Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content...

37
Construction Design Surveying and Planning T Level Technical Qualification Provider Webinar 23rd January 2020 David Pautsch, Gabriel Staples Image placeholder

Transcript of Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content...

Page 1: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Construction Design

Surveying and Planning

T Level Technical

Qualification

Provider Webinar

23rd January 2020

David Pautsch, Gabriel Staples

Image placeholder

Page 2: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Aims of the Session

• To update on progress

• To share latest content and assessment proposals

• Address any concerns/ issues prior to our final versions

being submitted

Page 3: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Where are we? January 2020

Submission made 6th January (MS3)

Initial Feedback from IFATE received & high level feedback given 22/01.

Awaiting final approval – further improvements likely to be made, e.g.

possible reduction in levels of control of external assessments, improving

manageability

Opportunity for additional provider feedback on latest assessments W/C

10th February (Panel)

Formal Ofqual feedback due March and accreditation expected by end of

month

Pre-approval draft Specifications and Assessments to be shared with

providers at end of February

Publication of Materials post accreditation / final IFATE approval (March)

Page 4: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Core - Draft

Assessment

Overview

Page 5: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Core Exam Paper 1

Page 6: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Core Exam Paper 2

Page 7: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Employer Set Project

15 hours

100 marks

Content areas

1 – Health & Safety

2 – Science

3 – Measurement

4 – Building Technology

5 – Information and Data

6 – Relationship Management

7 – Construction Mathematical Techniques

8 – Design

9 – Construction in the Built Environment

10 – Sustainability

11 – Relationship Management

12 – Commercial/Business

13 – Project Management

14 – Law

ScenarioThis project will be externally set and marked by Pearson. Students will produce documents towards a tender to design and build a block of

apartments, based on a specification provided by a client.

The project will show students demonstrating the following tasks:

Task 1: Complete report and project management documentation

Task 2: Complete annotated sketches and CAD designs for internal and exterior detail, and presentation justifying designs

Task 3: Complete costing exercise

Task 4: Complete a group exercise

Page 8: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Pre-release

Image placeholder

8

Image by Lucy Vigrass

Students will analyse project information and conduct independent research

that will inform design decisions and project risks

(0 marks)

2 hours supervised session scheduled by Provider within a window scheduled

by Pearson.

Resourcing: Computer access, word processing software, setting up of

secure folders.

Evidence type: No submission required. Research notes to be handed in or

saved in secure folder for access in later tasks.

Page 9: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Task 1 – Initial Project

Plan

Image placeholder

9

Image by Lucy Vigrass

Students will produce a report and project management

documentation to explore the scope, risk and initial ideas for the

project.

(18 marks)

Assessment within a window – 3 hour supervised

assessment, to take place during a single session scheduled by

the provider

Resourcing: Computer access, word processing software, and

spreadsheet/project management software, building regulations,

access to research notes. Setting up secure folders for student

evidence.

Evidence: Digital submission

- Report saved in .pdf format

- Project plan in the form of a gantt chart, saved in .pdf format

Page 10: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Task 2 – Designs and

presentation

10

Students will be given a more detailed specification from the client. Based on this specification,

students need to produce an annotated sketch of the ground floor and the external envelope of

the building, and a 2D annotated plan of the internal layout of one apartment using CAD

software.

Students will also need to prepare a presentation with speaker notes justifying their design

proposals.

(66 marks)

Assessment within a window – 9 hours during supervised sessions scheduled by the

provider within a window scheduled by Pearson

Resourcing: Computer access with word processing, presentation and CAD software.

Drawing materials, building regulations, access to research notes. Setting up secure folders for

student evidence.

Evidence: Digital submission

Sketches (scanned and saved in .pdf format), CAD drawing saved in .pdf format, presentation

and speaker notes saved in .pptx format.

Page 11: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Task 3 – Construction-

related Maths

Image placeholder

11

Image by Lucy Vigrass

Students will be required to produce costing documentation

related to the project. These calculations are based on

provided data. Calculation sheets will be provided

electronically to be completed.

(7 marks)

Timetabled assessment – 1 hour supervised assessment

to take place during a timetabled session scheduled by

Pearson

Resourcing: Computer access with word processing,

calculator. Setting up secure folders for student evidence.

Evidence: Digital submission

- completed unit rate calculation sheet, saved in .pdf

format.

