CONSTRUCTION MANAGER -AT-RISK (CMAR) SERVICES ... -...

22
PRE - SUBMITTAL CONFERENCE REQUEST FOR QUALIFICATION (RFQ) CONSTRUCTION MANAGER - AT - RISK (CMAR) SERVICES REHABILITATION OF TAXIWAYS WA AND WB (P901) RFQ NO . Q - H37 - TWAWB - 2017 - 012 Andre’ Morrow, C.P.M., CPPB Sr. Procurement Specialist Houston Airport System Tuesday, December 13, 2016, 10:00 a.m., CST SCM Conference Room #113 18600 Lee Rd., Humble Texas 77338

Transcript of CONSTRUCTION MANAGER -AT-RISK (CMAR) SERVICES ... -...

Page 1: CONSTRUCTION MANAGER -AT-RISK (CMAR) SERVICES ... - Houstonpurchasing.houstontx.gov/bids/Q-H37-TWAWB-2017-012/Pre-Submitt… · The City of Houston (City), Houston Airport System

PRE-SUBMITTAL CONFERENCEREQUEST FOR QUALIF ICATION (RFQ )

C O N S T R U C T I O N M A N A G E R - AT - R I S K ( C M A R ) S E R V I C E SREHABILITATION OF TAXIWAYS WA AND WB (P901)

RFQ NO. Q-H37-TWAWB-2017-012

Andre’ Morrow, C.P.M., CPPBSr. Procurement Specialist

Houston Airport System

Tuesday, December 13, 2016, 10:00 a.m., CSTSCM Conference Room #113

18600 Lee Rd., Humble Texas 77338

Page 2: CONSTRUCTION MANAGER -AT-RISK (CMAR) SERVICES ... - Houstonpurchasing.houstontx.gov/bids/Q-H37-TWAWB-2017-012/Pre-Submitt… · The City of Houston (City), Houston Airport System

PRE-SUBMITTAL CONFERENCE AGENDAREQUEST FOR QUALIFICATION (RFQ)

CMAR - REHABILITATION OF TAXIWAYS WA AND WB (P901)RFQ NO. Q-H37-TWAWB-2017-012

I. Opening Remarks Devon Tiner, P.E., PMPInterim Procurement Officer, HAS

II. Solicitation Overview Andre’ Morrow, C.P.M., CPPBSenior Procurement Specialist, HAS

III. Office of Business Opportunity HAS OBO

IV. Project Scope and Overview Cynthia Straughan, PE - Assistant DirectorEngineer of Record: Broutin Sherrill, PE RS&H

V. Questions/Answers

VI. Site Visit

Page 3: CONSTRUCTION MANAGER -AT-RISK (CMAR) SERVICES ... - Houstonpurchasing.houstontx.gov/bids/Q-H37-TWAWB-2017-012/Pre-Submitt… · The City of Houston (City), Houston Airport System

SOLICITATION OVERVIEW

Solicitation PurposeThe City of Houston (City), Houston Airport System (HAS), invites interested firms to submit Statements of Qualification (SOQ) to provide Construction Manager at Risk (CMAR) Services for the Rehabilitation and full-depth replacement of Taxiways WA, WB, and associated cross taxiways at George Bush Intercontinental Airport (IAH).

Page 4: CONSTRUCTION MANAGER -AT-RISK (CMAR) SERVICES ... - Houstonpurchasing.houstontx.gov/bids/Q-H37-TWAWB-2017-012/Pre-Submitt… · The City of Houston (City), Houston Airport System

SOLICITATION OVERVIEW

Statements of Qualification Due Date and Time:Wednesday, January 18, 2017 @ 2:00 P.M., CST

Questions and Requests for Additional Information Due: Tuesday, December 20, 2016 @ 12:00 P.M., (Noon) CST, must be received electronically and directed via email to: [email protected]

Page 5: CONSTRUCTION MANAGER -AT-RISK (CMAR) SERVICES ... - Houstonpurchasing.houstontx.gov/bids/Q-H37-TWAWB-2017-012/Pre-Submitt… · The City of Houston (City), Houston Airport System

ADDITIONAL INFORMATION AND SPECIFICATION CHANGES

Letters of Clarification (LOC):Responses to questions received from potential Respondent(s) and any changes to the Scope shall be confirmed in writing and a LOC will be posted to the City of Houston Strategic Procurement Division (SPD) website prior to submittal due date: http://purchasing.houstontx.gov/Bid_Display.aspx?id=Q-H37-TWAWB-2017-012

Page 6: CONSTRUCTION MANAGER -AT-RISK (CMAR) SERVICES ... - Houstonpurchasing.houstontx.gov/bids/Q-H37-TWAWB-2017-012/Pre-Submitt… · The City of Houston (City), Houston Airport System

NO CONTACT PERIOD

All inquiries regarding this solicitation are to be directed to the designated City Representative (Andre’ Morrow).Do not contact Council Members or City employees in an attempt to influence the outcome of the award. You will be able to speak publicly at the City Council Meeting.

