ConSTRuCTion MAnAgeMenT - LEBOLO Construction Management, ... As a board member of ABC Florida East...
Transcript of ConSTRuCTion MAnAgeMenT - LEBOLO Construction Management, ... As a board member of ABC Florida East...
www.LEBOLO.com
WSOC - Fort Meade, MDWaterproofing
TSA Training Room
2100 Corporate DriveBoynton Beach, FL 33426Cell: (561) 742-7644Fax: (561) 742-7636
ConSTRuCTion MAnAgeMenT
WSOC - Fort Meade, MD
Clyde Atkins Federal Courthouse in Miami, FL
gSA - PBi Airport
Society of
American Military EngineersS2100 Corporate DriveBoynton Beach, FL 33426Cell: (561) 742-7644Fax: (561) 742-7636
www.LEBOLO.com
Introduction
SCIF Wall Separation Project Profie
Moroso Motorsports Park Project Profie
Design/Build Internal Review Service 3rd and 9th Floor Renovation
Palm Springs Middle School Project Profie
New Fitness Center - Wilkie D. Ferguson Courthouse
Primary Care Medical Offie Project Profie
Del Mar Village Project Profie
Wachovia Securities Project Profie
Intracoastal Mall Project Profie
Royal Palm Elementary School Project Profie
Current Emergency Repairs Contractor for SDPBCand Broward County
Recognitions and Awards
Design Build Moisture Intrusion Repair, Improvements, Repairs and Mold Remediation Project Profie
LEED - Hyperpower Maintenance Facilities
Current and Recent Projects
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
www.LEBOLO.com Back to Top
TABLe oF ConTenTS
01
LEBOLO is a full service General Contracting and Construction Management Firmspecializing in Commercial, Educational and Federal markets.
Established in October 2000, LEBOLO employs a staff of educated Civil Engineers and Project Managers experienced in the construction industry. Managing projects from conception to completion with the use of a Document Management Program (PDM) and ProCore which enables LEBOLO to provide accuracy in estimating, budgeting, prequalification, scheduling and quality control. The repeat client list demonstrates the reputation of projects successfully completed within budget and to the highest standards of excellence.LEBOLO’S expertise and experience makes the development or redevelopment project a satisfying and lucrative experience. LEBOLO specializes in Construction Management, General Contracting, Estimating and Budgeting, Scheduling, Procurement, Quality Control, Plan Review, OSHA Compliance, Final Inspections and Supervision.
As a board member of ABC Florida East Coast Chapter, LEBOLO has valuable insight to the most qualified and dependable tradesmen for every phase of a project, allowing the best resources available therefore, assuring its success and eliminating costly delays. LEBOLO was recently awarded the 2013 S.T.E.P. (Safety, Training and Evaluation Process) Diamond Award and the 2012 and 2013 Pinnacle in Safety Award. LEBOLO is dedicated to job safety and is extremely proud of our safety accomplishments.
www.LEBOLO.com01 Back to Top
inTRoduCTion
2008 S.T.E.P. Safety Award - Gold
2009 S.T.E.P. Safety Award - Platinum
2010 S.T.E.P. Safety Award - Platinum
** 2012 ABC National Pinnacle Safety Award **
2011 AMEX Contractor of the Year
2011 ABC National Safety in Excellence Award
2010 National Safety Merit Award
2012 and 2013Pinnacle Safety Award
2008 ABC NationalExcellence inConstruction AwardMoroso MotorsportsPark Project
2011, 2012 & 2013 S.T.E.P. Safety Award - Diamond Level
Only 1 in South FloridaOnly 4 in the state of FloridaOnly 94 in the Nation
ReCogniTionS And AWARdS
www.LEBOLO.com Back to Top02
www.LEBOLO.com Back to Top
CuRRenT And ReCenT PRoJeCTS
LEBOLO’S RELEVANT EXPERIENCE:Wellness Center
GSAGSA – Fed Courthouse
Pure AirPure Air
GSA
USACE
Dept. of Army
HOMESTEAD Task Order Dept. of Army
MacDill AFBMacDill AFBDivine Savior AcademySWA CDM Smith FL HOUSEGSA
