Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16....

52
Constr Capital P 1. U 2. U 3. U UAA: 1. A 2. B 3. E 4. E 5. H 6. H 7. M 8. Sc 9. Se 10. W 11. K 12. K 13. K 14. K 15. K 16. K 17. K 18. K 19. M 20. M 21. P UAF: 1. A 2. A 3. C 4. C 5. C 6. C ruction I roject Maste UAA UAF UAS Allied Health, eatrice McD ngineering a ngineering A Health Scienc Housing Secu MAC Housing cience Build eawolf Spor Wendy Willia odiak Stude odiak Colleg PC Career an PC Generato PC Kachema PC Soil Rem PC Sprinkler PC Student MatSu Colleg MatSu Valley WSCC Welln Antenna Insta Atkinson Pow ampuswide ritical Electr TC Aviation utler Apartm InProgr er Schedules , 2 nd Floor Re Donald Build and Industry Asset Integri ces Building urity Systems g Renewal ing Renovat ts Arena amson Audit nt Services R ge Vocationa nd Technica or ak Bay Camp ediation r Renovation Housing ge Paramed y Center for ness Center allation Alas wer Plant Ren e Energy Upg rical Distribu Hangar Ren ment Retaini ress Rep s: enovations ing Renewal y Building ty and Corro s Upgrade tion orium Seatin Remodel al Technolog l Center pus Roof Rep n ic/Nursing L Arts & Lear Renovation ska Satellite newal Phase grades Fairb tion Renewa ovation ing Wall ports l osion Lab ng Replacem gy & Wareho placement Lab Addition ning & Campus R Facility e 2 banks Campu al Phase 1C ment ouse Facility, Renewal us Procu , Phase 1 (PA urement Me CMAR & T C C C AA) C ethod DBB DBB & DBB TERM CMAR DBB CMAR DBB CMAR Term DBB N/D DBB DBB DBB DBB DBB DBB DBB DBB DBB DBB DBB SS CMAR DBB DBB

Transcript of Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16....

Page 1: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

Constr 

Capital P

1. U

2. U

3. U

UAA: 

1. A

2. B

3. E

4. E

5. H

6. H

7. M

8. Sc

9. Se

10. W

11. K

12. K

13. K

14. K

15. K

16. K

17. K

18. K

19. M

20. M

21. PUAF: 

1. A

2. A

3. C

4. C

5. C

6. C

ruction I

roject Maste

UAA 

UAF 

UAS 

Allied Health,

eatrice McD

ngineering a

ngineering A

Health Scienc

Housing Secu

MAC Housing

cience Build

eawolf Spor

Wendy Willia

odiak Stude

odiak Colleg

PC Career an

PC Generato

PC Kachema

PC Soil Rem

PC Sprinkler

PC Student 

Mat‐Su Colleg

Mat‐Su Valley

WSCC Welln

Antenna Insta

Atkinson Pow

ampus‐wide

ritical Electr

TC Aviation 

utler Apartm

In‐Progr

er Schedules

, 2nd Floor Re

Donald Build

and Industry

Asset Integri

ces Building 

urity Systems

g Renewal 

ing Renovat

ts Arena 

amson Audit

nt Services R

ge Vocationa

nd Technica

or 

ak Bay Camp

ediation 

r Renovation

Housing 

ge Paramed

y Center for 

ness Center 

allation Alas

wer Plant Ren

e Energy Upg

rical Distribu

Hangar Ren

ment Retaini

ress Rep

s: 

enovations

ing Renewal

y Building

ty and Corro

s Upgrade

tion 

orium Seatin

Remodel

al Technolog

l Center

pus Roof Rep

ic/Nursing L

Arts & Lear

Renovation 

ska Satellite 

newal Phase

grades Fairb

tion Renewa

ovation

ing Wall

ports  

l

osion Lab

ng Replacem

gy & Wareho

placement

Lab Addition

ning

& Campus R

Facility

e 2

banks Campu

al Phase 1C

 

ment

ouse Facility,

Renewal

us

Procu

, Phase 1 (PA

urement Me

CMAR &

T

C

C

C

AA) 

C

ethod 

DBB 

DBB 

& DBB 

TERM 

CMAR 

DBB 

CMAR 

DBB 

CMAR 

Term 

DBB 

N/D 

DBB 

DBB 

DBB 

DBB 

DBB 

DBB 

DBB 

DBB 

DBB 

DBB 

DBB 

SS 

CMAR 

DBB 

DBB 

brberg
Typewritten Text
Reference 26
Page 2: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

7. Engineering Facility  CMAR 

8. Fine Arts Salisbury Theater Renovation  N/D 

9. Fine Arts Vapor Barrier   CMAR 

10. Life Sciences Research and Teaching Facility  CMAR 

11. Student Housing and Dining Facility  P3 

12. Utilities Wood Center Vault  SS 

13. West Ridge Steam Capacity Expansion  DBB 

14. West Ridge Deferred Renewal Master Plan  N/A 

15. Bristol Bay Science Lab and Clinical Space  DBB 

16. Kuskokwim Campus Kiln Project  DBB 

17. Kuskokwim Campus Vo‐Tech Building Room Addition  DBB 

18. Northwest Campus Nagozruk Restroom Remodel  DBB 

19. Research Vessel Sikuliaq  N/A 

UAS: 1. Anderson Building Remodel & Pedestrian Access  DBB 

2. Auke Lake Way Corridor Improvements and Reconstruction  DBB 

3. Freshman Student Housing Phase 1 (Banfield Hall Addition)  DBB 

4. Ketchikan Life Boat Davis Construction  DBB 

5. Ketchikan Upper Campus Parking Lot Reconstruction  DBB 

6. Sitka Career and Technical Education Center  DBB 

 

Construction Procurement Method abbreviations: 

Construction Manager at Risk  CMAR 

Design ‐ Bid ‐ Build   DBB 

Design – Build  DB 

Not Applicable  N/A 

Not yet Determined  N/D 

Public Private Partnership  P3 

Sole Source  SS 

Term Contractor Construction (Design‐Build)  TERM 

 

Construction in Progress Report abbreviations: 

Construction Award Amount  CAA$ 

Construction Manager at Risk  CMAR or CM@R 

Deferred Maintenance and Renewal  DM&R 

Formal Project Approval  FPA 

Preliminary Administrative Approval  PAA 

Project Change Request  PCR 

Schematic Design Approval  SDA 

Total Project Cost  TPC$ 

To Be Determined  TBD 

 

Page 3: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition
Page 4: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition
Page 5: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition
Page 6: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

U

Project Phase 1-classroomMedical SPhase 2—1st Floor

Schedu

PlanningAdvertisiConstruc Project Design TGeneral

Board oPreliminaFormal PSchemat Status UPhase 1 BOR in Dconferen

UAA All

Descriptio---Demolitionms and mocSonography—Upgrade aoffices and c

ule:

& Design: ng & Award

ction:

Team: Team Contractor

of Regentsary Admin AProject Approtic Design A

Update: was comple

December 20ce is schedu

lied He

on: n and replacck-up exam sy, Medical Asand renewal common spa

:

Kumin TBD

Approval Approval oval pproval

eted in Augu012. The prouled for Feb

Februar

ealth Sc

cement of thespace for teassisting, andof mechanic

aces.

JuJa

Ap

& Assoc.

& MotionsJunAugDec

st of 2012 ooject was adruary 8, 201

ry 2013 BOR 

cience

e 2nd floor laaching Radio

d EMT (Emecal systems

ly 2011—Jan/ Feb. 2013

pril/May 2013

s: ne 2, 2011 g. 17, 2012c. 7, 2012

on time and wdvertised for 3; and bid o

Update 

Buildin

abs (moved tologic Techn

ergency Medand roof rep

an. 2013 3 3—Aug.2013

within budgebids on Jan

opening is sc

ng Ren

to Health Scnology and D

dical Serviceplacement a

Total

TPC$ CAA$3

et. Phase 2 wnuary 15, 20cheduled for

novatio

cience Bldg.)Diagnostic s).

and renovatio

Project Co

5,680,415

TBD

was approve13; pre-bid r February, 2

n

) into

on of

ost:

ed by

2013.

Page 7: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

Project Completereplacemarchitect

Schedu

PlanningAdvertisiConstruc Project Design TGeneral

Board oPreliminaFormal PSchemat Status U65% drawFebruaryConstrucsemeste

UAA

Descriptioe renovation

ment of boileural interior

ule:

& Design: ng & Award

ction:

Team: Team Contractor

of Regentsary Admin AProject Approtic Design A

Update: wings were cy. Bid solicitaction is exper 2015. 

A Beatr

on: n of 1970’s br, roof and mand exterior

:

ArchiteTBD

Approval Approval oval pproval

completed oation is schected to begi

Februar

rice Mc

building on mmechanical sr improveme

060407

cts Alaska

& Motions7/112/8/1

on October 1eduled for Man in July 201

ry 2013 BOR 

cDonald 

main campussystems, repents.

