CONF I Design 378B I Apollo Extension Systems —Lunar ... · Phase B Final Report N75-7U5901 —...

84
I I I I I I I I I I I I I I I I I I CONF Design 378B Apollo Extension Systems —Lunar Excursion Module Phase B Final Report N75-7U590 1 '•«-s»e-«.»is«Li MI.UDE-D, (THRU) \SA-CR-70910) APOLLO EXTENSION SYSTEMS - LUNAR EXCURSION MODULE. VOLUME 2, PHASE B: I.1OARY DEFINITION STUDIES SUMMARY ^inal Report (Grumman Aircraft Engineering Unclas 81 p 00/98 23593 Vol. II Preliminary Definition Studies Summary (U) CONFIDENTIAL

Transcript of CONF I Design 378B I Apollo Extension Systems —Lunar ... · Phase B Final Report N75-7U5901 —...

IIII

IIIIIIIIIIIIII

CONF

Design 378B

Apollo Extension Systems —Lunar Excursion Module

Phase B Final Report

N75-7U5901

— '•«-s»e-«.»is«Li MI.UDE-D, (THRU)

\SA-CR-70910) APOLLO EXTENSION SYSTEMS -LUNAR EXCURSION MODULE. VOLUME 2, PHASE B:

I.1OARY DEFINITION STUDIES SUMMARY^inal Report (Grumman Aircraft Engineering Unclas

81 p 00/98 23593

Vol. II Preliminary Definition Studies Summary (U)

CONFIDENTIAL

Copy No

Apollo Extension Systems— Lunar Excursion ModulePhase B Final Report

to

National Aeronautics and Space AdministrationManned Spacecraft Center

Advanced Spacecraft Technology DivisionHouston, Texas 77058

byGrumman Aircraft Engineering Corporation

Bethpage, New York

This documeRtRontains information affecting the national defense of theUnited States wifffathe meaning of the Espionage Laws, Title 18, U S C ,Sections 793 and 794^^^ransmis,sion or revelation of^hich in any mannerto an unauthorized persorr^atMrphibited by law

Group 41owngraded^^DeclasdKd after 12 Yean

Vol. II Prel iminary Definit ion Studies Summary

Contract No. NAS 9-4983ASR 378B

8 December 1965

PrefaceX,

This report presents the results of the Phase"B" Preliminary Definition Study (ContractNAS 9-4983) of the Lunar Excursion Module(LEM) and its modifications and additions, asnecessary, for use in the Apollo ExtensionSystems (AES). This use includes a Laboratoryfor Earth and lunar orbital missions, and aShelter, a Taxi and a Truck for extended-staylunar surface missions. The overall objective ofthis study was to conduct sufficient analysesto provide a basis for selection by NASA of asingle concept for each mission for final defini-tion and development.

The study results are distributed in the vol-umes listed below in the following manner:Volume I contains a summary of the Prelimin-ary Project Development Plan (PDP) withemphasis on estimates of the program costsand schedules. This volume was submitted on30 October 1965, one month in advance of theremaining final documentation. Volume II is abrief summary of the overall study. VolumesIII through XVI contain the design analyses,preliminary specifications, and operations an-alyses for each of the AES/LEM vehicle types.Volumes XVII through XXVI contain prelim-inary project planning data in the areas ofmanagement, manufacturing, development test-ing, and support.

It was necessary to base the preliminaryproject planning data, including estimatedcosts, on a single configuration for each of theAES/LEM vehicle types. Since these" PDP datawere required by the end of October, the con-figurations had to be selected at the mid-pointof the study, before the configuration studieshad been completed. These configurations havebeen called "baseline" configurations. The con-tinuing design analyses in the second half ofthe study* have resulted in recommendedchanges to the baseline configurations. VolumesIII through VI describe the "recommended"configurations, the baseline configurations, andsome additional alternates which were studied.It is anticipated that NASA will make a selec-tion from these configurations? and that theseselections will then be the new baseline con-figurations for the next phase of AES definitionstudies.

The scope of this study included integrationof the experimental payloads with the Shelterand Taxi, but did not include study of the inte-

gration on individual LEM Laboratory flights.At approximately the mid-point of the study, anaddendum was written with the objective ofproviding support to the NASA Mission Plan-ning Task Force for study of the Phase I Lab-oratory flights. The schedule for the addendumcalls for completion of these mission planningstudies in January, 1966. Therefore, the adden-dum efforts are not described in this report

The volumes which comprise this report areas follows:

/ Phase B Preliminary Definition Plan(30 Oct 1965)

II Preliminary Definition StudiesSummary

III Phase I LaboratoryDesign Analysis Summary

IV Phase II LaboratoryDesign Analysis Summary

V Shelter Design Analysis SummaryVI Taxi Design Analysis Summary

VII Truck Design Analysis SummaryVIII Phase I Laboratory

Master End Item SpecificationIX Phase II Laboratory

Master End Item SpecificationX Shelter Master End Item Specification

XI Taxi Master End Item SpecificationXII Phase I Laboratory Experimental

Payload Performance &Interface Specification

XIII Phase II Laboratory ExperimentalPayload Performance &Interface Specification

XIV Shelter Experimental PayloadPerformance & Interface Specification

XV Taxi Experimental PayloadPerformance & Interface Specification

XVI Prelaunch & Mission OperationsXVII Manufacturing Plan

XVIII AES Modifications to LEMQuality Control Program Plan

XIX Ground Development Test PlanXX Support Equipment Specification

XXI Facilities PlanXXII Support Plan

XXIII Transportation PlanXXIV Training Equipment RequirementsXXV Support Equipment Requirements

XXVI Management Plan

TABLE OF CONTENTS

(H)iii

Section Page

1 INTRODUCTION 1

2 VEHICLES AND MISSIONS 32.1 Baseline and Recommended Configurations 32.2 Phase I Lab 32.3 Phase II Lab 112.U Shelter 152.5 Taxi 192.6 Truck 19

3 MANAGEMENT PLAN 233.1 Organization 233.2 Plans and Controls 23

U SCHEDULES 27h.I AES/LEM Summary Schedule 27k.2 AES and Basic LEM Vehicle Schedule 27

5 TEST REQUIREMENTS 335-1 Ground Development Testing 335.2 Flight Testing 35

6 FACILITIES Ul

7 SUPPORT h37.1 Scope U37.2 Equipment U37.3 Planning kh

Appendices

A TABLE II, REVISION L, AES BLUE BOOK A-l

B CONFIGURATION COMPARISONS TO PRESENT LEM VEHICLE B-l

C AES HARDWARE REQUIREMENTS SUMMARY C-l

D PHASE I LAB EXPERIMENTS UNDER STUDY D-l

(Il)iv

One-tenth Scale Model ofShelter with RepresentativeSurface Exploration Pay load.

One-tenth Scale Model of Phase IILaboratory and Experiments forRemote Sensing of Earth'sSurface and Atmosphere.

Mockup of Phase II Laboratory.

(11)1

1. INTRODUCTION

The Phase "B" Preliminary Definition Study of LEM utilization for the ApolloExtension System Program has yielded analyses, recommended designs, and plans forthe various vehicles that may be selected for the AES Program. In accordance withNASA's phased planning policy, the Definition Phase and the Development/OperationsPhase will follow this study.

Grumman management has a deep-rooted interest in the national space goals of theUnited States. This is evidenced by the Corporation's participation in a varietyof space programs including in-house studies on the manned space stations, LEMTruck and associated payload modes, and NASA directed and financed studies on theAES Program, as well as participation in the OAO, the Echo II and the Apollo Pro-grams .

The underlying philosophy in planning the AES Program is based on Grumman'sexperience that prime contractors must be accountable for design, fabrication, pro-curement, test, and support of the entire system under their jurisdiction. Thissystems responsibility demands an extensive array of facilities and manpowerskills which have been developed at Grumman on OAO, LEM and major defense programs.

Making use of this valuable experience, Grumman has conducted the study of LEMutilization for the AES Program according to requirements and constraints set byNASA and some additional guidelines outlined below. Highlights of this 26-volumereport are presented in this summary volume. Further, final definition of thevarious designs, parameters and constraints forms the basis of continuing studyat both NASA and Grumman.

The basic requirements and constraints set by NASA for this study are:

• No interference with the LEM Lunar Landing Program will occur• Minimum spacecraft modifications• Maximum utilization of Apollo hardware• Utilization of other qualified spacecraft hardware (Mercury, Gemini)• Maximum utilization of, and coordination with, existing development

studies• Minimum modifications to Ground Support Equipment (GSE), Acceptance

Checkout Equipment (ACE), and Manned Spaceflight Network (MSFN)• Where possible, qualification of modifications without flight testing• Modifications and development to be compatible with spacecraft launch

vehicle availability and launch schedules as defined in the FlightMission Assignment Plan for AES Planning, ML-65-1 dated 7 August 1965,and the LEM Program Schedule III Revision 1, dated 7 September 1965

• Mission time: Up to three months storage time on lunar surface forShelter; up to Ik days lunar surface manned operations; up to ^5 daysEarth orbital operations; and up to 28 days lunar orbital operations

(H)2

• Consistency in design requirements and commonality of design approachesfor the selected configurations for the Lab, Shelter,^and the Taxi

• Integration of experimental payloads with the Taxi and Shelter isincluded in the basic study, but integration on individual LEM Laboratoryflights is not. (The addendum for study of the Phase I Laboratoryflights, currently underway, is due for completion in January 1966.)

Additional guidelines used during the AES/LEM Study were:

1. General:

• Phase I Labs will be manufactured as LEM Spacecraft and modified atKSC

• All other vehicles will be manufactured to final configuration at theContractor's plant

• Each flight shall be supported by an AES/LEM of the same configuration,available for test in the environmental chamber at MSC, and a similarlyconfigured house spacecraft at Grumman prior to, during, and afterthe flight

• Mission Support for the Phase I and II Labs is a Payload Integrationtask

2. Design:

• Wo additional penetrations of the cabin pressure shell• Use of ascent and descent structures with added reinforcements• Retention of existing piping and wiring where possible• Possible use of modules for housekeeping or experiment extras.