GSA
GSA
GSA
GSA
BreezewayCENTCOMLEBOLO-Moss JV , DoralMaintenance Building , WPBDetox Center , Pompano BeachWilkie Ferguson Federal Building
Design/Build IRS 3rd & 9th Floor Renovation Ft LauderdaleJudge Ray Federal Courtroom Renovation , MiamiDesign/Build Renovation Break Room & Training Area Palm Beach International AirportWest Palm Beach
Wilkie Federal Courthouse , Fitness CenterMiami
Generator RelocationLEBOLO RUSH JV IDIQContract for Misc. O&M , MacDill AFB
IDIQ Contract for Misc. O&M , HomesteadHOMESTEAD Task Order , Sun ShadesHOMESTEAD Task Order , MacDill , SCIF WallsHOMESTEAD Task Order , Ammo Storage
Deerfield Beach
Courthouse Mold RemediationRepairs & Mold Remediation Fort Lauderdale
GSA Fort Myers Courthouse RemediationGSA Tampa Courthouse RemediationFed CourthouseWindow Repairs & Mold Remediation OcalaWSOCa LEBOLO Watts JV , Fort Meade
FL - $ 2.2M
Various $56.0 KFL $ 2.3 M
FL $ 2.3 M
FL $59.0 K
MD $19.0 M
FL $ 4.0 M$343K$1.3M$328K$338K
FL $ 4.0 M
$1 M$970KFL $18.0 MFL $ 2.0 MFL $ 1.9 MNew Garage $167.0 K
FL $ 1.2 M
FL $400.0 K
FL $190.0 K
FL $340.0 K
03
LEED Gold Building One
LEED Platinum PendingBuilding Two
PrOjECt DEsCriPtiOn:
This facility was built in the City of Pompano Beach and is the First LEED certified project for the city. This brand new 11,900 SF Facility was built on a 4.5 acre site and is the new Storage and Truck Maintenance yard for HYPOWER. The site will have 125,509 SF of concrete, in lieu of asphalt, 70,000 SF of Green area with native species to limit the use of well water. Two, 2 story, steel buildings were erected, and building 1 has 5,184 watts and building 2 has 5,390 watts dedicated to solar energy (PV) systems while the remaining portion of the roof is finished with a high SRI painting which will limit heat absorption. When you take into account all of the building integrated PV systems, energy efficient lighting, daylight harvesting technology, & high SEER HVAC units; these buildings have significantly reduced their annual power bill as compared to a similar non-LEED building. Building 1 has offset its energy use by 55% and building 2 is at a remarkable 90% offset.
Lebolo Construction has registered this project with the USGBC (www.gbci.org). Registration # 1000003346 and 1000007006. We achieved LEED Gold certification on Building #1 the office building and have submitted to achieve a Platinum Certification on Building #2, the fleet maintenance facility.
CLIENTP3 GroupBernard Paul-Hus954-978-9300
COST $1,811,135
BUILDING TYPE:Commerical - LEED
Leed - HyPeRPoWeR MAinTenAnCe FACiLiTieSPRoJeCT PRoFiLe
Project won 2012 Construction in Excellence Award
www.LEBOLO.com Back to Top04
PrOjECt DEsCriPtiOn:
Segregation of second floor in Building 501-D from the current 501-D Sensitive Compartmented Information Facility (SCIF) envelope in order to provide access for foreign partner nation personnel. Existing and new walls to receive Radio Frequency Shielding for complete security of foreign country information from all entities.
CLIENTThe Department ofthe ArmyLydia Jones(813)840-2809
COST $1,394,539
BUILDING TYPE:Federal - Renovation
Leed - HyPeRPoWeR MAinTenAnCe FACiLiTieSPRoJeCT PRoFiLe
www.LEBOLO.com Back to Top05
SCiF WALL SePARATionPRoJeCT PRoFiLe
www.LEBOLO.com Back to Top
PrOjECt DEsCriPtiOn:
Design / Build - Broward County Federal Courtroom Mold Remediation and Renovation: Demolition, Remediation, and Renovation of several rooms and roofing. Demolish existing space, remove carpet, underlayment, repair subfloor, removed ceilings (acoustical and wood), removed Gypsum, installed new walls, new electrical wiring, perimeter walls repairs, new acoustical ceilings, new paint, new wood floors, and new cabinetry.