6/2011—03/24/2013---05/27/2013---11/2

s: 1/11

/7/11 7/12

12, 2012. 95arch 2013 a13.The build

Update 

d Hall R

s. Will includplacement of

2013 2013 2014

5% drawingsnd award by

ding will be “

Renew

de HAZMAT f electrical s

Total

TPC$ CAA$

s to be compy May/June 2off-line” unti

wal

abatement, ystems and

Project Co

16,508,213

TBD

pleted by ear2013. l the Spring

 

ost:

rly

Page 8: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

Project Planningteaching electricalphotogratransportand confexisting b

ScheduPlanningAdvertisiConstruc

Project Design TGeneral

Board oPreliminaFormal PSchemat

Status UDesign DprogressBoard. FManagerConstrucin progre

UAA

Descriptio, programmareas not c

l engineeringammetry/carttation and hiferencing/cobuilding and

ule: & Design: ng & Award

ction:

Team: Team: Contractor

of Regentsary Admin AProject Approtic Design A

Update: Developments. UAA and UFull SDA appr @ Risk (CMction, Inc. in ess.  

A Engin

on: ing, design aurrently avag labs, fluidstography/GISghway enginllaborative le structured p

:

LivingstNeeser

Approval Approval oval pproval

t and coordiUAF are periproval was rMAR) Contralate Octobe

February 

neering

and construcilable on cams labs, heat aS, seismic aneering, landearning areaparking for th

MaJaAp

ton Slone, Inr Constructio

& Motions

NovSepJun

nation meetiodically updeceived at thact for pre-cor 2012. 65%

2013 BOR Up

and In

ction of a 75mpus. The pand mass tra

and earthquad surveying,

as. The projhe facility an

ay 2011-Decn-March 201

pril 2013-May

nc. on ( Pre-Con

s: v 2009 pt 2011 ne 2012 (Par

ings with thedating the joihe Decembeonstruction s

% design revi

pdate 

ndustry

5,000 gsf engproject includansfer labs, ake labs, fou, machine shect will also

nd any displa

c 2012 13 y 2015

nstruction Se

rtial)/ Dec 20

e Municipalitint UAA/UAFer BOR meeservices waiew and cost

y Buildi

gineering labdes: commusoils mecha

undation enghop, wood sinclude reno

aced parking

Total TPC: CCA: Pr

Se$2

Bu

ervices)

012 (Full)

ty of AnchorF Engineerineting. The Cos awarded tt reconciliati

ng

boratory andunications laanics labs, gineering, hop, “dirty” yovation of thg.

Project Co$123,204,0

re-Constructervices: 220,038 uilding: TBD

rage are in ng Advisory onstruction o Neeser ion are curre

d abs,

yard he

ost: 00

tion

ently

Page 9: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

Project Planningin room 3Lab vacameet curmechaniccaseworkAt the colaborator

Schedu

PlanningAdvertisiConstruc Project Design TGeneral

Board oPreliminaFormal PSchemat

Status UConstrucDecembeThe Con This will  

UAA A

Descriptio, programm

325 of the exated by the Wrrent School cal, plumbink, sinks, eme

ompletion of ry equipmen

ule:

& Design: ng & Award

ction:

Team: Team: Contractor:

of Regentsary Admin AProject Approtic Design A

Update: ction has beeer 4, 2012 intractor is co

be the final

Asset In

on: ing, design axisting enginWWAMI progof Engineerg and architergency eyethe new engt will be relo

:

LivingsKC Cor

Approval Approval oval pproval

en completen conjunctionrrecting pun

Construction

Februar

ntegrity

and construcneering buildgram in the ering programtectural workewash/showegineering facocated to the

FeMaAu

ton Slone, Inrporation

& MotionsAprMaMa

ed by the UAn with the Scch list defici

n in Progres

ry 2013 BOR 

y & Cor

ction of a 1,0ding. This prexisting Eng

m needs for ak for the inster, and resecility, the fume new labora

ebruary-May ay-June 201ugust-Novem

nc.

s: ril 2012 y 2012 y 2012

AA term conschool of Engencies.

s report on t

Update 

rrosion

000gsf enginroject will regineering Bua corrosion ltallation of fuearch compome hoods, caatory space.

2012 2

mber 2012

struction congineering op

this project.

Lab

neering corrnovate the G

uilding and reab. Work inc

ume hoods, onents for theasework and

Total

TPC: CAA:

ntractor. Graen house.

rosion laboraGross Anatoeconfigure itcludes electportable labe corrosion d associate

Project Co

$350,000

$208,956

and opening

atory omy t to rical,

b lab.

ost:

held

Page 10: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

 

Project

Design/ programseminarstudent

ScheduPlanningAdvertisiConstrucConstruc

Project Design TGeneral

Board oPreliminaFormal PSchematProject C

Status UThe Buildclosed-oResidualProviden

This will funding b

UA

t Descriptioconstruct a

ms of nursingr rooms, laboactivity spac

ule: & Design: ng & Award

ction F&F: ction:

Team: Team: Contractor:

of Regentsary Admin AProject Approtic Design AChange Req

Update: ding was comut and a Fin funding has

nce Dr. and p

be the final balance iden

AA He

on: pproximatelyg, WWAMI/Moratories for ces.

:

Livings Corner

Approval pproval oval pproval uests

mpleted in Aal Project Rs been allocaplanning for

constructionntified at the

Februar

ealth S

y 65,162 groMEDEX and r patient simu

DOAD

ston Slone, rstone Cons

& Motions

JaJFD

August 2011 eport was suated to additHSB 2. Art s

n in progressDec 2012 B

ry 2013 BOR 

Scienc

oss square foAllied Healtulators, Med

Dec 2007-SeOct 2009 -NoAug 2009- DeDec 2009-Au

Inc. struction Co

s: an 2008 une 2008 eb 2009

Dec 2012

on time andubmitted to ttional surfacselection an

s report on thBOR meeting

Update 

ces Bu

foot facility toh. Project in

d Tech and g

pt 2009 ov 2009 ec 2009 g 2011

ompany

d under budgthe Decembce parking, ad procureme

his project. g will be repo

uilding

o accommodncludes officegross anatom

Total TPC: CAA: Ea

Fo$1

Bu

get. The Prober 2012 BOa pedestrian ent is still in

The three ported on sep

g

date the acaes, classroomy spaces, a

Project Co$46,500,00

arly Siteworkooting/Found,772,370

uilding $28,6

oject has beeOR Meeting.

crossing ovprogress.

rojects usingparately.

ademic oms/ and

ost: 0

k dation

686,630

en

ver

g the

Page 11: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

Project Replacemas the as

Schedu

PlanningAdvertisiConstruc Project Design TGeneral

Board oPreliminaFormal PSchematProject C

Status UThe projeproject s  This will

Descriptioment of apprssociated so

ule:

& Design: ng & Award

ction

Team: Team Contractor

of Regentsary Admin AProject Approtic Design AChange Req

Update: ect was advehould be com

be the final

UAA H

on: roximately 1

oftware syste

AMC Johnso

Approval Approval oval pproval uests

ertised in Nomplete by th

construction

Februar

Housing

,000 obsoleem required

SEOCDE

on Controls I

& MotionsJULOCNON/A

ovember, anhe end of Jan

n in progress

ry 2013 BOR 

g Secu

ete door lockto control th

EP 2012 - OCT 2012 - NEC 2012 – J

ncorporated

s: L 2012

CT 2012 OV 2012 A

nd awarded tnuary 2013.

s report on th

Update 

rity Sys

ks in North, Ehem.

