S T A R - O R I O N S O U T H D I A M O N D P R O J E C T
D R A F T E N V I R O N M E N T A L I M P A C T A S S E S S M E N T
Version 2.0 SX03733 – Section 7.0 August 2012
Hig
hM
edLo
wN
eg
Neg Low Med High
Con
sequ
ence
s
Likelihood
Figure 7.2-1: Levels of Risk
S T A R - O R I O N S O U T H D I A M O N D P R O J E C T
E N V I R O N M E N T A L I M P A C T S T A T E M E N T
Version 2.0 SX03733 – Section 7.0 August 2012
Figure 7.4-1: Typical Dynamic Monitoring Equipment
S T A R - O R I O N S O U T H D I A M O N D P R O J E C T
E N V I R O N M E N T A L I M P A C T S T A T E M E N T
Version 2.0 SX03733 – Section 7.0 August 2012
Figure 7.4-2: Typical Static Monitoring Equipment
Reference
August, 2012
SX0373302
UTM Zone 13
DATE:
JOB No:
PROJECTION:
ANALYST: FigureMY
PDF FILE:
09-100-005_v3_water_monitoring_site.pdf
GIS FILE:
09-100-005_v3.mxd
NAD27
DATUM:
Water Monitoring Sites
PROJECT:
Star - Orion South Diamond Project
QA/QC:
BO
CLIENT:
Y:\
GIS
\Pro
ject
s\S
X\S
X0
37
33
_S
ho
re-G
old
_D
iam
on
d_
1\M
ap
pin
g\0
9_
wa
ter-
qu
alit
y\B
ase
line
\09
-10
0-0
05
_v3
.mxd
101 RavineWest Perimeter Ravine
East RavineDuke Ravine
Caution Creek
English Creek Saskatchewan River
West Ravine
FaLC Ravine
Wapiti Ravine
JAMES SMITH CREE NATION
500000
500000
505000
505000
510000
510000
515000
515000
520000
520000
525000
525000
530000
530000
5890
000
5890
000
5895
000
5895
000
5900
000
5900
000
5905
000
5905
000
5910
000
5910
000
LegendShallow Groundwater Well
Hydrology Site
Water Quality Monitoring Site
Fisheries and Aquatic Monitoring Site
Road
Watercourse
Contour(10m)
Waterbody
Local Study Area
First Nations Reserve
Major Watershed
101 Ravine
Caution Creek
Duke Ravine
FALC Ravine
East Ravine
English Creek
Wapiti Ravine
West Perimeter Ravine
West Ravine
Base data: NRCan National Road Network; NTS 1:50,000 scale: GeoSaskIndian Reserve/ Municipality Boundaries: GeoSaskMine facilities: AMEC dated August 30, 2011
0 2 41
Kilometres
1:110,000Scale:
August 03, 2012
SX03733
UTM Zone 13 NAD27
DATE:
PROJECT No:
PROJECTION & DATUM: DRAWN BY:
Figure 7.5-1
GIS TRACKING NUMBER:20120803_SoilMoisture.mxd
CLOSURE SOIL NUTRIENTAND MOISTURE REGIMES
PROJECT:
Star - Orion South Diamond Project
CLIENT:
Overburden Pile
Star Pit
Orion South Pit
Plant
PKCF
CPK
Ü
LegendSoil
Unclassified Closure85% Moist-Moderate, 15% Dry-Moderate85% Moist-Poor, 15% Dry-PoorDry-ModerateDry-PoorMoist-PoorMoist-ModerateOpen WaterWet-Moderate
August 03, 2012
SX03733
UTM Zone 13 NAD27
DATE:
PROJECT No:
PROJECTION & DATUM: DRAWN BY:
Figure 7.5-2
GIS TRACKING NUMBER:20120803_BPEcosites.mxd
Closure Ecosite Phases
PROJECT:
Star - Orion South Diamond Project
CLIENT:
Overburden Pile
Star Pit
Orion South Pit
Plant
PKCF
CPK
Ü
LegendBoreal Plain Ecosites
BP01BP01aBP02BP03BP04BP05BP06BP07BP09
BP10BP11BP12BP14BP15BP16BP18BP18aBP25Reclaimed Open Water Feature
dry - moderate dry - poor moist - poor wet - moderate
moist -poor
FINE PK
A A'
LL
LLLLLLL
Y C C CCC
CCCCCC
CY
w
ww
w w
w
}
}}}
}} n n}
1m captopsoil
= ==
dry - poor dry - moderate
incline 4:1 undulating 0% - 2% incline 4:1
DATE:PROJECT NO.:
FILE NAME:DATUM:
PROJECTION:
AMEC Environment & InfrastructureA Division of AMEC Americas Ltd.
LEGEND SCALE: July 26, 2012SX0373320120726_VegProfilePKCF.mxdNAD83 CSRSUTM 13N
Shore Gold Inc.
Figure 7.5-3PKCF PILE CROSS SECTION
Conceptual - Not to Scale
NOTES1) This product is intended for informational and reference purposes only and is not suitable for legal, engineering, or surveying purposes.
