Construction Equipment

24
DOZERS Rohan Porwal Sachin Mansharamani Construction Technology and Management VNIT

Transcript of Construction Equipment

Page 1: Construction Equipment

DOZERS

Rohan PorwalSachin Mansharamani

Construction Technology and ManagementVNIT

Page 2: Construction Equipment

Introduction

Drozer is a tractor unit that has a blade attached to its front.

The dozer has no set volumetric capacity

The amount of material, it moves is dependent on the quantity that will remain in front of the blade during push.

Page 3: Construction Equipment

Types of Dozers

Crawler Mounted Dozers

Wheel Mounted Dozers

Single Axle

Two Axle

Page 4: Construction Equipment

Crawler Dozer

Page 5: Construction Equipment

Wheel Dozer

Page 6: Construction Equipment

Dozers Uses

Dozers are self contained units that are designed to provide tractive force for drawbar work.

Consistent with there purpose as a unit for drawbar work they are low center of gravity machines. This is a prerequisite of good machine

The larger the difference between the line of force transmission from the machine and the line of resisting force the less affective the utilization of developed power

Page 7: Construction Equipment

Applications

• Land Clearing• Dozing(Pushing material)• Ripping• Towing other pieces of construction equipment• Assisting scappers in loading

Page 8: Construction Equipment
Page 9: Construction Equipment
Page 10: Construction Equipment
Page 11: Construction Equipment

Blades

• Horse Power Per Foot (Hp/ft) Provides an indication of the ability of the blade to penetrate and obtain a load.

• The higher this ratio the more aggressive the blade• Horse power per loose cubic yard (hp/lcy) measures the blade’s ability to

push a load• The higher ratio means that the bull dozer can push a load at a greater

speed

Page 12: Construction Equipment

Blades AdjustmentsTilt: - The Vertical movement of a blade end

is known as tilt. This movement is within the vertical of the blade. Tilting permits concentration of tractor driving power on limited length of blade.

Page 13: Construction Equipment

Blade AdjustmentPitch: - The control which allows the operator

to vary the angle of the attack of the blade cutting edge with the ground is a pitch . It is the movement of the top of the blade towards or away from the tractor .

Page 14: Construction Equipment

Blade AdjustmentAngling: - Turning the blade so that it is not

perpendicular to the direction of the tracors travel is angling. This cause the pushed material to roll of the trailing end of the blade. Rolling material of one end of the blade is called “side casting”.

Page 15: Construction Equipment
Page 16: Construction Equipment

Dozer Production EstimatingA bulldozer has no set volumetric capacity There is no hopper or bowl to load. The amount of material that the dozer moves

depend on the quantity which will remain in front of the blade during the push

The factors that control dozer production rate are: -

1. Blade type2. Type and Condition of material 3. Cycle time

Page 17: Construction Equipment

Dozer Production EstimateThe load that the blade carry can be

estimated by several methods: -1. Manufacturer’s blade rating2. Previous experience (Similar material,

equipment and work condition)3. Field Measurement

Page 18: Construction Equipment

Field MeasurementA procedure for measuring Blade Load: - Obtain a Normal Load :A dozer push a normal Blade load on a level

area Stop the Dozer’ s Forward motion. While

rising the blade, move forward slightly to create a symmetrical pile.

Reverse and move away from the pile.

Page 19: Construction Equipment

Field MeasurementMeasure the height(H) of the pile at the

inside edge of each rack.Measure the width(W) of the pile at the

inside edge of each rack.Measure the greatest length (L) of the pile.

This will not necessarily be at the middle.

Page 20: Construction Equipment

Computation of Blade LoadAverage both the height and the two width

measurement. If the measurement are in feet, the blade in lcy is calculated by the formula.

Blade load = 0.0139 HWL

Page 21: Construction Equipment
Page 22: Construction Equipment

Cycle TimeThe sum of the time required to push,

backtrack, and maneuver into position to push represents the complete dozer cycle.

Dozing is generally performed at low speed 1.5 to 2 mph

Return speed is usually the max that can be attained in the distance available.

For distance less than 100 ft the operator cannot get the machine past the second gear.

Page 23: Construction Equipment

Production FormulaThe formula to calculate dozer production

loose cubic yard per a 60 min hour is given as : -

Page 24: Construction Equipment