CONNECT VIRTUAL AND REAL DEVELOPMENT PROCESS
Dr. Wolfgang Puntigam
… ONE KEY SUCCESS FACTOR FOR AN AGILE DEVELOPMENT PROCESS
| |Public
VEHICLE DEVELOPMENT PROCESS
2
Project start
Integration Step X SOP
Vehicle Development
Process (VDP)
Power-train
Electrics & Electronics
Hard- & Software Integration
Hard- & Software
Mixed IntegrationSimulation +
Hard- & Software
Virtual IntegrationSimulation
Only
Chassis
Require-
ments
04.12.2014AVL List GmbH | Dr. Wolfgang Puntigam| IODP | Graz
| |Public
HETEROGENEOUS TOOL LANDSCAPE
307.09.2015AVL List GmbH | Dr. Wolfgang Puntigam AVL Integrated and Open Development Platform
Project start
Integration Step X SOP
Vehicle Development
Process (VDP)
Power-train
Electrics & Electronics
Chassis
Require-
ments
| |Public
HETEROGENEOUS TOOL LANDSCAPE
407.09.2015AVL List GmbH | Dr. Wolfgang Puntigam AVL Integrated and Open Development Platform
Project start
Integration Step X SOP
Vehicle Development
Process (VDP)
Electrics & Electronics
Chassis
Require-
ments
Power-train
| |Public
AVL ENABLES NEW WAYS OF DEVELOPMENT
04.12.2014AVL List GmbH | Dr. Wolfgang Puntigam| IODP | Graz 5
IODP Video
| |Public 18.11.2014AVL List GbmH | Dr. Josef Zehetner | IODP | Graz 6
| |Public 18.11.2014AVL List GbmH | Dr. Josef Zehetner | IODP | Graz 7
| |Public 18.11.2014AVL List GbmH | Dr. Josef Zehetner | IODP | Graz 8
| |Public 18.11.2014AVL List GbmH | Dr. Josef Zehetner | IODP | Graz 9
| |Public 18.11.2014AVL List GbmH | Dr. Josef Zehetner | IODP | Graz 10
| |Public 18.11.2014AVL List GbmH | Dr. Josef Zehetner | IODP | Graz 11
| |Public 18.11.2014AVL List GbmH | Dr. Josef Zehetner | IODP | Graz 12
| |Public 18.11.2014AVL List GbmH | Dr. Josef Zehetner | IODP | Graz 13
| |Public 18.11.2014AVL List GbmH | Dr. Josef Zehetner | IODP | Graz 14
| |Public 18.11.2014AVL List GbmH | Dr. Josef Zehetner | IODP | Graz 15
| |Public 18.11.2014AVL List GbmH | Dr. Josef Zehetner | IODP | Graz 16
| | 21 September 2015 | 17Confidential | |Public
Project start
Integration Step X SOP
Vehicle Development
Process (VDP)
Power-train
Electrics & Electronics
Hard- & Software Integration
Hard- & Software
Mixed IntegrationSimulation +
Hard- & Software
Virtual IntegrationSimulation
Only
Require-
ments
INTEGRATED & OPEN DEVELOPMENT PLATFORM –CONNECT SIMULATION AND TEST
… connect existing elements and enable frontloading
Comparable Results
Consistent
Models
Same Test
Procedures
Connect existing
tools
Seamless Data
Management
Efficient and
Effective Methods
AVL Integrated and Open Development Platform
| |Public
Vehicle
Systems
23.10.2014IODP 18
Traffic
Vehicle
Powertrain
ComponentsElectric
MotorICE Trans-
missionBattery Controls
ADASEnvironment
HOW?
HIGH AGILITY WITH AVL’S INTEGRATED AND OPEN DEVELOPMENT PLATFORM
Providing enhanced
development environments
for functional
integration
Connect “real” and
“virtual” world
| |Public
MODEL.CONNECT
16.05.2016AVL List GbmH | Dr. Wolfgang Puntigam| IODP ZEN/V1 | Graz 19
| |Public
EXAMPLE FOR INTEGRATION
23.10.2014AVL List GmbH | IODP 20
Model.CONNECT TM Video
HOW?