3. Plans and Schedules:

• All demonstrations and verifications existing as constraints on aflight mission should be satisfactorily relieved six weeks priorto launch

• Launch complex (LC) assignments are:

Saturn V Flights: LC 39Saturn IB LEM Lab Flights: LC 3?BSaturn IB CSM Flights: LC 34

• All vehicle/experiment comprehensive prelaunch checkout will beaccomplished in the Manned Spaceflight Operations Building (MSOB).(However, it is recognized that, since all experiments have not yetbeen defined, specific exceptions may require other facilities suchas the Hypergolic Test Building (HTB), and the RF Systems TestFacility (RFSTF).)

• All experiments are installed before integrated testing.

(11)3

BC 3

2. VEHICLES & MISSIONS

2.1 BASELINE AND RECOMMENDED CONFIGURATIONS• /

To provide NASA with a9preliminary definition of the complete program requiredfor the AES/LEM schedules, one configuration was selected for each of the Phase Iand Phase II Labs, the Shelter, and the Taxi at the mid-study point. These con-figurations were identified as "baseline configurations" and described in theMid-Term Report dated 20 September 1965, and the Preliminary Project DevelopmentPlan (PDP), Volume I of this report, submitted on 30 October 1965. In the latterhalf of the study, these baseline configurations were modified as a result ofNASA direction and continuing vehicle design studies. These more current con-figurations are identified as "recommended configurations" and are described inthis final report of the Preliminary Definition Study. In addition, for eachof the four vehicles, various "alternates" in certain subsystem areas have beenidentified and are presented as possible candidates for NASA selection. Finally,vehicle changes required only for specific flights have been identified as "per-flight modifications" and are also presented.

The recommended configurations, described briefly in this section, are capableof performing most of the AES missions as they are presently understood. Themission-related requirements for these configurations were derived from:

• Table II (Revision L) of the Blue Book (included in Appendix A forreference)

• Experiment Payload requirements studied in Phase A• NASA/MSFC mission descriptions• Preliminary results of the Phase B Addendum study of Experiment Payload

Integration.

The recommended vehicle designs keep the present LEM intact to the maximum extentpossible. Increases in subsystem capability are made by additions where possible,rather than modifications.

The LEM-Phase I Lab modification flow is represented pictorially in Fig. 2-1.General equipment arrangements for the Phase I Lab, Phase II Lab, Shelter and Taxiare shown in Figs. 2-2 through 2-5, respectively. Further descriptions of thesevehicles follow. In addition, itemized configuration comparisons to the presentLEM vehicle are included in Appendix B. A summary of AES hardware requirementsitemizing degree of modification by subsystem, by vehicle, is included in AppendixC.

The LEM Truck design study effort has been limited to maintaining the Truck con-sistent in concept with the other vehicles, particularly the Shelter.

2.2 PHASE I LAB

2.2.1 Mission

The Phase I Lab is a minimum-modification LEM used as an Earth and lunar orbitallaboratory to provide experiment support for mission durations of up to Ik days.

This vehicle operates in conjunction with the Apollo Command and Service Module.Its launch vehicle is a Saturn IB or Saturn V. '

' "\ --

The orbital characteristics of the Phase I Lab missions are described in AppendixA. These include low-altitude Earth orbits of varying inclination, synchronousEarth orbits, and low-inclination lunar orbits. Experiment-imposed mission re-quirements were selected from a broad survey of the Phase A studies and from dataavailable from the early portion of the Addendum I (Experiment Payload IntegrationStudy) to this Phase B study. Experiments identified by NASA for the Phase I Labflights, and which are being studied in the Addendum, are listed in Appendix D.

The accomplishment of rendezvous and/or dual launch were not included as missionimposed requirements.

2.2.2 Vehicle

2.2.2.1 Nature of Modifications to LEM Sybsystems

The recommended Phase I Lab configuration is a LEM with specific modifications tothe environmental control, electrical power, stabilization and control, andinstrumentation subsystems. Specific deletions and/or minor modifications arerequired to the guidance and navigation, landing gear, propulsion, communicationsand crew provisions subsystems. Deletions and modifications associated with thesesubsystem changes are required for the structure and the displays and controlssubsystem.

All modifications or changes, with reference to the present LEM configuration arelisted in Table B-l of Appendix B. In addition, Table C-l of Appendix C summa-rizes the hardware changes in terms of the degree of modification and commonalityof changes between the Phase I Lab, Phase II Lab, Shelter, and Taxi.

Significant modifications required for the Phase I Lab are:

2.2.2.2 Environmental Control

• Addition of two descent water tanks to the LEM active thermal controlsystem capacity for the lU-day mission

• Provision of Environmental Control Subsystem (ECS) capacity to rejectthe heat loads associated with the available 91.1 kw-hr of experimentenergy plus all housekeeping energy

• Cold plate area within the cabin to cool 500 watts of experiment load• Addition of five descent stage type gaseous oxygen (GOX) tanks to

enable 18 Lab repressurizations and 18 backpack charges.

2.2.2.3 Electrical Power

• Addition of 16 LEM descent batteries• Batteries actively cooled using cold rails, identical to LEM• Increased capacity of LEM Electrical Power Subsystem (EPS) from 68 kw-hr

to 274 kw-hr to provide 91.1 kw-hr for experiment use and 182.9 kw-hrfor housekeeping.

Thermal Shielding

Aft Equipment Bay

Propellant OuantityR/R Electronic?Assembly

^Helium Tankage

OOX Tankap,e

Propellant Tanks Ascent PropulsionEngine

AttitudeCoi

Ascent Stage Disassembly

ranslationoilers

R/R Antenna Assembly

INU

iplays £, Keyboard Panels

Thermal Shielding

Mid Section Cannister

Modified Displays & Control Panels

Ascent Stage Assembly

Fig. 2-1 Modification to Basic LEM toProduce Phase I Laboratory(Sheet 1 of 2)

Landing PadarAntenna

BlastDeflector

Descent 1 ngmeController

Connleted Descent ''tnr

Landing Kadar/Llectronics

Harnesses & Plurablne(Partial)

HeliumTankage

Descent Engine

Thernal Shield

Descent Stage Disassembly

(11)7/8

It ion

Water Supply Batteries

ries. Lower Deck Shield

Batteries

Thermal Shieldingand Insulation

Descent Stage Assembly

Completed Descent Stage

Fig 2-1 Modification to Basic LEM toProduce Phase I Laboratory(Sheet 2 of 2)

ServiceModuleEngine

Gaseous OxygeiTanks (5)

LEM AscentStage

Spacecraft LEM Adapte:

ExperimentCanister

LEMDescentStage

S-IV B

Launch Configuration ~v

(11)9/1

(SLA)

WaterTanks(3)

ServiceModule

Plan ViewAscent Stage

Batteries (16)

CommandModule ;

PropellantTanks (4)(Empty)

Existing LEMBatteries

Plan ViewDescent Stage

0 20 40 60 80 100i i i i i i i i i iScale, in.

LEMAscentStage

LEM;DescentStage

Orbiting Configuration

Fig. 2-2 Phase I Lab RecommendedGeneral Arrangement

(11)11

2.2.2.U Stabilizatipn'& Control

• Deletion of current LEM Primary Guidance, Navigation & Control Section• Modification of current LEM Abort Guidance & Control Section, Rate Gyro

Assembly and Attitude and Translation Control Assembly for reduced pro-pellant consumption during limit cycling

• Modification of Abort Electronics Assembly programming to enable inter-facing with Alignment Optical Telescope for attitude reference updating.

2.2.2.5 Instrumentation

• Addition of a data handling section to LEM instrumentation to providerecording, storage, and transmission of experiment data.

2.2.2.6 Propulsion

• Deletion of ascent propulsion system• Deletion of descent propulsion engine and Helium tanks.

2.2.2.7 Alternates

Significant subsystem alternate configurations are also presented in Volume IIIfor the Phase I Lab environmental control, electrical power and stabilization andcontrol subsystems.

Per-flight modifications for the Phase I Lab are also presented in Volume III andinclude considerations of experiment cooling, experiment storage volume within thevehicle, stabilization and control and propulsion.

2.3 PHASE II LAB

2.3.1 Mission

The Phase II Lab, a conversion from the LEM design, is used as an Earth and lunarorbital laboratory to provide experiment support for mission durations of up toij-5 days. This vehicle also operates in conjunction with an AES Command and ServiceModule. Its launch vehicle is a Saturn IB or Saturn V.

The orbital characteristics of the Phase II Lab missions, described in Appendix A,are similar to those for the Phase I Lab, except they also include polar lunarorbits. Experiment-imposed mission requirements were selected from a broad surveyof the proposed missions and from data available from the first phase of thisstudy (Phase A).

The accomplishment of rendezvous and/or dual launch were not included as missionimposed requirements.

2.3.2 Vehicle

2.3.2.1 Nature of Modifications to LEM Subsystems

The recommended Phase II Lab configuration is a LEM with specific modificationsto the environmental control, electrical power, stabilization and control,

(11)12

instrumentation, and reaction control subsystems. Specific deletions and/or minormodifications are required to the guidance and navigation, landing gear, propulsion,reaction controls, communications and crew provisions subsystems . Deletions andmodifications associated with these subsystem changes are required for the struc-ture and the .displays and controls subsystem. The structure is also modified bythe incorporation of an airlock.

All modifications or changes, with reference to the present LEM configuration arelisted in Table B-2 of Appendix B. In addition, Table C-I of Appendix C summa-rizes the hardware changes in terms of the degree of modification and commonalityof changes between the Phase I lab, Phase II Lab, Shelter, and Taxi.

