Considerations in Determining a Reasonable Standard:

39
Searching for Reasonable Solutions to an Imperfect Situation Charles Burt, P.E., Ph.D. March 14, 2005 SWRCB Hearing – SJ River Salinity

description

Searching for Reasonable Solutions to an Imperfect Situation Charles Burt, P.E., Ph.D. March 14, 2005 SWRCB Hearing – SJ River Salinity. The REASONABLENESS of achieving water quality conditions is one of the factors that must be considered when setting salinity standards. Water Code § 13241. - PowerPoint PPT Presentation

Transcript of Considerations in Determining a Reasonable Standard:

Page 1: Considerations in Determining a  Reasonable  Standard:

Searching for Reasonable Solutions to an Imperfect

Situation

Charles Burt, P.E., Ph.D.March 14, 2005

SWRCB Hearing – SJ River Salinity

Page 2: Considerations in Determining a  Reasonable  Standard:

The REASONABLENESS of achieving water quality conditions is

one of the factors that must be considered when setting salinity

standards.

Water Code §13241

Page 3: Considerations in Determining a  Reasonable  Standard:

Considerations in Determining a Reasonable Standard:

BACKGROUND-Cause of Elevated Salinity in SJR-The SJR as a DRAIN-Beneficial Uses

-Drinking water supply-Agricultural irrigation

-Regional nature and salinity sources

CHOICES-De-designate as drinking water supply.-Set water quality objectives by river section.-Allow surface drainage-Take a hard look at specific ECiw numbers

Page 4: Considerations in Determining a  Reasonable  Standard:

Point

The San Joaquin River between Mendota and Vernalis is no longer a pristine, natural channel.

Page 5: Considerations in Determining a  Reasonable  Standard:

The Basic Truths

- There is substantial irrigation on the West Side of the San Joaquin Valley.

- All irrigation water contains salts.- The salts must be removed to prevent

salinization of the soil.- The only DRAIN available is the San

Joaquin River.

Page 6: Considerations in Determining a  Reasonable  Standard:

Reality

When the CVP was constructed it was known that drainage would be needed – yet functional artificial drainage has not been supplied.

The options are:- Artificial drainage- Recirculate salts and eventually stop irrigating.- Reverse Osmosis ($$, plus disposal questions)- Use the San Joaquin River as a drain.

Page 7: Considerations in Determining a  Reasonable  Standard:

Responsibility

This Board’s D-1641 findings:

CVP is the cause of water quality problems in the West Side of the San Joaquin Valley.

Page 8: Considerations in Determining a  Reasonable  Standard:

Fact:Deep Percolation (Tile Drainage and

accretions) is saltier than source water.

Using a simplistic salt balance for illustration- Leaching Fraction of 0.2- No deep percolated rainfall- Irrigation water ECiw = 0.7 dS/m

The Drainage Water EC = ECiw/LF = 3.5 dS/m

Page 9: Considerations in Determining a  Reasonable  Standard:

It is unreasonable to require a drainage water quality that is better than the source water quality.

Delta-Mendota Canal Mean Monthly EC (Check 21) Mean Monthly EC values computed from daily data provided by USBR Bold indicates exceedance of San Joaquin River salinity targets (All values are in dS/m) 1993 1994 1995 1996

Jan 1.10 0.73 0.49 0.65 Feb 0.88 0.41 0.61 0.48 Mar 0.81 0.81 1.30 0.36 Apr 0.65 0.89 0.63 0.42 May 0.72 0.88 0.73 0.38 Jun 0.65 0.77 0.20 0.39 Jul 0.48 0.79 0.21 0.36

Aug 0.25 0.69 0.36 0.37 Sep 0.43 0.70 0.35 0.39 Oct 0.45 0.62 0.24 0.37 Nov 0.56 0.49 0.42 0.44 Dec 0.65 0.70 0.44 0.51

Average 0.64 0.71 0.50 0.42

Page 10: Considerations in Determining a  Reasonable  Standard:

Point (repeated)

The San Joaquin River between Mendota and Vernalis is no longer a pristine, natural channel.

• It is the only drain.• Drainage is necessary.• Drainage was not provided by CVP• Drainage water has a higher salinity than

the source water.

Page 11: Considerations in Determining a  Reasonable  Standard:

Beneficial UsesState Water Board Res. # 88-63 provides for excepting (de-

designating) surface waters with the designation of municipal or domestic supply if one of these apply:

• TDS > 3000 ppm, and water is not reasonably expected to supply a public water system.

• The pollution present cannot be reasonably treated either using BMP’s or best economically achievable treatment practices.

Page 12: Considerations in Determining a  Reasonable  Standard:

By de-designating Municipal/Domestic as a

beneficial use (the recommended action for this Board),

this leaves Agriculture.

