CONFERENCE PROGRAMMEmntk.rosenergoatom.ru/mediafiles/u/files/en/ProgramConf_eng.pdf14.45–15.15...
Transcript of CONFERENCE PROGRAMMEmntk.rosenergoatom.ru/mediafiles/u/files/en/ProgramConf_eng.pdf14.45–15.15...
8th International Scientific and Technical Conference
CONFERENCE PROGRAMME
Moscow, May 23–25, 2012
Joint Stock Company «The Russian Concern for Production of Electric and Thermal Energy
at Nuclear Power Plants»
2
CONTENTS
Conference programme .........................................................................................3
Conference topics .................................................................................................4
Plenary session .....................................................................................................6
Section 1. Safe and effective operation of Russian NPPs .....................................8
Subsection 1.1. Operation, maintenance and repair of NPPs
with VVER, RBMK, BN and EGP-6 reactors ......................................................8
✧ Operation of NPPs with VVER reactors ......................................................8
✧ Operation of NPPs with channel and fast reactors ..................................10
✧ Maintenance and repair ............................................................................12
Subsection 1.2. Enhancement of thermomechanical equipment operation
reliability, material science and metal inspections, diagnostics,
residual life, NPP upgrading and operating life extension ..............................14
✧ Enhancement of thermomechanical equipment operation reliability,
diagnostics, residual life, NPP upgrading and operating life extension ....14
✧ Material science and metal inspections ...................................................16
Subsection 1.3. Enhancement of electric and I&C equipment
operation reliability. NPP fire safety ...............................................................18
✧ Enhancement of electric and I&C equipment operation reliability ............18
✧ Fire Safety ................................................................................................20
Subsection 1.4. RW and SNF management. NPP power units decommissioning .....22
✧ RW management. NPP power units decommissioning ............................22
✧ SNF management .....................................................................................24
Subsection 1.5. Radiation safety, NPP ecology, emergency preparedness .........26
Section 2. Nuclear power economics ...................................................................28
Section 3. Nuclear power development................................................................30
Subsection 3.1. Development of new nuclear power units ..................................30
Subsection 3.2. Advanced nuclear power projects ..............................................33
Section 4. International cooperation focused on ensuring NPPs safety ..............35
Section 5. Transfer of the veteran traditions and experience to the youth ..........37
Plenary session/conference closing ...................................................................39
Reference information .........................................................................................40
3
CONFERENCE PROGRAMME
23 May (1st Day)− Registration of participants (lobby, Building 2)
− Conference opening (conference hall, Building 2)
− Plenary session (conference hall, Building 2)
− Exhibition of the displays and stands of industry’s enterprises (lobby, Building 2)
− Official dinner (canteen, Building 2)
24 May (2nd Day)− Topical section sessions (allocated rooms)
− Poster presentations (allocated rooms)
− Exhibition of the displays and stands of industry’s enterprises (lobby, Building 2)
25 May (3rd Day)− Exhibition of the displays and stands of industry’s enterprises
(lobby, Building 2)
− Reports from sections (subsections), summing up, conference closing (conference hall, Building 2)
2nd Day (section/subsection) working hours: 9.00–18.00
Conference venue is JSC “VNIIAES” (Building 1, Building 2, Module building)
4
CONFERENCE TOPICS
SECTION 1. SAFE AND EFFECTIVE OPERATION OF RUSSIAN NPPS(Chairman: A.V. Shutikov, Deputy Director General – Director for Production and NPP
Operation, JSC “Concern Rosenergoatom”)
Subsections:1.1 Operation, maintenance and repair of NPPs with VVER, RBMK, BN and EGP-6
reactors(Chairman: O.G. Chernikov, First Deputy Director for Production and NPP
Operation, JSC “Concern Rosenergoatom”;
Co-chairman: V.Ya. Berkovich, Chief Designer, JSC EDO “Gidropress”
Rooms 612, 613, 614 (Building 1)
1.2 Enhancement of thermomechanical equipment operation reliability, material science and metal inspections, diagnostics, residual life, NPP upgrading and operating life extension(Chairman: Yu.P. Teterin, Deputy Director of Engineering Support Department –
Head of diagnostics & residual life division, JSC “Concern Rosenergoatom”;
Co-chairman: S.I. Antipov, Deputy Director General – Director of JSC “Concern
Rosenergoatom” affiliate “Science & Engineering Center”)
Room 615 (Building 1); 3rd floor, left side (Building 2)
1.3 Enhancement of electric and I&C equipment operation reliability. NPP fire safety(Chairman: K.Sh. Yuzmiev, Chief Technologist, Engineering Support Department
JSC “Concern Rosenergoatom”;
Co-chairman: V.G. Dunaev, First Deputy Director General, JSC “VNIIAES”)
Room 19 (Module building, left side); Room 210 (Building 1)
1.4 RW and SNF management. NPP power units decommissioning(Chairman: M.R. Stakhiv, Deputy Director of Engineering Support Department –
Head of SNF, RW & Decom division, JSC “Concern Rosenergoatom”
Co-chairman: A.E. Arustamov, Coordinating Director, CJSC “Alliance-Gamma”)
Room 17 (Module building, 3rd floor), 3rd floor, center (Building 1)
1.5 Radiation safety, NPP ecology, emergency preparedness(Chairman: V.Ye. Khlebtsevich, Deputy Director for Production and NPP
Operation – Director of Department for Emergency Preparedness and Radiation
Protection, JSC “Concern Rosenergoatom”;
Co-chairman: Ye.A. Ivanov, Deputy Director General, JSC “VNIIAES”)
Room 211 (Building 1)
5
SECTION 2. NUCLEAR POWER ECONOMICS (Chairperson: Ms. A.I. Arkhangelskaya, Deputy Director General – Director for Econo-
mics, JSC “Concern Rosenergoatom”;
Co-chairman: Yu.V. Nevidomsky, Head of bureau for functional and cost justification,
Design Affiliate of JSC “Concern Rosenergoatom”)
3rd floor (Module Building)
SECTION 3. NUCLEAR POWER DEVELOPMENT(Chairman: A.K. Polushkin, Deputy Director General – Director for Design Engineering,
JSC “Concern Rosenergoatom”)
Subsections:3.1 Development of new nuclear power units
(Chairman: A.M. Katsman, Deputy Director for Production and NPP Operation –
Head of Directorate for New Power Units Commissioning Preparedness, JSC
“Concern Rosenergoatom”;
Co-chairman: Yu.M. Semchenkov, Deputy Director for Science & Organization,
NRC “Kurchatov Institute”)
Room 912 (Building 1)
3.2 Advanced nuclear power projects(Chairman: S.V. Yegorov, Director, Design Affiliate of JSC “Concern Ros energo-
atom”;
Co-chairman: B.A. Vasiliev, Chief Designer of Fast Neutron Nuclear Installations,
JSC “OKBM Afrikantov”)
Room 211 (Module Building, 2nd floor)
SECTION 4. INTERNATIONAL COOPERATION FOCUSED ON ENSURING NPP SAFETY(Chairman: A.M. Kirichenko, Director of Department for International Cooperation &
Foreign Economic Affairs, JSC “Concern Rosenergoatom”;
Co-chairman: M. Lipar, Head of Operational Safety section, IAEA)
Conference hall (Building 2)
SECTION 5. TRANSFER OF THE VETERAN TRADITIONS AND EXPERIENCE TO THE YOUTH (Chairman: Yu.P. Saraev, First Vice-Chairman of International Union of Public
Associations “International Union of Veterans of Nuclear Energy and Industry”)
3rd floor, right side (Building 2)
6
1st Day (23 May 2012, Wednesday)
PLENARY SESSION
Conference Hall
08.30–09.30 Registration of participants (lobby of VNIIAES conference hall)
09.30–09.40 Conference opening. Welcome addressKirienko S.V., Director, State Atomic Energy Corporation “Rosatom”
09.40–10.10 Operation Experience of NPPs of JSC “Concern Rosenergoatom”.