A summary of the significant modifications required for the Phase II Lab follows:

2.3.2.2 Environmental Control

• Addition of 60 sq ft of radiator area and supplemental LEM type waterboiling for the 45 -day mission

• Provision of ECS capacity capable of rejecting the heat loads associatedwith 834 kw-hr of experiment energy plus all housekeeping energy

• Cold plate area within the cabin to cool 500 watts of experiment load• A LEM ascent gaseous oxygen (GOX) tank functioning as an accumulator

to supply oxygen from the Electrical Power Subsystem (EPS) cryogenictanks and gaseous nitrogen stored in the LEM descent GOX tank, providecapacity to pressurize the airlock 44 times and recharge the backpack44 times .

2.3.2.3 Electrical Power

• Replacement of LEM batteries by two Allis Chalmers 2-kw nominal designfuel cells

• Addition of cryogenic tanks (presently being developed for the AES-CSM)for fuel cell reactants providing capacity of l680 kw-hr for a typicalmission

• Provision of Phase II Lab EPS capacity of 676 kw-hr for experiments and1004 kw-hr for housekeeping

• Addition of 60 sq ft of radiator area for fuel cell cooling.

2.3.2.4 Stabilization and Control - Same as Phase I Lab

2.3.2.5 Instrumentation - Same as Phase I Lab with a minor additional modification.

2.3.2.6 Reaction Control

• Addition of two sets of Reaction Control Subsystem (RCS) tanks to thepresent LEM capacity

• Reversal of fuel and oxidizer tank sizing due to lower oxidizer-fuel ratioof the RCS engine during minimum impulse bit firing, to produce a usabletank capacity of 1048 Ib .

Allis - ChalmersFuel Cells (2)

LEMAscentStage

Gaseous Oxygen& Water Tanks

Spacecraft LEMAdapter (SLA)

VerticalRadiators(6 Places, 120 sq ft Total)

LEMDescentStage

S-IV B

Nitrogen Tank

Electric Power SubiCryogenic Hydrogei

Launch Configuration

dditionalCS Propellant /ank (4) /

•— Z

Plan ViewAscent Stage

ServiceModule

CommandModule

LEMAscentStage

LEMDescent.^Stage

Plan ViewDescent Stage

0 20 40 60 80 100i . . . . , 1 , 1 , 1 , 1 . 1

Scale, in.

Orbiting Configuration

Fig. 2-3 Phase n Lab RecommendedGeneral Arrangement

(11)15*

2.3.2.7 Alternates

Significant alternate subsystem configurations are also presented in Volume IV forthe Phase II Lab environmental control, electrical power and stabilization andcontrol subsystems. In addition, several alternate airlock designs are presented.

Per-flight modifications for the Phase II Lab are also presented and include con-siderations of additional RCS tankage, use of the "low profile" descent stage, thedescent propulsion, and additional storage boxes, as well as incorporation of aviewfinder.

S.lj. SHEIITER

2.4.1 Mission

Significant mission characteristics of the Shelter are summarized as follows:

• Descent trajectory is_ Hohmann transfer from a CSM 80-n.mi parking orbit• Systems are activated, aligned and checked out by the astronaut prior

to separation from the CSM in parking orbit• Shelter operates in conjunction with LEM Taxi and provides capability for

a day or night manned mission on the lunar surface• Shelter is capable of unmanned lunar landing, surviving the lunar

environment in a quiescent state for periods up to three months, and thenproviding life support and scientific mission capability for the tvo LEMTaxi crewmen for periods up to 14 days

• There shall be a capability of providing status data to Earth on commandfrom the Earth during the quiescent state period of three months

• Ascent capability is not required.

2.4.2 Vehicle

2.4.2.1 Nature of Modifications to LEM Subsystems

The recommended Shelter configuration is a LEM with specific modifications to theenvironmental control, electrical power, navigation and guidance, and crew pro-visions subsystems. Specific deletions and/or minor modifications are requiredto the stabilization and control, communications, instrumentation, propulsion,and reaction control subsystems. Because of these subsystem changes, deletionsand modifications are also required for the structure and the controls anddisplays subsystem. The structure is also modified by the incorporation of anairlock.

All modifications and changes to the present LEM configuration, are listed inTable B-3 of Appendix B. In addition, a summary of the hardware modifications interms of degree of modification and commonality with the Phase I Lab, Phase IILab, Shelter, and Taxi is presented in Table 6-1 of Appendix C.

A summary of significant, required Shelter modifications follows:

(11)16

2.4.2.2 Environmental Control

• Addition of 75 sq ft of radiator assemblies vith supplemental waterboiling for heat rejection during manned mission phases

• Addition of 3/4 in. of insulation to the cabin, a passive thermal in-sulation blanket covering the top docking tunnel, and insulatingreflectors to the interiors of the windows

• Addition of a Radioisotope Thermoelectric Generator (RTG) waste heattransfer system for the three-month storage period

• Addition of life support provisions for extended cabin occupancy andsurface exploration.

2.4.2.3 Electrical Power

• Modification of LEM descent batteries due to increased mission operatingtime and changed power utilization time profile

• Addition of a 50-watt Space Nuclear Auxiliary Power (SNAP) 27, RTG forprimary power during the 90-da.y storage, with peak loads carried byenergy remaining in the descent batteries

• Deletion of ascent batteries and addition of two fuel cells (remotelystarted prior to the Taxi launch) for the 14-day manned phase

• Addition of fuel cell reactant ambient storage tanks (the oxygen tankalso includes the metabolic crew provisions).

2.4.2.4 Guidance, Navigation & Control

• Addition of LEM Optical Rendezvous System (LORS) for automatic updatingof Inertial Measurement Unit (IMU) during descent

• Deletion of Abort Guidance Section, Rate Gyro Assembly, and AlignmentOptical Telescope.

2.4.2.5 Propulsion

• Deletion of ascent propulsion system.

2.4.2.6 Reaction Control

• Deletion of eight of the l6 LEM thrusters and associated cluster plumbing/hardware to reduce jet impingement and heat loss, and increase externalpayload volume. In addition, deletion of half of the propellant tankagesince ascent is not required.

2.4.2.7 Alternates

Significant subsystem alternate configurations, presented in Volume V for theShelter, include environmental control, electrical power, guidance, navigationand control, reaction control, and communications subsystems.

Per-flight modifications for the Shelter are also presented in Volume V and in-clude considerations of antenna locations as a function of experiment payloadintegration; in particular, the two Lunar Scientific Survey Modules which wouldrequire relocating the S-band steerable antenna.

LEM AscentStage

Horizontal Radiator

Service ModuleEngine

Allis ChalmersFuel Cells(2)

Spacecraft LEMAdapter (SLA)

Airlock(Retracted)

RadioisotopeThermoelectricGenerator (RTG)

Water

LEMDescentStage

GaseousHydrogen

S-IVB

-A,Launch Configuration Pla

Deg

(II)17 A'

Pay load

Plan ViewAscent Stage

DescentPropellantTanks (4)

Airlock(Retracted)

GaseousOxygen

0 20 40 60 80 1001 , i , i , i , i , i i i , i i , i i i

Scale, in.

^" Airlock(Deployed)

^JJ

Portable LifeSupport System(2)

; Landed Configuration

Fig. 2-4 Shelter Recommended GeneralArrangement

(11)19

2.5 TAXI

2.5.1 Mission

The LEM Taxi mission differs from the basic LEM mission in that, subsequent tothe manned lunar landing in close proximity to the LEM Shelter, the Taxi mustsurvive the lunar environment up to lU days unmanned, and then execute a normalLEM rendezvous with the GSM.

2.5.2 Vehicle

2.5.2.1 Nature of Modifications to LEM Subsystems

The recommended Taxi configuration is a LEM with specific modifications to theenvironmental control and electrical power subsystems and structural changesassociated with these modifications. Minor modifications are also required tothe crew provisions and communications subsystems and to the micrometeoroidshielding. All modifications or changes, with reference to the present LEM con-figuration are listed in Table E-k of Appendix B. A summary of the significantTaxi modifications follows (Refer also to Table C-l, Appendix C):

2.5.2.2 Environmental Control

• Addition of an insulating blanket to cover the top docking tunnel andinsulated reflectors to the interior of the windows during quiescentstorage

• Additional water for the LEM active thermal control system water boilerfor day missions

• Addition of an RTG waste heat transfer system for night missions.

2.5.2.3 Electrical Power

• Utilization of three modified LEM descent batteries and a 50 watt RTGfor the quiescent storage night mission

• The RTG is the Shelter RTG used during the Shelter three month quiescentstorage and transported to the Taxi by the crew after Taxi landing.

2.5.2.4 Alternates

Significant subsystem alternate configurations are presented in Volume VI of thisreport for the Taxi environmental control, electrical power, guidance, navigationand control, reaction control, and communications subsystems.

Per-flight modifications for the Taxi are also presented and include considerationof off-loading one descent stage battery or some quantity of water as a functionof mission time and phasing, i.e. day or night.

2.6 TRUCK

Although specific recommendations for Truck subsystems were beyond the scope of the"minimum design study effort", a "Reference" configuration is presented which makesuse of the "Recommended" Shelter wherever feasible. This occurs in the areas of

(11)20

guidance, navigation and control, instrumentation, propulsion, communications andstructure (descent stage only). Conversely, the Environmental Control andElectrical Power Subsystem reflect the differences between the Truck and Shelter -missions. All modifications or changes with reference to the present LEM con-figuration are listed in Table B-5 of Appendix B.

