CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIAThe Roadmap to Ensuring Power For Allon 06 May 2015, CII-Sohrabji Godrej Green Business Centre, Hyderabad
Prof.Narashima Kishore Koka, CEO
Er.Swaminathan, M.Tech, Project Engineer
Er.Ms.Mahira Banu,B.E,Project Engineer
![Page 2: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/2.jpg)
Solar Rooftop- Case Study of Karnataka
![Page 3: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/3.jpg)
Introduction
A rooftop photovoltaic power station, or rooftop PV system, is a Photovoltaic system that has its electricity-generating solar panels mounted on the rooftop of a residential or commercial building or structure.
Rooftop PV systems on residential buildings typically feature a capacity of about 5 to 20 kilowatts (kW), while those mounted on commercial buildings often reach 100 kilowatts or more.
![Page 4: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/4.jpg)
Key Facts
India’s current installed power capacity: 254 GW India’s current RE portfolio: 33.79 GW India’s RE generation potential from commercially exploitable
resources: 895 GW India’s RE target for 2022: Total generation capacity = 175 GW § Solar: 100 GW (60 GW Ground Mount, 40 GW Roof Top)
![Page 5: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/5.jpg)
§ Wind: 60 GW § Others: 15 GW (Small-Hydro, Biomass) Total investments expected by 2022: US$ 100 Billion Total no. of companies committed to India’s RE
growth: 293 Total commitment from RE developers: 266 GW
![Page 6: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/6.jpg)
Total commitment from Mfg. sector: 23 GW Debt funding commitment from Banking sector: 78
GW Investment commitment from overseas
companies: 58 GW
![Page 7: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/7.jpg)
Solar Rooftop System
![Page 8: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/8.jpg)
3 TYPES OF ROOFTOP SOLAR PV SYSTEMS1. Grid-tied :
These rooftop systems are primarily designed to supply the generated power to the grid and also power the load.
These systems will NOT generate power during a power failure as the inverter shuts down the system to stop sending power into the grid and avoids the risk of electrocuting utility personnel who are working to repair the grid
![Page 9: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/9.jpg)
2. Grid-interactive :
This system works in conjunction with either a battery backup or diesel generator to support the load even during a power failure.
![Page 10: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/10.jpg)
3. Off-grid: This system does not work with the grid and is
designed to work only with a battery backup or diesel generator in off-grid applications.
The difference between the systems lies in the kind of inverter used, and the inclusion of batteries.
As various vendors use different terminology for these systems.
![Page 11: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/11.jpg)
TURN YOUR ROOFTOP INTO A POWERPLANT Energy is the important ingredient for present
industrial, commercial operations, education institutes. Invariably we ignore the energy cost in our costing.
The growing prices for grid electricity and diesel fuel to power diesel generators are a major concern for companies in India.
Solar PV rooftop systems for captive consumption can be integrated with the existing electricity infrastructure to offset a major part of your energy needs.
![Page 12: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/12.jpg)
The Net metering policy guidelines introduced by many of the state is encouraging all category consumers to think on the Solar PV rooftop power generation.
Another encouraging factor is Accelerated depreciation 80% is available under the Income tax act for Solar power generation and investments in India.
This can provide significant savings to a solar plant developer who is a taxable assess and has sufficient profits against which the depreciation can be charged.
The recent Karnataka Rooftop policy has proposed a wonderful net metering tariff to encourage installations from 1 KW to 1000 KW of solar Photovoltaic.
The tariff for the net metered export is Rs 9.53 for non subsidized installations and Rs 7.20 for the subsidized installation.
![Page 13: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/13.jpg)
Component cost of Grid connected rooftop PV systems A rooftop solar PV system costs approximately Rs. 1,00,000
per kWp (kilowatt peak) including installation charges but without batteries and without considering incentives . The cost breakup for a 1 kWp system is given below:
![Page 14: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/14.jpg)
![Page 15: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/15.jpg)
Case study : In KarnatakaConsidering the 10 KW contract demand for the existing operation.Running the operations for 8 hrs. The Annual consumption is appx: 23920 Units(considering 300 sunny days)
![Page 16: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/16.jpg)
Solar
![Page 17: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/17.jpg)
Non Solar
![Page 18: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/18.jpg)
TECHNO ECONOMIC – SITE REPORT/ QUESTIONNAIRE- ROOF TOP PV SOLAR PROJECT
NAME OF PERSON AUTHORISED PERSONNEL : DATE : NAME OF THE CLIENT : COMMUNICATION ADDRESS OF THE CLIENT : [with Contact Phone or Mobile Number] CLIENT SITE ADDRESS :
![Page 19: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/19.jpg)
LATITUDE & LONGITUDE OF THE SITE :
SYSTEM REQUIRED BY CLIENT IS :
Capital Subsidiary - Individual [up to 1 kWp].
