    Considerations for Large Scale

    CCUS Deployment

    Michael E. Moore

    Executive Director NACCSAVice President Energy Commodities and Advisory Services

    FearnOil Inc.

    June 9th2014 Birmingham, AL

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    2/59

    The Astrup Fearnley group represents over a century of history, growth and excellence in the area of shippingservices. This fascinating legacy is a success story created by generation after generation of the Astrup Fearnleyfamily. We believe it is a story worth telling.

    Fearnleys traces its history back to the year 1869 when its founder, Thomas Fearnley, established a shipbrokingand agency business in Christiania, as the city of Oslo was known in those days. The little company soon prospered

    and engaged in, among others, the trade in lumber, wine, pitch and ice. In connection with its trading activities the company bought shares in vessels and chartered vessels. Although the

    company began by chartering sailing vessels, by 1880 the age of the steamship had clearly begun. By 1881 thepartnership of Fearnley & Eger established the Christiania Steamship Company which contracted twonewbuildings at the the Kockums Shipyard in Malm, the 1235 deadweight Oslo and the 1215 deadweightBygdy.

    By the end of the 1880s the company had contracted a further six units. In the beginning of the 1900s Fearnley &Eger became, more or less, a shipowning company and invested in ever larger units. The company engaged in bothliner and tramp activities and survived the two world wars. In addition to these shipowning activities, the firmcontinued to engage in developing its skills in the area of shipping services and was engaged primarily in the area

    of dry cargo shipbroking. As the tanker industry started to develop at the beginning of the 20th century, Fearnleysbecame enthusiastically involved in this new field of endeavour. Later on, when the transportation of gas by seabecame an important area of commerce, Fearnleys developed a broking department which specialized in this newcommodity. All in all, the history of the company has been closely focused on the concept of innovation; whenevernew ideas and new industries developed which required seaborne transportation, Fearnleys was quickly on thescene.

    As the 20th century progressed, the need for brokerage services for the transportation industry became so greatthat Fearnleys began to develop these (along with related ancillary services) as its principal business area. Alwayson the cutting edge of new trends, the company became involved in car carrier transportation in the 1960s,offshore and rig broking in the 1970s, coinciding with the onset of the development of the Norwegian continental

    shelf offshore oil fields, and energy trading and financial services in the 1980s. Fearnleys was also a pioneer in thedevelopment of transportation industry research and consultancy services, and has been involved in monitoringand analysing shipping markets since the early 1960s when Fearnresearch was first established. Now at the dawnof the 21st century the little company which started in Christiania in 1869 is firmly established in every corner ofthe world and assumes a global perspective on transportation much to the benefit of its worldwide customerbase.

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    3/59

    Covered Topics

    US Oil, Gas and Coal Resources: CCUS Siting

    Considerations in the US

    Impacts of US Shale Gas: Expect Increasing

    Price Volatility

    CO2-EOR and CCUS Developments

    Coal Global-US Inter-related Energy Activities

    CCS/CCUS Financing

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    4/59

    US Oil, Gas and Coal Resources:

    CCUS Siting Considerations in the US

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    5/59

    US Conventional Oil and Gas Reservoirs

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    6/59

    US Hazardous Liquids Pipelines-Oil, Products,

    Natgas etc. ~500,000 mileshttp://phmsa.dot.gov/portal/site/PHMSA/menuitem.ebdc7a8a7e39f2e55cf2031050248a0c/?vgnextoid=4351fd1a874c6310VgnVCM1000001ec

    b7898RCRD&vgnextchannel=f7280665b91ac010VgnVCM1000008049a8c0RCRD&vgnextfmt=print

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    7/59

    US Shale Plays - Unconventional Oil &Gas

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    8/59

    US Coal ResourcesSource: http://pubs.usgs.gov/of/1996/of96-092/Comp/main.gif

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    9/59

    US Federal & Tribal Lands

    http://nationalatlas.gov/printable/images/pdf/fedlands/fedlands3.pdf

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    10/59

    US Population Density Map 2010 ~320mmSource: http://upload.wikimedia.org/wikipedia/commons/2/21/US_population_map.png

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    11/59

    US Power GridSource: http://en.wikipedia.org/wiki/File:UnitedStatesPowerGrid.jpg

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    12/59

    Impacts of US Shale Gas:

    Expect Increasing Price Volatility

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    13/59

    Marcellus Increasing US Daily Gas

    Production

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    14/59

    Major Shale (Gas/Oil) Basin Wells

    Rapid Declining Production Curve

    http://www.ogj.com/articles/print/vol-110/issue-

    4/exploration-development/bakken-s-maximum.html

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    15/59

    US Shale (Gas) Impacts

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    16/59

    US vs. Europe: Energy Battle Heats Uphttp://www.cnbc.com/id/101365772

    It all comes down to shale gas and the energy revolution it has triggered in the United States. As a result of the rapid adva nce of shale technology,the United States now has an abundance of low-cost natural gas at one-third the price of European gas. European industrial electricity prices aretwice as high as those in some countries and are much higher than those in the United States. To a significant degree, this is the result of a pell-mellpush toward high-cost renewable electricity (wind and solar), which is imposing heavy costs on consumers and generating large fiscal burdens forgovernments. In Germany, it was further accentuated by the premature shutdown of its existing nuclear industry after the 2011 Fukushima nuclearaccident in Japan.

    All this puts European industrial production at a heavy cost disadvantage against the United States. The result is a migration of industrial investmentfrom Europe to the United States what one CEO called an "exodus." It involves, not only energy-intensive industries like chemicals and metals, butalso companies in the supply chains that support such industries.

    Yet the competitiveness gap will continue to expand as Europe remains locked in a path of still -higher costs unless there is a change in policy. Andthe first signs of a potential change of policy abruptly emerged in both Brussels and Berlin during Davos week. European poli cy makers, strugglingwith already high unemployment, have begun to visualize the further job loss that will result from shutting down European plants. They have alsostarted to pay attention to the 2.1 million jobs in in the United States supported by the unconventional oil and gas revoluti on.

    His comments reflect the recognition that, if the course remains unchanged, Germany could be facing what Gabriel called "a dramaticdeindustrialization." And that would threaten Germany's prosperity, which hinges to a considerable degree on Germany's international

    competitiveness. Exports are responsible for over 50 percent of German GDP, compared to 27 percent for China, which is generally considered to bethe workshop of the world.

    Gabriel's comments stirred up criticism from environmentalists; indeed, they may seem strange words coming from the leader of the SocialDemocrats (the SPD). But the Social Democrats are very close to the trade unions, for which loss of competitiveness translates into loss of jobs.

    And it is jobs, as much the specter of "deindustrialization," the disinvestment in industry, that is now making competitiveness a significant part ofEurope's energy debates, especially on a continent where unemployment is so high. The risk of major job loss could well provi de the political stimulusto moderate energy policies in order to narrow the trans-Atlantic gap that was so evident a theme this year at Davos.

    US C l t E Di l N t

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    17/59

    US Coal to Europe Displaces Natgas-

    GHG Emissions Go Uphttp://www.bloomberg.com/news/2012-10-31/gas-golden-age-darkens-in-europe-on-u-s-coal-energy-

    markets.html

    Global gas consumption may rise 19 percent by 2017 from 2010 levels as demand surges inAsia and the U.S. while Europes usage drops 1.6 percent, according to the InternationalEnergy Agency. Increasing coal-fired generation in Europe has cut gas demand by 3 billioncubic feet a day, according to Sanford C. Bernstein & Co., about 7 percent of consumption.The IEA last year predicted a golden age for the fuel with new exports from America toAustralia.