ServiceModuleEngine

Plan ViewAscent Stage

'

Spacecraft LEMAdapter (SLA)

RTGHeatPipe

Water Tank

LEMDescentStage

RadioisotopeThermoelectricGenerator(RTG)

. ^S-IV B Plan ViewDescent Stage

LV \

Launch Configuration

Reaction Control SubsystemJet Cluster

DescentPropellantTanks (4)

0 20 40 60 80 100i i • •

Landed Configuration

Fig. 2-5 Taxi RecommendedGeneral Arrangement

(11)23/24

3. MANAGEMENT PLAN

3.1 ORGANIZATION

The AES/LEM Program will be managed by an organization designed specifically tomeet the special requirements of this program. (See Fig. 3-1)- Dr. R. H. Tripp•will head the organization as Program Director. He will report to Grumman Pres-ident E. Clinton Towl, from whom he derives the authority to command all re-sources required for the program.

The organization consists of key managers who will be accountable for planningand meeting the costs, schedules, and performance goals which will collectivelyassure the meeting of overall AES Program objectives. The functions they willmanage have been carefully defined to prevent duplication of effort and to pro-mote clear understanding of accountability. For example, each subsystem willbe handled both within the Grumman Company and at the subcontractor's plant bya Subsystem Manager who will be accountable for all aspects of the managementof his subsystem until it is installed in a vehicle. There will be a vehiclemanager for each vehicle from inception to launch. Continuing top managementguidance and participation will be accomplished through the Executive andTechnical Review Board.

Studies of the proposed organization will continue during the Definition Phase.As a result of these studies and discussions with NASA, the organization for theDevelopment/Operations Phase will be finalized.

The work task requirements for the AES Program dictate the need for people withhigh technical competence and space technology experience. Grumman can meet thisneed with people who will become available from the LEM, OAO and other Companyprograms. This will be done without interference to these programs and willprovide people who have experience in design, development, fabrication and testof space hardware and vehicles.

3.2 PLANS & CONTROLS

Plans required for the Definition and Development/Operations Phases are presentedand discussed in the various volumes of this report. They include the followingareas:

Design and DevelopmentProcurementTest and Site OperationsManufacturingPERT IntegrationManpowerFacilities

Configuration ManagementQualityReliabilityMaintenanceSupportTrainingTransportation

These plans to be defined in detail throughout the Definition Phase, will be thebasis of controlling all program parameters.

&XumnuuL

RELIABILITY MGR.M. Brill

PROGRDr.

DEPUTY DIRECTOR

FACILITIES &ADMIN. MGR.

CONFIGURATIONMGT. MGR.

DATA MANAGER

INSTRUMENTATION &DATA HANDLINGSERVICES MGR.

PROGR.R.

FUNCTIONAL OPERATIONS

QUALITYCONTROL MGR.

1

[Q

UA

LIT

YA

SS

UR

AN

CE

INS

PE

CT

ION

SYSTEMS

MATERIELMGR.

F. Petro

1

MA

TE

RIE

LP

LA

NN

ING

1

PU

RC

HA

SIN

G

MA

TE

RIE

LH

AN

DL

ING

rENGINEERING

ENGINEERINGMGR.

T. Barnes

I

PR

OJE

CT

EN

GR

.L

AB

S.

PR

OJE

CT

EN

GR

.S

HE

LT

ER

/TA

XI

PR

OJE

CT

EN

GR

.T

RU

CK

TEST

D.

rF

LT

. M

ISSI

ON

PL

AN

NIN

G

^—

SUBSYSTEMS ENGINE ERIN

I DIRECTORH. Tripp

EXECUTIVE &TECHNICAL

REVIEW BOARD

CONTRACTS MGRE. Deinard

PROG. PLAN &CONTROL MGR.

J. Rosse

VI MANAGERBenito

- ASST. PROG. MGR.

MANAGERS

SITE OPS.MGR.loltje

1H

rifi

HT

F

AU

ILdT

AC

TIV

AT

ION

TE

ST

OP

ER

AT

ION

S

SUPPORT

C. R.

IHPH

IOU

ND

SU

PP

OE

NG

INE

ER

ING

o

MGR.Spinner

1

LO

GIS

TIC

S

MAI

J.

ro!Z

AN

UFA

CT

UR

I]IT

MnT

Min

r'nT'

Nm

%

\TEST ENGINEERING

2

(11)25

Note: Shaded Boxes Designate Activities WhichWill Be Staffed & Phased-in During theDefinition Phase

_,LJFAC TURING

MGR.Jierschenk

OH0PPO3

SUB-SYSTEM

MGRSVEHICLE

MGRS.

VEHICLE DESIGN ENGINEERING

Fig. 3-1 Grumman AES/LEM ProgramOrganization

(11)27

4. SCHEDULES

k.l AES/LEM SUMMARY SCHEDULE

The AES/LEM Summary Schedule shown in Fig. h-1 presents the basic program for eachof the four vehicles in relation to the LEM launch schedule. (The schedules arebased upon the Flight Mission Assignment Plan for AES Planning, ML-65-1 dated 7August 1965, and the LEM Program Schedule III Revision 1, dated 7 September 1965.)

In accordance with NASA guidelines, the Phase I Laboratory vehicles will be fab-ricated and assembled to the LEM configuration at Grumman; subsequently, they willbe modified to each particular laboratory flight configuration at KSC. The Phase ILab missions currently planned include Earth orbit rendezvous, Earth polar orbit,Earth synchronous orbit, and lunar orbit flights. Saturn IB and Saturn V launchvehicles will be used. As shown on the schedule, these launches will occur duringthe time span of the last four LEM launches.

The Phase II Laboratories will be fabricated and assembled at Grumman using a modi-fied LEM manufacturing cycle. Their missions will be similar to those of the PhaseI Laboratories except that mission durations will be up to It-5 days instead of l.k,and the experiments conducted will be progressively more comprehensive. All Lab-oratory missions will be manned. Some of the missions will be launched by theSaturn IB, the others will use the Saturn V launch vehicle.

The Shelter and Taxi vehicles, also fabricated and assembled at Grumman, will beused for extended-stay lunar exploration missions. These missions, along with thePhase II Lab missions, will take place in the two-year time period following thebasic LEM and Phase I Lab missions. The Shelter will be landed unmanned on thelunar surface and be capable of 90-day storage prior to use as the base of operationsfor the two-man team during their lit--day stay. The Taxi, which will separate fromthe CSM in lunar orbit, will land the two-man team on the Moon and, after a l^-dayquiescent storage period during the operations from the Shelter, the Taxi's ascentstage will return them to the CSM, and thence to Earth. Shelters and Taxis willbe launched by the Saturn V.

U.2 AES AND BASIC LEM VEHICLE SCHEDULE

A composite manufacturing, prelaunch, mission operations schedule for all LEM andAES vehicles is shown in Fig. k-2. It indicates the phasing required to integratethe AES spacecraft into the presently planned Manned Lunar Landing Program withoutimpairing the LEM schedule. It should be noted that the start of manufacturingafter LEM k is advanced to accommodate the Phase I Lab modifications and the testarticle development, within the launch-date and final-assembly facility availabilityconstraints. This is additionally advantageous in that it permits a constantdelivery rate for efficient manpower/facility utilization.

Phase II Laboratory experiments are assumed to be installed on the assembly linein parallel with installation of the Lab primary systems and subsystems. Thisprocedure will reduce the number of stations in the operational flow, preclude

(11)28

repetition of test cycles, and permit simultaneous checkout of the experimentswith the basic Lab.

Spacecraft-launch vehicle combination checkout flows are based upon currentlyapproved Apollo prelaunch operations and make maximum use of existing KSC facilitiesand equipment. Based on a two-shift, five-day week, the checkout flows require thefollowing nominal calendar time spans (weeks):

• Phase I Lab 16• Phase II Lab 18• Shelter 17 1/2• Taxi 16

D

LEM

Phase ILab(5 Flight Vehicles,507, 509, 214, 511, 216)

Phase IILab(11 Flight Vehicles;513, 218, 516, 220, 517, 518,224, 521, 522, 523, 228)

Shelter(3 Flight Vehicles;514, 519, 524)

Taxi(3 Flight Vehicles,515, 520, 525)

1966

M D M

PDR

I Design & Dev

IMfg - 1

Dea

I De

PDRW

(11)29/10-

1967 , 1968 1969 1970 1971

J S D M J S D M J S ' D M

'l\ /1X 2,Prelaunch Operations

lopment

est Articles

oJlfg. Fit Vehicles at Grumman & Modify at KSC

A A APrelaunch Operations

gn & Development

Mfg - Test Articles

S D M J SI

Legend

^7 Design Milestone

PDR- Preliminary Design Review

CDR- Critical Design Review

<0: First Vehicle Assembled & Tested

/\ Launch

A Earth Orbit

A Earth Polar Orbit

Zl\ Earth Synchronous Orbit

/4\ Earth Orbit - Rendezvous

Lunar Mission

D

Manufacture Flight Vehicles

AAA® A AAPrelaunch Operations

sign & Development

Mfg - Test Articles

O ;

Manufacture Flight Vehicles

Prelaunch Operations

sign & Development

| Mfg - Test Articles

Manufacture Flight Vehicles

Prelaunch Operations

Fig. 4-1. AES/LEM Schedule Summary

^Skunman.

Vehicle

LEM 1LEM-2LEM- 3LEM-4LEM-5LEM- 6LEM- 7Lab 1-1LEM- 8Lab I/LLTA-1Lab 1-2Lab 1-3Lab 1-4LEM- 9Lab 1-5Lab H/LLTA-4Sh/SLTA-1Lab H/LLTA-3

Lab II- 1Shelter- 1Taxi-1Lab II- 2Lab II- 3Lab II-4Lab II- 5Lab II- 6Shelter- 2Taxi- 2Lab II-7Lab II- 8Lab II- 9Lab 11-10Lab 11-11Shelter- 3Taxi- 3

BoosterNo.