Page 12: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Task 4 – Group

Presentation

Image placeholder

12

Image by Ben Wiseman

Students will be required to produce a group presentation

in response to an issue that has arisen with the project.

Each group member must present a minimum of three

slides each.

(9 marks)

Assessment within a window – 2 hour supervised

assessment, to take place during a single session

scheduled by the provider

Resourcing: Computer access, project management

software, word processing software. Setting up of secure

folders for student evidence.

Evidence: Digital submission

- Presentation in .pptx format, submitted for each learner

- Screencast in .mp4 format submitted for each learner

Page 13: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Occupational Specialism

• The occupational specialism

contains skills and knowledge

that build upon the learning

that takes place in the core of

the Technical Qualification.

• This synoptic approach

provides a balanced content

and assessment approach that

allows students to fully explore

this underpinning content in

detail to achieve competency.

Surveying and Design for Construction and the Built Environment

30 hours

100% of the Occupational Specialist Component assessment

180 marks

Graded P, M and D

Content overview

Students are required to:

∙ Measure the built environment

∙ Analyse the built environment

∙ Design the built environment

∙ Verify delivery of the built environment

Assessment overview

This project will be externally set and marked by Pearson.

Students will respond to a client brief to measure a site, analyse information, design

construction solutions and verify delivery of those construction solutions.

The project will show students demonstrating 7 tasks.

The project will consist of a portfolio of evidence including an observation report to evidence

practical skills, where they occur, to meet threshold competence where appropriate. This will

be accompanied by video evidence.

Page 14: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Occupational Specialism

Surveying and Design for Construction and the Built Environment

30 hours

100% of the Occupational Specialist Component assessment

180 marks

Graded P, M and D

Content overviewStudents are required to:

∙ Measure the built environment

∙ Analyse the built environment

∙ Design the built environment

∙ Verify delivery of the built environment

Assessment overviewThis project will be externally set and marked by Pearson. Students will respond to a client brief to measure a site,

analyse information, design construction solutions and verify delivery of those construction solutions. The project will

consist of a portfolio of evidence including an observation report to evidence practical skills, where they occur, to meet

threshold competence where appropriate. This will be accompanied by video evidence.

The project will show students demonstrating the following tasks:

Task 1: Planning a survey

Task 2: Calculating and managing waste and on the site

Task 3: Practical surveying

Task 4: Project management and stakeholder management

Task 5: Quantity Surveying

Task 6: Redesign of given buildings

Task 7: Design

Page 15: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Task 1

Image placeholder

15

Image by Lucy Vigrass

Students will produce a detailed plan and risk assessment

to survey a site within given constraints. They will produce

an email that summarises this plan.

Timetabled assessment – 3 hours

Resourcing: Computer access, word processing software,

setting up of secure folders

Evidence type: Digital Submission:

- Report

- Risk assessment

- email

Page 16: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Task 2

Image placeholder

16

Image by Lucy Vigrass

Students will perform calculations in relation to the survey

that will take place on the site using a given data set. They

will produce a report that covers an aspect of waste

management.

Timetabled assessment – 2 hours 30 minutes

Evidence type: Hardcopy Submission of Answer Booklet:

- Calculations

- Written report

Page 17: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Task 3

Image placeholder

17

Image by Lucy Vigrass

Students to undertake a practical surveying task. Students

will be observed and video recorded using surveying

equipment to take measurements and will produce a

drawing based on their collected data.

Assessment within a window – 3 hours

Resourcing: Sourcing a site/building that meets given

parameters prior to the assessment. Sourcing and

Calibrating equipment required for the assessment. Video

recording equipment. Computer access, CAD software,

Responsibilities of provider: Expert teacher to carry out

façade survey/site survey and provide these

measurements alongside student observation forms and

video recording of the assessment. Setting up secure

folders for student evidence.

Evidence: Observation record, Video, Collected data, CAD

Drawing

Page 18: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Task 4

Image placeholder

18

Image by Ben Wiseman

Students will produce project management documentation

and a stakeholder engagement plan.

Students will use given stimulus to produce this

documentation.

Timetabled assessment – 3 hours

Resourcing: Computer access, project management

software, word processing software, setting up of secure

folders

Evidence: Digital Submission:

- Project planning documentation

- Written plan - communication

Page 19: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Task 5

Image placeholder

19

Image by Ben Wiseman

Students will produce a spreadsheet and valuations

for the project. Students will be expected to carry

out calculations.