    Gas for delivery next month on the Netherlands Title Transfer Facility, the mainlandEuropean benchmark, traded at 27.50 euros ($35.65) a megawatt-hour yesterday, morethan double the price four years ago, according to broker data compiled by Bloomberg.Thats equivalent to $10.43 per million British thermal units and compares with $3.69 permillion Btu for front- month fuel in the U.S., which fell 43 percent over the period.

    German power stations make a loss of 11.25 euros a megawatt-hour from burning gas,according to Bloomberg calculations of the so-called clean-spark spread, which takes intoaccount electricity, fuel and carbon prices for next month.

    The equivalent measure when burning European coal for delivery to Amsterdam,Rotterdam and Antwerp shows a profit of 14.22 euros a megawatt-hour. U.S. CentralAppalachian Coal Futures for the next month traded at $59.43 a short ton on Oct. 29,excluding shipping, versus $84.85 a metric ton ($93.53 a short ton) for European coal.

    Burning coal has contributed to a 10 percent increase in EU carbon-dioxide output thisyear through September, according to Bloomberg New Energy Finance. First-quarter

    emissions from power generation in the U.S. dropped to the lowest since 1992 because ofincreased gas usage and a milder-than-normal winter, the EIA said in an Aug. 1 report.

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    18/59

    California Natgas ShortageAP Feb 6th2014

    Water isn't the only resource running short in California. The drought-

    stricken state is also low on natural gas. With a move that usually comesin the height of summer when temperatures are soaring and airconditioners blasting, Californians were urged to voluntarily cut theirelectricity use after frigid weather across the U.S. and Canada caused ashortage of natural gas at Southern California power plants.

    The so-called Flex Alert, in which residents are asked to turn off unneededlights, avoid using large appliances or equipment, and turn off electricallypowered heaters, was allowed to expire at 10 p.m. Thursday, nine hoursafter it began. The shortage was only in Southern California, but the northwas asked to do its part too.

    "Statewide electricity and gas conservation will help free up bothelectricity and gas supplies for Southern Californians," the CaliforniaIndependent System Operator, which runs the state's power grid, said in a

    statement. There was no immediate call for an extension of the alert, butit wasn't clear whether more could be coming.

    Stephanie McCorkle, a spokeswoman for the grid operator, said SouthernCalifornia has become increasingly dependent on natural gas-fired plantssince the decision last year to shutter the troubled San Onofre nuclearpower plant, which is located between Los Angeles and San Diego.

    http://bigstory.ap.org/article/natural-gas-shortage-affects-calif-power-supply

    http://bigstory.ap.org/article/natural-gas-shortage-affects-calif-power-supplyhttp://bigstory.ap.org/article/natural-gas-shortage-affects-calif-power-supplyhttp://bigstory.ap.org/article/natural-gas-shortage-affects-calif-power-supplyhttp://bigstory.ap.org/article/natural-gas-shortage-affects-calif-power-supplyhttp://bigstory.ap.org/article/natural-gas-shortage-affects-calif-power-supplyhttp://bigstory.ap.org/article/natural-gas-shortage-affects-calif-power-supplyhttp://bigstory.ap.org/article/natural-gas-shortage-affects-calif-power-supplyhttp://bigstory.ap.org/article/natural-gas-shortage-affects-calif-power-supplyhttp://bigstory.ap.org/article/natural-gas-shortage-affects-calif-power-supplyhttp://bigstory.ap.org/article/natural-gas-shortage-affects-calif-power-supplyhttp://bigstory.ap.org/article/natural-gas-shortage-affects-calif-power-supplyhttp://bigstory.ap.org/article/natural-gas-shortage-affects-calif-power-supplyhttp://bigstory.ap.org/article/natural-gas-shortage-affects-calif-power-supplyhttp://bigstory.ap.org/article/natural-gas-shortage-affects-calif-power-supplyhttp://bigstory.ap.org/article/natural-gas-shortage-affects-calif-power-supplyhttp://bigstory.ap.org/article/natural-gas-shortage-affects-calif-power-supplyhttp://bigstory.ap.org/article/natural-gas-shortage-affects-calif-power-supply
  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    19/59

    As Gas Generators' Fuel Costs Soar, Grid

    Operator Asks FERC To Waive Price CapPeter Behr, E&E reporter Published: Friday, January 24, 2014

    But PJM said it was obliged to accept bids from various generators for 4,000 megawatts of powerTuesday at $999 per MWh, in order to meet the heavy demand for power as the cold wave continued.

    The price of natural gas to gas-fired plants drove up the price, PJM said.

    With heating demands for gas soaring, gas prices at two points on the Transco pipeline running

    through the mid-Atlantic region averaged more than $120 per million British thermal units onJan. 21 with a high mark of $140 per million Btu,

    PJM said -- prices that pushed some generators' costs to more than $1,200 per MWh.

    "This is untenable," PJM said in its petition to FERC. "Generators cannot lawfully be required to buy fuelat a cost of many millions of dollars for the purpose of generating power and selling it at a loss."

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    20/59

    Natgas Forward Curve-Volatility Impacts

    From Polar VortexSource: DTN 2-20-14 vs 2-26-14

    The rapid upward change in the nearby pricing a direct effect of this winters longer colder season

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    21/59

    US Natgas Storage Hit HardEIA Feb 14th2014

    If the cold weather continues and withdrawals maintain their recent pace of 200 +

    Bcf/week then storage could easily fall below 1 Tcf by the end of March, for the first

    time since 2003 (orange dashed projection on the chart). RBN 2-24-14

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    22/59

    CO2-EOR and CCUS Developments

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    23/59

    US goes to Carbon Capture Utilization

    and Storage

    July 28th2011 Chuck McConnell at hisfirst confirmation hearing in the USSenate Energy and Natural ResourcesCommittee, puts forth his plan for theDOE Fossil Energy and the US to make

    use of the captured CO2such as inenhanced oil recovery to add value tothe process. He and his plan wereaccepted and confirmed.