Ensuring Safety and Enhancement of Efficiency of Russian Nuclear
Power
Asmolov V.G., JSC “Concern Rosenergoatom” / Russia
Chair: Sorokin N.M.
10.10–10.30 About Russian Nuclear Power Industry Development Strategy till
2050
Sidorenko V.A., NRC “Kurchatov Institute” / Russia
10.30–10.50 Nuclear Fuel for NPPs: Current State and Prospects.
Molchanov V.L., JSC “TVEL”, jointly with JSC “VNIINM” / Russia
10.50–11.10 Recent Changes to WANO’s Programs and Structure Following
Fukushima Accident
Stricker L., WANO
11.10–11.30 Arrangements for and Initial Results of Implementation of the IAEA
Action Plan on Nuclear Safety Related to Operational Safety and
Operating Organizations
Lipar M., IAEA
11.30–12.00 Coffee breakBriefing for mass media (Building 1, 2nd floor, room 211, OPAS hall)
Chair: Asmolov V.G.
12.00–12.30 Lessons of Fukushima-Daiichi NPP's Accidents to Contribute and
to Ensure the NPPs Safety in the World
Narabayashi T., Hokkaido University / Japan
12.30–12.50 Implementation of Post-Fukushima Compensatory Measures at
Russian NPPs
Shutikov A.V., JSC “Concern Rosenergoatom” / Russia
12.50–13.10 EDF experience feedback from Fukushima accident
Debes M., EDF Generation and Engineering Division / France
7
13.10–13.30 Safety and Economics of Ukrainian Nuclear Power Industry (after
the Fukushima accident)
Biley D.V., NNEGC “Energoatom” / Ukraine
13.30–15.00 Lunch
Chair: Shutikov A.V.
15.00–15.15 Advanced Designs of VVER Reactor Units
Berkovich V.Ya., JSC EDO “Gidropress” / Russia
15.15–15.30 Graphite Structural Elements of RBMK Reactor Units: Studies of
Properties, Evaluation of Technical State, and Prediction of Residual
Life
Shtrombakh Ya.I., NRC “Kurchatov Institute” / Russia
15.30–15.45 Prospective of Closed Fuel Cycle Development and Implementation
Saraev O.M., JSC “Concern Rosenergoatom” / Russia
15.45–16.00 Operating Performance of RBMK NPPs in 2010–2012. Challenges
of RBMK Operation during a Final Operating Period
Petrov A.A., JSC RDIPE / Russia
16.00–16.15 JSC “Concern Rosenergoatom” Operations in the New Market
Environment
Khval’ko A.A., JSC “Concern Rosenergoatom” / Russia
16.10–16.40 Coffee break
Chair: Davidenko N.N.
16.40–16.55 The Main Engineering Solutions for VBER-500, a Power Unit for
Regional Power Supply
Petrunin V.V., JSC “OKBM Afrikantov”, jointly with JSC “NIAEP”,
NRC “Kurchatov Institute”, JSC “Concern Rosenergoatom” / Russia
16.55–17.10 Development of Activities on Scientific & Engineering Support to
Nuclear Power Units Operation
Antipov S.I., JSC “VNIIAES” / Russia
17.10–17.25 Development of New Structural Materials to Improve Efficiency and
Reliability of NPP Equipment
Karzov G.P., FSUE CRISM “Prometey”
17.25–17.40 Development of Means for VVER-1000 RPV Annealing
Dub A.V., JSC SPA “CNIITMASH”
17.40–18.00 Plenary session summary
18.00–19.00 Reception / Buffet
8
2nd Day (24 May, Thursday)
SECTION 1. SAFE AND EFFECTIVE OPERATION OF RUSSIAN NPPS
Subsection 1.1. Operation, maintenance and repair of NPPs with VVER, RBMK, BN and EGP-6 reactors
Topical area: Operation of NPPs with VVER reactors
Room 613 (Building 1)
9.00–9.15 Session openingMarkov Yu.M., Berkovich V.Ya.
9.15–10.00 AREVA's solution for Post-Fukushima safety enhancements
Rolf Janke, AREVA NP GmbH (Germany)
10.00–10.30 Analysis of BDBAs progression and their radiological consequences
for designing a system for emergency release from the containment
of VVER NPP
Zhurbenko A.V., NRC “Kurchatov Institute”
10.30–11.00 Elaboration of technical specification for the supplementary design
solutions focused on preclusion of VVER safety barriers breach
under abnormal external impacts
Schurov N.I., JSC EDO “Gidropress”
11.00–11.15 Coffee break
11.15–11.50 Engineering and economic aspects of fuel utilization in the period
of VVER-1000 power units transition to 18-months fuel cycles, with
operation at the uprated level of 104% taken into account
Orlov V.I., JSC “VNIIAES”
11.50–12.25 Experience obtained from TVS-2M fuel assemblies operation at
existing VVER-1000 NPPs. Prospects of development of the design
and operational parameters of the reactor core
Kushmanov S.A., JSC EDO “Gidropress”
12.25–13.00 The accuracy of thermal power control at VVER-1000 NPPs and
possibilities of its enhancement
Mil’to N.V. (Ms), NRC “Kurchatov Institute”
13.00–13.45 Lunch
9
13.45–14.15 Justification of the “zero defect of fuel rod” concept and implemen-
tation of nuclear fuel handling technology at NPPs in support of the
concept
Shestakov Yu.M., JSC “VNIIAES”
14.15–14.45 Development of methods for in-service inspection of VVER fuel
thermomechanic condition
Yevdokimov I.A., FSUE “NRC RF TRINITI”
14.45–15.15 Main results of post-reactor tests of the 2nd generation VVER-440 fuel
Zvir Ye.A. (Ms), JSC “NRC RIAR”
15.15–15.45 Results of studies of coolant local mass exchange and
hydrodynamics in advanced FA designs for water-cooled water-
moderated nuclear reactors
Dmitriev S.M., Nizhny Novgorod State Technical University
15.45–16.00 Coffee break
16.00–16.30 Calculation study of the effect of mixer grids on thermohydraulic
parameters of FAs of VVER-type reactors
Merinov I.G., National Research Nuclear University MEPhI
16.30–17.00 The CARAVAN software complex for diagnostics, monitoring and
forecast of emergency progression at VVER NPP
Fedorovsky A.Yu., JSC “JET”
17.00–18.00 Discussion of the presentationsSession summing up
10
Topical area: Operation of NPPs with channel and fast reactors
Room 612 (Building 1)
9.00–9.15 Session openingBystrikov A.A., Druzhinin V.Ye.