206207503504505506508507510

509214511512216

513514515218516220517518519520224521522523228524525

1965

J A S O N Di

LEM-2

]

J F M A M :I

^_^_ i^^LEM- 3 ^^^MH

LEM-'LE

166

J A S O N D

1967

J F M A M J J A S O 1 S

Jt...

1-5 ^.•^.•'^•^.•^.•^.•^.•^.•^.•^.•^.•^.•^.^.•^^.•^.•'q^.^^.^.^.^.•^.•^•^.•^.•^

LEM-7Lab 1-1

LEM-8

Lab I/LLT! ^^ Lab 1-2

Lai

Shelter

bI-3— •Lab

I

•/SLTA-1Lab II

Lab 1-5 iLab II/LL1

/LLTA-3

D

1968

J F M A M J J A S O N D J F M

Illlllllllllllllllll

.....J7

I•^ ^ ^ ^ ^ "^fc- . . . •%! Illlllllllllllll •

% . ^ . ^ . V V V V V X . V ^ Illllllllll

X.%.^.X.VVVVVX.X.^ .X.VI Illllll

^•^^•^•^•^•^•^•^ ^y>. -^ •^ •%. ^ ^/

,...JIllllll .1

Illllllllll

Illllllll

Lab H-lShelter -1 c~v ^.•^.V^.'^.^.-^.-^.-^,

Lab II-2 iLab H-3

Lab II-4

Lab n-6iShelti

1969

M J J A S O N D

1970

J F M A M J J A S

Lab II-10 iLab 11-11

Shelter-3Taxi-3_j

IDENTIAL (11)3:

O N D

19

J F M A M J

71

J A S O N D

Structural AssemblyFinal Assembly & Test

mi Modification,Installation & Checkout at KSC

• • Prelaunch Checkout at KSC

— Structural & Environmental TestsOriginal Shipping Date (LEM Schedule III)Launch Date

...1• ••MM

szs >m\• ' »...LJ^ ^ ^ "^

..J

i

..JLV»^ •.1m m m l

Fig. 4-2 Proposed LEM & AESIntegrated Schedule

(11)33

5. TEST REQUIREMENTS

5.1 GROUND DEVELOPMENT TESTING

5.1.1 Objectives

Ground development testing is concerned with events accomplished during design anddevelopment, system verification/demonstration, and flight spacecraft fabricationand acceptance. Design and development requires defining the structural, mechanical,thermal, electrical, and data management interfaces. System verification/demon-stration is concerned with the structural dynamic response of the baseline vehicleand the verification or demonstration of experimental payload and spacecraft inte-gration under ambient and induced environmental conditions. The flight spacecraftfabrication and acceptance identifies the procedures used for installation andacceptance testing of the integrated flight configuration.

Objectives of the AES/LEM development test articles are to verify:

Subsystem and systems integration of the basic vehicleFunctional integrity of the basic vehicleBasic vehicle subsystems under environmental conditionsDesign changes by testingGround support equipment functional interface with the basic vehicleOperational checkout procedures generated to check out the basic vehicleElectromagnetic compatibility within the basic vehicles and between thebasic vehicle subsystems and the external equipment

• Reliability analysis and predictions

5.1.2 Major Test Articles

The following is a summary of the required major test articles:

PHASE I LAB

LM-1

LLTA-1

Wood-and-metal mockup fabricated in Phaseto reflect current configuration.

"C" and further updated

LLTA-2

Complete Ascent/Decent Stages structurally and thermally func-tional and representative of the Lab Configuration. Cabinleakage integrity must be maintained. Subsystems will bestructurally and thermally representative of qualified equip-ment .

LEM LTA-8 modified to the Phase I Lab Configuration for use atMSC.

(~£AAvnmajL

PHASE II LAB

LM-2

LTM-1

Wood-and-metal mockup of the Ascent/Descent Stages fabricated inPhasePhase II Lab Configuration.

"B" and further updated to include airlock and current

Full scale Ascent/Descent Stages with a CSM thermal simulator.Cabin to maintain leakage integrity, systems other than ECS tobe thermally simulated.

Power Generation Simulator - Thermal model of structure supporting and sur-rounding fuel cell power generation system. EnvironmentalControl System (ECS), Electrical Power System (EPS), and in-strumentation as required for operation and temperature control.(Fuel cells, cryogenic tanks, etc.)

LLTA-3

LLTA-4

SHELTER

SM-1

STM-1

SLTA-1

SLTA-2

TAXI

TTM-1

TTE-1

TLTA-1

TLTA-2(HSC)

Complete Ascent/Descent Stages structurally and thermallyfunctionally representative of Lab Configuration for use atMSC. Cabin leakage integrity must be maintained. Subsystemsstructurally and thermally representative of qualified equipment,

Identical to LLTA-3 for use as House Spacecraft.

Wood and metal mockup of the Ascent/Descent Stages fabricatedin PhaseShelter Configuration

"B" and further updated to include airlock and current

LEM TM-2 modified from Taxi (TTM-1) to Shelter and configuration;systems other than ECS are thermally simulated.

Complete Ascent/Descent Stages with landing gear, structurallyand thermally functionally representative of the Shelter.Leakage integrity must be maintained.

Modified Phase I Lab Test Article (LLTA-l) maintaining structuralthermal and functional integrity.

LEM TM-2 modified to the Taxi configuration maintaining cabinstructural and leakage integrity. Systems other than ECS arethermally simulated.

Full-scale structural element representing the battery andRadioisotope Thermoelectric Generator (RTG) installation.

LLTA-2 (Phase I Lab from LEM LTA-8) modified to represent theTaxi, structurally and thermally.

LTA-1 from LEM - functionally representative of Taxi flightarticle.

(11)35/36

The development schedule presented in Fig. 5-1 indicates tasks necessary to verifythe design and demonstrate the capability of the four basic spacecraft. It coversthe utilization of the test articles listed above and highlights their use formore than one basic configuration.

5.2 FLIGHT TESTING

The prime purpose of the AES missions is to conduct extensive experiments for basicscientific research, develop and qualify new systems and subsystems, show space-craft and crew capability to withstand long duration missions, and develop spaceoperating procedures and techniques. The planned number of AES-LEM flight missionscan be categorized as follows:

LAUNCH VEHICLEAES-LEM Saturn IB Saturn V

Phase I Lab 2 3Phase II Lab k 7Shelter 3Taxi 3

Since each type of AES-LEM is scheduled for a number of flight missions, the space-craft test objectives must be satisfied as early as practicable. Instead of per-forming special flight development missions, the AES program will utilize theprerequisite Apollo program flight development in conjunction with a comprehensiveAES Ground Development Test Program to relieve AES test constraints. However,flight test objectives will be integrated within the flight operations of theinitial flight of each AES/LEM mission combination. The chief requirements forthis are:

• To demonstrate system performance for environmental conditions notattainable to a satisfactory degree on the ground

• To assure subsequent mission success of each similar baseline AES/LEMvehicle

• To assure maintaining the high-density launch schedule.

Table 5-1 summarizes the flight test requirements associated with each of theAES-LEM spacecraft. These requirements are further defined in terms of testobjectives for each type of AES-LEM/mission combination in Vol. XVI, Prelaunchand Mission Operations. As the scientific mission objectives are further defined,the flight test requirements will be reviewed and considered in the light of thetotal flight mission requirements.

> f

1LM-1 Ph I Lab Mockup

(from PhC)

LM-2 Ph U Lab Mockup(from PhC)

SM-1 Shelter Mockup(from PhC)

LTM-1 Ph II Lab Test Model(New Aso/Desc Stages) ,

TTM-1 Taxi Test Model(Tm-2 from LEM)

STM-1 Shelter Test Model(TTM-1 from Taxi)

LTE-1 Ph I Lab Battery Bay(New Test Element)

TTE-1 Taxi Battery/fcTG Bay(New Test Element)

PCS Pwr Gen Section Lab(New 4-Bay Test Facility)

FCI Fit Controls Integ Lab(Add'l Equipt)

IBS Internal Environ Simul(Existing on LEM)

HR-2 Cold Flow N

KR-3 Hot FiringTestRigs

PA-1 Hot Firing > fromLEM

HD-1 Desc Prop

PD-1 Desc Prop J

LLTA-1 Ph I (new) N

LLTA-2 Ph I (LEM LTA-8)> Lab

LLTA-3 Ph II (new)

LLTA-4 Ph II (new) J Test' Articles

SLTA-1 (new) ^1S Shelter

SLTA-2 (Ph I Lab LLTA-1)")

TLTA-1 (Ph I Lab LLTA-2)]S Taxi

TLfA-2 (LEM LTA-1) J

1966 19671

1 i 1 2 vmtmsss—^ Basic Lab I

1 | 2 3

1 Fabricate2 Static Test3 Simul Equ4 Prepare5 Vibrate Ci6 Subsys Ins

1 1

i

1 |

^^^^' Basic Lab n

3 1i

1 | 2 | 3

\1 | 2 | 3 4| 5 f (

1 i h1 Design2 Fabricate3 Heater Inst4 Prepare5 T/VTest

i Basic Lab I

i i i hi 4 i 5 r-~— .Basic

{,

n*Taxi

1 1 1 2 1

,| 4 | 5

| 1 | 2 | 3 | 4

/(*1 1 1 2 [Grumman

ModificationsShelter & PhRCS Cold Flo

1 2

Shelter Cold Flow L

& 1pt&Experlnstl 1 1 sheltert)esc

•itlcal Config \2TaxiDescPitl & FEAT / N.