    He based his confidence in thisapproach on a recently completed

    DOE study on this concept. http://www.netl.doe.gov/energy-

    analyses/pubs/storing%20co2%20w%20eor_final.pdf

    http://www.netl.doe.gov/energy-analyses/pubs/storing%20co2%20w%20eor_final.pdfhttp://www.netl.doe.gov/energy-analyses/pubs/storing%20co2%20w%20eor_final.pdfhttp://www.netl.doe.gov/energy-analyses/pubs/storing%20co2%20w%20eor_final.pdfhttp://www.netl.doe.gov/energy-analyses/pubs/storing%20co2%20w%20eor_final.pdfhttp://www.netl.doe.gov/energy-analyses/pubs/storing%20co2%20w%20eor_final.pdfhttp://www.netl.doe.gov/energy-analyses/pubs/storing%20co2%20w%20eor_final.pdfhttp://www.netl.doe.gov/energy-analyses/pubs/storing%20co2%20w%20eor_final.pdfhttp://www.netl.doe.gov/energy-analyses/pubs/storing%20co2%20w%20eor_final.pdf
  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    24/59

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    25/59

    US CCUS and CCS Projects

    Mississippi Powers Kemper CCUS lignite gasification

    Air Products-operational-CCUS methane reformer

    Plant Barry-pilot operational-CCS post combustion

    ADM-pilot operational-CCS ethanol plant

    Summits TCEP-on hold-CCUS polygen

    NRG-in development-CCUS post combustion

    HECA-in development-CCUS polygen

    FutureGen-in development-CCS oxycombustion

    DKRW-on hold-CCUS coal to methanol

    Peabody-Great Point-on hold-CCUS Indiana Gasification-on hold-CCUS petcoke polygen

    Leucadia Louisiana Methanol (petcoke gasification)-indevelopment-CCUS petcoke to methanol

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    26/59

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    27/59

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    28/59

    Navajo Nation Speaker Naize Welcomes Royal NorwegianGeneral Consulate to discuss Energy Initiatives

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    29/59

    ROZ or Residual Oil Zone

    This study set the

    stage for moving

    CO2EOR in the ROZ

    into full gear.

    Source: Melzer Consulting

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    30/59

    Source: Melzer Consulting

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    31/59

    Source: Melzer Consulting

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    32/59

    Source: Melzer Consulting

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    33/59

    Source: Melzer Consulting

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    34/59

    Next Frontier for CO2-EOR -- Shale

    Oil/Bakken

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    35/59

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    36/59

    CO2-EOR and EU/EC

    January 14th2014 EU Parliament passed: The implementation report 2013: developing and applying carbon

    capture and storage technology in Europe (2013/2079(INI))

    Note: item 34 Welcomes the various initiatives to make use of CO2in ways that reduce overall emissions into the atmosphere and create

    alternative products such as sustainable transport fuels;calls in particular for the Commission to assess urgently the potentialfor the secure use of CO2to enhance oil and gas recovery within theEU

    http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A7-2013-0430&language=EN#title2

    http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A7-2013-0430&language=ENhttp://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A7-2013-0430&language=ENhttp://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A7-2013-0430&language=ENhttp://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A7-2013-0430&language=ENhttp://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A7-2013-0430&language=ENhttp://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A7-2013-0430&language=ENhttp://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A7-2013-0430&language=ENhttp://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A7-2013-0430&language=ENhttp://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A7-2013-0430&language=EN
  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    37/59

    Coal

    AEO2014 P j t M C l Fi d P Pl t

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    38/59

    AEO2014 Projects More Coal-Fired Power Plant

    Retirements By 2016 Than Have Been Scheduledhttp://www.eia.gov/todayinenergy/detail.cfm?id=15031# February 14, 2014

    Coal-fired power plants in the United States have been under significant economic pressure in recent years because of low natural gas prices and slow electricity demand growth. The Annual Energy

    Outlook 2014 (AEO2014) Reference Case projects that a total of 60 gigawatts (GW) of capacity will retire by 2020, which includes the retirements that have already been reported to the U.S. Energy

    Information Administration.

    Coal-fired power plants are subject to the Mercury and Air Toxics Standards (MATS), which require significant reductions in emissions of mercury, acid gases, and toxic metals. The standards arescheduled to take effect in April 2015, a deadline that is conditionally allowed to be extended by up to one year by state environmental permitting agencies. Projected retirements of coal-fired

    generating capacity in the AEO2014 include retirements above and beyond those reported to EIA as planned by power plant owners and operators. In these projections, 90% of the coal-fired capacity

    retirements occur by 2016, coinciding with the first year of enforcement for the Mercury and Air Toxics Standards.

    To comply with MATS, it is assumed that all coal-fired plants have flue gas desulfurization equipment (scrubbers) or dry sorbent injection systems installed by 2016. Retirement decisions are based on

    the relative economics and regulatory environment of the electricity markets. A plant may retire if higher coal prices, lower wholesale electricity prices (often tied to natural gas prices), or reduced

    utilization make investment in equipment like scrubbers uneconomical. The Reference case projections shown in the graph above reflect EIA's baseline for comparing a number of different sensitivity

    cases exploring variations on these factors. The full Annual Energy Outlook 2014 including all sensitivity cases will be released in the spring.

    At the end of 2012 there were 1,308 coal-fired generating units in the United States, totaling 310 GW of capacity. In 2012 alone, 10.2 GW of coal-fired capacity was retired, representing 3.2% of the

    2011 total. The table below shows the progression of coal-fired generating unit retirements between 2010 and 2012. Units that retired in 2010, 2011, or 2012 were small, with an average size of 97

    megawatts (MW), and inefficient, with an average tested heat rate of about 10,695 British thermal units per kilowatt-hour (Btu/kWh). In contrast, units scheduled for retirement over the next 10 years

    are larger and more efficient: at 145 MW, the average size is 50% larger than recent retirements, with an average tested heat rate of 10,398 Btu/kWh.

    http://www.eia.gov/todayinenergy/detail.cfm?id=15031http://www.eia.gov/todayinenergy/detail.cfm?id=15031
  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    39/59

    China Coal ImportsArgus 2-12-14

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    40/59

    Coal Export Terminalshttp://www.platts.com/news-feature/2012/coal/coalexports/map

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    41/59

    US Coal Exports-Importshttp://www.eia.gov/coal/production/quarterly/

    U.S. coal consumption totaled 229.5 million short tons in first quarter 2013; this was

    1.5% above the 226.1 million short tons reported in fourth quarter 2012

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    42/59

    Where US Coal Goeshttp://democrats.naturalresources.house.gov/sites/democrats.naturalres

    ources.house.gov/files/documents/Our_Pain_Their_Gain1.pdf

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    43/59

    Global-US Inter-related Energy Activities

    h

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    44/59

    Chinas Energy Appetite Growshttp://www.eia.gov/todayinenergy/detail.cfm?id=8070

    China is the world's largest energy consumer. China's economy, which has grown at an

    average real rate of about 10 percent per year over the last 10 years, is a key driver of the

    increase in energy consumption, both in China and internationally. Economic growth in

    China is still robustChina's gross domestic product grew an estimated 7.8% in the first

    half of 2012. China had the most installed generating capacity in the world in 2011, at1,073 gigawatts, slightly higher than the United States.

    Map of Basins with assessed Shale Oil and

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    45/59

    Map of Basins with assessed Shale Oil and

    Shale Gas Formations, as of May 2013

    Source: Technically Re coverable Shale Oil and Shale Gas Resources: An Assessment of 137 Shale Formationsin 41 Countries Outside the United States EIA June 13th2013

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    46/59

    Panama Canal Expansion and Its Impact

    It could be the single biggest game changer for the export

    of US energy and related commodities to the Far East. LNG Exportsfirst export facility online in 2015

    Coal Exportsmajor expansions of GC terminals

    NGL Exportslong term export contracts

    Transportation Fuels Exports-from foreign and UScrude, GTL and CTL projects

    Crude Oil Exportstalk to open up lower 48restrictions

    Petrochemical Exportsworld scale new builds andexpansion underway in the GC

    Total vessel throughput last year 18,000new locksincrease throughput and triple vessel sizes.