9.15–9.50 Optimization of RBMK operating regimes taking into account the
limited residual life of the graphite stack
Krayushkin A.V., NRC “Kurchatov Institute”
9.50–10.25 Fuel afterburning in course of decommissioning of RBMK reactors
Fedosov A.M., NRC “Kurchatov Institute”
10.25–11.00 Implementation of operational reliability improvement measures for
RBMK’s Cluster Regulating Device (CRD).
Mironov Yu.I., JSC “Moscow Plant of Polymetals”
11.00–11.15 Coffee break
11.15–11.50 Some aspects of safety analysis of EGP-6 reactor units from the
“stress test” viewpoint
Kashirin V.I., JSC “Izhorskie Zavody”
11.50–12.25 Package of activities aimed at introduction of precision codes into
routine operational calculation practice at RBMKs
Druzhinin V.Ye., JSC “VNIIAES”
12.25–13.00 Development and implementation of a high-level software complex
for the “Scala-Micro” data-measuring system at Unit 1 of Smolensk
NPP”
Lysov D.A., JSC “VNIIAES”
13.00–14.15 Lunch
14.15–15.00 Experiments performed with the RBMK criticality test bench for
verification and adjustment of an operating method for diagnostics
of CRD barrel water filling
Kachanov V.M., NRC “Kurchatov Institute”
15.00–15.45 Development and implementation of new revision of the Generic
Technical Specifications for Operation of a Nuclear Power Unit with
RBMK Reactor
Maslennikov A.V., JSC RDIPE
15.45–16.00 Coffee break
16.00–16.35 Comparative analysis of operating conditions for TVS-F and
standard fuel assemblies for RBMKs
Dmitrieva I.A. (Ms.), JSC RDIPE
11
16.35–17.10 Analysis and generalization of results of post-reactor testing of
RBMK fuel assemblies
Ivanov A.V., JSC RDIPE
17.10–17.45 Development experience and implementation results for the
advanced fuel for RBMKs
Severinov D.V., JSC RDIPE
17.45–18.00 Discussion of the presentationsSession summing up
12
Topical area: Maintenance and repair
Room 614 (Building 1)
9.00–9.15 Session openingKrupsky A.G., Yanchenko Yu.A.
9.15–9.45 Implementation of a technology for telescopic joint channels recovery
without fuel channel replacement at Leningrad NPP Unit 1 in 2011
Lavrenov V.S., Leningrad NPP
9.45–10.10 Developments in the use of contingency equipment reserve
centralised repair exchange fleet for plant equipment repairing
purposes
Bubnov A.G., JSC “Concern Rosenergoatom”
10.10–10.35 Upgrading of the SG replacement process at VVER-1000
(model V-320) power units
Gerasimov A.V., JSC “Atomenergoremont”
10.35–11.00 Evaluation of economic efficiency and feasibility of transfer of
M&R personnel to outsourcing and impact of this process on safe
operation of NPPs
Fiantsev V.S., Khmelev A.A., Samoylov B.S., Yanchenko Yu.A.,
JSC “VNIIAES”
11.00–11.15 Coffee break
11.20–12.00 Experience of operation at Rosenergoatom NPPs of a nut-running
machine with simultaneous extraction of studs. Specificities and
peculiarities of nutrunner application at Russian NPPs as compared
to other countries. Proposals regarding improvement of efficiency
of nutrunner application at Russian NPP. Prospects of further
collaboration
Wessolowsky B.D., Simpelkamp Tensing Systems GmbH (Germany)
12.00–12.30 Challenges of equipment operation during an inter-outage period
exceeding 12 month
Rikhter R.A., Kalinin NPP
12.30–13.00 Bench testing of 6-kV electromotor in the no-load mode after the
overhaul
Malakhov I.V., Rostov NPP
13.00–14.00 Lunch
14.00–14.30 The M&R concept in the VVER-TOI design
Yanchenko Yu.A., Gurinovich V.D., JSC “VNIIAES”
13
14.30–15.00 A rig for tension flange joint fasteners
Savin A.A., Balakovo NPP
15.00–15.45 Status and prospects of application of automated argon-arc welding
for NPP equipment repairing
Khodakov V.D., Karas’ V.A., Khodakov D.V., JSC “TsNIITMASh”
15.45–16.00 Coffee break
16.00–17.00 Experience of the use of tools for diagnostics of the automatic
control systems and systems of the flow-through turbine part
Lukin V.A., JSC “VNIIAES”
17.00–18.00 Automatization of welding processes for installation and repair of
MCC pipelines at NPPs with VVER and RBMK reactors
Khavanov V.A., Kozlov V.Ye., Khorev V.V., JSC “NIKIMT-Atomstroy”
18.00–18.30 Discussion of the presentationsSession summing up
14
Subsection 1.2. Enhancement of thermomechanical equipment operation reliability, material science and metal inspections,
diagnostics, residual life, NPP upgrading and operating life extension
Topical areas: Enhancement of thermomechanical equipment operation reliability, diagnostics, residual life, NPP upgrading and operating life extension
Room 615 (Building 1)
9.00–9.15 Session openingTeterin Yu.P., Antipov S.I.
9.15–9.40 NPP upgrading and operating life extension
Gilev V.A., Kiselev S.A., JSC “Concern Rosenergoatom”
9.40–10.05 Experience with upgrading and operating life extension of the
leading unit of VVER-1000 type
Schukin A.P., Novovoronezh NPP
10.05-10.30 Main results of BN-600 reactor unit equipment operating life
extension activities
Vasiliev B.A., Vilensky O.Yu., Kamanin YU.L., JSC “OKBM
Afrikantov”
10.30–11.00 NPP upgrading and operating life extension in the light of
Fukushima events
Kezin S.N., WANO-MC
11.00–11.15 Coffee break
11.15–11.50 Industry-wide diagnostic system (IDS)
Jan Frelich, TES s.r.o. (Czech Rep.)
11.50–12.25 Improving efficiency of engineering support to Rosenergoatom’s
NPP operation. Engineering & scientific support organization as
part of IDS development
Davidenko N.N., Teterin Yu.P., Berezanin A.A., Krylov M.V.,
JSC “Concern Rosenergoatom”
12.25–13.00 Establishment and implementation of the Industry-wide diagnostic
system (goals, tasks and targets)
Teterin Yu.P., Berezanin A.A., JSC “Concern Rosenergoatom”
Zhidkov S.V., Krylov K.A., Pavelko V.I., CJSC SRC “Diaprom”
13.00–14.00 Lunch
15
14.00–14.35 Involvement of JSC “Atomtechenergo” and its Smolensk affiliate
(SmATE) in the Industry-wide diagnostic system (IDS)
of JSC “Concern Rosenergoatom”
Serdyuk A.V., Smolensk affiliate JSC “Atomtechenergo”
14.35–15.10 JSC “CKBM” designer’s support to operation of MCPs at NPPs with
VVER-1000 within the Industry-wide diagnostic system
Gerasimov V.S., Sokolov L.A., Turoverov S.P., JSC “CKBM”
15.10–15.45 Evolution of reactor unit diagnostics within the IDS of JSC “Concern
Rosenergoatom”
Dvornikov P.A., Lukyanov D.A., SSC RF IPPE,
Pavelko V.I., SRC “Diaprom”
15.45–16.00 Coffee break
16.00–16.35 Improvement of operational reliability of NPP equipment
Potapov V.V., JSC “VNIIAES”
Subbotovsky V.I., JSC “Atomtechenergo”
16.35–17.10 “Regime diagnostics” based on transformation of data from the
Process parameters displaying system (PPDS)
Sal’nikov A.A., Zhukov A.G., Adamenkov A.K., Rostov NPP
17.10–18.00 Discussion of the presentationsSession summing up
16
Topical area: Material science and metal inspections
3rd floor, left side (Building 2)
9.00–9.15 Session openingLovchev V.N., Tomarov G.V.
