

    CASE STUDY

    PROJECT TITLE

    AIR CONDITIONING INSTALLATIONS

    Fakulti Alam Bina

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    75/77

    2009 Sarajul Fikri Mohamed

    Studio work

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    76/77

    AIR CONDITIONINGINSTALLATIONS SPLIT UNIT

    Fakulti Alam Bina

  • 8/2/2019 Construction Measurement III Air Conditioning Window and Split

    77/77

    INDOOR: FCU

    AIR CONDSCHEDULE

    OUT DOOR : CONDENSOR UNIT