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    47/59

    Arctic Sea Routes

    As of September 5, 2013 the NSRAdministration has issued 495permits to navigate and operateon the NSR so far this year.However, most of these permits

    are for only parts of the route,predominantly the western part ofRussian waters, i.e. thesouthwestern Kara Sea. As of 31July 2013, of the 296 permitsgranted only 18% (58 permits) are

    for actual transits and 45% (133permits) are approved for voyagesonly in the southwestern Kara Sea,primarily shipping goods withinthe region or bringing them south-westwards to Europe.http://www.oceansnorth.org/system/files/styl

    es/fullsize/private/imagedb/arctic%20shipping

    %20map_0.jpg?itok=KITnA6sT

    http://www.oceansnorth.org/system/files/styles/fullsize/private/imagedb/arctic%20shipping%20map_0.jpg?itok=KITnA6sThttp://www.oceansnorth.org/system/files/styles/fullsize/private/imagedb/arctic%20shipping%20map_0.jpg?itok=KITnA6sThttp://www.oceansnorth.org/system/files/styles/fullsize/private/imagedb/arctic%20shipping%20map_0.jpg?itok=KITnA6sThttp://www.oceansnorth.org/system/files/styles/fullsize/private/imagedb/arctic%20shipping%20map_0.jpg?itok=KITnA6sThttp://www.oceansnorth.org/system/files/styles/fullsize/private/imagedb/arctic%20shipping%20map_0.jpg?itok=KITnA6sThttp://www.oceansnorth.org/system/files/styles/fullsize/private/imagedb/arctic%20shipping%20map_0.jpg?itok=KITnA6sThttp://www.oceansnorth.org/system/files/styles/fullsize/private/imagedb/arctic%20shipping%20map_0.jpg?itok=KITnA6sT
  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    48/59

    Significant Carbon Events

    November 7th2013'Unburnable' carbon fuels investment concerns-Investors group with 7.3tn of assets asks energy giants about theirexposure and response to the risk of falling demand for oil and coal.http://www.theguardian.com/sustainable-business/unburnable-carbon-investment-agenda

    June 12th2013 Obama Quietly Raises 'Carbon Price' as Costs to ClimateIncrease. The increase of the so-called social cost of carbon, to $38 ametric ton in 2015 from $23.80, adjusts the calculation the governmentuses to weigh costs and benefits of proposed regulations. The figure ismeant to approximatelosses from global warming such as flood damageand diminished crops. http://www.bloomberg.com/news/2013-06-

    12/tougher-regulations-seen-from-obama-change-in-carbon-cost.html

    EPA and NSPS on new and existing power plants

    President Obamas June 2nd

    TEPCO Plans Two 500 MW IGCC

    http://www.theguardian.com/sustainable-business/unburnable-carbon-investment-agendahttp://www.theguardian.com/sustainable-business/unburnable-carbon-investment-agendahttp://www.theguardian.com/sustainable-business/unburnable-carbon-investment-agendahttp://www.bloomberg.com/news/2013-06-12/tougher-regulations-seen-from-obama-change-in-carbon-cost.htmlhttp://www.bloomberg.com/news/2013-06-12/tougher-regulations-seen-from-obama-change-in-carbon-cost.htmlhttp://www.bloomberg.com/news/2013-06-12/tougher-regulations-seen-from-obama-change-in-carbon-cost.htmlhttp://www.bloomberg.com/news/2013-06-12/tougher-regulations-seen-from-obama-change-in-carbon-cost.htmlhttp://www.bloomberg.com/news/2013-06-12/tougher-regulations-seen-from-obama-change-in-carbon-cost.htmlhttp://www.bloomberg.com/news/2013-06-12/tougher-regulations-seen-from-obama-change-in-carbon-cost.htmlhttp://www.bloomberg.com/news/2013-06-12/tougher-regulations-seen-from-obama-change-in-carbon-cost.htmlhttp://www.bloomberg.com/news/2013-06-12/tougher-regulations-seen-from-obama-change-in-carbon-cost.htmlhttp://www.bloomberg.com/news/2013-06-12/tougher-regulations-seen-from-obama-change-in-carbon-cost.htmlhttp://www.bloomberg.com/news/2013-06-12/tougher-regulations-seen-from-obama-change-in-carbon-cost.htmlhttp://www.bloomberg.com/news/2013-06-12/tougher-regulations-seen-from-obama-change-in-carbon-cost.htmlhttp://www.bloomberg.com/news/2013-06-12/tougher-regulations-seen-from-obama-change-in-carbon-cost.htmlhttp://www.bloomberg.com/news/2013-06-12/tougher-regulations-seen-from-obama-change-in-carbon-cost.htmlhttp://www.bloomberg.com/news/2013-06-12/tougher-regulations-seen-from-obama-change-in-carbon-cost.htmlhttp://www.bloomberg.com/news/2013-06-12/tougher-regulations-seen-from-obama-change-in-carbon-cost.htmlhttp://www.bloomberg.com/news/2013-06-12/tougher-regulations-seen-from-obama-change-in-carbon-cost.htmlhttp://www.bloomberg.com/news/2013-06-12/tougher-regulations-seen-from-obama-change-in-carbon-cost.htmlhttp://www.bloomberg.com/news/2013-06-12/tougher-regulations-seen-from-obama-change-in-carbon-cost.htmlhttp://www.bloomberg.com/news/2013-06-12/tougher-regulations-seen-from-obama-change-in-carbon-cost.htmlhttp://www.bloomberg.com/news/2013-06-12/tougher-regulations-seen-from-obama-change-in-carbon-cost.htmlhttp://www.bloomberg.com/news/2013-06-12/tougher-regulations-seen-from-obama-change-in-carbon-cost.htmlhttp://www.bloomberg.com/news/2013-06-12/tougher-regulations-seen-from-obama-change-in-carbon-cost.htmlhttp://www.bloomberg.com/news/2013-06-12/tougher-regulations-seen-from-obama-change-in-carbon-cost.htmlhttp://www.bloomberg.com/news/2013-06-12/tougher-regulations-seen-from-obama-change-in-carbon-cost.htmlhttp://www.bloomberg.com/news/2013-06-12/tougher-regulations-seen-from-obama-change-in-carbon-cost.htmlhttp://www.bloomberg.com/news/2013-06-12/tougher-regulations-seen-from-obama-change-in-carbon-cost.htmlhttp://www.theguardian.com/sustainable-business/unburnable-carbon-investment-agendahttp://www.theguardian.com/sustainable-business/unburnable-carbon-investment-agendahttp://www.theguardian.com/sustainable-business/unburnable-carbon-investment-agendahttp://www.theguardian.com/sustainable-business/unburnable-carbon-investment-agendahttp://www.theguardian.com/sustainable-business/unburnable-carbon-investment-agendahttp://www.theguardian.com/sustainable-business/unburnable-carbon-investment-agendahttp://www.theguardian.com/sustainable-business/unburnable-carbon-investment-agendahttp://www.theguardian.com/sustainable-business/unburnable-carbon-investment-agendahttp://www.theguardian.com/sustainable-business/unburnable-carbon-investment-agendahttp://www.theguardian.com/sustainable-business/unburnable-carbon-investment-agenda
  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    49/59

    TEPCO Plans Two 500 MW IGCC

    Projects in Japan

    May 21-2014 http://www.enerdata.net/enerdatauk/press-and-

    publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.html

    Japanese power utility TEPCO has submitted to the Minister of Economy, Trade andIndustry of Japan the "Planning Phase Environmental Impact Statement forReconstruction of Fukushima: Demonstration plan for large scale coal basedintegrated gasification combined cycle". TEPCO aims to build two 500 MW coal based

    integrated gasification combined-cycle (IGCC) power plants; the first one would bebuilt in the Hirono area, on the site of the existing power plant and would bedeveloped independently by TEPCO. The second one would be built within thepremises of Nakoso power plant, in partnership with Joban Joint Power. Twoadditional projects are also under consideration.