Page 7: CONSTRUCTION MANAGER -AT-RISK (CMAR) SERVICES ... - Houstonpurchasing.houstontx.gov/bids/Q-H37-TWAWB-2017-012/Pre-Submitt… · The City of Houston (City), Houston Airport System

PROCUREMENT TIMELINE

Description Scheduled DateDate of RFQ 12/02/2016Pre-Submittal Conference and Site Visit 12/13/2016Questions from Respondents Due to City 12/20/2016Submittals (Step One) Due from Respondents 01/18/2017Notification of Shortlisted Firms (Estimated) 2/07/2017

Oral Presentations/Interviews (Step Two) (Estimated) 02/16/17 - 2/17/2017Price Proposal (Step Two) Due 2/17/2017Council Agenda Date (Estimated) 5/10/2017Contract Start Date (Estimated) 5/17/2017

Page 8: CONSTRUCTION MANAGER -AT-RISK (CMAR) SERVICES ... - Houstonpurchasing.houstontx.gov/bids/Q-H37-TWAWB-2017-012/Pre-Submitt… · The City of Houston (City), Houston Airport System

SUBMITTAL PROCEDURES

One (1) original marked “original” signed in BLUE ink and ten (10) copies of the submittals AND in a separate, sealed envelope, clearly marked “Financial Statements”, one (1) stamped “Original” and one (1) copy of its Financial Statements will be received at the addressbelow not later than 2:00 p.m., January 18, 2017:Attention to: Chief Procurement Officer

Strategic Purchasing Division901 Bagby, Suite B300Houston, Texas 77002

Please include the phrase “RFQ No.: Q-H37-TWAWB-2017-012 Rehabilitation of Taxiways WA and WB CMAR Services” in the subject line and provide all applicable contact information.

Page 9: CONSTRUCTION MANAGER -AT-RISK (CMAR) SERVICES ... - Houstonpurchasing.houstontx.gov/bids/Q-H37-TWAWB-2017-012/Pre-Submitt… · The City of Houston (City), Houston Airport System

SUBMITTAL REQUIREMENTS

Each SOQ must be organized and followthe required format as stated in Section7.0 of the RFQ.

Each Section must be appropriately tabbedand inclusive of all required submittals.

Page 10: CONSTRUCTION MANAGER -AT-RISK (CMAR) SERVICES ... - Houstonpurchasing.houstontx.gov/bids/Q-H37-TWAWB-2017-012/Pre-Submitt… · The City of Houston (City), Houston Airport System

MINIMUM QUALIFCATIONS,EVALUATION CRITERIA,AND SCORES

MINIMUM QUALIFICATIONS Pass/FailMWSBE Compliance Pass/FailFinancial Capabilities Pass/FailExperience Modification Ratio Pass/FailOSHA Records Pass/Fail

EVALUATION CRITERIA ScoreCompany Experience 30Staffing/Key Personnel 20Preconstruction Phase Services 25Construction Phase Services 25TOTAL SCORE 100

This RFQ will be evaluated as follows:

Page 11: CONSTRUCTION MANAGER -AT-RISK (CMAR) SERVICES ... - Houstonpurchasing.houstontx.gov/bids/Q-H37-TWAWB-2017-012/Pre-Submitt… · The City of Houston (City), Houston Airport System

FORMS TO BE SUBMITTED WITH STATEMENT OF QUALIFICATION

The forms to be submitted with the SOQ are listed in the RFQ document, PART IV – City Required Documents and Attachments:• 00450 Bidder’s Statement of MBE/WBE/PDBE/DBE/SBE Status• 00454 Affidavit of Non-Interest• 00455 Ownership Information Form• 00457 Conflict of Interest Questionnaire• 00460 POP 1 Program Acknowledgement Form• 00480 Reference Verification Form• 00481 Anti-Collusion Statement

Page 12: CONSTRUCTION MANAGER -AT-RISK (CMAR) SERVICES ... - Houstonpurchasing.houstontx.gov/bids/Q-H37-TWAWB-2017-012/Pre-Submitt… · The City of Houston (City), Houston Airport System

EXHIBITS (Continued).