9.15–9.45 Methodology for ensuring integrity of plant equipment & pipelines
subjected to flow accelerated corrosion
Tomarov G.V., CJSC “Geoterm-M”
9.45–10.15 Calculation and experimental justification of life estimation methods
for welded junction of coolant distribution header to the case of
PGV-1000 steam generator
Kazantsev A.G., JSC SPA “TsNIITMASh”
10.15–10.45 Development of standards for in-service ultrasonic inspections of
welded junction of coolant distribution header to the case of PGV-
1000 steam generator, which are based on actual flaw sizes
Tikhonov D.S., SPC “ECHO+”
10.45–11.00 Coffee break
11.00–11.30 Calculation modeling of crack formation in weld joints made
of sensitized austenite steel in the environment of RBMK-1000
multiple forced circulation circuit
Kisilev V.A., JSC RDIPE
11.30–12.00 Development and implementation at NPPs of the informational
analytical system for non-destructive ISI of plant equipment &
pipelines
Alexandrov A.Ye., SPC “Sigma-IT”, LLC
12.00–12.30 Experimental justification of efficiency of VVER-1000 RPV welding
metal recovery annealing for the goals of its life extension up to
60 years
Gurovich B.A., NRC “Kurchatov Institute”
12.30–13.00 Modernization of the VVER-1000 specimen programme
Yerak D.Yu., NRC “Kurchatov Institute”
13.00–14.00 Lunch
14.00–14.30 Methodical support to justification of strength and residual life of
VVER-1000 RPVs and reactor internals for operating life extension
up to 60 years
Margolin B.Z., FSUE CRISM “Prometey”
17
14.30–15.00 Specimenless a priory estimation of comparative reliability of
ultrasonic inspection methods
Scherbinsky V.G., JSC SPA “TsNIITMASh”
15.00–15.30 Assessment of discontinuity flaw nature using А1550 IntroVisor
flaw detector in the tomography mode
Shevaldykin V.G., CJSC “Techknow”
15.30–16.00 Elastic wave parameter based study of material conditions of VVER
RPVs exposed to neutron radiation
Khlybov A.A., Nizhny Novgorod State Technical University
16.00–16.15 Coffee break
16.15–16.45 Flow accelerated corrosion issues relevant to NPP pipelines
Baranenko V.I., JSC “VNIIAES”
16.45–17.15 About the issue of acoustic elasticity method application for
justification of safe operation conditions for plant process
components
Butorin S.L., ANO ICNS
17.15–17.45 Specimens as the basis for adequate assessment of RPV residual
life having no alternative
Maximov O.B., JSC “Izhorskie Zavody”
17.45–18.00 Discussion of the presentationsSession summing up
18
Subsection 1.3. Enhancement of electric and I&C equipment operation reliability. NPP fire safety
Topical area: Enhancement of electric and I&C equipment operation reliability
Room 19 (Module Building, 3rd floor, left side)
09.00–09.05 Session openingYuzmiev K.Sh.
09.05–09.40 Improving reliability of turbine generators and power transformers
diagnostics based on simultaneous detection of vibration and
electric discharge phenomena
Axenov Yu.I, CJSC “DIAKS”
09.40–10.15 New indicators for diagnostics of electric insulation conditions
using the restored voltage method
Kononenko A.I., FSUE “NIIPriborov”
10.15–10.40 Operation and upgrading of Relay Protection and Automatic
Equipment at JSC “Concern Rosenergoatom” NPPs Karaulov A.A., JSC “VNIIAES”
10.40–11.05 Practical methods of assessment of technical conditions and
residual life of turbine generators of TVV-500-2UZ, TVV-220-2AUZ
types focused on their operating life extension beyond the term set
in the technical specifications
Golubev A.V., FSUE VEI
11.05–11.15 Coffee break
11.15–11.40 Automated systems for monitoring and diagnostics of generator
and transformer equipment
Dolgikh N.Ye., CJSC “SPA Energosoyuz”
11.40–12.05 Automation of checks of primary and secondary plant equipment
Soloviev M.Yu., SPE “EKRA”, LLC
12.05–12.30 Integrated solutions of SPE “EKRA” for nuclear industry facilities
Doronin A.V., SPE “EKRA”, LLC
12.30–12.55 DBA damaging factors accounting in determination of cable residual
life during an extended term of nuclear power unit operation
Tsykanin A.G., FSUE “NIIPriborov”
12.55–13.00 Closing remarksYuzmiev K.Sh.
13.00–14.00 Lunch
19
14.00–14.05 Opening addressDunaev V.G.
14.05–14.30 Design of a digital safety control system for VVER nuclear power units
Kudryavtsev A.V., NRNU MEPhI
14.30–14.55 Modernization of Kola NPP Unit 4 CRDM system based on
experience of similar modernization at Unit 3 and making use of
TELEPERM XS equipment
Pisarenko V.V., JSC “VNIIAES”
14.55–15.20 Electromagnetic conditions at nuclear power units. Electromagnetic
impact and radiation exposure resistance of the pressure
transducers used in control systems at NPPs
Sarylov V.N., Vodolazhsky A.S., JSC “VNIIAES”
15.20–15.45 Analysis of AKNP-AKE neutron flux monitoring system operation in
the period of power startup of Kalinin NPP Unit 4
Malenkin D.A., CJSC “SNIIP-Systematom”
15.45–16.00 Coffee break
16.00–16.25 Electric equipment set for a new generation Control & Protection
System for NPPs with VVER-1200 (NV-II, Leningrad-II projects),
VVER-TOI and BN-800 reactors
Grishanina O.Ye.(Ms), JSC “VNIIEM Corporation”
16.25–16.50 An integrated approach to assurance of fault tolerance and quality
of controls of software-hardware complex (SHC) for plant safety-
important control systems
Raskin Ye.M., CJSC “Avtomatika-E”
16.50–17.20 Innovative technologies for NPP SHCs
Khochansky M.D., “Moscow plant FIZPRIBOR”, LLC
17.20–17.45 New thermoelectric transducers for temperature control in BN
reactors
Zaytsev P.A., FSUE RI SPA “Luch”
17.45–18.00 Closing remarks, summing upDunaev V.G.
20
Topical area: Fire Safety
Room 210 (Building 1)
9.00–9.15 Session openingNikiforov V.V., Zakharov V.I.