    ("Statement") that summarizes the environmental items to be considered,

    independently for the Hirono area, and in collaboration with Joban Joint Power Co.,Ltd. for the Nakoso area. In addition to the above, for the purpose of making inquiryreferences from the viewpoint of environmental preservation, we have also submittedthe said document to the Governor of Fukushima prefecture, and the Mayor of Hironotown as well as the Mayor of Naraha town for the Hirono area; and the Governor ofFukushima prefecture and the Mayor of Iwaki city for the Nakoso area.

    http://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.htmlhttp://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/tepco-plans-two-500-mw-igcc-projects-japan_28804.html
  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    50/59

    Mexico Opens Up Its Energy Markets

    On Dec. 12, 2013, Mexican legislators approved controversial, far-reachingreforms to the countrys energy sector. Outside the federal legislativechambers in Mexico City, protesters pounded on metal barriers with rocksand spoons, while phalanxes of riot police stood guard behind thebarricades.

    Many felt their countrys patrimony and fiscal independence were being

    sold at a fire sale. Mexico was opening up its energy sector to private,foreign interests for the first time since President Lazaro Cardenas hadtossed out foreign companies and nationalized oil reserves to wide andenthusiastic support in 1938.

    For the past 75 years, Mexican oil has been controlled exclusively by the

    state-owned oil firm Pemex, the second most profitable company in LatinAmerica, according to the Fortune 500 index. Almost all of Pemexs profitsgo back into national coffers. But the state-owned company is alsonotoriously corrupt.

    http://www.texasobserver.org/american-media-misses-story-mexican-oil-reform/

    S di A Uth i h CO EOR

    http://www.texasobserver.org/american-media-misses-story-mexican-oil-reform/http://www.texasobserver.org/american-media-misses-story-mexican-oil-reform/http://www.texasobserver.org/american-media-misses-story-mexican-oil-reform/http://www.texasobserver.org/american-media-misses-story-mexican-oil-reform/http://www.texasobserver.org/american-media-misses-story-mexican-oil-reform/http://www.texasobserver.org/american-media-misses-story-mexican-oil-reform/http://www.texasobserver.org/american-media-misses-story-mexican-oil-reform/http://www.texasobserver.org/american-media-misses-story-mexican-oil-reform/http://www.texasobserver.org/american-media-misses-story-mexican-oil-reform/http://www.texasobserver.org/american-media-misses-story-mexican-oil-reform/http://www.texasobserver.org/american-media-misses-story-mexican-oil-reform/http://www.texasobserver.org/american-media-misses-story-mexican-oil-reform/http://www.texasobserver.org/american-media-misses-story-mexican-oil-reform/http://www.texasobserver.org/american-media-misses-story-mexican-oil-reform/http://www.texasobserver.org/american-media-misses-story-mexican-oil-reform/http://www.texasobserver.org/american-media-misses-story-mexican-oil-reform/
  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    51/59

    Saudi Aramco Uthmaniyah CO2-EOR

    at Ghawar CO2EOR Demonstration project. 0.8 Mt of CO2injection over 3 years, coming from the Hawiyah gas

    plant.

    The CO2injection will take place in a well characterized field, theGhawar field, of which Uthmaniyah represents a small area. The

    project will consist of 4 injection wells, 2 observation wells and 4productions wells.

    Monitoring and Surveillance technology will record theproduction/injection rates, the residual oil saturation, the plumeevolution (flood front), the well integrity, and the quantity of CO2sequestered.

    Demonstrate CO2EOR with intensive monitoring effort. CO2injection is expected to start in 2015.

    http://www.globalccsinstitute.com/project/uthmaniyah-co2-eor-demonstration-project-0

    US Becomes World Scale LPG and

    http://www.globalccsinstitute.com/project/uthmaniyah-co2-eor-demonstration-project-0http://www.globalccsinstitute.com/project/uthmaniyah-co2-eor-demonstration-project-0http://www.globalccsinstitute.com/project/uthmaniyah-co2-eor-demonstration-project-0http://www.globalccsinstitute.com/project/uthmaniyah-co2-eor-demonstration-project-0http://www.globalccsinstitute.com/project/uthmaniyah-co2-eor-demonstration-project-0http://www.globalccsinstitute.com/project/uthmaniyah-co2-eor-demonstration-project-0http://www.globalccsinstitute.com/project/uthmaniyah-co2-eor-demonstration-project-0http://www.globalccsinstitute.com/project/uthmaniyah-co2-eor-demonstration-project-0http://www.globalccsinstitute.com/project/uthmaniyah-co2-eor-demonstration-project-0http://www.globalccsinstitute.com/project/uthmaniyah-co2-eor-demonstration-project-0http://www.globalccsinstitute.com/project/uthmaniyah-co2-eor-demonstration-project-0http://www.globalccsinstitute.com/project/uthmaniyah-co2-eor-demonstration-project-0http://www.globalccsinstitute.com/project/uthmaniyah-co2-eor-demonstration-project-0http://www.globalccsinstitute.com/project/uthmaniyah-co2-eor-demonstration-project-0http://www.globalccsinstitute.com/project/uthmaniyah-co2-eor-demonstration-project-0
  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    52/59

    US Becomes World Scale LPG and

    Ethane Exporter GPA 14: US exports of LPG poised to

    skyrocket. 4-15-14 A near-doubling of US propane

    exports occurred from 2012 to 2013.This paradigm shift looks likely tocontinue.

    At least 77 projects to build orexpand LPG processing capacity arein the works, Ms. Anderson said.These projects will bring online 13billion cubic feet per day (Bcfd) ofadditional capacity in US by the endof 2015.

    Bentek anticipates US LPG supplyfrom gas plants to reach 2 MMbpd by

    2019 http://www.hydrocarbonprocessing.c

    om/Article/3331124/GPA-14-US-exports-of-LPG-poised-to-skyrocket.html

    Enterprise Building Ethane Export

    Terminal to Cut Glut . 4-22-14 The operator of the largest U.S.

    storage hub for natural gas liquids,plans to reduce an oversupply ofethane by exporting the plasticsingredient from the Texas coast.

    The refrigerated export facility is

    expected to begin operating in thethird quarter of 2016.

    It will have the capacity to load240,000 barrels a day, making it thelargest such facility in the world, thecompany said.