^D [

3rumman

Prop Tests |op Tests (

21 3 |4| 5 1 6 &

1 1Basic Lab I

1 1 2 J 3

t Basi

1 1 1 ^ 1 3 |4| 5

* Sasic Shelter

1968 1969

( 1 Mod Kit Instl, Controls & Displ1 2 SLA & GSE Compatibility

{ 1 Update2 Subsys Instl, Exper Payld, Cont Si Displ3 SLA & GSE Compatibility

4 | 5 | 6 | 7

*l * L__

L^^ Basic Lab II

T Basic Taxi~~ • —

+ 519 '11 Fabricate

2 Heater Instl3 Simul Equipt & Exper Inst4 Prepare5 T/V Test

' 1 1 Mnriifv

I | 2 | 3 [— -:=*- { 2 Prepare

DesignFabricatePrepareStatic TestsVibration

1

T 513

^ 1 3 T/V TestBasic Shelter

(1 Fabricate Test Ri2 Ph II Lab Subsecti3 Ph H Lab System 1

5 Shelter Subsection6 Shelter System Int

1970

1 Update2 Subsys Instl, Expe3 SLA Si GSE Compa4 Exper Payld Oper

1 524 5 SLA Si GSE Compa6 Exper Payld Oper7 SLA & GSE Compa

?son TestsntegyTests

eei ° r

H e kl

'ests

""3" I Marquardt

- — i r^rn

J 1 2 |V

i 514

• •^^ f Shelter Unmanned Ldg( St Taxi Beacon Ldg

(1 Modify to Ph I Lab

\2 Manned Operations3 Modify to Ph D Lab4 Manned Operations5 Modify to Shelter6 Manned Operations

I 1 Shelter RCS Tests1 2 Ph II Lab RCS TealsI 3 Taxi RCS Tests

WSMR

^X. 1 Shelter RCS Tests^ 2 Ph n Lab RCS Tests

J 3 Taxi RCS Si ASC Prop Test

rSMR

^x^>/^><^> Grumman^>x^>X^>^^^>|

](<^^^^^^^^^^^r>MSC _ --'"

9

1 Fabricate2 Static Test3 Simul Equi]4 Prepare

^ 5 Vibrate Cr]^ — 6 Subsys Inst

.s' 1 Pack Si Shi]^- — 8 Prepare

^9 T/V

5 1 6 |7| 8 9 F^x/' x ' x-^^X^^^abll 1

2+ Basic Lab nt

^^x:x^::'//<x^^'*x^ 1 Fabricate2 Subsys Instl Si FEAT r-* MSC

6| 7 | 8 | 9 1 10 | 11 | 12

1 * * +

k/MSC^^/>q 13 |

i514 514 614 J Vs^/Z/A 2 1 3 1

1 Modify to t>14 \ ^*2 Modify to 519 1 .^

4 Modify to 524 | 15 Vibration )

Modify } — ' — 1

*i

2 | 3 p.MSC^*^_| Coolly to

isis Is T/vr(Chn

(11)37

Payld, Cent & Displnhtyiskssilityisksaility

rttlcal Conflg& Exper Instl

:al Conflgi FEAT

L5

r B )

Legend

f Constraint on Launchu^/n Mission Supportr^3 & Payload Integration

T/V Thermal Vacuum ChamberSLA Spacecraft Lem AdapterFEAT Formal Engineering

Acceptance TestEMC Electromagnetic CompatibilityRCS Reaction Control Subsystem

\

1 Fabricate2 Static Test Critical Conflg3 Slmul Equipt & Exper Instl4 Instrumentation5 Vibrate Critical Config6 Drop7 Final Assy & C/O8 Vibration9 Pack & Ship10 Prepare11 T/V Unmanned i Chamber12 T/V Manned / B13 T/V14 T/V

Fig. 5-1. Development Schedule

5

(II)39AO

Table 5-1

AES SPACECRAFT FLIGHT TEST REQUIREMENTS SUMMARY

REQUIREMENTS

• Capability of the extended LEM spacecraft ECS to support the crewover the mission duration shall be demonstrated prior to extendedmissions. As flight mission durations build up from Phase I throughPhase II, the flight data shall be monitored and considered in thedetailed ground test planning for subsequent missions.

• Integrated flight control of the AES LEM and AES CSM shall be con-firmed for all flight regimes, specifically:

Transposition and docking maneuvers

- Docked maneuvering throughout each mission's inertia! range

• AES fluid systems , particularly fuel cell EPS shall be demonstratedunder long term earth orbital space conditions prior to extendedlunar mission commitment, specifically:

Eadiator thermal control system performance

- Fuel cell power generator performance

• Polar orbital tracking and MSFN/MCC capability shall be demonstratedby ground simulation and verified on the first polar orbital AESmission.

• Functional mechanical operations perfected during the basic Apolloprogram should be reconfirmed. Typical of these operations are:

- Spacecraft compatibility with Saturn IB, Saturn V and ServiceModule vibration environments

- LEM stage separation

- Spacecraft separation from the S-1VB

- LEM/CSM docking and separations

- Landing gear deployment and landing stability

• AES experiment and functions which cannot be demonstrated satis-factorily in ground test conditions (i.e., simulated space flightenvironment) and which could compromise flight safety in the eventof failure will be demonstrated in early near Earth orbital con-ditions, rather than during lunar, Phase II Earth orbital missionsor resupply missions.

AES VEHICLE

Ph ILab

X

X

X

X

X

X

X

X

Ph IILab

X

X

X

X

X

X

X

X

Shelter

X

X

X

X

X

X

X

X

Taxi

X

X

X

X

X

X

X

X

Vuvnman.

6. FACILITIES

6.1 INTRODUCTION

The AES Program, as presently planned, takes fullest advantage of the currentApollo/LEM facilities on a non-interference basis. Because of the proposed vehiclemodifications and increased production rate, some existing facilities will have tobe modified and new ones added. These facilities include manufacturing and testfacilities at Grumman and government facilities at Kennedy Spacecraft Center (KSC),Manned Spacecraft Center (MSC) and the White Sands Test Facility (WSTF). They donot include those for the Manned Spacecraft Flight Network (MSFN) or other opera-tional facilities after vehicle launch.

6.2 GRUMMAN MANUFACTURING FACILITIES

The facilities planning performed during Phase B indicates that existing and plannedLEM manufacturing facilities will satisfy the major needs for the manufacture andassembly of up to eight AES vehicles a year at Grumman. Fig. 6-1 is a recent photoof the LEM final assembly area, which will be similarly utilized for AES vehicles.

Additional facilities requirements are limited to accommodation space and a thirdAcceptance Checkout Equipment-Spacecraft (ACE-S/C) facility consisting of a com-puter and control room and assumed to be provided as Government Furnished Equip-ment (GFE). Fig. 6-2 shows a LEM Acceptance Checkout Facility.

6.3 GRUMMAN TEST FACILITIES

Existing or planned LEM test facilities at Grumman will be fully utilized for AES.New facilities or major modifications to existing facilities indicated by the PhaseB study are:

• A Power Generation System (PGS) Test Facility to support fuel cell andreactant tankage development and integration testing

• An additional test room for concurrent Phase II Lab, Shelter and TaxiElectrical Power System (EPS) development, subsystems integration andpower distribution (PDS) breadboarding.

6.U GOVERNMENT FACILITIES

Government facilities utilization will be required at KSC, MSC, and WSTF. With fewexceptions, existing facilities at these locations are capable of supporting theAES Program activities without major changes. Those additional facilities requiredare needed primarily to support the modification of LEM vehicles to the AES Phase ILab configuration, and to accommodate the increased launch density planned for theAES vehicles. The required additional facilities are:

• Space at KSC for the modification activities associated with the Phase ILaboratories

(H)te

A vibration shaker system with sine and random capabilities to permitvibration testing at KSC after vehicle modificationsTwo additional ACE station installations to support the modification andprelaunch checkout operations of the AES/LEM vehiclesProvisions for the support of mission training simulation and an InternalEnvironment Simulator for flight crew training.

Fig. 6-1 LEM Final Assembly Area

Fig. 6-2 Acceptance Checkout Facility

7. SUPPORT

7.1 SCOPE

The AES Support Program will provide the definition, integration, and delivery ofground support equipment and publications during the development manufacturing,checkout, launch, and post-launch phases of the AES Lab I, Lab II, Shelter, andTaxi vehicles. The program is planned as a continuation of the LEM support effortalong a parallel path with somewhat expanded objectives. Applicable LEM supportelements and program plans will be continually monitored to ensure concurrent com-patibility between the two programs relative to AES items which are dependent uponthe LEM Program.

7.2 EQUIPMEM1

Preliminary definition of the AES Support Equipment required for the AES Programduring the development, manufacturing, and operational cycles, was accomplishedduring the Phase B Study. Areas included in this definition and covered morefully in the several Support volumes of this report are:

• Ground Support Equipment (GSE) and Special Test Equipment (STE) concepts• GSE/STE end items required by the AES Program. The quantities of unique

AES and existing Apollo equipment are summarized as follows:

Apollo Equipmentfor AES/LEM

AES/LEM UniqueEquipment

TOTALS

EquipmentDesigns

Ul+3

150

TotalQuantityRequired

2101

617

QuantitiesEstimated ToBe AvailableFrom Apollo

1707

AdditionalQuantity To BeObtained For AESCFE GFE

319

532

75

85

593 2718 1707 1011

• Support Equipment Specification• Training equipment concepts resulting in the following recommended items;

Phase I Lab Training Equipment

• Mission trainer using the LEM Mission Simulator (IMS) on a time-sharingbasis, plus separate "trainee cabin"(See Fig. 7-1)

(11)44

• System Trainers

- Integrated Flight Control System (IFCS)- Environmental Control System (ECS)- Electric Power System (EPS), Batteries- Sequential Flow System

• Familiarization Trainers

Phase II Lab Training Equipment

• Lab Mission Trainer• Internal Environment Simulator (IES). Trainer

- • System TrainersfT

- IFCS (Phase I trainer modified)- ECS (Phase I trainer modified)- Electric Power System (EPS), Fuel Cells- Sequential Flow System (Phase I trainer modified)

• Familiarization trainers (Phase I trainers modified)

Shelter Training Equipment

• Operational Procedures Trainer (OPT)• System trainers

- Electric Power System (EPS), RTG V- ECS(Phase II Lab trainer modified)- Sequential (Phase II Lab trainer modified)

• Familiarization Trainers (Phase II Lab trainers modified)

Taxi Training Equipment

• LEM Mission Simulator (Modified) <

7-3 PLANNING

Preliminary analyses and studies were performed, and plans and schedules formulatedfor the AES Support Program, including:

• A Training Plan for identifying the general requirements, objectives,course data, training equipment, and facilities

• A Support Manual Program with the criteria and methods for its establish-ment, implementation, and maintenance

• The Maintenance Analysis effort, and the procedures and documentation in-volved in its application

• A Material Support Plan for insuring spare hardware availability in supportof the development and operation of vehicles and Ground Support Equipment(Spare hardware includes two sets of "black box" spares plus the equivalentof one set in bit-and-piece parts.)