CT 2012 OV 2012

JAN 2013

d

to Johnson C

his project.

stem

East, and We

Tota

TPC CAA

Controls in D

est Halls, as

l Project C

$ 1,690 $ 1,026

December.

s well

Cost:

,000 6,998

The

Page 12: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

Project This prorenew: fienvelope

Schedu

PlanningAdvertisiPhase 1:Construc Project Design TGeneral

Board oPreliminaFormal PSchematProject C Status UThe projamount

Descriptiooject is currenishes, fixtu

e; and ADA m

ule:

& Design: ng & Award: ction, Phase

Team: Team Contractor

of Regentsary Admin AProject Approtic Design AChange Req

Update: ject Total Pof $12,132

UAA M

on: ently underres, and equmodification

,

1:

Bezek Watters

Approval Approval oval pproval uests

Project Cost,000 and is

Februar

MAC H

r review. Thuipment; mes. The proje

MA TBTB

Durst Seiseson Constru

& MotionsOctJunSepPen

t estimate as currently u

ry 2013 BOR 

Housing

his renovatioechanical, eleect will be ac

AR 2012 - D

BD BD

r uction

s: tober 2011ne 2012 ptember 201nding

at 65% desunder revie

Update 

g Rene

on of the 6 Mectrical, and

ccomplished

DEC 2012

12

ign is abovew.

ewal

MAC Housingd plumbing s

in phases

Tota

TPC CAA Phase

ve the FPA

g buildings wsystems; buil

l Project C

TBD TBD

e 1 $ 4,132

approved T

will lding

Cost:

2,000

TPC

Page 13: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

Project Phase 3 second frenovatiolab, staff

ScheduPlanningAdvertisiConstruc

Board oPreliminaFormal PSchemat

Project Design TGeneral Status UThe projesections ConstrucArt selecused by t

UA

Descriptiocompletes tloor, the maon includes 9work/break

ule: & Design: ng & Award

ction:

of Regentsary Admin AProject Approtic Design A

Team: Team: Contractor:

Update: ect completein the Spring

ction is workction is in prothis project w

AA Sci

on: he renovatioin corridors 9 offices for room and st

:

Approval Approval oval pproval

Architects Watterson

ed in Decemg semester. ing on a chaogress. This will be alloca

Februar

ence B

on of the Scion the 1st anBiology andtudent collab

FeMaMa

& MotionsNovAprPhaPha

s Alaska, AMn Constructio

mber. The neThe building

ange order toproject was

ated to other

ry 2013 BOR 

Building

ience Buildinnd 2nd floor, d 5 for Math, boration are

eb 2011-Febarch 2012 ay 2012 – D

s: vember 200ril 2009 ase 1 Septase 3 June

MC, BBFM, Eon

ew Biology Cg is fully occo the pedest

s funded by mr R&R/DM p

Update 

g Reno

ng. It includenew elevatoa collection

eas in the ha

b 2012

ec 2012

C C C

8

t.2009, Phase 2011

EHS, Estima

Classroom iscupied and ctrian bridge fmulti-year Rrojects such

ovation

es the East hor, and a newns room, Biollways.

Total ProjTPC Ph I Ph 2 Ph 3 $ CCA Ph 1 $CCA Ph 2 $CCA Ph 3 $

$7

se 2 Sept. 2

ations

s already sccomplete. Wfor building

R&R/DM fundh as BMH an

half of the w roof. The logy lab, LS

ect Cost:$2,645,600$5,100,000$5,300,00013,045,600

1,405,729 3,536,000 2,853,000 7,794,729

2010,

heduled for Watterson

code upgradds. Funding nd/or AHS.

  

IS

13

des. not

Page 14: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 BOR Update 

 

UAA Seawolf Sports Arena

Project Description: 196,000 sf multi-use facility that will house a 5,000 seat performance gymnasium for basketball & volleyball; a practice & performance gym for the gymnastics program; support space consisting of a fitness & training room, administration/coaching offices, laundry, A/V production, locker & team rooms for basketball, volleyball, gymnastics, skiing, track & cross country programs. Schedule: Total Project Cost: Planning & Design: Aug 2008- Summer 2012 TPC$ 109,000,000

CAA$ 86,000,000 Advertising & Award: Fall 2011 (CMAR process) Construction: Spring 2012 to Fall 2014 Project Team: Design Team MCG/Hastings-Chivetta General Contractor Cornerstone General Contractor Board of Regents Approval & Motions: Preliminary Admin Approval: Aug 2008 Formal Project Approval(s): Feb 2009 /June 2011 Schematic Design Approval(s): June 2009/Sept 2011 Project Change Requests: June 2011 – approved $109M Status Update: Reconciliation of Phase II pricing is complete and a final GMP contract is fully executed at $86M. Remaining additive alternates have been prioritized by the project team and will be incorporated into the project as construction progresses and remaining construction contingency funds can be released. Interior balcony walls, gymnastics pit walls and upper column/pier pours are now complete. Under slab electrical/plumbing work continues throughout basement area and concrete slab on grade pours are nearing completion (excluding the performance gym area). Over 50% of the structural steel is now on site and the remaining 500 tons are in transit. Metal decking is all on site and approx. 30% of the precast concrete riser panels for the performance gym have been fabricated/cast and delivered to the site. Erection of structural steel began in mid-December and installation of metal decking & wind girts to start very shortly.

Page 15: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

Project Thisprojseats wereplaced.concrete

Schedu

PlanningAdvertisiConstruc Project Design TGeneral

Board oPreliminaFormal PSchemat Status UThe seatwas usepercentafinalcon

UAA W

Descriptioectreplacedere removed Electrical afloorwaspa

ule:

& Design: ng & Award

ction:

Team: Team Contractor

of Regentsary Admin AProject Approtic Design A

Update: tingwas pud just for tageoftheTnstructionin

Wendy W

on: dthewornod and takenand cable watchedandre

:

FPC KC Corp

Approval Approval oval pproval

urchased dithe installatTPC.Projectnprogressr

Februar

WilliamRepl

outseats intby a local

was installedepainted,and

05/207/207/2

p./ Northern

& Motions5/36/66/1

irectly throtion resultitwascompreportonth

ry 2013 BOR 

mson Alaceme

theWendyWrecycler forat the cent

dnewseatsw

2012—02/202012 2012—01/06

Office Supp

s: 1/12 /12 4/12

ughUAAPng in a lowpletedontimhisproject.

Update 

Auditoriuent

WilliamsonAr re‐use. Carter row forwereinstalle

012

6/2013

ply

Procuremenwer Construmeandund

um Sea

Auditorium. rpet was deuse by WW

ed.

Total P

TPC$ 50 CAA$ 16

t and the Tuction Awaderbudget.

ating

Atotalof91emolished anWA staff. Th

roject Cos

00,000

66,731

TermContrrd AmountThiswillb

10ndhe

st:

actort as abethe

Page 16: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

UA

Project The UAAof the Stuone class

Schedu

PlanningAdvertisiConstruc Project Design TGeneral

Board oPreliminaFormal PSchemat Status UProject dproject isscheduleinstallatiofunded bR&R/DM This will

AA Kod

DescriptioA Kodiak Coludent Servicsroom, one c

ule:

& Design: ng & Award

ction:

Team: Team Contractor

of Regentsary Admin AProject Approtic Design A

Update: date of comps progressinge. DBR Conson of DIRTT

by multi-yearM projects at

be the fina

diak Co

on: llege Studences area on computer la

:

McCooDBR C

Approval Approval oval pproval

pletion has bg under budstruction is g

wall compor R&R fundsthe Kodiak c

al construct

Februar

ollege S

nt Services Rthe first floob, three offic

JaJuAu

l Carlson Gronstruction,

& Motions5/25/26/1

een extendeget and is e

getting closeonents, ceilin. Funding nocampus.

ion in progr

ry 2013 BOR 

Studen

Remodel conr of the Kodces and one

n, 2012- Junne, 2012 – A

ug 19, 2012 –

reen ArchiteInc.

s: 5/12 5/12 3/12

ed to Feb 1, xpected to bto project c

ng tiles, lightsot used by th

ress report

Update 

t Servi

nsists of remiak College

e reception a

ne, 2012 Aug, 2012 – Feb 1, 201

ects

2013. The be completeompletion as, and job si

his project w

on this pro

ces Re

modeling 2,2Campus Ce

area.

Total

TPC$ CAA$ 13

Student Serd within the nd is currenite cleanup.

will be allocat

oject.

emode

200 square feenter includin

Project Co

838,100

600,000

rvices Remoextended tly finishing This projectted to other

l

eet ng

ost:

odel

their t was

Page 17: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

 

Status UBezek Ddesign seFinal ConCommun The proje

Project This pro

renovatiworkforcIsland cvocationof 4,624repurpoprogram

ScheduPlanningAdvertisiConstruc Project Design TGeneral

Board oPreliminaFormal PSchematProject C

Kodia

Update: urst Seiser (ervices for thncept Designity Campus

ect is curren

Descriptiooject includeion of an exice developmommunities

nal, health/p4 square feetsing of 5,46

ms.

ule: & Design: ng & Award

ction:

Team: Team: Contractor:

of Regentsary Admin AProject Approtic Design AChange Req

ak Coll& W

(BDS) Archithis project. n Study havProject for t

tly on hold p

on: s the planninisting facility

ment courses. Work incluhysical educt of new outd5 square fee

July 20: July-Au

August

Bezek TBD

Approval pproval: oval: pproval: uest

Februar

ege VWareh

tects was seReview of th

ve been comthe FY14 Ca

pending Cap

ng, programy to provide ts that are in udes the concation/recreadoor covereet of existing

13-June 201ugust 2014

2014-July 2

Durst Seiser

& MotionsFebTBDTBDNA

ry 2013 BOR 

Vocatioouse F

elected to prohe program cpleted. This

apital Budge

pital funding

mming, desigthe space anhigh deman

nstruction of ation (HPERd vocational

g space for v

14

2015

r

s: bruary 2012D D

A

Update 

onal TeFacility

ovide prograconcept, des

s project is Uet.

for planning

n and constnd amenitiesnd from the lo

21,763 squaR) and maintl training spa

vocational, H

echnoly

amming andsign and na

UAA’s highes

g and design

truction of a s to support ocal and remare feet of nenance spaace; and ren

HPER and ad

Total TPC:

CAA:

logy

conceptual rrative, and st priority

n.

new facility career and

mote Kodiaknew enclosedce; construcnovation anddult enrichm

Project Co$24,300,00

TBD

the

and

k d ction d

ment

ost: 0

Page 18: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

Project

This newProgramfabricatiosmall conworkroom

ScheduPlanningAdvertisiConstruc *TPC incat a later

Project Design TGeneral

Board o PreliminaFormal PSchematProject C

Status U

Roofing awill start Process

K

Descriptio

w building wils. Three larg

on lab are thnference room/break area

ule: & Design: ng & Award

ction:

cludes $3.0Mr date.