    U.S. ethane supply currently exceeds

    demand by about 300,000 barrels aday, a figure that may reach 700,000barrels by 2020.

    http://www.bloomberg.com/news/2014-04-22/enterprise-building-ethane-export-terminal-to-cut-glut.html

    CO2 Shi i

    http://www.hydrocarbonprocessing.com/Article/3331124/GPA-14-US-exports-of-LPG-poised-to-skyrocket.htmlhttp://www.hydrocarbonprocessing.com/Article/3331124/GPA-14-US-exports-of-LPG-poised-to-skyrocket.htmlhttp://www.hydrocarbonprocessing.com/Article/3331124/GPA-14-US-exports-of-LPG-poised-to-skyrocket.htmlhttp://www.hydrocarbonprocessing.com/Article/3331124/GPA-14-US-exports-of-LPG-poised-to-skyrocket.htmlhttp://www.bloomberg.com/news/2014-04-22/enterprise-building-ethane-export-terminal-to-cut-glut.htmlhttp://www.bloomberg.com/news/2014-04-22/enterprise-building-ethane-export-terminal-to-cut-glut.htmlhttp://www.bloomberg.com/news/2014-04-22/enterprise-building-ethane-export-terminal-to-cut-glut.htmlhttp://www.bloomberg.com/news/2014-04-22/enterprise-building-ethane-export-terminal-to-cut-glut.htmlhttp://www.bloomberg.com/news/2014-04-22/enterprise-building-ethane-export-terminal-to-cut-glut.htmlhttp://www.bloomberg.com/news/2014-04-22/enterprise-building-ethane-export-terminal-to-cut-glut.htmlhttp://www.bloomberg.com/news/2014-04-22/enterprise-building-ethane-export-terminal-to-cut-glut.htmlhttp://www.bloomberg.com/news/2014-04-22/enterprise-building-ethane-export-terminal-to-cut-glut.htmlhttp://www.bloomberg.com/news/2014-04-22/enterprise-building-ethane-export-terminal-to-cut-glut.htmlhttp://www.bloomberg.com/news/2014-04-22/enterprise-building-ethane-export-terminal-to-cut-glut.htmlhttp://www.bloomberg.com/news/2014-04-22/enterprise-building-ethane-export-terminal-to-cut-glut.htmlhttp://www.bloomberg.com/news/2014-04-22/enterprise-building-ethane-export-terminal-to-cut-glut.htmlhttp://www.bloomberg.com/news/2014-04-22/enterprise-building-ethane-export-terminal-to-cut-glut.htmlhttp://www.bloomberg.com/news/2014-04-22/enterprise-building-ethane-export-terminal-to-cut-glut.htmlhttp://www.bloomberg.com/news/2014-04-22/enterprise-building-ethane-export-terminal-to-cut-glut.htmlhttp://www.bloomberg.com/news/2014-04-22/enterprise-building-ethane-export-terminal-to-cut-glut.htmlhttp://www.bloomberg.com/news/2014-04-22/enterprise-building-ethane-export-terminal-to-cut-glut.htmlhttp://www.bloomberg.com/news/2014-04-22/enterprise-building-ethane-export-terminal-to-cut-glut.htmlhttp://www.bloomberg.com/news/2014-04-22/enterprise-building-ethane-export-terminal-to-cut-glut.htmlhttp://www.bloomberg.com/news/2014-04-22/enterprise-building-ethane-export-terminal-to-cut-glut.htmlhttp://www.bloomberg.com/news/2014-04-22/enterprise-building-ethane-export-terminal-to-cut-glut.htmlhttp://www.bloomberg.com/news/2014-04-22/enterprise-building-ethane-export-terminal-to-cut-glut.htmlhttp://www.bloomberg.com/news/2014-04-22/enterprise-building-ethane-export-terminal-to-cut-glut.htmlhttp://www.bloomberg.com/news/2014-04-22/enterprise-building-ethane-export-terminal-to-cut-glut.htmlhttp://www.bloomberg.com/news/2014-04-22/enterprise-building-ethane-export-terminal-to-cut-glut.htmlhttp://www.hydrocarbonprocessing.com/Article/3331124/GPA-14-US-exports-of-LPG-poised-to-skyrocket.htmlhttp://www.hydrocarbonprocessing.com/Article/3331124/GPA-14-US-exports-of-LPG-poised-to-skyrocket.htmlhttp://www.hydrocarbonprocessing.com/Article/3331124/GPA-14-US-exports-of-LPG-poised-to-skyrocket.htmlhttp://www.hydrocarbonprocessing.com/Article/3331124/GPA-14-US-exports-of-LPG-poised-to-skyrocket.htmlhttp://www.hydrocarbonprocessing.com/Article/3331124/GPA-14-US-exports-of-LPG-poised-to-skyrocket.htmlhttp://www.hydrocarbonprocessing.com/Article/3331124/GPA-14-US-exports-of-LPG-poised-to-skyrocket.htmlhttp://www.hydrocarbonprocessing.com/Article/3331124/GPA-14-US-exports-of-LPG-poised-to-skyrocket.htmlhttp://www.hydrocarbonprocessing.com/Article/3331124/GPA-14-US-exports-of-LPG-poised-to-skyrocket.htmlhttp://www.hydrocarbonprocessing.com/Article/3331124/GPA-14-US-exports-of-LPG-poised-to-skyrocket.htmlhttp://www.hydrocarbonprocessing.com/Article/3331124/GPA-14-US-exports-of-LPG-poised-to-skyrocket.htmlhttp://www.hydrocarbonprocessing.com/Article/3331124/GPA-14-US-exports-of-LPG-poised-to-skyrocket.htmlhttp://www.hydrocarbonprocessing.com/Article/3331124/GPA-14-US-exports-of-LPG-poised-to-skyrocket.htmlhttp://www.hydrocarbonprocessing.com/Article/3331124/GPA-14-US-exports-of-LPG-poised-to-skyrocket.htmlhttp://www.hydrocarbonprocessing.com/Article/3331124/GPA-14-US-exports-of-LPG-poised-to-skyrocket.htmlhttp://www.hydrocarbonprocessing.com/Article/3331124/GPA-14-US-exports-of-LPG-poised-to-skyrocket.htmlhttp://www.hydrocarbonprocessing.com/Article/3331124/GPA-14-US-exports-of-LPG-poised-to-skyrocket.htmlhttp://www.hydrocarbonprocessing.com/Article/3331124/GPA-14-US-exports-of-LPG-poised-to-skyrocket.htmlhttp://www.hydrocarbonprocessing.com/Article/3331124/GPA-14-US-exports-of-LPG-poised-to-skyrocket.htmlhttp://www.hydrocarbonprocessing.com/Article/3331124/GPA-14-US-exports-of-LPG-poised-to-skyrocket.html
  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    53/59

    CO2 Shipping

    Anthony Veder CO2 shipping.http://www.anthonyveder.com/activities/new-business/co2-shipping/

    AP Moeller/Maersk CO2 shipping.http://www.maersktankers.com/Activities/Pages/CO2%20Shipping.aspx

    Yara CO2 Business Unit.http://www.yara.com/media/news_archive/Yara_co2_ships.aspx

    GCCSI CO2 Liquid tanker study Vopak.http://cdn.globalccsinstitute.com/sites/default/files/publications/25491/co2-liquid-logistics-shipping-concept.pdf

    GCCSI Chiyoda Preliminary Feasibility Study on CO2 Carrier for Ship.http://www.globalccsinstitute.com/publications/preliminary-feasibility-study-co2-carrier-ship-based-ccs