CLIENTGeneral Services Admin (GSA)Bryan Pyle(954) 356-7783(813)840-2809
COST $2,336,548
BUILDING TYPE:Federal - Design BuildRenovation, Remediation
deSign BuiLd MoiSTuRe inTRuSion RePAiRS, iMPRoveMenTS, RePAiRS And MoLd ReMediATion
PRoJeCT PRoFiLe
06
www.LEBOLO.com Back to Top
MoRoSo MoToRSPoRTS PARkPRoJeCT PRoFiLe
PrOjECt DEsCriPtiOn:
The uniqueness of this project is due to its history. Palm Beach International Raceway as it was known in the 1960’s was purchased by Dick Moroso from David Rupp in the 1980’s and renamed Moroso Motorsports Park. In 1968 Dick Moroso was known as one of the most successful modified production drag racers on record. The purchase of the property enabled him to establish a drag strip for local fans.
Located on over 200 acres of wooded property in northwest Palm Beach County, the Motorsports Park is known for catering to the motorsports enthusiasts hosting more than 850 events annually. Auto racing being the number one spectator sport in the country, events at the park draw an estimated one million people per year, with media coverage impacting several million or more. As a result, the park previously created an economic impact on Palm Beach County and surrounding areas in excess of $25 million. Now the new Palm Beach International Raceway is projected to double that figure.
The park’s Road Course, Drag Strip and Karting track have brought motorsport enthusiasts from all over the country. To have the opportunity as local General Contractors and subcontractors to give back to the track, their spectators and the surrounding community is a privilege. The enhancement and needed refurbishment of the facility only broadens the scope of activities and bring a needed in fluctuation of tourism and employment to the area.
CLIENTMoroso Investment Group Keith Ennis 561-267-1859
COST$12,021,000
BUILDING TYPE
Racetrack Renovation
07
www.LEBOLO.com Back to Top
PrOjECt DEsCriPtiOn:
Design / Build - IRS 3rd and 9th Floor Renovation: Demolish existing space, remove carpet, underlayment, repair sub-floor, removed ceilings (acoustical and wood), removed old benches, installed new flooring, benches, specialty desks, new electrical wiring, perimeter walls repairs, new acoustical ceilings, new paint, new wood floors, new cabinetry, conduit and pull-strings for new A/V system.
CLIENTGeneral Services Admin(GSA)Bryan Pyle(954) 356-7783
COST $1,287,061
BUILDING TYPE:Federal - Renovation
deSign/BuiLd inTeRnAL RevieW SeRviCe 3Rd And 9TH FLooR RenovATion
PRoJeCT PRoFiLe
08
www.LEBOLO.com Back to Top
CM FOr PrOjECt - Cr. kLEwin PrOjECt DEsCriPtiOn
As Construction Manager, CR Klewin, and its M/WBE CM partner, Lebolo Construction, worked closely with the owner and design team during the preconstruction planning phases to assure the project met schedule and budgetary requirements. This project consisted of a 203,000 SF, 1 and 2-story, tilt-wall and steel construction. Phase 1 - partial demolition of existing campus buildings and locating 23 new portables on site and beginning construction of the 3 new buildings. In addition, a temporary covered walk was constructed to provide access to the existing campus from the bus loop. Phases 2 & 3 - electrical and chiller work and the renovation of the kitchen portion in building 2. Phase 4 - demolition of the existing buildings with the exception of the gymnasium that remained in service until the new facility was completed. Phase 5 - demolition of the existing gym and the completion of the playgrounds.
Project Executive, Randall Lebolo and Assistant Superintendent, Ricky Lopez. Under the direct supervision of Klewin’s general superintendent, Bill Talbot, Ricky Lopez was responsible for all trade contractor coordination and supervision of their work on the entire site. Mr. Lopez was also lead superintendent for construction of the multipurpose / cafeteria. Additional responsibilities included coordination of all mechancial and electrical systems within the cafeteria
Lebolo Construction’s Specific Roll on Project as CM Minority Partner.