Team: Team Contractor

of Regents

ary Admin AProject Approtic Design AChange Req

Update:

and exterior this month. Simulator is

KPC Ca

on:

ll be used foge labs for ine main focu

om, eight offa, and stude

:

M for Proces

McCooBlazy C

Approval

Approval oval pproval uests

metals studPlumbing, E

s nearly com

Februar

areer &

or the Procesnstrumentatis of the build

fices for facuent collabora

MaApJu

s Tech Equi

l Carlson GrConstruction

& Motions

FebFebSepFeb

ds are complElectrical, HVpletion.

ry 2013 BOR 

& Techn

ss Technologion, electronding. The bu

ulty, work areative spaces.

arch 2011 - Npril 2012 - ly 2012 - J

pment & Ba

reen, RSA, W

s:

bruary 2011bruary 18, 20ptember 23, bruary 9, 20

lete. The extVAC rough in

Update 

nical C

gy, Instrumenics and the uilding also cea for an ad. The entire

Nov 2011 May 2012 July 2013

ackfill Renov

WCB, Schne

011 2011 12

terior siding n has started

Center

entation andsimulation lacontains threministrative building is 1

Total TPC $CAA $

vation which

eider, LDN U

has shippedd. The 3D de

Electronicsab and a smee classroomassistant,

19,370 gsf.

Project Co$ 15,250,000$ 7,140,600

will be awar

USKH

d and installesign of the

s maller ms, a

ost: 0* 0

rded

ation

Page 19: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

Project The Kenawas unabthe buildneeded talarm syssound atthe existiBrockel a

Schedu

PlanningAdvertisiConstruc

Project Design TGeneral

Board oPreliminaFormal PSchematProject C Status UThe proje

Descriptioai River Camble to keep oings at risk, to provide postem. This ptenuating ening electricaand Steffy B

ule:

& Design: ng & Award

ction:

Team: Team Contractor

of Regentsary Admin AProject Approtic Design AChange Req

Update: ect is under

on: mpus had a operating. Tparticularly w

ower for lighproject will innclosure, witl system. Thuildings.

:

AMC EQuality

Approval Approval oval pproval uests

contract. Su

Februar

KPC G

power outaghe campus ewhen the tets, compute

nstall a naturth an automahe generato

DeSeDe

ngineers Electric

& MotionsAprJunSep

ubmittals are

ry 2013 BOR 

Genera

ge during finexperiencesmperatures rs, phones, ral gas fired atic transfer

or will power

ec 2011 –Juleptember 20ec 2012- July

s: ril 17, 2012ne 27, 2012ptember 5, 2

e being prepa

Update 

ator

als week in s numerous reach -30F.heating pumstandby genswitch with areas in the

ly 2012 012 y 2013

2012

ared by the

the Fall 201outages eac A standby g

mps, ventilatnerator in a wnecessary m

e Ward, Goo

Total

TPC $CCA $

contractor.

1 semester ch winter putgenerator is ion and fire weather tighmodificationsodrich, McLa

Project Co

$ 550,000 $ 369,000

and tting

ht, s to

ane,

ost:

Page 20: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

Project Remove and vapoinstall ne

Schedu

PlanningAdvertisiConstruc Project Design TGeneral

Board oPreliminaFormal PSchemat Status UFunds wethe roof. complete This will

KPC

Descriptiothe original

or barrier, insew metal roo

ule:

& Design: ng & Award

ction:

Team: Team Contractor

of Regentsary Admin AProject Approtic Design A

Update: ere received Contractor

e the project

be the final

Kache

on: zip rib metastall rigid ins

ofing.

:

Bezek Sunlan

Approval Approval oval pproval

d in May 201mobilized toOct 24, 201

construction

Februar

emak B

al roof panelssulation and

DeMaJu

Durst Seiserd Developm

& MotionsMaMaMa

2 to finalizeo the project 12. Final ins

n in progress

ry 2013 BOR 

Bay Roo

s from the ornew roof ov

ec 2011 – Apay 2012 l 2012 – Oct

r ment Compan

s: y 2012 y 2012 y 2012

e design, advJul 10, 2012

spection was

s report on th

Update 

of Rep

riginal buildiverhangs, cre

pr 2012

t 2012

ny LLC

vertise and a2 and was a

s Oct 29, 20

his project.

placeme

ng. Repair ueate roof ve

Total

TPC$ CAA$

award a conable to subst12.

ent

underlaymenentilation and

Project Co

700,000

573,651

tract to replatantially

nt d

ost:

ace

Page 21: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

Project This projsignifican

Schedu

PlanningAdvertisiConstruc

Project Design TGeneral

Board oPreliminaFormal PSchematProject C Status UTesting p In Januasoil on thside and proceed Final out

Descriptioect is cleanint amounts o

ule:

& Design: ng & Award

ction:

Team: Team Contractor

of Regentsary Admin AProject Approtic Design AChange Req

Update: performed in

ry UAA met he West side

testing will bwith planting

come will be

KP

on: ng up a site of diesel con

:

ShannoFoster

Approval Approval oval pproval uests

n September

with the ADe will be pushbe performeg 400 trees p

e a letter from

Februar

PC Soil

off campus ntamination a

ThFeAp

on & WilsonConstruction

& MotionsFebFebFebJun

r came back

DEC and devhed into the

ed in July. If tper acre.

m the ADEC

ry 2013 BOR 

Reme

that was usat 14 feet be

hru January 2ebruary 2010pril 2010- Oc

n

s: bruary 9, 20bruary 17, 20bruary 17, 20ne 1, 2010, O

with DRO le

veloped a woopen excav

the tests com

C stating no f

Update 

ediation

sed for fire trelow ground

2010 0 – March 20ctober 2013

10 010 010 October 21,

evels above

ork plan for tvation. Tillingme back wit

further actio

n

raining in thelevel.

Total

TPC$ CCA$010

2011, Jan 1

the ADEC c

the Summerg will continuh low DRO l

on needed on

e 1980’s and

Project Co

481,464 $ 162,146

0,2011

cleanup leve

r 2013. Cleaue on the Welevels we wi

n this site.

d had

ost:

el.

n est ll

Page 22: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

Project The fire designereplacedrates. Thflow rate

Schedu

PlanningAdvertisiConstruc Project Design TGeneral

Board oPreliminaFormal PSchematProject C

Status U The consThe cont  

Descriptiosprinkler syd to work wd with a newhe sprinklere.

ule:

& Design: ng & Award

ction:

Team Team: Contractor:

of Regentsary Admin AProject Approtic Design AChange Req

Update:

struction contractor is ma

KPC

on: ystems in t

with the exisw public war pipes nee

:

MCG, RSA Blazy

Approval Approval oval pproval uests

ntract has beaking good p

Februar

Sprink

he Ward, Gsting water ater line wited to be res

SeApJu

A

& MotionsSepSepSepJuly

een extenderogress and

ry 2013 BOR 

kler Re

Goodrich, Mwell and firh a lower o

sized to wor

ep – Feb 201pril 2012 ne 2012 – A

s: ptember 9, 2ptember 9, 2ptember 12, y 23, 2012 a

d four monthd is about 60

Update 

enovat

McLane andre pump syoperating prrk with the n

12

April 2013

2011 2011 2011

and Septemb

hs to 4/30/130% complete

tion

d Brockel buystem whichressure andnew water

Total

TPC: $CAA:

ber 24, 2012

3 due to pere.

uildings weh has been d different fpressure a

Project Co

$ 663,120 $ 468,880

2

rmitting dela

re

flow nd

ost:

ys.

Page 23: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

Project New studbeds. Fokitchen adesk, a kroom, an

Schedu

PlanningAdvertisiConstruc Project Design TGeneral

Board oPreliminaFormal PSchematProject C Status URoofing astarted. Athe Contcomplete

Descriptiodent housingour of the suiand living rookitchen and and fitness roo

ule:

& Design: ng & Award

ction:

Team: Team: Contractor:

of Regentsary Admin AProject Approtic Design AChange Req

Update: and FramingAlthough theractor’s man

e on schedul

KP

on: g is a two stotes are ADA

om. At the ea maintenanom. The tota

:

Bettisworth Bristol Env

Approval Approval oval pproval uests

g is completee Contractor’nagement tele. 