Providing enhanced
development environments
for functional
integration
Connect “real” and
“virtual” world
| |Public 23.10.2014AVL List GmbH | IODP 21
| |Public
CONFIGURATION & EXECUTION
04.12.2014 22
Engine
Engine
Drivetrain
Drivetrain
E-motor
Electri
c
Motor
Battery
Li-Ion
Batter
y
Hybrid
Control Unit
Hybrid
Controlle
r
Cooling
System
Cooling
Package
Driver
Driver
Virtual integration platform
Configuration ofthe systemsimulation
Execution of thesystem simulation
AVL List GmbH | Dr. Wolfgang Puntigam| IODP | Graz
| |Public
CONFIGURATION & EXECUTION
04.12.2014 23
Driver Engine Drivetrain Hybrid
Control Unit
Engine Drivetrain
E-motor
Electri
c
Motor
Battery
Li-Ion
Batter
y
Hybrid
Controlle
r
Cooling
System
Cooling
Package
Driver
Execution of thesystem simulation
Configuration ofthe systemsimulation
Online co-simulationVirtual integration platform
Continuous integration ofthe system simulation
AVL List GmbH | Dr. Wolfgang Puntigam| IODP | Graz
| |Public
NEUTRAL AND OPEN PLATFORM
… released 11.12.2015 for OFFICE
• Integrate different simulation tools as the customers are using today
• from different software vendors
NEUTRAL and OPEN Integration Platform
| |Public
NEUTRAL AND OPEN PLATFORM
… released 11.12.2015 for OFFICE
• Integrate different simulation tools as the customers are using today
• from different software vendors
NEUTRAL and OPEN Integration Platform
| |Public
NEUTRAL AND OPEN PLATFORM
… released 11.12.2015 for OFFICE
• Integrate different simulation tools as the customers are using today
• from different software vendors
NEUTRAL and OPEN Integration Platform
| |Public
NEUTRAL AND OPEN PLATFORM
• Reuse his existing simulation models
• Early interaction of different systems
• Choose the right configuration
• Asses different efficiency measure
… released 11.12.2015 for OFFICE
NEUTRAL and OPEN Integration Platform
| |Internal 16.05.2016AVL List GmbH | Dr. Wolfgang Puntigam 28
Concept Phase Serial Development Phase
Model based design an simulation (testing) Model/Hardware based testing
System Simulation Model/Hardware based System Testing – Combine Virtual/Real WorldSystem Layer
SUMMARY AVL’S PHILOSOPHY - IODP
Simulation Models
Testcases
Consistent Platform: Model Integration, Execution, Data Management, Automation
| |Public
DATA.CONNECT
16.05.2016AVL List GbmH | Dr. Wolfgang Puntigam| IODP ZEN/V1 | Graz 29
| |Public
Applications
Aggregation,
Preparation
Sources,
Tools
Re
ally
dis
trib
ute
dV
irtu
ally
ce
ntr
aliz
ed
Use
r a
ctio
n
DB 1 DB 3DB 2 DB 4 DB6DB5
• Virtually centralized data base
• Structured
• Accessible
• Traceability
• Table or graph
• Link repository
Application specific:
• Data specification
• Data navigation
• Data access
• Data analysis
• Data algorithms (KPI etc.)
• Workflows
• Roles and rights
OUTLOOK DATA.CONNECT
Santorin Creta TFMS Drive ProCalc SAP
Data.CONNECTion Layer
Intelligence
Application
Calibration Application
t.b.d
Farming
Market
Restaurant
| |Public
Applications
Aggregation,
Preparation
Sources,
Tools
Re
ally
dis
trib
ute
dV
irtu
ally
ce
ntr
aliz
ed
Use
r a
ctio
n
DB 1 DB 3DB 2 DB 4 DB6DB5
• Virtually centralized data base
• Structured
• Accessible
• Traceability
• Table or graph
• Link repository
Application specific:
• Data specification
• Data navigation
• Data access
• Data analysis
• Data algorithms (KPI etc.)
• Workflows
• Roles and rights
Data.CONNECTion Layer
Intelligence
Application
Calibration Application
t.b.d
Farming
Market
Restaurant
OUTLOOK DATA.CONNECT
| |Public
IODP LEAD PROJECTS
16.05.2016AVL List GbmH | Dr. Wolfgang Puntigam| IODP ZEN/V1 | Graz 32
| | 21 September 2015 | 33Confidential
Test Bed Chassis Dyno Road TestVirtual Test BedSimulation
DOING LEAD PROJECTS WITH CUSTOMERS
• Connect simulation models … and connect it to Testbeds• For an customer specific development tasks
• Start with analyzing the actual process@customer@the moment• Identify the gaps• Execute it together with the customer
| | 21 September 2015 | 34Confidential
Test Bed Chassis Dyno Road TestVirtual Test BedSimulation
“Reuse” simulation
models
IODP Lead Projects
DOING LEAD PROJECTS WITH CUSTOMERS
Example: Hybrid operating strategy, Refine strategy with REAL ENGINE in a reproducible environment and starting with pre-calibration
Example: Thermal Management, Influence of underhood flow over the cooling package to engine power an behavior (charge air cooling, …)
| | 21 September 2015 | 35Confidential
Test Bed Chassis Dyno Road TestVirtual Test BedSimulation
DOING LEAD PROJECTS WITH CUSTOMERS
“Frontload” together with the customer
IODP Lead ProjectsExample: Drivability evaluation on the engine testbed, integrate Vehicle model with high frequency capability on engine test bed
Example: RDE behavior on engine testbed, integrate powertrain and vehicle model on engine test bed
| |Public
CONCLUSION, AGILE DEVELOPMENT NEEDS
• Integration & consistency throughout the process
• Effective frontloading of development tasks for early decisions
• Perform development tasks over different environments (office, HIL, test beds, road)
• System modeling independent from simulation models (tool vendors)
• Application orientation (one working environment)
• CONNECT existing tools
3604.12.2014AVL List GmbH | Dr. Wolfgang Puntigam| IODP | Graz
• Process consulting• Process integration• Integration Services• Integration Products
www.avl.com
| | 37
IODP… connecting things
www.avl.com
… connecting things and enhancing capabilities
23.10.2014IODP