CLIENTSchool District of Palm Beach CountyWarren Haan3300 Forest Hill BlvdWest Palm Beach, FL 33406(561) 357-7578
SIZE 203,000SF BUILDING TYPE Education, New Construction and Modernization
PALM SPRingS MiddLe SCHooLPRoJeCT PRoFiLe
09
www.LEBOLO.com Back to Top
PrOjECt DEsCriPtiOn:
Design/Build brand new fitness center. Installed a raised flooring to contain sound for floor below, new bathrooms, new plumbing, new HVAC, new electrical, new walls, new ceilings.
CLIENTGeneral Services Admin(GSA)Bryan Pyle(954) 356-7783
COST$1,287,061
BUILDING TYPE:Federal - Renovation
neW FiTneSS CenTeR - WiLkie d. FeRguSon CouRTHouSe
PRoJeCT PRoFiLe
10
www.LEBOLO.com Back to Top
PrOjECt DEsCriPtiOn
This project was an Interior Build out – Tenant Improvement for a new 5,200 square feet high end Medical Office in a multi-tenant building in the city of Boynton Beach. Two contiguous spaces were turned into one bigger space by demolishing all interior partitions, demising wall and all interior finishes including any related mechanical, electrical or plumbing work, to leave it a shell ready to accommodate the approved floor plan and receive all finishes. All ceiling, wall and floor finishes as well as the cabinetry and counter tops for the business center, examination rooms, laboratory and in general, for all spaces, were chosen by the owners of the finest quality and of first class materials to satisfy also their fine clientele.
Because this is medical facility, HVAC and plumbing systems were the most significant and critical aspect of this project and demanded from the construction team, special attention to details and technical aspects as well as the careful planning of all activities so that every piece of equipment required was installed to meet strict standards and comply with the norms and regulations of the health agencies and authorities having jurisdiction. Previous to any of the interior work started the existing slab had to be cut and all of the concrete removed to allow for the new sanitary system to be installed as per required standards.
CLIENTCambridge Medical CenterRich Lucibella 877-817-7826
COST$354,467
BUILDING TYPE Interior Build-out Healthcare
PRiMARy CARe MediCAL oFFiCePRoJeCT PRoFiLe
11
www.LEBOLO.com Back to Top
• Allamanda ES• Barton ES• Benoist Farms ES• Christa McAuliffe Middle• Citrus Cove ES• Conniston Community
Middle• Coral Reef ES
CuRRenT eMeRgenCy RePAiRS ConTRACToR FoR SdPBC And BRoWARd CounTy
PRoJeCT PRoFiLe
School Names
School Names
In September 2004, CR Klewin contracted Lebolo Construction Management to make emergency repairs on various schools within Palm Beach County.The scope of work consisted of clearing debris, grading, cleaning, tree bracing clearing roof drains, securing fencing, spraying for mold, securing light fixtures, replacing AC ducts and replacing ceiling tiles.
In November 2004, CR Klewin contracted Lebolo Construction Management to make emergency repairs on various schools within Palm Beach County.The scope of work consisted of clearing debris, grading, cleaning, tree bracing clearing roof drains, securing fencing, spraying for mold, securing light fixtures, replacing AC ducts and replacing ceiling tiles.
Boca Raton Community Cypress Trails Elementary SchoolEquestrian Trails Elementary SchoolIndependence Middle SchoolPalm Beach Central High School
• Lake Worth Middle• New Horizons ES• North Palm Beach ES• Palm Beach Central High• Palm Beach Gardens High• Palm Beach Lakes Community• Palmetto ES
• Grassy Waters ES• Highland ES• HL Johnson ES• Independence Middle• Indian Ridge School• Jeaga Middle• Jupiter ES
• Pleasant City ES• Waters Edge ES• West Gate ES• Westward ES
SDPBC Emergency Repairs – Hurricane Frances
SDPBC Emergency Repairs – Hurricane Jeanne
CLIENTSchool District ofPalm Beach County
Broward CountySchool District
and
12
www.LEBOLO.com Back to Top
deL MAR viLLAgePRoJeCT PRoFiLe
CLIENTWool bright Development Jimmy Freyman 561-989-2240
COST$ 1,438,140
BUILDING TYPE Exterior Façade Renovation
PrOjECt DEsCriPtiOn
This project was a complete façade renovation project of a strip mall in Boca Raton that included the complete demolition of the existing façade and structural steel modifications required to build a new three level towers with standing seam metal roof. All columns were reframed and sheeted, foam bands, EIFS system, decorative medallions and stucco were installed throughout. Since this mall was totally functional at the time of the project safety was always a priority that required a 100% commitment from all the subcontractors and parties involved. A full time safety director was always monitoring that all safety measures were put in place and fully observed by all personnel and pedestrians.