9.15–9.40 Enhancement of fire safety and modernization of plant fire
protection systems. Overview of status of fire safety and protection
at NPPs. Fire Safety Rules PPB-AS-2011 and Provision on Fire
Safety Divisions at NPPs
Nikiforov V.V., FSS / JSC “Concern Rosenergoatom”
9.40–10.00 Regarding coordination of RF Emercom and JSC “Concern
Rosenergoatom” activities in the field of ensuring fire safety of
NPPs in operation and under construction
Bogdanov A.Ye., Emercom of Russia
10.00–10.20 Organization of fire prevention at NPPs in operation and under
construction
Kharevsky V.A., FSS / JSC “Concern Rosenergoatom”
10.20–10.40 Establishment of volunteer fire brigades
Yermilov V.A., Central Council of Russian VFBs
10.40–11.00 Principal directions of R&D in the area of improvement and
enhancement of NPP fire safety
Groshev Yu.M., FSS / JSC “Concern Rosenergoatom”
11.00–11.15 Coffee break
11.15–11.35 Peculiarities of departmental supervision performance at the
stages of designing and construction of a nuclear power unit
Sazykin V.I., FSS / JSC “Concern Rosenergoatom”
11.35–11.55 A concept of flexible regulation of NPP fire protection issues
Putsev D.I., All-Russian Research Institute of Fire Defense
11.55–12.15 Peculiarities of ensuring safety in case of a fire on 1st and 2nd circuit
equipment of NPP with BN-type reactor
Lobanova N.A. (Ms.), JSC “SPbAEP”
12.15–12.35 Assessment of fire risks for EU NPPs
Jan Kandrac, Risk Consult, LTD (Slovak Rep.)
12.35–12.55 New technologies implemented in fire protection systems
Boguslav Pribis, A.T.Servis, a.s. (Slovak Rep.)
12.55–13.45 Lunch
21
13.45–14.05 Issues of the state fire supervision of NPPs in operation
Komkov P.M., Emercom of Russia
14.05–14.15 Experience with fire protection system modernization as part of
operating life extension activities at Leningrad NPP
Mikhailov Yu.V., Leningrad NPP
14.15–14.35 Improvement of fire safety and fire protection system
modernization at Kursk NPP
Usik V.V., Kursk NPP
14.35–14.55 Establishment of a single integrated fire alarming system based on
the “Rubezh” LLC equipment in course of replacement of various
threshold fire alarming systems at Beloyarsk NPP
Volokitin A.P., Beloyarsk NPP
14.55–15.10 Challenges of designing fire prevention systems for RW and SNF
management facilities
Dul’kin A.B., Volgograd affiliate of JSC “Atomenergoproject”
15.10–15.45 Short presentations of participants from fire engineering
production enterprises
15.45–16.00 Coffee break
16.00–16.45 (Cont’d) Short presentations of participants from fire engineering
production enterprises
16.45–18.30 Discussion of the presentations.Session summing up
22
Subsection 1.4. RW and SNF management. NPP power units decommissioning
Topical areas: RW management. NPP power units decommissioning
Room 17 (Module Building , 3rd floor)
9.00–9.15 Session openingStakhiv M.R., Arustamov A.E.
9.15–9.35 Main tasks focused on implementation of the Federal Law #190
“On RW Management” in State Corporation “Rosatom”
Abramov A.A., Rakitskaya T.G., SC “Rosatom”
9.35–9.55 The corporate level of the industry-wide informational system for
nuclear- and radiation-hazardous facilities decommissioning
Morozov M.A., CJSC “Neolant”
9.55–10.15 Enhancement of informational support to RW management as part
of implementation of the Federal Law #190
Tikhonovsky V.L., CJSC “Neolant”
10.15–10.35 Methodological bases for nuclear power unit decommissioning
costs estimation
Beroyev T.Yu., Zhigina A.Ya., Zimin V.K., JSC “VNIIAES”
10.35–10.55 Kalinin NPP experience with reduction of generated SRW
Nikolaenko Yu.P., Kalinin NPP
10.55–11.15 Application of a plasmic shaft technology for NPP RW reprocessing
Gorbunov V.A., Kobelev A.P., Polkanov M.A., SUE MosSPA “Radon”
11.15–11.30 Coffee break
11.30–11.50 RW Management system in Sweden
Inessa Chirman, Christer Ekblad, SSM (Sweden)
11.50–12.10 Development and implementation at Beloyarsk NPP of a remote-
controlled tool for RW extraction from plant process pools and SNF
pools
Yarmolenko O.A., JSC RDIPE; Ufaev N.N., JSC “VNIIAES”; Ronzhin V.L.,
Beloyarsk NPP; Volkov L.P., SPE “Alpha-Diagnostics”
12.10–12.30 Establishment of a system for RW characterization at NPPs within
the Rosenergoatom RW information system
Tikhonovsky V.S., CJSC “Neolant”
12.30–12.50 About status of preparatory activities to decommissioning NV NPP
Units 1 & 2
Shevchenko B.N., Novovoronezh NPP
23
13.00–14.00 Lunch
14.00–14.20 Spent ion-exchange resin conditioning with subsequent placement
into containers of NZK-1,5P (I) type
Peregudov N.N., Technology Affiliate of JSC “Concern
Rosenergoatom”
14.20–14.50 Packages and the practice of safe transportation of low-level RW
Gelbutovsky A.B., CJSC “ECOMET-S”, St.Petersburg
14.50–15.10 Novovoronezh NPP experience with LRW conditioning as part of
implementation of the Federal Law #190 “On RW Management”
Nalivayko Ye.M., Novovoronezh NPP
15.10–15.30 About status of preparatory activities to decommissioning
Beloyarsk NPP Units 1 & 2
Roslyakov V.F., Beloyarsk NPP
15.30–15.50 Requirements as to handle containers of NZK type at all stages of
their life cycle
Sorokin V.T., JSC “Engineering Works 345”
15.50–16.10 Preparation to decommissioning of Leningrad NPP power units
Kuznetsov A.N., Kotykov R.N., Leningrad NPP
16.10–16.30 Elaboration of the AMB-100 reactor graphite stack dismantling
process using a 3D simulation model
Chuiko D.V., CJSC “Neolant”
16.30–16.45 Coffee break
16.45–17.05 Prospects of application of primary circuit zinc treatment in course
of RBMK power unit preparation to decommissioning
Grigorovich S.M., Yevropin S.V., Petrov A.A., Yurmanov V.A., JSC RDIPE
17.05–17.25 Experience related to transfer of a SRW reprocessing site from
Kursk NPP to the Technology Affiliate
Yerzylev S.A., Technology Affiliate of JSC “Concern
Rosenergoatom”
17.25–18.30 Discussion of the presentationsSession summing up
24
Topical area: SNF management
3rd floor, center (Building 2)
9.00–9.10 Session openingLobkov Yu.M., Karyakin Yu.Ye.
9.10–9.30 Development and implementation of departmental “Programme of
SNF infrastructure establishment and management for 2011–2020
and for a period till 2030”
Gusakov-Stanyukovich I.V., SC “Rosatom”
9.30–10.00 Safety status of SNF management at NPPs of JSC “Concern
Rosenergoatom”
Filippova Yu.Yu. (Ms), Shestakov Yu.M., JSC “VNIIAES”
10.00–10.20 Calculation and experimental evaluation of nuclear fuel burnup level as
a nuclear safety related parameter for SNF storage and transportation.