Februar

PC Stu

ory wood fraA compliant. ntrance ther

nce area. Onal sf is 39,87

JuMaJu

h, RSA, BBFvironmental R

& MotionsMaFebSepN/A

e. Plumbing’s on-site maam have im

ry 2013 BOR 

dent H

amed buildinThe suites h

re is a commn the second75 sf.

ne 2010 – Aay 2012 – July 2012 – Ju

FM, Dowl, HMRemediation

s: y 13, 2010bruary 19, 20ptember 23, A

, Electrical, Hanagement hproved thing

Update 

ousing

g with 24 suhave 4 bedro

mons, multipd floor there

April 2012 une 2012 uly 2013

MS n Services

011 2011

HVAC and Fhas been wegs significan

g

uites for a totooms, two reurpose roomis a study lo

Total

TPC: $CAA:

Fire Protectioeak, several

ntly and work

tal of 96 studestrooms, sm

m, 2 offices, ounge, laund

Project Co

$ 17,800,00$ 11,924,15

on rough-in meetings w

k is expected

dent mall front

dry

ost:

0 58

has with d to

Page 24: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

Project GO Bondclassroom

Schedu

PlanningAdvertisiConstruc Project Design TGeneral

Board oPreliminaFormal PSchemat Status UContractothe additremains complete This will

MSC

Descriptiod funded addms, offices,

ule:

& Design: ng & Award

ction:

Team: Team Contractor

of Regentsary Admin AProject Approtic Design A

Update: or was subsion and are for spring co

ed. 

be the final

C Para

on: dition to the labs, worksp

:

LivingsNeeser

Approval Approval oval pproval

stantially comoperational

ompletion of

construction

Februar

medic/

Mat-Su campace and sto

FeApJu

tone Slone Ir Constructio

& MotionsFebNovSep

mplete in Defor the Sprin

f the project.

n in progress

ry 2013 BOR 

/Nursin

mpus. The Sorage for the

eb 2011 – Mapril 2011 ne 2012 – D

Inc on, Inc

s: b 2009 v 2010 p 2011

cember 201ng semester This is the

s report on th

Update 

ng Lab

Snodgrass He paramedic

ar 2012

Dec 2012

2. Campus r. A small amfirst UAA FY

his project.

Additio

Hall addition c and nursing

Total

TPC$ CAA$

programs hamount of lanY11 GO Bon

on

will include g programs.

Project Co

3,625,000

2,438,536

ave moved indscaping nd project to

new

ost:

into

o be

Page 25: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

Project The projemusic sptheater/a

Schedu

PlanningAdvertisiConstruc Project Design TGeneral

Board oPreliminaFormal PSchemat Status UDesign wto reviewhas beenadvertise 

MSC

Descriptioect will desig

pace and insauditorium fo

ule:

& Design: ng & Award

ction:

Team: Team Contractor

of Regentsary Admin AProject Approtic Design A

Update: work is compw and improvn submitted tement. This

C Valle

on: gn and consttrument stor

or lectures, p

:

Kumin AN/A

Approval Approval oval pproval

pleted and bive the bid doto the Borouis UAA’s las

Februar

y Cent

truct a new frage, displaypublic gather

JuFeMa

Associates

& MotionsFebNovJun

id documentocuments. A ugh and appst FY11 GO

ry 2013 BOR 

ter for A

facility that wy areas, gathrings and co

l 2011- Nov eb 2013 ar 2013 – De

s: b 2009 v 2011 n 2012

ts are being section lineroval is anticBond projec

Update 

Arts &

will provide ahering/study

onferences.

2012

ec 2014

prepared. De easement scipated prior

ct to be awar

Learnin

a classroomy spaces and

Total

TPC$ CAA$

Design periosetback varir to the consrded for cons

ng

, drama lab,d a 500 seat

Project Co

20,000,000

TBD

od was extenance reques

struction bid struction.

, t

ost:

nded st

Page 26: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

PW

Project GO BondThe workflooring aelectronicmechanic

Schedu

PlanningAdvertisiConstruc Project Design TGeneral

Board oPreliminaFormal PSchemat Status UThe wellncompleteconstruct

WSCC W

Descriptiod funded genk will includeand finishes;c entry systecal system u

ule:

& Design: ng & Award

ction:

Team: Team Contractor

of Regentsary Admin AProject Approtic Design A

Update: ness center e. The new tion to contin

Wellne

on: neral renovae: ADA comp; new doors em; ACM remupgrades; en

:

Kumin AEklutna

Approval Approval oval pproval

remodel is nlobby is framnue. The ex

Februar

ess CenRe

ation of the epliant locker/and hardwamoval; replanergy conse

FeDeAp

Associatesa Services L

& MotionsFebDecSep

nearing commed and rooxterior siding

ry 2013 BOR 

nter Reenewal

existing Well/restrooms;

are; lighting racement of grvation cont

eb 2011 – Noec 2011 – Japr 2012 – Au

LC

s: b 2009 c 2010 p 2011

mpletion and fing will be i

g will begin in

Update 

enovatil

lness Centenew entrancreplacementgalvanized wtrols; and ex

ov 2011 an 2012 ug 2013

the overall pnstalled soon the spring.

on & C

r and Campce and count and electric

water lines; ITxterior siding

Total

TPC$ CAA$

project is abon to allow w.

Campus

us Renewalter space; ncal upgradesT upgrades; improveme

Project Co

5,000,000

2,789,896

out 65% winter

s

. ew s; ; nts.

ost:

Page 27: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 CIP Update 

Schedule: 

Planning & Design:  June—August 2012 

Adver sing & Award:  August 2012 

Construc on:  Phase 1:  August—October 2012 

Board of Regents Approval & Mo ons: 

Preliminary Administra ve Approval  Phase 1:  August 15, 2012 

Schema c Design Approval  Phase 1:  August 20, 2012 

Formal Project Approval  Phase 1:  August 20, 2012 

Status Update: Contractor has completed the ini al site work and founda ons and the balance of the work will be completed July, 2013. 

Antenna Installa on Alaska Satellite Facility AS311 Phase 1 (AIASF) 

Total Project Cost: 

$6,000,000 

Phase 1 $1,000,000 

Project Descrip on Phase One of the project involves site work on an area of approximately 150 feet by 150  feet, founda on and construc on of a 20-foot high concrete base. The construc on of the concrete base will be expedited as much as the coming winter season will reasonably allow. The site prepara on includes clearing brush and trees, excava on and trenching, grading and improvements to the exis ng service road. This work will also realign the adjacent exis ng ski trail and expand the training/ski head area.  

Antenna Installa on Alaska Satellite Facility AS311 Phase 1 

Funding Source: 

NASA and ITT Exelis Architect/Engineer: 

General Contractor: 

PDC, Inc. 

GHEMM Company 

Page 28: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 CIP Update 

Schedule Phase 2: 

Planning & Design:  October 2006—May 2012 

Adver sing & Award:  May-June 2012 

Construc on:  July 2012—July 2013 

Board of Regents Approval & Mo ons: 

Formal Project Approval  June 03, 2011 

Schema c Design Approval  February 10, 2012 

Status Update: The comple on date has been changed to February, 2013. A delay was encountered in obtaining control valves for the tank. 

Atkinson Power Plant Renewal Phase 2 (BARN2) 

Total Project Cost: 

$1,927,000 

Project Descrip on Phase 2 work consists of four primary items; De‐aerator Replacement:  It is proposed to provide a redundant de-aerator that can be put into service with a short plant shut down in lieu of replacing the exis ng equipment.  Feed‐water Heater Replacement:  It is proposed to replace the exis ng heater with new equipment at a  me of low steam load. This plan will not require a complete plant shutdown.  Eliminate Single Points of Failure in Cri cal Piping:  The proposed scope of work includes installa on of 12 new valves and some bypass piping. These valves will allow boilers to be isolated and sec ons of the high pressure piping can be bypassed during a boiler failure. Replace Variable Frequency Drives:  The alloca on of FY12 funds does not allow the replacement of all VFD’s in the plant, but key VFD’s that power fans and pumps for Boilers 3 and 4, as well as condenser fans for Turbine No. 3 will be replaced in this phase.

Atkinson Power Plant Renewal Phase 2 

Funding Source: 

FY12 General Funds / Bonds 

Architect/Engineer: 

General Contractor: 

Design Alaska, Inc. and Evergreen Engineering 

Kiewit Building Group, Inc. 

Page 29: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 CIP Update 

Schedule: 

Planning & Design:  2009-2012 

Adver sing & Award:  N/A 

Construc on:  January 2013-August 2013 

Board of Regents Approval & Mo ons: 

Preliminary Admin Approval  August 8, 2012 

Formal Project Approval  September 27, 2012 

Schema c Design Approval  September 27, 2012

Status Update: Construc on is scheduled to begin in January 2013 and will be ongoing thru August 2013. 