CuRRenT eMeRgenCy RePAiRS ConTRACToR FoR SdPBC And BRoWARd CounTy
PRoJeCT PRoFiLe
13
www.LEBOLO.com Back to Top
WACHoviA SeCuRiTieSPRoJeCT PRoFiLe
BUILDING TYPE Renovation
Various Renovations for numerous locations. Work includes, demolition, carpeting / tile, interior build out, painting, ceilings, electrical and HVAC work.
Wachovia Securities, Reg. Offices,Miami - Office RenovationsWachovia Securities, Melbourne - Office RenovationsWachovia Securities, Aventura - Office RenovationsWachovia Securities, Coral Gable - Office RenovationsWachovia Securities, Coral Springs - Office RenovationsWachovia Securities, Lantana - Office RenovationWachovia Securities, Las Olas - Office RenovationsWachovia Securities, PGA - Office RenovationsWachovia Securities, Stuart - Office RenovationsWachovia Securities, Sun City - Office RenovationsWachovia Securities, Vero Beach - Office Renovations & Emergency Repairs
CLIENTWells Far Corp.Properties Brad Divins 704-975-6010
COST$ 2,251,000
PrOjECt DEsCriPtiOn
14
www.LEBOLO.com Back to Top
inTRACoASTAL MALLPRoJeCT PRoFiLe
CLIENTWool bright DevelopmentJimmy Freyman561-989-2240
COST$1,240,391
BUILDING TYPE Exterior Façade Renovation
PrOjECt DEsCriPtiOn
This project consisted of the complete demolition of the existing façade and breezeway structure of the eastern section of the Intracoastal Mall in North Miami, to make it wider by extending it into the parking area and completely renovate the façade, stucco and bandings, of a two story out parcel, adding a second means of egress to the second floor by adding an exterior metal stair. The complete face lift of both the eastern wing and out parcel included the framing and sheeting, stucco, foam bands, EIFS systems, stone finishes, exposed structural wood beam and columns and decorative aluminum trellis among other finishes enhanced the appearance and gave it a modern look. The renovation of the parking and concrete curbs, new striping and new landscape throughout completed the total renovation process.
15
www.LEBOLO.com Back to Top
RoyAL PALM eLeMenTARy SCHooL PRoJeCT PRoFiLe
Partnering with CR Klewin, the team completed approximately 146,00 GSF replacement facility to accommodate 564 K-12 student stations. The replacement facility will be constructed on the current site followed by demolition of the existing facility, construction of playfields and auxiliary facilities.This contract was completed in 3 phases: Phase I consists of the construction of temporary drives, parking and a temporary bus loop. Also included is the permanent construction of the west staff and visitor parking, the parent dropoff, new drainage and retention, sidewalks and covered walk and drop-off Areas. The building construction consists of Building 1 & 2 entirely and approximately 25% of Building 3; the relocation of (2) hard surfaced play areas and associated equipment; the service court and drive; and the new chiller building.
Phase II consists of the construction of the remaining area of Building 3, the balance of the west parking and drives, the pre-k drop-off loop and the associated covered walkways. The demolition of the existing school structure, portions of the existing parking and drives and the north area portables.Phase III consists of the construction of the Shade House, the covered PE Building, the permanent playgrounds, play courts, the completion of the east drives, drop-off and parking areas, the balance of the landscaping, irrigation and drainage, and the removal of the remaining modular classrooms. LEBOLO’S portion of the project was 15% of the total project.
BUILDING TYPE Education, New Construction
CLIENTSDPBCPhyllis Karp561-719-8286
COST$33,239,544
16
PrOjECt DEsCriPtiOn