Outcome from development and pilot operation of relevant installations
Somov I.Ye., Nikolaev S.A., FSUE “SSC RF IPPE”
10.20–11.00 About outcomes from commissioning of the SNF container storage
facility at Leningrad NPP and dispatching SNF to FSUE “GKhK”
Simonov V.N., Ananyev A.N., Leningrad NPP
11.00–11.15 Coffee break
11.15–11.40 About enhancement of RBMK SFA cutting process as per results
of commissioning SFA cutting equipment at Leningrad NPP and
introduction at Kursk and Smolensk NPP sites
Nekhozhin M.A., Smirnov V.P, SPA “Sosny”, LLC (Moscow)
11.40–12.00 Justification of TUK-109 transport container safety for repeated
railway transportation
Suvalko V.Yu., JSC “KBSM”
12.00–12.20 Software set for end-to-end calculations of thermal processes for
RBMK SNF transfer to dry container storage conditions
Karyakin Yu.Ye., St.Petersburg State Polytechnic University;
Simonov V.N., Leningrad NPP
12.20–12.40 Implementation of a dehydration technology as applicable to MBK
container with RBMK-1000 SNF at Leningrad NPP
Malikov T.B., FSUE “NITI n.a. A.P.Alexandrov” (Sosnoviy Bor)
12.40–13.00 Development of a system for nuclear material accounting and
control for the “SNF dry storage and handling system complex at
Leningrad NPP using MBK”
Zavialov L.A., Leningrad NPP
25
13.00–14.00 Lunch
14.00–14.20 Implementation of a pilot project of RBMK-1000 closed fuel cycle
organization. Dispatching of fuel rod bundles from ill-conditioned
RBMK SFAs from Leningrad NPP Unit 2 to FSUE PA “Mayak” for
reprocessing
Cheremiskin I.V., Leningrad NPP
14.20–14.40 Methodology of and device for operational control of RBMK-1000
SFA leaktightness
Masterkov A.V., FSUE “SSC RF IPPE”
14.40–15.20 Technology for preparation to transportation of leaky and faulty
VVER SFAs from NPP sites
Spitsyn S.A., “SPE Machproject”, LLC;
Yanenko Yu.Ye., Technology Affiliate of JSC “Concern
Rosenergoatom”
15.20–15.40 New engineering solutions for creation of a transport container for
storage and transportation of VVER-1000 SNF with more stringent
characteristics
Suvalko V.Yu., JSC “KBSM”
15.40–16.00 Implementation of innovative solutions in creation of new transport
container sets for transportation of RBMK and VVER-1000/1200 SNF
Dolbischev S.F. Kladov P.V., FSUE RFNC VNIIEF (Sarov)
16.00–16.20 Coffee break
16.20–16.40 Development and manufacturing of a transport container set for
VVER-440 SNF transportation
Yershov A.Yu., Zubkov A.A., JSC “Engineering Center for Nuclear
Containers”
16.40–17.00 Steel compounds production by means of electron beam welding
for manufacturing of components for SNF storage
Pobol’ I.L., Physics Engineering Institute (Minsk, Belarus)
17.00–17.20 Passive residual heat removal (PRHR) system for SNF pool
Sviridenko I.I., SEC NNEGC “Energoatom” (Sevastopol, Ukraine)
17.20–17.40 Information system to support production cycle of SNF handling in
SNF storage pools located in bldg.235 of FSUE SA “Mayak”
Morozov M.A., CJSC “Neolant”
17.40–18.30 Discussion of the presentationsSession summing up
26
Subsection 1.5. Radiation safety, NPP ecology, emergency preparedness
Room 211 (Building 1)
9.00–9.10 Session openingKhlebtsevich V.Ye, Ivanov Ye.A.
9.10–9.40 New approaches to provision for radiological safety: assessment of
risks of negative effects of ionizing radiation
Chekin S.Yu., FSBE Medical radiological scientific center of the
Ministry of Health and Social Development of Russia
9.40–10.10 Challenges of implementation of NRB-99/2009 and OSPORB-
99/2010 regulations. In search of thresholds for classifying waste
as radioactive one
Ivanov Ye.A., JSC “VNIIAES”
10.10–10.40 Organization and results of on-site monitoring of conditions of the
depths at NPPs
Glinsky M.L., Gidrospetsgeologia
10.40–11.00 Overview of poster session
11.00–11.45 Discussion on relevant areas of radiation protection optimization
and enhancement of radiation control at NPPs
Participants from NPPs, enterprises and institutions
11.45–12.00 Coffee break
12.00–12.20 25th anniversary of OPAS group establishment. Summary,
experience and prospects
Gorelov I.I., JSC “Concern Rosenergoatom”
12.20–12.40 Experience of IBRAE’s ECC response on radiological accident at
Fukushima-1 NPP within the Industry-wide emergency response
system (OSChS)
Krasnoperov S.N., IBRAE of RAS
12.40–13.00 Software and hardware complexes supporting decision-making
in case of a radiological accident at a NPP: current status and
development prospects
Pripachkin D.A., IBRAE of RAS
13.00–13.25 Discussion of the presentations
Participants
27
13.25–13.45 Challenges of the decision-making support on early stages of a
radiological accident at a NPP
Kosov A.D., JSC “VNIIAES”
13.45–14.30 Lunch
14.30–14.50 Organization of a system for warning about hazardous meteorological
phenomena at the Crisis Center and NPPs of JSC “Concern
Rosenergoatom”
Katunina O.V. (Ms.), FSBE SPA “Taifun”
14.50–15.10 Discussion of the presentations
Participants
15.10–15.30 Discussion on relevant areas of enhancement of the emergency
preparedness system
Participants from NPPs, enterprises and institutions
15.30–15.50 Experience of assessment of ecological situation in the regions of
placement of nuclear industry facilities based on analysis of risks
for the public health
Vorobieva L.M. (Ms.), IBRAE of RAS
15.50–16.10 Discussion of the presentation
Participants
16.10–16.30 Discussion on relevant areas of environmental safety of NPPs
Participants from NPPs, enterprises and institutions
16.30–16.45 Coffee break
16.45–17.00 Concluding remarks from the subsection chairman
Khlebtsevich V.Ye.
17.00–18.00 Discussion of the presentationsSession summing up
28
SECTION 2. NUCLEAR POWER ECONOMICS
3rd floor (Module Building)
9.00–9.15 Session openingArkhangelskaya A.I.