Campus-wide Energy Upgrades—Fairbanks Campus (CWEMC) 

Total Project Cost: 

$6,000,000 

Project Descrip on This project will upgrade the ligh ng, HVAC controls and sensors, replace old inefficient motors and controls, and install new door and window seals on 10 University Bldgs.  Project cost will be recovered in energy savings in 10 years.  

Campus Wide Energy Upgrades—Fairbanks Campus 

Architect/Engineer: 

General Contractor: 

Siemens Bldg Technologies, Inc. 

Siemens Bldg Technologies, Inc. 

Page 30: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 CIP Update 

Schedule Phase 1C: 

Planning & Design:  January 2009 - June 2009 

Adver sing & Award:  May-July 2011 

Construc on:  July 2011 - August 2012 

Board of Regents Approval & Mo ons: 

Formal Project Approval  April 8, 2011 

Schema c Design Approval  June 2, 2011 

Status Update: Work in this phase is complete. Work on this CM@R contract was done under budget and the savings was returned to UAF. Phase 2 work will start in March, 2013. 

Cri cal Electrical Distribu on Renewal Phase 1C (UTERC) 

Total Project Cost: 

$10,000,000 

Project Descrip on Phase 1C  scope will  install all  the major electrical equipment  in  the building  constructed  in Phase  1B,  including  switchgear,  transformers,  switches,  and  cable  for  two  new  electrical feeders.  Addi onal feeders will be installed as funds are available. 

Cri cal Electrical Distribu on Renewal Phase 1C 

Funding Source: 

FY12 R&R Funding 

Architect/Engineer: 

General Contractor: 

PDC Inc. Engineers 

Kiewit Building Group, Inc. 

Page 31: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 CIP Update 

Schedule: 

Planning & Design:  May—August 2012 

Adver sing & Award:  September 2012 

Construc on:  October 2012—February 2013 

Board of Regents Approval & Mo ons:   

Formal Project Approval  August 27, 2012 

Schema c Design Approval  August 27, 2012 

Preliminary Administra ve Approval  August 17, 2012 

Status Update: 

Construc on is 60% complete.  The exterior is insulated and the concrete slab has been poured.  Construc on con nues with interior framing and mechanical and electrical rough-in complete.  Interior finishes including paint, ceilings, ligh ng, and mechanical fixtures are underway.  Project comple on is on schedule for February 2013. 

UAF CTC Avia on Hangar Renova on (CTCHR) 

Total Project Cost: 

$1,725,000 

UAF CTC Avia on Hangar Renova on 

Project Descrip on This project will provide enough program space for the Avia on programs to move a por on of their teaching opera ons into the new facility.  The project construc on includes minor modifica ons to the exis ng hangar and offices, inclusion of new ba ery and sand blas ng rooms, condi oning the unfinished 8,000 sf area, addi on of public restrooms, and new head bolt outlets for winter  me parking. Condi oning the 8,000 sf of currently unfinished space includes exterior wall insula on, vapor barrier, under slab u li es, a concrete floor slab and installa on of new mechanical and electrical rooms.  

Funding Source: 

UAF and CTC Opera ng Funds 

USKH, Inc. 

TBI Construc on Company 

Architect/Engineer: 

General Contractor: 

Page 32: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 CIP Update 

Schedule: 

Planning & Design:  April 2012—June 2012 

Adver sing & Award:  May 2012—June2012 

Construc on:  June 2012—August 2012 

Board of Regents Approval & Mo ons:   

Formal Project Approval  April 26, 2012 

Schema c Design Approval  June 06, 2012 

Status Update: Approximately 500 feet of failing wood retaining wall has been replaced with concrete walls.  New ADA compliant ramp and stairs have been installed and provide access to Cutler Apartments.  Deteriorated wooden steps have been replaced and handrails were installed at all front entries.  Installa on of headbolt heaters is  near comple on.  Paint and hydroseeding will be completed in Spring 2013. 

UAF Cutler Apartment Retaining Wall (CURW) 

Total Project Cost: 

$1,460,495 

UAF Cutler Apartment Retaining Wall 

Project Descrip on This project will construct a new concrete retaining wall, stairs, sidewalks, ADA accessible ramp and head bolt heater outlets to comply with building codes and improve safety throughout the Cutler Apartment complex.   

Funding Source: 

FY12 Bond Issue Residence Life 

PDC Inc. Engineers 

Alcan Builders, Inc. 

Architect/Engineer: 

General Contractor: 

Page 33: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 CIP Update 

Status Update: The design firm. UAF, and the CMAR have completed design review of the Design Development set of drawings and the various comments are being incorporated.  Structural and Civil design are expedi ng to allow for ground breaking to occur in April.  A glazier contractor has been selected and the exterior façade detailed design has begun.   

Project Descrip on The  Engineering  Facility project will building 117,000  gsf of new  space  and  renovate  about 23,000gsf  of  exis ng  space  in  the  Duckering  Building  in  support  of  the  UAF  College  of Engineering and Mines.  The six story building will provide space for engineering learning and discovery and will  feature open  lab concepts and a high-bay area  for prac cal applica on of engineering know how. 

UAF Engineering Facility 

Designer:  ECI Hyer, NBBJ, PDC Inc, AMC 

CM@Risk:    Davis Constructors 

Board of Regents Approval & Mo ons:  

Preliminary Project Approval    September 9, 2006 

Formal Project Approval    June 4, 2010 

Amended Formal Project Approval  September 23, 2011  

Schema c Design Approval    June 8, 2012 

Occupancy Date:  Fall 2015 

Schedule Bar Chart: Design 

Construc on 

0%

0%

100%

100%

Groundbreaking Mar-2013

Occupancy Sept-2015

UAF Engineering Facility (ENNF) 

Total Project Cost: $108,600,000 

Funding Source:   

SOA Appropria on 

Page 34: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 CIP Update 

Schedule: 

Planning & Design:  September 2012 

Adver sing & Award:  TBD 

Construc on:  TBD 

   

Board of Regents Approval & Mo ons: 

Preliminary Administra ve Approval  January 10, 2012 

Formal Project Approval  TBD 

Schema c Design Approval  TBD 

Status Update: Planning and programming phase is complete 

Fine Arts Salisbury Theater Renova on (FAREN) 

Total Project Cost: 

$750,000 

Fine Arts Salisbury Theater Renova on 

Project Descrip on Phase I: Analysis  of exis ng condi ons and program/user group needs , followed by op ons       and recommenda ons for renova on. Phase II: Design and construc on documents for the renova on of Salisbury Theater. 

Architect/Engineer: 

General Contractor: 

Funding Source: 

FY12 General Fund UAF Q Series Bond Bezek Durst Seiser 

TBD 

 

Page 35: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 CIP Update 

Schedule: 

Planning & Design:  October 2012-February 2013 

Construc on:  March 2013-September 2013 

Board of Regents Approval & Mo ons: 

Preliminary Administra ve Approval  October 18, 2011 

Formal Project Approval  September 28, 2012 

Schema c Design Approval  Submi ed to BoR February 2013 

Status Update: 65% design review submi al scheduled for Jan. 15, 2013. 

Fine Arts Complex Vapor Barrier and Installa on (FAVB) 

Total Project Cost: 

$5,600,000 

Fine Arts Complex Vapor Barrier Design and Installa on 

Project Descrip on This project will correct building envelope deficiencies by applica on of spray foam and vapor barrier to the inside of exterior walls to the music wing.  

Architect/Engineer: 

CM@R:  

USKH 

Wa erson 

Page 36: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 CIP Update 

Status Update: The project has progressed into the next phase of construc on: finishes.  Building comple on is well underway with ligh ng, ceilings, final casework, and controls installa ons fully underway.   Contractors have completed most of the wiring and plumbing and the permanent power has been turned on to the facility.  The exterior of the building is 95% complete.  Overall the project remains on schedule for occupancy in the summer of 2013.   

Project Descrip on The Murie Building will provide mul use teaching and research  labs, classrooms, and office space for life science research and academic purposes. The research por on will provide nearly 60,000 gsf of lab space for biology research. The teaching por on will provide 40,000 gsf of academic classroom and lab space for biology and wildlife degree programs.  The project also includes expansion of the West Ridge u lidor steam line, and a greenhouse replacement. 

UAF Margaret Murie Building UAF Life Sciences Research and Teaching Facility 

Schedule Bar Chart: Design

Construction

BASIC PROJECT INFORMATION:  

Designer: Bezek Durst Seiser Inc., Smith Group, PDC Inc., RFD Inc.  

