J&P Building Systems Ltd
Introduction
![Page 2: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/2.jpg)
With an extensive range of products for many of today’s modern construction requirements, J & P Building Systems have developed a reputation for providing safe, smart solutions.
Supplying standard off-the-shelf products and bespoke designed solutions, J&P work closely with our parent companies to provide cost-effective, high quality and reliable products to benefit the construction industry.
Alongside our range of products we also have an experienced team providing design guidance, technical support, sales and pricing assistance – to ensure our customers are supplied the most suitable value-engineered products and solutions for their projects.
J&P Building Systems
![Page 3: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/3.jpg)
J&P Parent Partnership Companies
J&P Building Systems is the supply partner in the UK for our parent companies
![Page 5: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/5.jpg)
Steel balconies are a common feature of apartments
![Page 6: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/6.jpg)
They are normally fixed to the face of the insitu concrete floor slab
![Page 7: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/7.jpg)
Until recently, proprietary fixing systems were always used
![Page 8: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/8.jpg)
Typical proprietary balcony fixing inserts
![Page 9: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/9.jpg)
Apart from cost, the big drawback with these systems is tolerance
-or lack of it
![Page 10: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/10.jpg)
Extract from proprietary technical literature
![Page 11: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/11.jpg)
The lack of tolerance means that surveys and retro-drilling is usually required
![Page 12: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/12.jpg)
Threaded rods projecting from slab edge
![Page 13: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/13.jpg)
Threaded sockets cast into slab edge
![Page 14: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/14.jpg)
![Page 15: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/15.jpg)
Balcon channel inserts
![Page 16: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/16.jpg)
Cast-in channel has always been known to offer high tolerance
![Page 17: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/17.jpg)
Invented by Anders Jordahl in 1913, it has a proven track record of safety and provision of high tolerance.
![Page 18: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/18.jpg)
In particular, channel allows considerable errors in casting to be overcome with no remedial work required.
![Page 19: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/19.jpg)
Ideal position for channel and balcony plate
![Page 20: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/20.jpg)
Channel to one side - plate remains in correct position
![Page 21: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/21.jpg)
Channel too high - plate remains in correct position
![Page 22: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/22.jpg)
Channel rotated - plate remains in correct position
![Page 23: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/23.jpg)
Balcon system
The channels are cast-in, with bars welded-on.The stub and back plate normally form part of the balcony package
![Page 24: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/24.jpg)
How does it work?
![Page 25: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/25.jpg)
How does it work?
Shear is taken by the vertical toothed channels
![Page 26: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/26.jpg)
How does it work?
Moment is taken by tension in the top channel and compression against the vertical channels
![Page 27: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/27.jpg)
Thermal performance
The stub beam can be encased in a block of insulation.The thickness of insulation is not ‘fixed’ as with the proprietary systems.
![Page 28: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/28.jpg)
Thermal performance
The Balcon system has been thermally assessed by BBA.
![Page 29: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/29.jpg)
Thermal performance
The results showed that Balcon was thermally superior to existing proprietary systems.
![Page 30: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/30.jpg)
Thermal performance
Importantly, the analysis showed that the performance meet the criteria for minimising the risk of internal surface condensation.
![Page 31: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/31.jpg)
Durability
The channels and bolts have a hot-dipped galvanized finish. The minimum thickness of galvanizing is 50μm (microns).
The Galvanizers Association publish guidance based on BS EN ISO 14713:2009
This indicates a coating life expectancy of at least 70 years.
![Page 32: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/32.jpg)
Practical details
BBC Media City
![Page 33: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/33.jpg)
Practical details
BBC Media City
![Page 34: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/34.jpg)
Practical details
BBC Media City
![Page 35: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/35.jpg)
Practical details
Clancy Barracks, Dublin
![Page 36: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/36.jpg)
Balcon Case studies
Woodberry Down
![Page 37: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/37.jpg)
Balcon Case studies
BBC Media City
Media City
![Page 38: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/38.jpg)
Balcon Case studies
The Rock, Bury
![Page 39: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/39.jpg)
Balcon Case studies
Clancy Barracks, Dublin
![Page 40: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/40.jpg)
Balcon Case studies
Beaufort Park, Hendon
![Page 41: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/41.jpg)
Balcon Case studies
Kew Bridge Road, Brentford
![Page 42: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/42.jpg)
Balcon Case studies
Finzels Reach, Bristol
Finzels Reach, Bristol
![Page 43: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/43.jpg)
Balcon Case studies
Finzels Reach, Bristol
Finzels Reach, Bristol
![Page 44: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/44.jpg)
Balcon Case studies
Olympic Athletes Village (3 sites)
![Page 45: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/45.jpg)
In addition:
Cast-in channels are remarkably tolerant of mis-use and abuse, as these examples show.
![Page 46: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/46.jpg)
Channel not secured before casting has sunk below the surface of the concrete.
Concrete is highly honeycombed
Used after load testing.
![Page 47: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/47.jpg)
After this channel was missed out, the Contractor cut a chase in the column and ‘fixed’ a channel with resin.
Rejected!
![Page 48: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/48.jpg)
After this channel was mis-positioned, the Contractor added another, with resin.
Rejected!
![Page 49: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/49.jpg)
The missing concrete was replaced with grout.
Used after load testing.
![Page 50: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/50.jpg)
This group was severely mis-aligned, and the lower surface was set back.
After load testing, this was used as designed with a modified end plate to the beam.
![Page 51: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/51.jpg)
Inappropriate use of an oxyacetylene burner damaged the galvanizing. Concrete was blown off by the extreme heat.
After making-good, and load testing, this was used as designed.
Load = 70 kNm + 100 kN
![Page 52: Connection Systems Jordahl Balcon](https://reader038.fdocuments.us/reader038/viewer/2022102806/5585bb1ad8b42af75f8b4bab/html5/thumbnails/52.jpg)
J&P Building Systems LtdThame Forty Jane Morbey Road
Thame Oxon OX9 3RRT: +44 (0)1844 215 200 F: +44 (0)1844 263 257
E: [email protected] W: jp-uk.com
GENERAL