9.15–9.40 Place and role of JSC Concern Rosenergoatom within the State
Corporation “Rosatom” structure
Khlebnikova N.S., SC “Rosatom”
9.40–10.05 Impact of changing of the electricity & power market model on the
financial pattern of the generating company Rosenergoatom
Bokarev B.A., SC “Rosatom”
10.05–10.30 Operational efficiency of JSC “Concern Rosenergoatom» and how
to achieve it
Demidova L.N., JSC “Concern Rosenergoatom”
10.30–10.55 Peculiarities of entering of existing and new nuclear power units
into the wholesale electricity & power market
Polozov A.G., Novikov A.A., JSC “Concern Rosenergoatom”
10.55–11.15 Pricing trends relevant to the products (services) of nuclear fuel
cycle enterprises supplied (rendered) to NPPs
Nikishkina I.N., JSC “Concern Rosenergoatom”
11.15–11.30 Coffee break
11.30–11.50 Formation and implementation of Rosenergoatom investment
programme with FOIV requirements taken into account
Stepanov A.A., JSC “Concern Rosenergoatom”
11.50–12.05 Establishment of the integrated programme for JSC “Concern
Rosenergoatom” performance efficiency
Smol’nikov A.S., JSC “Concern Rosenergoatom”
12.05–12.30 Economic model of all stages of life cycle of the “VVER-TOI”
investment project
Mel’nikova Yu.E., Bunak I.V., Design Affiliate of JSC “Concern
Rosenergoatom”
Grikurov A.V., JSC “VNIIAES”
12.30–12.45 Evaluation of economic efficiency of nuclear power investment projects
Ol’binskaya N.I., JSC “Concern Rosenergoatom”
12.45–13.00 Methodology and optimization of thermal energy production costs
for NPPs under condition of state-regulated tariffs
Andreeva V.N., Kalinin NPP
29
13.00–14.00 Lunch
14.00–14.30 Organizational and methodological aspects of management of
successful professional career of personnel in nuclear power
industry
Axinenko S.P., JSC “Concern Rosenergoatom”
14.30–15.00 Features of tariff setting and tariff policy for Floating co-generation
nuclear plants (PATES)
Zavialov S.N., PATES / JSC “Concern Rosenergoatom”
15.00–15.30 Evaluation of the Russian nuclear power development model
sensibility to possible changes of key economic parameters
Yegorov A.F., Korobeynikov V.V., Poplavskaya Ye.V., SRC RF IPPE
15.30–16.00 Economic aspects of nuclear power units decommissioning
Makanina S.N., Sorokina M.S., Bunak I.V., Design Affiliate of JSC
“Concern Rosenergoatom”
16.00–16.30 Evaluation of investment efficiency of the project on Novovoronezh
NPP Units 3&4 operating life extension up to 55–60 years
Netyaga I.N., Novovoronezh NPP
16.30–16.45 Coffee break
16.45–17.00 Discussion on the topic “Feasible ways of reduction of NPP
construction costs by means of implementation of mechanisms for
motivation of investment project participants”
Nevidomsky Yu.V., Design Affiliate of JSC “Concern
Rosenergoatom”,
Section participants
17.00–18.00 Discussion of the presentationsSection session summing up
30
SECTION 3. NUCLEAR POWER DEVELOPMENT
Subsection 3.1 Development of new nuclear power units
Room 912 (Building 1)
9.00–9.10 Session openingKatsman A.M., Semchenkov Yu.M.
9.10–9.40 Actual problems of assessment of man-induced impacts on
a nuclear installation site
Kozlov M.A., JSC “SPbAEP”
9.40–10.10 Regarding the issue of reliability analysis of BN-800 reactor safety
systems for Beloyarsk NPP
Kalinkin A.A., JSC “SPbAEP”
10.10–10.40 Application of an integrated model and spherical panoramic sights
at Leningrad-II NPP construction site
Dorobin D.S., CJSC “NEOLANT»
10.40–11.10 Status of industry-level regulations optimization and matching to
federal-level ones
Konstantinov S.S., JSC “Atomtechenergo”
11.10–11.45 Importance of efficiency of the non-conformance handling
algorithm during NPP commissioning phase
Fomin M.N., JSC “Atomtechenergo”
11.45–12.00 Coffee break
12.00–12.30 Establishing role of the diagnostics in quality improvement
and reduction of startup testing period duration at NPPs under
commissioning
Rachkov V.L., Rostov affiliate of JSC “Atomtechenergo”
12.30–13.00 Advance training of operating personnel of NPPs under construction
Gunin L.P., JSC “Atomtechenergo”
13.00–13.20 Training of the JSC “Atomtechenergo” commissioning personnel as
regard to performance works at Beloyarsk NPP Unit 4
Zhabin S.A., JSC “Atomtechenergo”
13.20–13.35 The concept of comprehensive use of natural circulation in primary
circuits of power units with VVER-1000 (1200) and prospects of its
implementation
Blagoveschensky A.Ya., Mityukov V.N., St.-Petersburg State
Polytechnic University
31
13.35–13.45 Announcement of a poster presentation.
About application of acoustic elasticity method for ensuring quality
of works on installation or repair of NPP equipment & pipelines
Arzhaev A.I., Podlatov M.A., Smolensk affiliate of JSC
“Atomtechenergo”
13.45–14.30 Lunch
14.30–15.10 Direct measurement methods for monitoring primary circuit coolant
flow rates in MCP loops and SG feedwater lines using ultrasonic
flow meters
Arutyunyan A.H., Nosov S.N., JSC “Atomtechenergo”,
CJSC “Techknow”
15.10–15.50 Studies of coolant temperature distribution fields at the entry to
reactor core and coolant mixing inside RPV as per results of the
commissioning tests performed at VVER-1000 power units.
Experimental evaluation of some factors governing coolant
stratification in hot legs of primary circuits of VVER-1000 reactor units
Saunin Yu.V., Semenikhin A.V., JSC “Atomtechenergo”
15.50–16.30 Methodology of full-scale justification of the dynamic
characteristics of systems and components of nuclear power units,
which determine the resistance to seismic impacts.
Seismic resistance verification results for process equipment of
Kalinin NPP Unit 4 obtained during the commissioning phase
Kaznovsky P.S., Ryasny S.I., JSC “Atomtechenergo”
16.30–16.45 Coffee break
16.45–17.15 Advantages and ways towards implementation of the enhanced
method for level and steam humidity in SG without injection of
indicator salt
Kutdyusov Yu.F., SRC of Energy Technology “Centrenergo”
17.15–17.45 Kalinin NPP Unit 4 condensate purification system. Design features
and startup work experience obtained during power startup and
on-power testing
Schelik S.V., Sitishev V.A., Mescherinov S.S., Kalinin Affiliate of
JSC “Atomtechenergo”
17.45–17.50 Announcement of a poster presentation.
About application of acoustic elasticity method for ensuring quality
of works on installation or repair of NPP equipment & pipelines
Arzhaev A.I., Podlatov M.A., Smolensk affiliate of JSC
“Atomtechenergo”
32
17.50–17.55 Announcement of a poster presentation.
Experimental study of VVER SG model operation in the
condensation mode in case of BDBA with a combined leak in the
secondary circuit
Remizov O.V., Morozov A.V., FSUE “NRC RF IPPE”
17.55–18.00 Announcement of a poster presentation.
Hollow ingots as an element of material-saving production
technology in the machine-building sector
Romashkin A.N., JSC SPA “TsNIITMASh”
18.00–18.30 Discussion of the presentationsSession summing up
33
Subsection 3.2. Advanced nuclear power projects
Room 211 (2nd floor, Module building)
9.00– 9.15 Session opening. Yegorov S.V., Vasiliev B.A.