CM@Risk:    Davis Constructors  

Board Approvals: FPA  February 2010  SDA  November 2010 

 

Total Project Cost:   $88,578,000 Construc on Cost:  $67,700,000  

Occupancy Date:  Fall 2013  Funding Source:  GO Bond    UA Revenue Bond

0%

0%

100%

100% Groundbreaking

Mar-2011 Occupancy Sept-2013

 UAF Life Sciences Facility (LFRF)

For actual values refer to a ached budget sheet 

$0 $50 $100

Project Management

Building Completion

Construction

Design

Millions

Budget vs ActualActual

Budget

Page 37: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 CIP Update 

UAF Margaret Murie Building UAF Life Sciences Research and Teaching Facility 

UAF Life Sciences Facility (LFRF) 

Formal Project Approval:  $108,600,000  to fund three projects associated with the construc on of the new facili es: 

-Life Sciences Facility   ($88,275,000) TPC Increase October 2011 for $303,000 -West Ridge  Steam Capacity Expansion ($15M)  -Arc c Health Greenhouse  ($5,325,000) - Refer to AHRG CIP Update 

Page 38: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 CIP Update 

Schedule: 

Planning & Design:  March 22, 2011-February 18. 2013 

Adver sing & Award:  N/A 

Construc on:  May 1, 2013-July 16, 2014 

Board of Regents Approval & Mo ons:   

Formal Project Approval  June 2, 2011 

Schema c Design Approval  September 28, 2012 

Status Update: The bonds were sold for the project in December. Design is progressing with final documents to be ready February 18th. Construc on is set to begin the first of May, 2013; with construc on complete in July 2014.   

Campus Wide Student Housing & Dining Development (CWHD) 

Total Project Cost: 

$25,070,000 

Campus Wide Student Housing & Dining Development 

Project Descrip on: Design and build a new student dining facility adjacent to the Wood Center through a public-private partnership. 

Perkins & Will 

Ghemm Company 

Architect/Engineer: 

General Contractor: 

Page 39: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 CIP Update 

Schedule: 

Planning & Design:  September 2012—February 2013 

Advertising & Award:  April 2013 

Construction:  April 2013 

Board of Regents Approval & Motions: 

Preliminary Admin Approval  July 1, 2012 

Formal Project Approval  September 27, 2012 

Schematic Design Approval  Submitted Feb. 2013 BoR

Status Update: Design Alaska is progressing with the design. Design is 95% complete. 

Utilities Wood Center Vault (UTWCV) 

Total Project Cost: 

$3,000,000 

Project Description This project will build new utility infrastructure in the area of the Wood Center and Chapman buildings. The new infrastructure will support the new dining facility and continue the effort to upgrade the utilities campus wide. 

Utilities Wood Center Vault 

Architect/Engineer: 

General Contractor: 

Design Alaska 

TBD 

Page 40: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 CIP Update 

Schedule: 

Planning & Design:  February - May 2011 

Adver sing & Award:  April - July 2011 

Construc on:  August 2011 - October 2012 

Board of Regents Approval & Mo ons: 

Formal Project Approval  November 9, 2011 

Schema c Design Approval  April 8, 2011 

Status Update: Substan al comple on was on November 8, 2012. Landscaping will be completed in June 2013. There has been a significant increase in steam capacity at the west ridge which will serve the Life Sciences building as well as future buildings.    

U li es West Ridge Steam Capacity Expansion (UTCE) 

Total Project Cost: 

$15,000,000 

Project Descrip on This project installs a 10-inch steam line and a 6-inch condensate line from the Atkinson Power Plant to the West Ridge  in the vicinity of the Arc c Health Research Building to  increase the steam capacity for West Ridge and the new Life Sciences Facility.   A new u lidor will also be constructed to house the steam piping and other u li es from the u lidor near the Lola Tilly Building to the u lidor west of the Student Recrea on Center. 

U li es West Ridge Steam Capacity Expansion 

Funding Source: 

UA Revenue Bond GO Bond (Life Sciences) 

Architect/Engineer: 

DB Contractor: 

PDC Inc. Engineers 

Kiewit Building Group  Design Alaska 

Page 41: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 CIP Update 

West Ridge Deferred Renewal Master Plan (WRDM)  

West Ridge Deferred Renewal Master Plan 

Project Descrip on The intent of the project is to create a master plan for the renewal of the facili es on the West Ridge and develop 

logical phasing, budgetary es mates, and program space alloca on.  The first task will update the current 

facili es audit and provide a true reflec on of the quan ty of code correc ons, the amount of deferred 

maintenance, and the extent of space renewal pertaining to func onal obsolescence.  Upon comple on, an 

analysis of logical adjacencies will occur and the plan will make sugges ons for reloca on of programs, including 

major changes to various spaces to create these adjacencies.  Finally, the plan will create logical phasing plans 

with recommended funding levels to become the basis for future capital budget requests.  

Schedule: 

Planning & Design:  January 2012 to September 2013 

Design Build Award:  N/A 

Construc on:  N/A 

Board of Regents Approval & Mo ons: 

Formal Project Approval  December 22, 2011 

Schema c Design Approval  N/A 

 

Total Project Cost: 

$700,000 

Funding Source: 

FY12 Capital Appropria on 

Map of Facility Condition Blue is Renew or Replace

Status Update: The project team is working on a master plan for the renewal of the facili es on the West Ridge that will address 

and  develop  logical  phasing,  budgetary  es mates,  and  program  space  alloca on.    The  team  has  completed 

facili es condi on analyses and established a condi on index that has helped guide the master planning efforts.  

The design  team  and execu ve  commi ee have  also  completed  advance programming of  the  space on West 

Ridge as  it relates to the deficit of teaching and research space noted  in the 2010 UAF Master Plan.   The next 

steps are to work on an analysis of logical program adjacencies and the plan for reloca on of programs, including 

major  changes  to  various  spaces  to  create  these  adjacencies.   At  the  same  me,  the  team will  create  logical 

phasing  plans  with  recommended  funding  levels  to  become  the  basis  for  future  capital  budget  requests. 

Addi onal specific planning for reloca on of func ons  in the Geophysical  Ins tutes and crea ng be er 

suited space for the  Irving 1 Animal Quarters  is   underway as well.   Phase 2 planning will take over the 

remaining efforts of the master plan. 

Page 42: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 CIP Update 

Schedule: 

Planning & Design:  September 2012-January 2013 

Adver sing & Award:  February 2013-March 2013 

Construc on:  April 2013-December 2013 

Board of Regents Approval & Mo ons: 

Preliminary Project Approval  May 17, 2012 

Formal Project Approval  December 7, 2012 

Schema c Design Approval  Has been submi ed for Feb 2013 BOR 

Status Update: This project is in the design phase. 

Bristol Bay Applied Sciences (BBAS) 

Total Project Cost: 

$2.6 Million 

Bristol Bay Applied Sciences 

Project Descrip on Renova on of the Napa Auto Parts building to provide space and facili es for the Bristol Bay Campus Applied Sciences program.  

Architect/Engineer: 

General Contractor: 

McCool Carlson Green Architects 

TBD 

Page 43: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 CIP Update 

Schedule: 

Planning & Design:  September 2011-February 2012 

Adver sing & Award:  March 2012 

Construc on:  May 2012—January 2013 

Board of Regents Approval & Mo ons: 

Preliminary Project Approval  January 25, 2012 

Formal Project Approval  March 23, 2012 

Schema c Design Approval  March 23, 2012 

Status Update: Project Substan al Comple on inspec on has occurred. Contractor is comple ng minor punch list work. Project is 95% complete. 

Kuskokwim Campus Kiln Project (KCKP) 

Total Project Cost: 

$640,000 

Kuskokwim Campus Kiln Project 

Project Descrip on Design and install ven la on and electrical service upgrades to accommodate the kiln and po ery wheels for the Ceramic Program which is to be located in Room 155. The kiln will be moved from the local high school to UAF Kuskokwim Campus.

  

Funding Source: 

FY11 DM Alloca on 

Architect/Engineer: 

General Contractor: 

Livingston Sloan, Inc. 

Denali General Contractors, Inc. 

Page 44: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 CIP Update 

Schedule: 

Planning & Design:  November 2011—February 2012 

Adver sing & Award:  March—April 2012 

Construc on:  April—September 2012 

Board of Regents Approval & Mo ons: 

Preliminary Project Approval  December 13, 2010 

Formal Project Approval  January 26, 2011 

Schema c Design Approval  February 24, 2012 

Status Update: Project SC inspec on has occurred. Minor punch list work remains. Project is 97% complete. 

Kuskokwim Campus Voc-Tech Building Room Addi ons (KCRA) 

Total Project Cost: 

$1,128,500 

Kuskokwim Campus Voc-Tech Building Room Addi ons 

Project Descrip on A U.S. Department of Educa on (DOE) Title III Grant was applied for and awarded to the UAF Kuskokwim Campus in Bethel for construc ng restrooms on the second level and addi onal offices and a classroom, in the Voc-Ed Building. These new areas will be used to provide needed addi onal classroom, office and restroom facili es. The approximate area of this project is 3,725 square feet.

 

Funding Source: 

DOE Title III Grant 

Architect/Engineer: 

General Contractor: 

Livingston Sloan, Inc. 

Denali General Contractors, Inc. 