DOCUMENTS TO BE SUBMITTED BY SUCCESSFUL FIRM

Within 10 work days after receipt of the Notice of Intent to Award, successful Respondent shall execute and deliver to the City of Houston the following documents:

• 00501 Resolution of Corporation• 00570 Bidders MWSBE Participation Plan• 00571 Record of Post-Award Good Faith Efforts• 00572 Contractor’s Request For Plan Deviation• 00600 List of Proposed Subs and Suppliers• 00601 Drug Policy Compliance Agreement• 00604 History of OSHA Actions and List of On-The-Job Injuries

Page 13: CONSTRUCTION MANAGER -AT-RISK (CMAR) SERVICES ... - Houstonpurchasing.houstontx.gov/bids/Q-H37-TWAWB-2017-012/Pre-Submitt… · The City of Houston (City), Houston Airport System

DOCUMENTS TO BE SUBMITTED BY SUCCESSFUL FIRM (continued)

• 00606 Contractor's Certificate of No Safety Impact Positions• 00620 Affidavit of Insurance• 00621 COH Certificate of Insurance (ACORN Form)• 00630 Certificate of Compliance with POP program• 00631 POP Program List of Subs• 00632 OBO Certification by Professional Service Provider• 00636 Form 1295 – Certificate of Interested Parties• 00842 Letter of Intent

Page 15: CONSTRUCTION MANAGER -AT-RISK (CMAR) SERVICES ... - Houstonpurchasing.houstontx.gov/bids/Q-H37-TWAWB-2017-012/Pre-Submitt… · The City of Houston (City), Houston Airport System

EXHIBITS (Continued).

DIVERSITY REQUIREMENTS

M/WBE Participation Goal:

• Pre-Construction Goal - 10% M/WBE

• Construction Goal - 31% 21% MBE 10% WBE

Page 16: CONSTRUCTION MANAGER -AT-RISK (CMAR) SERVICES ... - Houstonpurchasing.houstontx.gov/bids/Q-H37-TWAWB-2017-012/Pre-Submitt… · The City of Houston (City), Houston Airport System

EXHIBITS (Continued).

CERTIFICATION

• Participating Firms Must Be Certified M/WBE

• Firms Must Be Certified M/WBE At Time Of SOQ Submission. If Not Certified M/WBE, They Will Not Be Counted Towards Contract Participation.

• Questions About Certification, Visit http://www.houstontx.gov/obo Or By Phone (832) 393-0600.

Page 17: CONSTRUCTION MANAGER -AT-RISK (CMAR) SERVICES ... - Houstonpurchasing.houstontx.gov/bids/Q-H37-TWAWB-2017-012/Pre-Submitt… · The City of Houston (City), Houston Airport System

EXHIBITS (Continued).

Page 18: CONSTRUCTION MANAGER -AT-RISK (CMAR) SERVICES ... - Houstonpurchasing.houstontx.gov/bids/Q-H37-TWAWB-2017-012/Pre-Submitt… · The City of Houston (City), Houston Airport System

Project Manager: Cynthia Straughan, PE, PMP, CMEngineer of Record: Broutin Sherrill, PE RS&HProject number 901, formerly 651 General Overview of Project

• Full depth replacement for Group VI aircraft• 95% drawings to be reviewed/improved• No FAA Funding • FAA Standards, Specifications, Expectations• Safety and Quality• Schedule without compromise

Project Scope and Overview

Page 19: CONSTRUCTION MANAGER -AT-RISK (CMAR) SERVICES ... - Houstonpurchasing.houstontx.gov/bids/Q-H37-TWAWB-2017-012/Pre-Submitt… · The City of Houston (City), Houston Airport System

Pre-Construction Services (4 months):• Weekly Meetings with EOR, HAS, Mat Test, CMAR• Document review/improve/concur• Design to Schedule 720 days (maximum)• Develop Fast Tracked Critical Path Schedule by phase• Quality Control Plan & Construction Safety Plan• Permits (in house)• Potential Bidders Outreach

• Prepare GMP Site Visit

Project Scope and Overview

Page 20: CONSTRUCTION MANAGER -AT-RISK (CMAR) SERVICES ... - Houstonpurchasing.houstontx.gov/bids/Q-H37-TWAWB-2017-012/Pre-Submitt… · The City of Houston (City), Houston Airport System

Project Scope and Overview

Page 21: CONSTRUCTION MANAGER -AT-RISK (CMAR) SERVICES ... - Houstonpurchasing.houstontx.gov/bids/Q-H37-TWAWB-2017-012/Pre-Submitt… · The City of Houston (City), Houston Airport System

Thank you

Page 22: CONSTRUCTION MANAGER -AT-RISK (CMAR) SERVICES ... - Houstonpurchasing.houstontx.gov/bids/Q-H37-TWAWB-2017-012/Pre-Submitt… · The City of Houston (City), Houston Airport System

Questions and Requests for Additional Information Due: Tuesday, December 20, 2016 @ 12:00 P.M., (Noon) CST, via email to: [email protected]

Answers will be posted on City of Houston SPD websiteas a Letter of Clarification:http://purchasing.houstontx.gov/Bid_Display.aspx?id=Q-H37-TWAWB-2017-012

QUESTIONS…