    Lloyds Feasibility of Danish CCS Scheme Comprised of Capture at PowerPlans, Ship Transport and CO2-EOR. Supports using modified chilled LPGcarriers and modified ethane carriers for CO2 in supercritcal for long haulshipping.http://www.dendanskemaritimefond.dk/public/dokumenter/2010/2010-71/Report%20-%20Feasibility%20of%20Danish%20CCS%20Scheme%20Comprised%20of%20Capture%20at%20Power%20Plants%20Ship%20Transport%20and%20

    CO2%20EOR.pdf

    http://www.anthonyveder.com/activities/new-business/co2-shipping/http://www.anthonyveder.com/activities/new-business/co2-shipping/http://www.maersktankers.com/Activities/Pages/CO2%20Shipping.aspxhttp://www.maersktankers.com/Activities/Pages/CO2%20Shipping.aspxhttp://www.yara.com/media/news_archive/Yara_co2_ships.aspxhttp://www.yara.com/media/news_archive/Yara_co2_ships.aspxhttp://cdn.globalccsinstitute.com/sites/default/files/publications/25491/co2-liquid-logistics-shipping-concept.pdfhttp://cdn.globalccsinstitute.com/sites/default/files/publications/25491/co2-liquid-logistics-shipping-concept.pdfhttp://cdn.globalccsinstitute.com/sites/default/files/publications/25491/co2-liquid-logistics-shipping-concept.pdfhttp://www.globalccsinstitute.com/publications/preliminary-feasibility-study-co2-carrier-ship-based-ccshttp://www.globalccsinstitute.com/publications/preliminary-feasibility-study-co2-carrier-ship-based-ccshttp://www.globalccsinstitute.com/publications/preliminary-feasibility-study-co2-carrier-ship-based-ccshttp://www.dendanskemaritimefond.dk/public/dokumenter/2010/2010-71/Report%20-%20Feasibility%20of%20Danish%20CCS%20Scheme%20Comprised%20of%20Capture%20at%20Power%20Plants%20Ship%20Transport%20and%20CO2%20EOR.pdfhttp://www.dendanskemaritimefond.dk/public/dokumenter/2010/2010-71/Report%20-%20Feasibility%20of%20Danish%20CCS%20Scheme%20Comprised%20of%20Capture%20at%20Power%20Plants%20Ship%20Transport%20and%20CO2%20EOR.pdfhttp://www.dendanskemaritimefond.dk/public/dokumenter/2010/2010-71/Report%20-%20Feasibility%20of%20Danish%20CCS%20Scheme%20Comprised%20of%20Capture%20at%20Power%20Plants%20Ship%20Transport%20and%20CO2%20EOR.pdfhttp://www.dendanskemaritimefond.dk/public/dokumenter/2010/2010-71/Report%20-%20Feasibility%20of%20Danish%20CCS%20Scheme%20Comprised%20of%20Capture%20at%20Power%20Plants%20Ship%20Transport%20and%20CO2%20EOR.pdfhttp://www.dendanskemaritimefond.dk/public/dokumenter/2010/2010-71/Report%20-%20Feasibility%20of%20Danish%20CCS%20Scheme%20Comprised%20of%20Capture%20at%20Power%20Plants%20Ship%20Transport%20and%20CO2%20EOR.pdfhttp://www.dendanskemaritimefond.dk/public/dokumenter/2010/2010-71/Report%20-%20Feasibility%20of%20Danish%20CCS%20Scheme%20Comprised%20of%20Capture%20at%20Power%20Plants%20Ship%20Transport%20and%20CO2%20EOR.pdfhttp://www.dendanskemaritimefond.dk/public/dokumenter/2010/2010-71/Report%20-%20Feasibility%20of%20Danish%20CCS%20Scheme%20Comprised%20of%20Capture%20at%20Power%20Plants%20Ship%20Transport%20and%20CO2%20EOR.pdfhttp://www.dendanskemaritimefond.dk/public/dokumenter/2010/2010-71/Report%20-%20Feasibility%20of%20Danish%20CCS%20Scheme%20Comprised%20of%20Capture%20at%20Power%20Plants%20Ship%20Transport%20and%20CO2%20EOR.pdfhttp://www.dendanskemaritimefond.dk/public/dokumenter/2010/2010-71/Report%20-%20Feasibility%20of%20Danish%20CCS%20Scheme%20Comprised%20of%20Capture%20at%20Power%20Plants%20Ship%20Transport%20and%20CO2%20EOR.pdfhttp://www.dendanskemaritimefond.dk/public/dokumenter/2010/2010-71/Report%20-%20Feasibility%20of%20Danish%20CCS%20Scheme%20Comprised%20of%20Capture%20at%20Power%20Plants%20Ship%20Transport%20and%20CO2%20EOR.pdfhttp://www.dendanskemaritimefond.dk/public/dokumenter/2010/2010-71/Report%20-%20Feasibility%20of%20Danish%20CCS%20Scheme%20Comprised%20of%20Capture%20at%20Power%20Plants%20Ship%20Transport%20and%20CO2%20EOR.pdfhttp://www.dendanskemaritimefond.dk/public/dokumenter/2010/2010-71/Report%20-%20Feasibility%20of%20Danish%20CCS%20Scheme%20Comprised%20of%20Capture%20at%20Power%20Plants%20Ship%20Transport%20and%20CO2%20EOR.pdfhttp://www.dendanskemaritimefond.dk/public/dokumenter/2010/2010-71/Report%20-%20Feasibility%20of%20Danish%20CCS%20Scheme%20Comprised%20of%20Capture%20at%20Power%20Plants%20Ship%20Transport%20and%20CO2%20EOR.pdfhttp://www.dendanskemaritimefond.dk/public/dokumenter/2010/2010-71/Report%20-%20Feasibility%20of%20Danish%20CCS%20Scheme%20Comprised%20of%20Capture%20at%20Power%20Plants%20Ship%20Transport%20and%20CO2%20EOR.pdfhttp://www.dendanskemaritimefond.dk/public/dokumenter/2010/2010-71/Report%20-%20Feasibility%20of%20Danish%20CCS%20Scheme%20Comprised%20of%20Capture%20at%20Power%20Plants%20Ship%20Transport%20and%20CO2%20EOR.pdfhttp://www.globalccsinstitute.com/publications/preliminary-feasibility-study-co2-carrier-ship-based-ccshttp://www.globalccsinstitute.com/publications/preliminary-feasibility-study-co2-carrier-ship-based-ccshttp://www.globalccsinstitute.com/publications/preliminary-feasibility-study-co2-carrier-ship-based-ccshttp://www.globalccsinstitute.com/publications/preliminary-feasibility-study-co2-carrier-ship-based-ccshttp://www.globalccsinstitute.com/publications/preliminary-feasibility-study-co2-carrier-ship-based-ccshttp://www.globalccsinstitute.com/publications/preliminary-feasibility-study-co2-carrier-ship-based-ccshttp://www.globalccsinstitute.com/publications/preliminary-feasibility-study-co2-carrier-ship-based-ccshttp://www.globalccsinstitute.com/publications/preliminary-feasibility-study-co2-carrier-ship-based-ccshttp://www.globalccsinstitute.com/publications/preliminary-feasibility-study-co2-carrier-ship-based-ccshttp://www.globalccsinstitute.com/publications/preliminary-feasibility-study-co2-carrier-ship-based-ccshttp://www.globalccsinstitute.com/publications/preliminary-feasibility-study-co2-carrier-ship-based-ccshttp://www.globalccsinstitute.com/publications/preliminary-feasibility-study-co2-carrier-ship-based-ccshttp://www.globalccsinstitute.com/publications/preliminary-feasibility-study-co2-carrier-ship-based-ccshttp://www.globalccsinstitute.com/publications/preliminary-feasibility-study-co2-carrier-ship-based-ccshttp://www.globalccsinstitute.com/publications/preliminary-feasibility-study-co2-carrier-ship-based-ccshttp://www.globalccsinstitute.com/publications/preliminary-feasibility-study-co2-carrier-ship-based-ccshttp://cdn.globalccsinstitute.com/sites/default/files/publications/25491/co2-liquid-logistics-shipping-concept.pdfhttp://cdn.globalccsinstitute.com/sites/default/files/publications/25491/co2-liquid-logistics-shipping-concept.pdfhttp://cdn.globalccsinstitute.com/sites/default/files/publications/25491/co2-liquid-logistics-shipping-concept.pdfhttp://cdn.globalccsinstitute.com/sites/default/files/publications/25491/co2-liquid-logistics-shipping-concept.pdfhttp://cdn.globalccsinstitute.com/sites/default/files/publications/25491/co2-liquid-logistics-shipping-concept.pdfhttp://cdn.globalccsinstitute.com/sites/default/files/publications/25491/co2-liquid-logistics-shipping-concept.pdfhttp://cdn.globalccsinstitute.com/sites/default/files/publications/25491/co2-liquid-logistics-shipping-concept.pdfhttp://cdn.globalccsinstitute.com/sites/default/files/publications/25491/co2-liquid-logistics-shipping-concept.pdfhttp://cdn.globalccsinstitute.com/sites/default/files/publications/25491/co2-liquid-logistics-shipping-concept.pdfhttp://cdn.globalccsinstitute.com/sites/default/files/publications/25491/co2-liquid-logistics-shipping-concept.pdfhttp://cdn.globalccsinstitute.com/sites/default/files/publications/25491/co2-liquid-logistics-shipping-concept.pdfhttp://www.yara.com/media/news_archive/Yara_co2_ships.aspxhttp://www.yara.com/media/news_archive/Yara_co2_ships.aspxhttp://www.maersktankers.com/Activities/Pages/CO2%20Shipping.aspxhttp://www.maersktankers.com/Activities/Pages/CO2%20Shipping.aspxhttp://www.anthonyveder.com/activities/new-business/co2-shipping/http://www.anthonyveder.com/activities/new-business/co2-shipping/http://www.anthonyveder.com/activities/new-business/co2-shipping/http://www.anthonyveder.com/activities/new-business/co2-shipping/http://www.anthonyveder.com/activities/new-business/co2-shipping/http://www.anthonyveder.com/activities/new-business/co2-shipping/http://www.anthonyveder.com/activities/new-business/co2-shipping/
  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    54/59