Page 45: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 CIP Update 

Schedule: 

Planning & Design:  May—July 2012 

Adver sing & Award:  July—August 2012 

Construc on:  September 2012—January 2013 

Board of Regents Approval & Mo ons: 

Preliminary Project Approval  May 15, 2012 

Formal Project Approval  June 27, 2012 

Schema c Design Approval  June 27, 2012 

Status Update: Project is substan ally complete. Punch list items remaining. Project is 98% complete. 

Northwest Campus Nagozruk Restroom Remodel (NWNR) 

Total Project Cost: 

$434,000 

Northwest Campus Nagozruk Restroom Remodel 

Project Descrip on  This project will remove exis ng finishes and fixtures in both restrooms and replace with new finishes and fixtures.  ADA accessibility will be incorporated into the project. The referenced restrooms are original construc on and have finish issues with the surface materials and fixtures, including the ceilings, walls, floors, par ons, toilets, urinals, sinks, mirrors, and hand dryers. If asbestos containing material is encountered in the project area, it will be abated under this project.  

Funding Source: 

CRCD Opera ng Funds 

Architect/Engineer: 

General Contractor: 

Design Alaska, Inc. 

Concor Construc on, Inc. 

Page 46: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 CIP Update 

Schedule: 

Planning & Design:  August 2007-October 2008 

Adver sing & Award:  February 2009-December 2009 

Construc on:  January 2010-July 2013 

Approvals & Mo ons: 

Preliminary Project Approval  Board of Regents:  September 2008 

Formal Project Approval  Na onal Science Founda on:  December 2008 

Schema c Design Approval  Na onal Science Founda on:  December 2008 

Status Update: The launching ceremony for the R/V Sikuliaq was on October 13, 2012 in Marine e, Wisconsin.  The Sikuliaq is expected to arrive in Seward in late 2013.  Science opera ons will begin in early 2014. 

R/V Sikuliaq (ARRV) 

Total Project Cost: 

$199,500,000 

Project Descrip on The R/V  Sikuliaq  (formerly  the Alaska Region Research Vessel)  is  a  261-foot  oceanographic research vessel capable of performing complex science in the ice-choked waters of Alaska and the  polar  regions.   When  complete  the  ship will  be  one  of  the most  advanced  university research vessels in the world and will be able to break ice up to 2.5 feet thick. 

Research Vessel Sikuliaq 

Funding Source: 

NSF Coopera ve Agreement 

Architect/Engineer: 

General Contractor: 

Glosten Associates 

Marine e Marine Corpora on 

Page 47: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 Board of Regents

Anderson Building Remodel & Pedestrian Access

Project Description: This project will totally remodel the Juneau campus principal science instruction space to accommodate the needs of the UAS Science program. The project is divided in to two separate construction contracts. The first is the building remodel including classrooms, teaching labs, faculty offices, and research spaces. The second contract will be for the construction of a pedestrian crossing of Glacier Highway. These two elements are being designed, bid and constructed as separate contracts due to the different nature and schedules for the work. In the remodel work major building components will be upgraded or replaced including heating and ventilating equipment and controls, the roof membrane and insulation, new toilet rooms, interior finishes, elevator replacement, classroom and laboratory casework and the emergency generator. Interior space will be reconfigured to improve effectiveness of the teaching and research areas. The number of faculty offices will be reduced. The work has required the building to be vacated during renovation. Interim space for offices and labs is being accommodated elsewhere on campus, at the UAF Fisheries facility at Lena Point and at the old NOAA lab adjacent to the Anderson Building. The pedestrian access work will include a pedestrian bridge connecting to the third floor of the Anderson Building and a paved and lighted pathway to the main campus. Total Project Cost: $10,700,000 Project Schedule: Building Remodel Pedestrian Access

Final Design 9/2008 –9/2009 7/2013 – 10/2013

Bid & Award 10/2009-11/2009 2/2014-3/2014

Construction 12/2009 – 9/2010 4/2014 – 10/2014

Project Approvals:

Formal Project Approval September 2008 Schematic Approval February 2009

Status Update: Building Remodel: Construction contract is completed. Pedestrian Overpass: UAS is awaiting detailed design data on the Alaska DOT&PF’s proposed re-alignment of Glacier Highway. DOT&PF and UAS are re-examining the impacts of the future road and right-of-way re-alignment. Construction is intended for 2014 assuming DOT&PF makes a determination on road alignment in early 2013.

Page 48: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 Board of Regents

Auke Lake Way Corridor Improvements & Reconstruction

Project Description:

• Reconstruction of Auke Lake Way from Hendrickson to the Egan bus circle to replace pavement, signage and lighting, and add traffic control devices and provide for service and emergency access;

• Reconstruction of the Novatney parking area to a service turn-around; • Construction of a paved and lighted pedestrian connection from the Hendrickson

Building to the Auke Creek bridge path, eliminating pedestrian use of the road; • Reconstruction, paving and drainage of the Chapel-by-the-Lake parking lot as

required by the parking agreement; • Construction of a roof structure atop the path between the main parking lots and the

Whitehead entrance; • Revised entry canopies at the intersections of the Novatney and Whitehead exterior

walkways. • Traffic and signage improvements at the Loop Road intersection.

Total Project Cost: $4,300,000 Project Schedule: Phase 1 Phase 2 Phase 3 Planning & Design 1/2011 – 9/2011 8/2011-3/2012 10/2012 – 3/2013 Bid & Award 5/2011 – 6/2011 4/2012 4/2013 Construction 4/2011 - 10/2012 5/2012-11/2012 5/2013 – 10-2013 Project Approvals

Formal Project Approval December 2010 Schematic Approval (Phase 1) April 2011 Schematic Approval (Phase 2) April 2012 Schematic Approval (Phase 3) March 2013 (anticipated)

Status Update: Phase 2 is substantially complete. Planning for phase 3 is underway.

Page 49: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 Board of Regents

New Freshman Residence Hall – Phase 1

Project Description:

This project is the first phase of a new Freshman Residence Hall. This project will construct the first sixty beds of what will be a 120 bed facility. The second phase will add the second sixty beds and make improvements to the existing campus cafeteria. The new residence hall will be located on a prime site on the westerly edge of the developed parking area, situated between Noyes Pavilion and the drop-off circle to Egan Library. The residence units are organized in a suite arrangement similar to that utilized for Banfield hall, but slightly increased in size and features. The basic module pairs two double occupancy rooms with a shared bathroom and kitchenette area. The project area is approximately 21,800 square feet. Total Project Cost: $9,250,000 (Phase 1) Project Schedule: Design Jan 2011 to March 2013 Bid & Award April 2013 Construction May 2013 to July 2014 Project Approvals:

Formal Project Approval June 2011 Schematic Approval September 2012

Status Update: 95% design documents are due at the end of January. A ground-source heat pump has been selected as the heating system.

Page 50: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 Board of Regents

Ketchikan – Life Boat Davit Construction

Project Description: This project will construct a platform for a life boat davit at the lower campus. The project is funded with Title III grants. Total Project Cost: $504,000 (Phase 1) $250,000 (Phase 2)

Project Schedule Phase 1 Phase 2 Design 2008 – 2/2009 2/2013 Construction: 4/2012 – 9/2012 3/2013 – 8/2013

Project Approvals

Formal Project Approval 2/2012 Schematic Design Approval 2/2012 TPB increase 2/2013 (anticipated)

Status Update: This phase of the project is substantially complete. A new Title III grant application has been awarded that would complete the project. An amended total project cost increase is being prepared based on the new federal grant.

Page 51: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 Board of Regents

Ketchikan Upper Campus Parking Lot Reconstruction

Project Description: A geotechnical report on pavement failure at the upper campus parking lot indicated the need to remove the pavement and 2.5 feet of existing soils, and install a geotexile and non-frost susceptible sub-base and new paving. Total Project Cost: $850,000 Project Schedule: Design Fall – 2011 to Spring 2012 Construction May 2012 to September 2012 Project Approvals:

Formal Project Approval February 2012 Schematic Approval February 2012 Project Budget Increase March 2012

Status Update: Project is complete. Contract close out is in process.

Page 52: Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16. Kuskokwim Campus Kiln Project DBB 17. Kuskokwim Campus Vo‐Tech Building Room Addition

February 2013 Board of Regents

Sitka Career & Technical Education Center

Project Description: A Title III grant is providing funding over two federal fiscal years to remodel portions of the existing facility. The project will:

• Expand the existing student success center, • Create a new instructional design center, • Reconstruct the construction technology laboratory, • Construct new records storage, and • Construct a new lecture hall.

Total Project Cost: $3,755,000 Project Schedule

Planning & Design 11/2008 – 9/2009 Bid & Award 11/2011 – 12/2011 Construction: 1/2012 - 10/2012

Project Approvals

Formal Project Approval December 2010 Schematic Approval July 2011 Total Project Cost Increase November 2011

Status Update: Commissioning was completed in January and the construction contract is in closeout phase.