N.T.S.
YL
wn
}
C=jack pine
white spruce
willows/ alder
aspenlabrador tea/other shrubs
blueberry
saskatoon berry
ProcessKimberlite
ContainmentFacility(PKCF)
A A'Overburden
Pile (OB)
Star Pit
OrionSouth Pit
Plant
CoarseProcess
Kimberlite(CPK)
cross section
15cm topsoil
= n nn
nn
n
ww
ww
}
}w
== ===L
L LYY
Y
YY C CCLCC C
CC}}
nw
w C C CCCC }
dry - poor0 % - 5% undulating
moist - moderate(channel)
moist - moderate0 % - 10% undulating
dry - moderate25% slope
moist - moderate25% slope
85% CL/ 15% S
B B'
DATE:PROJECT NO.:
FILE NAME:DATUM:
PROJECTION:
AMEC Environment & InfrastructureA Division of AMEC Americas Ltd.
LEGEND SCALE: July 26, 2012SX0373320120726_VegProfileOB.mxdNAD83 CSRSUTM 13N
Shore Gold Inc.
FIGURE 7.5-4OB PILE CROSS SECTIONConceptual - Not to Scale
NOTES1) This product is intended for informational and reference purposes only and is not suitable for legal, engineering, or surveying purposes.
N.T.S.
YL
wn
}
C=jack pine
white spruce
willows/ alder
aspenlabrador tea/other shrubs
blueberry
saskatoon berry
ProcessKimberlite
ContainmentFacility(PKCF)
B
B'
OverburdenPile (OB)
Star Pit
OrionSouth Pit
Plant
CoarseProcess
Kimberlite(CPK)
cross section
C
L}
15cm topsoil
Orion South FPK
moist - moderate0% - 20% slope
C
15cm topsoil
CC
CY YY
LY
}
}L}}
}
}L
C'
moist - moderate0% - 20% slopeOPEN WATER
DATE:PROJECT NO.:
FILE NAME:DATUM:
PROJECTION:
AMEC Environment & InfrastructureA Division of AMEC Americas Ltd.
LEGEND SCALE: July 26, 2012SX0373320120726_VegProfileStar.mxdNAD83 CSRSUTM 13N
Shore Gold Inc.
Figure 7.5-5STAR PIT CLOSURE CROSS SECTION
Conceptual - Not to Scale
NOTES1) This product is intended for informational and reference purposes only and is not suitable for legal, engineering, or surveying purposes.
N.T.S.
Y
L}
Cjack pine
white spruce
aspenlabrador tea/other shrubs
ProcessKimberlite
ContainmentFacility(PKCF)
C C'
OverburdenPile (OB)
Star Pit
OrionSouth Pit
Plant
CoarseProcess
Kimberlite(CPK)
cross section
D D'
L
OPEN WATER
15cm topsoil
LLLL C
C }}
}
}
YY
YY
moist - moderate0% - 20%
moist - moderate0% - 20%
DATE:PROJECT NO.:
FILE NAME:DATUM:
PROJECTION:
AMEC Environment & InfrastructureA Division of AMEC Americas Ltd.
LEGEND SCALE: July 26, 2012SX0373320120726_VegProfileOrion.mxdNAD83 CSRSUTM 13N
Shore Gold Inc.
Figure 7.5-6ORION PIT CLOSURE CROSS SECTION
Conceptual - Not to Scale
NOTES1) This product is intended for informational and reference purposes only and is not suitable for legal, engineering, or surveying purposes.
N.T.S.
Y
L}
Cjack pine
white spruce
aspenlabrador tea/other shrubs
ProcessKimberlite
ContainmentFacility(PKCF)
D
D'
OverburdenPile (OB)
Star Pit
OrionSouth Pit
Plant
CoarseProcess
Kimberlite(CPK)
cross section
E E'
LC }
n
1m cap
salvage materialroll back =
dry - poor3:1 slope
dry - poorundulating 0% - 5%
moist - poor (channel) dry - poor dry - poor
moist - poor
(channel)
CPK
1m cap
salvage materialroll back
C C CC C C
C
C C
CC
C w
w
ww w
w
w
w
w
n
L
C }
}
}
}
}
C
C=
DATE:PROJECT NO.:
FILE NAME:DATUM:
PROJECTION:
AMEC Environment & InfrastructureA Division of AMEC Americas Ltd.
LEGEND SCALE: July 26, 2012SX0373320120726_VegProfileCPK.mxdNAD83 CSRSUTM 13N
Shore Gold Inc.
Figure 7.5-7CPK PILE CROSS SECTIONConceptual - Not to Scale
NOTES1) This product is intended for informational and reference purposes only and is not suitable for legal, engineering, or surveying purposes.
N.T.S.
YL
wn
}
C=jack pine
white spruce
willows/ alder
aspenlabrador tea/other shrubs
blueberry
saskatoon berry
ProcessKimberlite
ContainmentFacility(PKCF)
EE'
OverburdenPile (OB)
Star Pit
OrionSouth Pit
Plant
CoarseProcess
Kimberlite(CPK)