Capital Subsidiary – Commercial [up to 100 kWp].
Capital Subsidiary Third party sale.
Third Party Sale [REC]/ Captive Project
State / National Scheme
SOLAR SYSTEM POSITION : Ground Mounted
Roof Top
![Page 20: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/20.jpg)
TYPE OF BUILDING : RESIDENTIAL COMMERCIAL SCHOOLS OR COLLEGES INDUSTRIES IT PARKS OR HOSPITALS
TYPE OF ROOF : RCC FLAT METAL ROOF ASBESTOS ROOF TILED ROOF [Mention Angle if you know Roof Tilted Angle ----------]
GENERAL DETAILSAre the Drawings for Land / Roof top Available : YES NOIf yes, have the Drawings be collected : Total Energy Consumption per Month : ------------ kWh
Monthly Electricity Consumption from EB : ------------ kWh
![Page 21: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/21.jpg)
Total Running Load for DG with No.of.Hours : ------------ kWh
Total Disel Consumption per day : ------------ Litres
Total Free Area available for system installation : ------------- Sq.Mtr
If on roof top total duration for lease agreement
In case of a lease property : ------------- Years
Is Plant being set up to fulfill RPO Obligation : YES NO
TYPE OF EXISTING AC CONNECTION : Single Phase 230V [Phase + Neutral]
Three Phase 415V [RYB+ Neutral]
![Page 22: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/22.jpg)
LOAD DETAILS[OFF-GRID RESIDENTIAL CLIENTS]
S.No
LOAD DESCRIPTION WATTAGE
QUANTITY
TOTAL
![Page 23: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/23.jpg)
BATTERY BACKUP REQUIRED:
No.of.hours / Day: 2 Hours 3 Hours 4 Hours 5 Hours 6 Hours.
No.of.Days Required: One Day Two Day Three Day Four Day.
Photos of the Roof are taken YES NO
![Page 24: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/24.jpg)
LOAD CHART: [ON-GRID & GRID-TIED SYSTEM CLIENTS]
S.No LOAD DESCRIPTION KILO-WATT QUANTITY TOTAL
01 Lighting Loads
02 Inductive Loads
03 Other Loads
EXISTING SYSTEM AVAILABLITY
S.No LOAD DESCRIPTION CAPACITY VOLTAGE LEVELS
QUANTITY
01 Transformer
02 Diesel Generator
![Page 25: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/25.jpg)
EXISTING SYSTEM AVAILABLITY:AC SYSTEM VOLTAGE [in kV]
3 Phase + Neutral [3ø 415V 50 Hz] 3 Phase 11kV
3 Phase 22kV
3 Phase 33kV
SOLAR SYSTEM SHOULD SYNCHRONIZED WITH EXISTING MV PANEL: YES NO
![Page 26: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/26.jpg)
UTILITY SCALE GRID CONNECTED PV PROJECTS
LAND AREA IN ACRE’S :
SYSTEM CAPACITY [CLIENT WOULD LIKE TO PROVIDE] :
TRANSMISSION VOLTAGE GRID AVAILABLE NEAR PLANT :
DISTANCE B/W POWER EVACUATION SUBSTATION &
SITE :
ANY OBSTACLES IN THE SITE :
Signature with Date Signature with Date
[M/s. KNK Renewables] CLIENT
Er. P.Kumar - VP – Solar.
Prof. Narasimha Kishore Koka - CEO
![Page 27: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/27.jpg)
![Page 28: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/28.jpg)
![Page 29: CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji Godrej.](https://reader036.fdocuments.us/reader036/viewer/2022062314/56649dbd5503460f94aaff33/html5/thumbnails/29.jpg)
Thank you and time to Brain storm,
“Be the change that you wish to see in the World”
-Mahatma Gandhi
Prof. Narasimha Kishore Koka,CEO
Er.Swaminathan, M.Tech, Project Engineer
Er.Ms.Mahira Banu,B.E,Project Engineer
Knk Renewables
Knk Bio-tech.Inc
Poly Engineers & Consultants
Lamda Power Geenco Private Ltd. Bangalore
Cell: +91-9008850033, +91-9611910778
www.knkrenewables.in