These calculations are based on provided data.

Timetabled assessment – 3 hours

Resourcing: Computer access, spreadsheet

software, setting up of secure folders

Evidence: Digital Submission:

- Calculations using a spreadsheet

- Completing pro-formas

Page 20: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Task 6

Image placeholder

20

Image by Laucy Vigrass

Students will prepare designs and accompanying

justifications.

Students will redesign based on given information

using annotated sketches.

Assessment within a window – 3 hours

Evidence: Hardcopy submission:

- Sketches

- Justification of design

- Designers risk assessment

Page 21: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Task 7

Image placeholder

21

Image by Laucy Vigrass

Students will produce a 3D model and supporting

report and presentation.

Assessment within a window 12 hours 30

minutes

Resourcing: Computer access, CAD Software,

word processing software, setting up secure

folders

Evidence: Digital Submission:

- 3D model

- Report justifying design

- Presentation.

Page 22: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Civil Engineering

Image placeholder

22

Image by Lucy Vigrass

Task Focus

1 Project Analysis: Students will produce

an analysis of the proposed project

considering potential risks, commercial

viability and performing calculations to

support their report.

2 Report on Structural detail: Students will

produce a report that explores the choice

of structural form for the proposed building

works and support this with sketch details.

3 Column and Beam Design with related

Mathematics: Students will produce

designs for beams and columns showing

calculations and structural mechanics

diagrams. Students will perform

calculations that relate to their design.

Page 23: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Civil Engineering

Image placeholder

23

Image by Lucy Vigrass

Task Focus

4 Cutting or Retaining Wall Design: Students will

produce draft designs showing their calculations

and sketch diagrams. They will then refine their

designs using software.

5 External works Presentation and Risk

Assessment: Students will produce a presentation

that explores a proposal for an aspect of the

external works that needs to take place on side.

They will produce an accompanying risk

assessment.

6 Tender and Price Comparison: Students will use

a spreadsheet to complete an analysis comparing

the original tender price of one aspect of the

construction with the final account figures. They

will provide commentary on variations, the reasons

for changes in cost and any recommendations

Page 24: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Civil Engineering

Image placeholder

24

Image by Lucy Vigrass

Task Focus

7 Quality assurance and Data analysis:

Students will quality assure a testing

process and carry out analysis of test

results associated with this process.

8 CAD details: Students will produce CAD

drawings that detail an aspect of the design

for the site.

9 Practical Setting Out: Students will

undertake a setting out task where they will

be required to accurately set out two points

according to the measurements given in

the project brief.

Page 25: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Building Services

Design

Image placeholder

25

Image by Lucy Vigrass

The building services that will be covered for this

assessment consist of the following:

- ventilation

- air conditioning/cooling

- plumbing

- drainage

- hot water supply

- cold water

- heating

- electrical

- lighting

- mechanical.

Page 26: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Building Services

Design

Image placeholder

26

Image by Lucy Vigrass

Task Focus

1 Analyse client and site information to make

project management decisions

- Analysing project information

- Project Management using an appropriate IT

package.

- Responding to a communication from the

client

2 Service 1 Analysis and design

- Calculations for a service

- Selection of equipment for a system with

justification and sketching

- Design an addition of a system to an existing

CAD drawing.

3 Service 2 Analysis and design

- Calculations for a system

- Design a system for an area in a building and

placement of the system

- Produce a rationale for the design of a

system.

Page 27: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Building Services

Design

Image placeholder

27

Image by Lucy Vigrass

Task Focus

4 Service 3 Analysis and design

- Design a system, identifying the

equipment used, number of fittings

needed, positioning, and design

calculations.

- Rationalise how a system can be

adapted to meet new client

requirements.

5 Maintenance and installation

- Production of a maintenance schedule

- Review of electrical installation

certification and addition of missing

parts.

6 Costings

- Price comparison

- Presentation of findings

Page 28: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Hazardous Materials

Analysis and Surveying

Image placeholder

28

Image by Laucy Vigrass

Task Focus

1 Analysis of information from client

- Risk assessment

- Survey report

2 Analysis of information from site

- Risk assessment

- Method statement

- Video demonstration of safe use of tools

and equipment

3 Sampling

- Survey plan

- Simulated sample collection

Page 29: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Hazardous Materials

Analysis and Surveying

Image placeholder

29

Image by Laucy Vigrass

Task Focus

4 Laboratory Analysis

- Material observations under a microscope

- Hazardous material report analysis

5 Management of hazardous materials

- Material register and management plan

- Email – communication with contractor.