• The Basic Transportation Policy, which will be essentially the same as thatdeveloped for the LEM Program, will be to use air transportation as the basicmode for moving flight articles and major test articles to and from Grumman.Fig. 7-2 indicates a typical mode utilizing the B-377 P.G. Aircraft.

I•r-C

o

CO

§2wJ•8co

01CJcoOto

en

w

SHOJH

• rH

<

d

C-C-eo

i

g,

CM

t-

bb

ooCO

CO

COUJ

O

CO

CO

UJQ_Q_

to£_,cdgS

PH

-P 08•H CQ

nd H CQ FHCO -H CU 0O XI M -PH 03 ft>> ft •» C8 CQCO CO X! jgj H

0CO

0 O£3 PH«(-! pM H

PH PH

§•H•p

CO CQ

p -a

HOC

,_j ,_J ^^^

Xi Q -p bQFH • r-j 0O fl <! tJ

ti•H

Coo

-p •H O

HCOO•H

0

Q

•HPH

^-P0HHCO

PH

sCQ

1

,

fO0

EH

CQ

O r"SM

• O-P HH OPm fl

_-j-

H

OON

WooCM

SCQO

HHOJ

^

CU-pCQ

CQ

j>5Q)> HFH COd o

CQ vH

FH 0cO 83 -H

0ooCOON

MC !>5-P•H 0 dCQ > Od FH AJ0 S O

CQ CQ 0

•P 3

cd 3 £*iH ^ CO

j-H

OON

W

Q

OJ

1~*g-CQO

Is-0

cOo•H

0So•HPH >3

^ 0-P CJ0 OH FHrH -P

CO COPH ^

8cn

•s,o

feg

co-pUJ

_^-H

O

pf"|

OLj"\ooONH

1^CQO

ONQ

LTN

_-j-

r-\X! OJOa ad 0cO 0

-pS 0S X>a

CQrti d0 Ofl >3 0

TO f^Ci (U

tOPH

8* *

oo

1 11 1

1 -H/

1 H

• •

CO COOJ OJ

O 0o oOJ OJ

S SH CQa o

-^~ Lf\H HOJ OJ

^S0-pCQj>^

CQ

r**0

JH

^jCQ

LTN FHrH COCM g08 I-H

O0OJ

o

08r^0

2

CQ

c3Hp

^-H

J5

r^"• ^

[ "]

OCO

1^CQU

HHLT\

Or*2cti

SM

i — ! hHcOO T3•H 0

0 2

Q C3

•H SPH tD

*

Mfl I

•H 1

ftcOS

11

LTN•

COOJ

"H"ooOJ

2Fya

voOJ

^orHOJ

a00Is-p0

CQjjO

^

0 C—^ i — IC OJ0K 08

OOCO

r-TOO

,

1

-4-H

LT\•

COOJ

O0OJ

g.CQ^

t—HOJ

iO

o *\CO

^ arH 0CO -HFH -PO cO•H >^ ?H03 CU& CQ(L> ,0 ^pp o bC

o•xrH H• CO O

TJ O FH0 -H OS CQ 00 >» -p•H Xl 0W ftS

0o0

06"ON

0-P CQc a0 O•H -HFH -P

O cOo

Xl «H-P HFH ft03 ft

LTN

"

PH

ooCO

"H*ooOJ

1

^CQO

OOH

0^H

f_l

0-PH4)cj

CQ

^H0

•HrH0P

OJ•N

oON

FH0-pH0XlCQ

SS

oH

h4f—1

oi T

oCO

i~^CQO

^ -

HLTN

00cO

^JCQ

f_|

CtJC3

LTN 1-3HLfN 13

0-P T3

tiO 0•H -PH L.I

?spTi rj

o0OJ

a

i *Hh a0 co

•H ^rH r ]0 W

OOCM

a[_p

O

j "^

0oo

S3~CQO

LT\HL/N

^•rJ;

aCO EJ>j £

CO r-

P ^a-4* tH C

a0 p-p

4ft Cd c

CH• Fft :O 0

c0•HCQCQ

•H

43

g

cO1 — 1

^*

HLTN fd

" CU] ^ ^3

bO co•H fi

r ' .

*

I1

LfN

LfN

COCM

• r THH

o0OJ

.-5

COHOJ

COHCM

S3CU<u43cu

PQ

ndezv

ous

CDK

8CO

Hoo

,i

LfN

LfN

COOJ

""• ^

H

OOOJ

2COo

ONHCM

CQ O43 OJO OJ

43rH 0 S3CO S3 0)O d CU•H CO >S i-5 -Po cuS3 2 rQo faf-i 3 CQ-p dCQ Tj O<; cu >

S3 NON • s3 cui — ! rH Co T3-OJ CU g S3

rH C CUeg Pn t3 K

O OO 0OO 00

0 HVD on

cJ

S4 i iO i i^_|

-P

LfN LfN LTN-4" -4" -4-

LfN LfN0 • •\CO COW OJ OJ

*s*<^ "'s 1

O H HLfNOO O OON O OH CM CM

1 sCO 0 COO i-q U

VO O HH OJ OJLTN OJ OJ

CU

•8PM

^f>j

CU

dCO

H fnOJ COOJ S3

^08 ^

OJ

OON

•dp•H43

OJ_J

o3S3

3

LfNOO

0ON

(-5

0CO

1COo

t—HLTN

1O hS3 CUco -p0) rHcj cuO 43

COlivery

teoro

logy

aphy

liver LE

M

CU CU £H CUO 2 bO P

0 Oo oO OJ

CO OON ON

•d-P COS3 S3 MCU O CU•H -H -Pr< -P H

O C3 CU>i O 44CU 44 vH CQ> -P H

h % &2y CD QJ P4co w <a

LfN O-4- H

LfN• t

CO p-5CM •""*-*. h^pr"] **s^

i "1

0o oCM CO

IICO COo o

oo ONH HLfN LfN

O 1

cu

cu• Kft

O CUU

• COCQ <H

CQ

CU CQ•d >>S3 co(U 13•pH H

oOCM

OON

r*} 'HM l«j S3CU CO O> EH -H

•H CQH 2 CQCU W |H

OOOJ

.

•{_P*>.

i-5

cS

1COo

oOJLfN

OJON CMi-H 43LfN O S3

S3 CU-p d cu43 CO >M^ -P

-H CUH 2 43

us w

ith

Fm

anned L

Endezvous

O S3 CU> D K

oo

HOO

1 I1 1

LfN LfN

LTN LfN

CO COCM CM

H r^i0 0o oOJ OJ

11

OJ OJOJ OJ

o§cuoo^

22

5te

oro

logy

CU08 2

Oo0

COON

-dcupcu•H

£_J

0

44p

CCJ

LfN-4"

oONpr*|

0OCM

ICOo

HCMLTN

CQ

g

H 0)CO 43?H O

-P PMr™H^ 1a•H "5f-t 'cuJP£<< H

d >>•vCQ JH

>> CU43 fi >ft CO -HCO S3 Hf-i d cu^0 1 1 f"*!

0oCMQ*

ON

H

S3 P0 -H•H 43J t i

co OCJ . >J•H !H CUH CO >

ft 3 3<! 1-5 CQ

LfNOO

OONl_ l

OCO

1COo

CMCMLfN

•CO -N

43 43 OOO 0 CM

S3 LfNH dCO CO 43•H ^5 PP -Hco 2 Is

tra

-Te

rre

man

ned

LE

ndezv

ous

X S3 CUw D ffi

0

•v ik00 *ON

feg

0S3 iO 1£_j

1

LfN LfN

LTN LTN

CO COCM CM

W H

S O0

CM OJ

1CO So a

rocoCM CMLTNOJ

OO fnOJ OOJ 'H

P CU•H -P

cuCQ 43d cootNl W LfNCU 1-5 OJrd LfNS3 f-iCU CU PK > 43

•H bQON H -HCM CU HOJ P P>4

0 00 0CO CM

H OOO ON

(UPf l ^ i

1 44 CU1 CO >

•H

3 cua o

LfN O-4- H

LfN

CO 1-5OJ •

^*- f-^

H **"*--.i_^

80OJ CO

1CO CO0 0

OJ OJOJ LfN

1

O CQCO 43

HH -\ P! H CO -Hd f>s ^

CO Cti

5-t dCO -4- OS3 H >d ts5J O CU -4-

p fd OJT3 S3 LfNcu ft cuS3 43CU • CU bOP CQ O -HX 4D CO rH

H O <H PH

0oOJ

cTON

•Hfc-J (-HrS MCo O

EH -HCQ

S w

COf\l^VJ

9

c

[ "1*N^ ^

"1

0CO

ICQ

LTNCMLfN

CQS3O•HPco

•H

(U

-Pdo43p•His

•eoS3•HcdppCO

opCQ(UT)iPO

QJ

CU

ooCO

ooCQ•H

vuunman.