    CCS/CCUS Financing

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    55/59

    Money Everywhere But..

    In terms of financing for CCS, despite anincreasing number of operating plants, there havebeen no examples of commercially (bank) financedCCS projects yet as far as we are aware..

    Allan Baker - Societe GeneraleTargeted report: Financing Large Scale IntegratedCCS Demonstration Projects

    Report issued May 1, 2014 by GCCSI-SocieteGenerale

    http://www.globalccsinstitute.com/publications/targeted-report-financing-large-scale-integrated-ccs-

    demonstration-projects

    Available Financing Sources

    http://www.globalccsinstitute.com/publications/targeted-report-financing-large-scale-integrated-ccs-demonstration-projectshttp://www.globalccsinstitute.com/publications/targeted-report-financing-large-scale-integrated-ccs-demonstration-projectshttp://www.globalccsinstitute.com/publications/targeted-report-financing-large-scale-integrated-ccs-demonstration-projectshttp://www.globalccsinstitute.com/publications/targeted-report-financing-large-scale-integrated-ccs-demonstration-projectshttp://www.globalccsinstitute.com/publications/targeted-report-financing-large-scale-integrated-ccs-demonstration-projectshttp://www.globalccsinstitute.com/publications/targeted-report-financing-large-scale-integrated-ccs-demonstration-projectshttp://www.globalccsinstitute.com/publications/targeted-report-financing-large-scale-integrated-ccs-demonstration-projectshttp://www.globalccsinstitute.com/publications/targeted-report-financing-large-scale-integrated-ccs-demonstration-projectshttp://www.globalccsinstitute.com/publications/targeted-report-financing-large-scale-integrated-ccs-demonstration-projectshttp://www.globalccsinstitute.com/publications/targeted-report-financing-large-scale-integrated-ccs-demonstration-projectshttp://www.globalccsinstitute.com/publications/targeted-report-financing-large-scale-integrated-ccs-demonstration-projectshttp://www.globalccsinstitute.com/publications/targeted-report-financing-large-scale-integrated-ccs-demonstration-projectshttp://www.globalccsinstitute.com/publications/targeted-report-financing-large-scale-integrated-ccs-demonstration-projectshttp://www.globalccsinstitute.com/publications/targeted-report-financing-large-scale-integrated-ccs-demonstration-projectshttp://www.globalccsinstitute.com/publications/targeted-report-financing-large-scale-integrated-ccs-demonstration-projectshttp://www.globalccsinstitute.com/publications/targeted-report-financing-large-scale-integrated-ccs-demonstration-projectshttp://www.globalccsinstitute.com/publications/targeted-report-financing-large-scale-integrated-ccs-demonstration-projectshttp://www.globalccsinstitute.com/publications/targeted-report-financing-large-scale-integrated-ccs-demonstration-projectshttp://www.globalccsinstitute.com/publications/targeted-report-financing-large-scale-integrated-ccs-demonstration-projectshttp://www.globalccsinstitute.com/publications/targeted-report-financing-large-scale-integrated-ccs-demonstration-projectshttp://www.globalccsinstitute.com/publications/targeted-report-financing-large-scale-integrated-ccs-demonstration-projectshttp://www.globalccsinstitute.com/publications/targeted-report-financing-large-scale-integrated-ccs-demonstration-projectshttp://www.globalccsinstitute.com/publications/targeted-report-financing-large-scale-integrated-ccs-demonstration-projects
  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    56/59

    Available Financing Sources

    Fi i l I tit ti d Th i R l

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    57/59

    Financial Institutions and Their Role

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    58/59

    Considerations

    Risk: project, market, political, regulatory, permitting Complexity of project to be funded

    Term contracted off-take agreements

    Lack of familiarity by institutions of the CCUS value

    chain Geographic

    Resource access: Water, power, markets for output

    Competitive landscape: water, power, land,

    alternatives.. Technology: first of kind vs. off the shelf

    Project Team

  • 8/12/2019 Considerations for Large Scale CCUS Deployment

    59/59

    Questions & Thank You!

    Michael E. Moore

    VP Energy Commodities and Advisory Services

    FearnOil Inc. (a division of Astrup-Fearnleys)

    www.fearnleys.com

    Executive Director

    North American Carbon Capture Storage Association

    www.naccsa.org

    [email protected] Tel: 281-759-0245

    http://www.fearnleys.com/http://www.naccsa.org/mailto:[email protected]:[email protected]://www.naccsa.org/http://www.fearnleys.com/