9.15–10.15 The “VVER-TOI” project. The design and perspectives of
application. Features. Competitiveness
Yegorov S.V., Design Affiliate of JSC “Concern Rosenergoatom”
10.15–10.45 The “VVER-TOI” project: innovative engineering solutions and
modern information technologies
Kuchumov A.Yu., JSC “Atomenergoproject”
10.45–11.15 Discussion of the presentations
11.15–11.35 VVER-TOI Turbine Hall with Arabelle turbine unit and prospects of
its development
Belyaev V.V., JSC “NIAEP”
11.35–11.45 Discussion of the presentation
11.45–12.00 Coffee break
12.00–12.30 The main design and layout solutions for a power unit with fast
commercial reactor of a high rated capacity
Yershov G.A., JSC “SPbAEP”
12.30–13.00 Combination of inherent self-protection features with design
measures for ensuring safety of BN-1200 reactor
Vasiliev B.A., JSC “OKBM Afrikantov”
13.00–13.20 Discussion of the presentations
13.20–13.40 Announcement of poster presentations
13.40–14.30 Lunch
14.30–15.00 SUPER-VVER reactors for efficient operation as part of the closed
nuclear fuel cycle
Alexev P.N., NRC “Kurchatov Institute”
15.00–15.10 Discussion of the presentation
15.10–15.40 The key conceptual requirements to floating nuclear power units
Makarov V.I., NRC “Kurchatov Institute”
15.40–15.50 Discussion of the presentation
34
15.50–16.20 The concept of a fast neutron steam reactor of low capacity
Prosvirnov A.A., JSC “VNIIAES”
16.20–16.30 Discussion of the presentations
16.30–16.45 Coffee break
16.45–17.10 Nuclear power plant with direct heat removal to the ultimate sink
Ronchinsky A.B., Rostov NPP
17.10–17.30 Announcement of poster presentations
17.30–18.30 Discussion of the presentationsSession summing up
35
SECTION 4. INTERNATIONAL COOPERATION FOCUSED ON ENSURING NPPS SAFETY
Conference Hall (Building 2)
09.00–09.10 Session openingKirichenko A.M., Lipar M.
International cooperation of Operating Organizations
09.10–09.40 Effective international cooperation as an important factor of NPP
safety ensuring and nuclear power development
Kirichenko A.M., JSC “Concern Rosenergoatom” (Russia)
09.40–10.10 Post-Fukushima international programmes of NNEGC “Energoatom”
and cooperation with Rosenergoatom
Vlasenko N.I., NNEGC “Energoatom” (Ukraine)
10.10–10.40 EDF Energy Nuclear Generation response to Fukushima
Reynaud M., EDF Energy Nuclear Generation (France-UK)
Activities of international organizations and associations
10.40–11.10 Reformation of WANO-MC operations after the Fukushima events
Chudakov M.V., WANO-MC
11.10–11.30 Coffee break
11.30–12.00 Integrated Nuclear Infrastructure Review Mission after Fukushima
Troschenko Yu.G., IAEA
12.00–12.30 Lessons Learned from CEZ/NRI EPRI Membership
Zdarek J., Stratil V., Nuclear Research Institute Rez (Czech Republic)
12.30–13.00 International organizations for standardization: their role in NPP
safety ensuring
Dobryansky S.V., FSUE VO “Bezopasnost” (Russia)
13.00–14.15 Lunch
Peer reviews of international organizations
14.15–14.45 Lessons learned from OSART mission in Russian Federation
Lipar M., IAEA
14.45–15.15 An example of international cooperation: the WANO Corporate Peer
Review of Rosenergoatom, April 2011
Jean-Paul Combemorel, EDF (France)
Safety inspections and liability
15.15–15.45 Fukushima Daiichi Accident Impact in Respect of Nuclear Insurance
Kettle B., International Nuclear Insurance Pool (UK)
36
15.45–16.15 International Pooling System and Russian NPP Inspections
Rudensky P.O., Russian Nuclear Insurance Pool (Russia)
16.15–16.45 Compensation of transboundary nuclear damage by Russian
nuclear operators
Arsentiev S.V., JSC “Nuclear Insurance Broker” (Russia)
16.45–17.05 Coffee break
International safety assistance
17.05–17.35 Safety cooperation between Finland and neighbouring NPPs in Russia
Reponen H., Olkonen I., Radiation and Nuclear Safety Authority
STUK (Finland)
17.35–18.05 Results of implementation of TACIS R2.01/06 Project. Development
of measures towards modernization of water chemistry monitoring
systems for 1st and 2nd circuits of Kalinin NPP Units 1&2
Prelovsky A.R., JSC “EREC” (Russia)
18.05–18.30 Discussion of the presentationsSession summing up
37
SECTION 5. TRANSFER OF THE VETERAN TRADITIONS AND EXPERIENCE TO THE YOUTH
Room 310 (Building 2, 3rd floor, right side)
9.00–9.15 Session opening Saraev Yu.P.
9.15– 9.40 Management of engineering knowledge. Why it is necessary to
continuously preserve nuclear knowledge and manage it
Akimov Ye.M., Poroykov V.S.
9.40–10.05 Developments in the priority area of “Nuclear fuel in national energy
budgets”
Vatagin M.Yu.
10.05–10.30 Safety issues and measures to improve safety
Poroykov V.S.
10.30–11.15 Composition and content of design documentation related to
“NPP management organization”
Kornienko A.G., Vel’chinsky V.I., Nedel’chenko A.A.
11.15–11.45 Discussion
11.45–12.00 Coffee break
12.00–12.25 Nature management challenges and new perspectives for JSC
“Concern Rosenergoatom”
Boldyrev V.M.
12.25–12.50 Regarding experience of organization and conduction of career-
guidance tours of groups of senior pupils to NPPs
Kalinin V.P., Akimov Ye.M.
12.50–13.15 High-efficient thermal installations and systems with coaxial
heating elements and coaxial heating cables
Stepanchuk G.N.
13.15–13.45 Discussion
13.45–14.30 Lunch
14.30–14.55 Organization of familiarizing practical works at German nuclear
power facilities for students of Power Engineering faculty of Kola
Affiliate of Petrozavodsk State University
Nikolaev V.G.
14.55–15.20 Vitality of structural alloys used in NPP equipment
Gorbatykh V.P.
38
15.20–15.45 One of the Fukushima lessons – termination of water supply to
reactor
Petukhov V.S.
15.45–16.10 The light-emitting diode (LED) sources of light
Lunev D.V.
16.10–16.30 Discussion
16.30–16.45 Coffee break
16.45–17.10 Shall we team up, and what does experience show?
Terekhin Yu.K.
17.10–18.30 Discussion of the presentationsSession summing up
39
3rd Day (25 May 2012, Friday)
PLENARY SESSION / CONFERENCE CLOSING
Conference Hall (Building 2)
09.30–09.40 Plenary session openingAsmolov V.G., JSC “Concern Rosenergoatom” / Russia
09.40–11.00 Section chairmen reports (round table)
11.00–12.00 Discussion. Contributions from NPPs, enterprises and institutions
12.00–12.30 Summing up. Conference closing
40
Reference information
Organizational and Programme committees address:
Kholodilny per. 3a, Moscow 115191, Russia.
MNTK-2012 web site: www.mntk.rosenergoatom.ru
Coordinator, Organization committee : Mr.Puchkov Valery V.
Tel: +7 495 7830143 ext. 2154, E-mail: [email protected]
Coordinator, Programme committee : Mr. Gashenko Sergey V.
Tel: +7 495 7830143 ext. 2156, E-mail: [email protected]
Coordinator, International participants : Mr. Kharlampiev Sergey A.
Tel: +7 495 6474379, E-mail: [email protected]
Exhibition matters : Ms. Konyukhova Marina G.
Tel: +7 495 9692933, E-mail: [email protected]