Page 13: Considerations in Determining a  Reasonable  Standard:

Accretions and Tile Drain outflows do not always originate within the boundaries of the discharger.

Deverel and Schmidt Drainage Study

Page 14: Considerations in Determining a  Reasonable  Standard:

The Salinity Objective

• De-designate as drinking water supply(already mentioned)

• Set objectives by river section• Set objective or also restrict surface

drainage??• Modify the specific ECiw objective

Page 15: Considerations in Determining a  Reasonable  Standard:

Data Viewer and Stream Schematic [Jan 1, 1999: 9 | Jan 1, 2000: 374 | Jan 1, 2001: 740 | Jan 1, 2002: 1105 | Jan 1, 2003: 1470]

Stanisalus River Tuolumne River Merced RiverEnter Data Row: 1347 0.00 0.00 0.00 0.00

0.00Date 0 29

Vernalis 1,110 cfs 22 0Vernalis 613 ec 16 16 7 37

1 0 15Maze 922 ec 104 17 12 0

36 49 3 11 13 387 60 4 14

3 75 39 11 26 9

15 1 63 0.00Goodwin 205 cfs Crows Landing 351 cfs Mud Sl. Nr Gustine 53 cfsOrange Blsm 246 cfs Crows Landing 1,350 ec Mud Sl. Nr Gustine 3,140 ec 148 0 106 27 16Orange Blsm 67 ecRipon 312 cfs Orest @ RR 0 cfs SLD @ Term 46 cfsRipon 91 ec Orest @ RR 0 ec SLD @ Term 3,710 ec

Orest nr. Newman 0 cfs 37Maze 922 ec Salt Sl. @ Lander 82 cfs 200 cfs

Newman 276 cfs Salt Sl. @ Lander 1,270 ec 900 ecLa Grange 83 cfsModesto 233 cfs Stevinson 52 cfs SJR @ Lander 30 cfsModeto 202 ec Stevinson 311 ec SJR @ Lander 1,800 ec

Cressy 81 cfsDel Puerto 0 cfs Cressy 52 ec

Patterson 287 cfsPatterson 1,342 ec Note: All data is presented for current day, no lag time.

August 31, 2002

Eastside Bypass

SJR @ Lander

Salt Sl @ Lander

So. Mud Sl.

San Luis Drain

Mud Sl. nr Gustine

Cressey

Stevinson

Newman

Orest Cr. @ Riv Rd.

Orest Cr. nr Newman

Crows Landing Br.Patterson

Del Puerto nr Patterson

La Grange

Modesto

Vernalis

Ripon

Goodwin

Orange Blossom Br.

Sand Dam

San Joaquin River

FarmingtonNew Don Pedro New Exchequer

Owens

Hidden

San Luis

TID Op Spills

MID Op Spills

OID Op Spills

SSJID/OID Op SpillsMerced Op Spills

Precipitation - InchesOp Spills - cfs

Maze Rd. Br.

River Pumping/Returns

12345678910

Mendota Pool

Sack Dam

Setting salinity objectives by river section

Page 16: Considerations in Determining a  Reasonable  Standard:

Mean Monthly ECiw by River Section - ITRC Analysis Results March and August 2002

0

500

1,000

1,500

2,000

2,500

1- M

endo

ta P

ool to

Sac

k Da

m

2- S

ack

Dam

to B

ear C

reek

(Eas

tside

Byp

ass)

3- B

ear C

reek

(Eas

tside

Byp

ass)

to S

alt S

lough

4- S

alt S

lough

to M

ud S

lough

5- M

ud S

lough

to M

erce

d Ri

ver

6- M

erce

d Ri

ver t

o O

rest

imba

Cre

ek

7- O

rest

imba

Cre

ek to

Del

Pue

rto C

reek

8- D

el Pu

erto

Cre

ek to

Tuo

lumne

Rive

r

9- T

uolum

ne R

iver t

o St

anisl

aus

Rive

r10

- Sta

nislau

s Ri

ver t

o Ve

rnali

s

EC, µ

S/cm

March Mean ECiw, µS/cm

August Mean ECiw, µS/cm

Page 17: Considerations in Determining a  Reasonable  Standard:

Mean Monthly ECiw by River Section - ITRC Analysis Results March and August 2002

0

500

1,000

1,500

2,000

2,500

1- M

endo

ta P

ool to

Sac

k Da

m

2- S

ack

Dam

to B

ear C

reek

(Eas

tside

Byp

ass)

3- B

ear C

reek

(Eas

tside

Byp

ass)

to S

alt S

lough

4- S

alt S

lough

to M

ud S

lough

5- M

ud S

lough

to M

erce

d Ri

ver

6- M

erce

d Ri

ver t

o O

rest

imba

Cre

ek

7- O

rest

imba

Cre

ek to

Del

Puer

to C

reek

8- D

el Pu

erto

Cre

ek to

Tuo

lumne

Rive

r

9- T

uolu

mne

Rive

r to

Stan

islau

s Ri

ver

10- S

tanis

laus

Rive

r to

Vern

alis

EC, µ

S/cm

March Mean ECiw, µS/cm

August Mean ECiw, µS/cm

Major points:1. Salinity is different by river section.2. Crop mixes and diversions are different by river section.