Page 30: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Provider Support

Page 31: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Provider Support - Materials (core)

31

Delivery Pack

1X Delivery Pack for

Construction Design

Surveying & Planning

Topic Guides

Each Topic

Guide will

Include

Con Maths

& Science

Introductory Powerpoint, 4/6 topic lesson plans, Industry

resource links, Links to assessment

Design Law

CBE

Industry/

Rel Mgt/

Commercial

-Business

Project Management

Page 32: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Approach to Topic Guides (core)

32

Distill and simplify the very large amount of content into

bitesize chunks

Encourage Holistic Teaching

Contextualise to real life projects to engage learners

Identify topics that may be usefully taught together

Embed topics that may appear in multiple times

Centres can chose to teach topic-first, or case-study-first

approach, or a mix

Page 33: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Provider Support – Materials

33

Delivery Pack

Introduction

How to use the Delivery Pack and its contents.

Topic Guides: 5 x Topic Guides

Introduction

PowerPoint

● Introduce the topic area to the students.

● Contextualise within an industry environment.

● Introduce the depth and breadth of the topic.

● How the topic relates to the sector.

● How the topic looks in an assessment.

Topic Lesson

Plans

● 4 - 6 Lesson Plans for each topic.

● Each Lesson Plan to include several activities to develop knowledge, understanding and

skills, enable students to demonstrate.

● Where possible - each Lesson Plan must include English, maths and digital opportunities.

Industry

Resource Links

● A selection of industries/employers that are high quality examples for the topic.

● Links to resources and materials that could be used to ‘bring the topic to life’ within a

classroom environment. (Also see below Case Studies)

Case Studies ● A series of real life projects that bring teaching to life

● Background to each project with links to online information

● Suggestions of how to link to each mapped topic

Page 34: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Provider Support - Draft Topic Map

34

CrossRail

Leeds Flood

Alleviation

scheme

Birmingham

City "Big

City Plan"

Thames

Tideway HS2

Dover

Western

Docks

Revival –

Dover, Kent

Trafford

Park

Metrolink

scheme

Gatwick

Airport Pier

6 extension

Topic Guide 1 Construction Maths and

Science X X X X X X X X

Topic Guide 2 Design X X X X X X X

Topic Guide 3 Law X X X X X

Topic Guide 4 CBE Industry/ Relationship

Management/ Commercial-Business X X X X X X X X

Topic Guide 5 Project Management X X X X X X X X

Health and Safety (embedded) X X X

Sustainability (embedded) X X X X X X

Measurement (embedded) X X X X X X X

Information and Data (embedded) X X X X X X

Building Technology (embedded) X X X X X X

Digital Technology (embedded) X X X X

Coverage relating to year 2 Specialisms All

Design, civils,

surveying All

Design,

surveying,

haz mats,

civils All

civils,

surveying

civils,

surveying

design,

building

services, civils,

surveying

Page 35: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Provider Support – Specialisms

35

Will be written after Core Materials are finalised

Plan to focus on ‘preparation for assessment’ - as project task

assessment is a new format for providers

Possible mock assignments or activities that get learners to develop the

skills required in the final project

Links to SAM already produced and Guide Standard Exemplification

Materials

Case Studies used in Core can also be used to contextualise to

specialisms, when covered in more depth (see map)

Page 36: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

Provider Support – Training Events

36

Getting Ready to Teach (GRTT) Events

What are GRTT events?

These free events are delivered live in a face to face seminar environment with a

selection of centres who have pre-registered via our website.

What will I learn at these events for the T Levels?

During these events construction industry specialist trainers will guide you on how to

practically deliver the spec and SAM with a focus on planning your delivery. The

trainer will also help you better understand the assessment methodology of the

qualification.

When will these events start?April. An email will be sent to everyone attending this webinar once the date is set.

Page 37: Construction Design Surveying and Planning€¦ · Employer Set Project 15 hours 100 marks Content areas 1 –Health & Safety 2 –Science 3 –Measurement ... The project will consist

37

Email any further feedback/questions to

[email protected]