Page 18: Considerations in Determining a  Reasonable  Standard:

Mean Monthly ECiw by River Section - ITRC Analysis Results March and August 2002

0

500

1,000

1,500

2,000

2,500

1- M

endo

ta P

ool t

o Sa

ck D

am

2- S

ack

Dam

to B

ear C

reek

(Eas

tside

Byp

ass)

3- B

ear C

reek

(Eas

tside

Byp

ass)

to S

alt S

loug

h4-

Sal

t Slou

gh to

Mud

Slou

gh5-

Mud

Slou

gh to

Mer

ced

Rive

r6-

Mer

ced

Rive

r to

Ore

stim

ba C

reek

7- O

rest

imba

Cre

ek to

Del

Pue

rto C

reek

8- D

el Pu

erto

Cre

ek to

Tuo

lumne

Rive

r9-

Tuo

lum

ne R

iver t

o St

anis

laus

Rive

r10

- Sta

nislau

s Ri

ver t

o Ve

rnali

s

EC, µ

S/cm

March Mean ECiw, µS/cm

August Mean ECiw, µS/cm

These values look high. Why not restrict surface inflows from the WEST SIDE?

Page 19: Considerations in Determining a  Reasonable  Standard:

Estimated EC in the San Joaquin River with Zero Westside Agricultural Surface DischargesLow Groundwater Accretion Rate

0

500

1,000

1,500

2,000

2,500

1- M

endo

ta P

ool to

Sac

k Da

m

2- S

ack

Dam

to B

ear C

reek

(Eas

tside

Byp

ass)

3- B

ear C

reek

(Eas

tside

Byp

ass)

to S

alt S

lough

4- S

alt S

lough

to M

ud S

lough

5- M

ud S

lough

to M

erce

d Ri

ver

6- M

erce

d Ri

ver t

o O

rest

imba

Cre

ek

7- O

rest

imba

Cre

ek to

Del

Puer

to C

reek

8- D

el Pu

erto

Cre

ek to

Tuo

lumne

Rive

r

9- T

uolum

ne R

iver t

o St

anisl

aus

Rive

r10

- Sta

nislau

s R

iver t

o Ve

rnali

s

EC, µ

S/cm

March ECiw w/ No Agric. Discharge, µS/cmAugust ECiw w/ No Agri. Discharge, µS/cm

Proposed Regional Board Alternative Objective of 1,000 µS/cm

It’s not as simple as eliminating WEST SIDE surface discharges!

Page 20: Considerations in Determining a  Reasonable  Standard:

Where did 0.7 dS/m and 1.0 dS/m come from?

• Testimony will show that it comes from– Beans– No yield decline

Page 21: Considerations in Determining a  Reasonable  Standard:

Where did 0.7 dS/m and 1.0 dS/m come from?

My point will be that it reflects an inaccurate understanding of • Leaching REQUIREMENT• Leaching FRACTION• FIELD vs. LABORATORY conditions• ECe vs. ECiw vs. ECsw vs. ECdw

Page 22: Considerations in Determining a  Reasonable  Standard:

Understanding salinity is not intuitive.

It’s also not an exact science.

Nevertheless, there are certain fundamentals that everyone should understand when

discussing a salinity objective.

Page 23: Considerations in Determining a  Reasonable  Standard:

Some basic principles

• Crop tolerance levels – ECe• Maintenance leaching vs. reclamation

leaching.• LR (leaching requirement) formulas• Impact of rainfall• Actual field irrigation – LF (leaching

fraction)• Bottom line – ECe is manageable.

Page 24: Considerations in Determining a  Reasonable  Standard:

Threshold ECe and Rates of Yield Decline

0

20

40

60

80

100

0 5 10 15 20

EC of a saturated paste extract (ECe)

% Y

ield

BEANSCOTTON

**For typical cyclic irrigations

Page 25: Considerations in Determining a  Reasonable  Standard:

Threshold ECe and Rates of Yield Decline..are not FIXED in

concrete

0

20

40

60

80

100

0 5 10 15 20

EC of a saturated paste extract (ECe)

% Y

ield

BEANSCOTTON

MoreFrequentIrrigations (DRIP)

CyclicIrrigations

Page 26: Considerations in Determining a  Reasonable  Standard:

Leaching Requirement Concept

• Irrigation water has salt.• The incoming salt must be removed.• Leaching can occur with rainfall….or with

irrigation water.• Leaching is DEEP PERCOLATION• The leaching must be frequent (once/year is often

sufficient). “Frequent” is a relative term.

Page 27: Considerations in Determining a  Reasonable  Standard:

Leaching Requirement ConceptKEY IDEAS THAT MAY HAVE BEEN MISSED!

• Salt tolerance values are ECe, not ECiw

• Plants respond to soil salinity.

• ***For a specific WATER salinity, farmers can manage for a wide range of SOIL salinities.

Page 28: Considerations in Determining a  Reasonable  Standard:

The formula that we used in our analysis.

LR = Fraction of applied irrigation water that must deep percolate to maintain the desired ECe in the

plant root zone (soil).

If LR = 0.10,That means 10% of the applied irrigation water at a

point in the field must deep percolate.

Page 29: Considerations in Determining a  Reasonable  Standard:

The formula that we used in our analysis.

LR = Fraction of applied irrigation water that must deep percolate to maintain the desired

ECe in the plant root zone (soil).

ECiwLR = (5 ECe) - ECiw

Where ECe = target ECe in the soil.

Page 30: Considerations in Determining a  Reasonable  Standard:

Other, less restrictive recommendations exist.

012345678

0 2 4 6

ECiw (dS/m)

ECe

(dS/

m) C

rop

Thre

shol

d

Lr = .05 .10.15

.20

.30Lr = .30 with our equation

Tanji, et al. 1990. Agricultural Salinity Assessment and Management. American Society of Civil Engineers. Div. of Irrig. and Drainage. ASCE manuals and reports on engineering practice: no. 71. 619 pg.

Page 31: Considerations in Determining a  Reasonable  Standard:

The major point

With an ECiw of irrigation water of 2.0 dS/m, one can manage for an average root zone salinity (ECe) of 1.0 dS/m – by controlling the leaching fraction.

…and rainfall eases the management even further.

Page 32: Considerations in Determining a  Reasonable  Standard:

But there’s another important fact that has not been brought

forward.

All irrigations are non-uniform.

The “distribution uniformity” (DU) isalways less than a perfect 1.0

Page 33: Considerations in Determining a  Reasonable  Standard:

Water needed to replenishthe crop ET requirement

Non-uniformityWater

Inchesof IrrigationWaterat variouspoints

Various points across a field

STANDARD IRRIGATION WITHOUT ADDING EXTRA WATER FOR LR …..BUT……LF = about 0.4

Non-uniformity is a very real fact in all irrigation.A typical ratio of (most/least) water = 2.0

MOST LEAST

Page 34: Considerations in Determining a  Reasonable  Standard:

Water needed to replenishthe crop ET requirement

Non-uniformityWater

Inchesof IrrigationWaterat variouspoints

Various points across a field

STANDARD IRRIGATION WITHOUT ADDING EXTRA WATER FOR LR …..BUT……LF = about 0.4

Water needed to replenishthe crop ET requirement

Water for LR

Non-uniformityWater

Inchesof IrrigationWaterat variouspoints

Various points across a field

Irrigation considering LR. This provides a LF at the point that receives the least.

LR = .15; LF = about 0.55

Page 35: Considerations in Determining a  Reasonable  Standard:

Water needed to replenishthe crop ET requirement

Non-uniformityWater

Inchesof IrrigationWaterat variouspoints

Various points across a field

STANDARD IRRIGATION WITHOUT ADDING EXTRA WATER FOR LR …..BUT……LF = about 0.4

Water needed to replenishthe crop ET requirement

Water for LR

Non-uniformityWater

Inchesof IrrigationWaterat variouspoints

Various points across a field

Irrigation considering LR. This provides a LF at the point that receives the least.

LR = .15; LF = about 0.55

YIELDONLYDECLINESINSPOTS

Page 36: Considerations in Determining a  Reasonable  Standard:

Points from the previous slides

• The soil salinity is not “fixed” by the irrigation water salinity.

• Most of a typical field receives adequate leaching from non-uniformity without even applying the “LR” equation.

Page 37: Considerations in Determining a  Reasonable  Standard:

When we put it all together

Considering- Availability of water in the river for leaching.- The crops upstream of Vernalis- The variation in EC during the year.- Rainfall- Crop sensitivity to salinity- Salinity of CVP water- Groundwater accretions to the river- etc.

Page 38: Considerations in Determining a  Reasonable  Standard:

Reasonable actions to a difficult challenge:

• De-designate municipal/domestic water uses.

• Standards must recognize the use of the SJR as a salt drain.

• Do not eliminate surface inflows from the West Side.

• From Merced River to Vernalis, a maximum water salinity objective = 2.0 dS/m

• From Sack Dam to Merced River, a maximum water salinity objective could be higher (2.5).

Page 39: Considerations in Determining a  Reasonable  Standard:

Thank you.