-I/

TO

PRESENT LEM VEHICLES

Vehicle Recommended Configuration

ItemChange

Removed Modified Added

1.0Structure

(Ascent)

(Descent)

Ascent Engine CoverPropellant Tank Supts.Water Tank SupportsAscent GOX Tank Supts.Prop. Tank Shielding

• Base Heat Shield

• Mid-• GOX

• Lowe2• Watei• Batte16 Bq

2.0Stabilization andControls

• DECA• GDA

AEA (Software change toaccommodate star catalog)Modify RGA to provide low-er rate thresholdChange Rate gain in ATCAto insure one Pulse limitcycle

3-0Navigation andGuidance

Landing RadarRendezvous RadarIMULGCPTAPSACDU

U.OCrew Provisions • Remove lunar specimen

return containers• Remove EVA life line• Remove water pro"be andholster

• Remove 1 LiOH (LEM/ARS) conister

• Revise External Lighting • 18 LBack

• Battpack

• Food• 26 C• Add• Provment

• Addligh

• Add• Add2)

Table B-l Phase I Laboratory

PDF Baseline Configuration

Removed Modified Added

ection Canisterank Supports

Deck InsulationTank Supts.

ry Supports (Fortteries)

• Ascent Engine Cover• Propellant Tank Supts,• Water Tank Supports• Ascent GOX Tank Supts,• Prop. Tank Shielding

• Base Heat Shield*

• Mid-Section Canister• GOX Tank Supports

Lower Deck* InsulationWater Tank Supts.Battery Supports (Foreight Batteries)

• DECA*

Landing RadarRendezvous Radar*'IMU*LGC*PTA*PSA*CDU*DSKY*

AEA

OH Cartridges forPack rechargeries for 18 backrechargesfor 13 daysM LiOH cartridgesxtra flood lightsde 21 const. wear gar-

work tops & work topsseatLEM voice recorder (total

ReviseExternalLighting

Vehicle must be ca-pable of retainingall items markedwith asterisk

Vehicle Recommended Configuration

Item ChangeRemoved Modified Added

5.0Environmental

Control• STD LEM Asent GOX Tanks• Secondary coolant loopWater evaporator

• Accessible secondarycoolant loop plumbingand valves

• Drain & Cap off secondarycoolant loop

• Cabin fans (to providefor duct losses)

ASA Byp;GSM/Lab2 Descei5 DesceiCold Pli

16 De:h De:

6.0Landing Gear o Remove Completely

7-0Instrumentation One PCM

Two mod,recorde;U09 KB/isingle ;tion

8.0Electrical Power 2 Descent ECA's • l6 Desci

• 5 Modif• 1 Circu• 1 Buss '

9.0Propulsion • Ascent Engine

• Ascent Prop Tank• Aseent He System

• Descent Engine• Descent He Tank

Table B-l (Cont)(IDB-5/5

PDF Baseline Configuration

>s*icirc Duct, Water Tanks, GOX Tanks;es for

:ent- Batteries:ent ECA's

Fied CSM3 providingdump rate andlase AC opera-

it Batteries3d Descent ECA'st BR PanelLring

»

Removed

Ascent EngineAscent Prop TankAscent He SystemAscent Controls &Control ElectronicsDescent Engine*Descent He Tanks*

* Vehicle must becapable of retain-ing all itemsmarked withasterisk

Modified

,

• RemoveCompletely

Added

21 PLSS LiOH CartridgesGSM/Lab Recirc Fan Assy2 Descent Water Tanks5 Descent GOX TanksCold Plates for

1 PCM2 Recorders,8 Descent Batlenes (l)h Descent ECA's

• One PCM (2)« Two CSM Type Recorder• One Selector Switch

• 8 Descent Batteries• k Descent ECA's0 1 Circuit BR Panel• 1 Buss Wiring

(l) Batteries assumeactive cooling

(2) Experiment datasensors, experimentsignal conditioningand power to operatesame are consideredto be an experimentresponsibility

Vehicle Recommended Configuration

Item ChangeRemoved Modified Added

10.0RCS No Change From LEM No Chan

11.0Communications • S-Band Erect Antenna

• VHF Erect Antenna• SPA Mod - Provide forhardline intercom

• Hardl• Provito EW

12.0Displays &Controls ACA (l)

TCA (l)FDAI (l)DSKYASC Eng. conrolsDesc. eng. controlsRadar displays

• DEDA• S 8& C Panel• Audio Control• Explosive Devices

• Contrbatteand h

• Crew• Data

and d

Table B-l (Cont)

PDF Baseline Configuration

Removed Modified Added

;e From LEM No Change From LEM No Change From LEM

Lne Intercomle Data ChannelModulatorS/s - Bypass SPA)

• S-Band Erect Antenna• VHF Erect Antenna ,

• SPA • Hardline Intercom

>ls for additional•ies, water tanksirdline intercomSafety displayslandling controls.splays

• ACA (l)• TCA (1)e FDA 1 (l)

• ReviseEPS,COMM

• Controls

• Controls for additionalbatteries, water tanksand hardline intercom.

Vehicle

ChangeItem

1.0Structure(Ascent)

(Descent)

2.0Stabilization& Controls

3-0Navigation &Guidance

Recommended Configurat

Removed

•Ascent Engine Cover•Propellant Tank Supts•Water Tank Supports•Battery Supports•GOX Tank Supports•Prop. Tank Shielding•Base Heat Shield*•Battery Supports

•GDA•DECA

•Landing Radar•Rendezvous Radar•IMU•LGC•PTA•PSA•CDU

Crew Provisions

Modified

•AEA (Softwechange todate starcatalogue)•Modify RGAproviderate•Change ratein ATCA to Ione pulsecycle

•Revise Ex1jlighting•Add furnid

^Vehicle Must Be Capable of Retaining All Items

ion

Table

PDF Baseline Co

Added Removed

•Airlock (No Specific-Recommendation)•GOX Tank Supports•SOX & SH2Tank Supts.•Fuel Cell Supts.•RCS Tank Supts.•Radiator Supt s.•Lower Deck Insula-tion•Water Tank Supts.

•Ascent Engine Cover•Propellant Tank Sup•Water Tank Supports•Battery Supports•GOX Tank Supports•Prop. Tank Shieldin•Base Heat Shield*•Battery Supports

'6

:como-

;o:r

gaininsureirait

•DECA*

•Landing Radar•Rendezvous Radar*•IMU*•LGC*•PTA*•PSA*•CDU*•DSKY*

rnal

ings

•Provide capabilityfor .kk backpackrecharges (assumerechargablebatteries)•Airlock--suit loop in"•Add battery charger

i Witn Asterisk

3-2 Phase II Laboratory

"iguration

Modified Added

•M/M Shielding

•M/M Shielding

•Mid Section Canister•GOX Accum. Supports•SOX & SH2 Tank Supts.•Fuel Cell Supts.•RCS Tank Supts.•Radiator Supts.•Lower Deck* Insula-tion•Water Tank Supts.

•AEA

•Revise Externallighting

•Add furnishings

Vehicle Recommended Configuration

Change RemovedItem

Modified

k.OCrew Provision(cont'd)

•Lunar SpecimanReturn Containers•Still Camera•EVA Life Line•Water Pro"beand Holster

5.0EnvironmentalControl

•LEM Water Tanks•Secondary Glycol Loop•One Water Boiler•Ascent Stage GOX Tank

•Glycol Pump•Cabin Fans (toprovide for ductlosses)

6.0Landing Gear •Remove Completely

7.0instrumentation

Table B-2 (Cont)

PDF Baseline Configuration

^dded Remove i Modified Added

iChange backpack bat-tery capability to kh(assume rechargeable).(°2 batts)»Provide 66 const, weargarments>Extra flood lights»2 work tops & worktop lights•Dome Light•1 seat1 LEM voice rec.(total—2)

•ASA Bypass•Suit Circuit Interfaceto Airlock•CSM/Lab Recirc Duct•1 'Fuel Cell' TypeWater Management Tanks»2 30 ft2 RadiatorPanels (A)•Fuel Cell Coolant Loop•Two Gas Airlock System

•LEM Water Tanks(•Secondary GlycolLoop•One Water Boiler•2 A/S GOX Tanks

•Glycol Pump •GSM/Lab RecircFan Assy•2 'Fuel Cell' TypeWater Management Tanks•2 30 ft2 RadiatorPanels (A)•16 PLSS LiOH Cartridges

•RemoveCompletely

»1 Modified PCM (B)•2 CSM Type RecordersModified to providek09 kb/s dump digitaltrack mod and SinglePhase AC OP.

•PCM •1 Modified PCM (B)•2 CSM Type Recorders

(A) l80°Apart(B) Experiment Data Sensors, Experiment signal conditioning and power to

operate same are considered to be an experimenter's responsibility

VehicleChange

Item

8.0ElectricalPower Supply

9.0Propulsion

10.0RCS

11.0Communications

12.0Displays &Controls

Recommended Configuration

Removed

•LEM Batteries & ECA's

•Ascent Engine•Ascent Prop System•Ascent He System

•Descent Engine•Descent He System•Descent Prop Tanks•Descent Prop Plumbing

•S-Band Erect An-tenna•VHF Erect Antenna

•ACA (l)•TCA (1)•FDA I (1)•GASTA•DSKY•Ascent Eng. Controls•Battery Controls•Descent Eng. Controls•Radar displays

Modified

•Wiring

Interchange fueland ox lines attank outlets

•SPA mod-providefor hardlineintercom

•DEDA•Audio Control•Explosive Devices

•"Vehicle Must Be Capable of Retaining all Items marked With As1

Table B-2 (Cont)

PDF Baseline Configuration

ided Removed Modified Added

Fuel Cell ECA'sPeaking Battery EGA2 AC Fuel Cells2-30 ft2 Radiators (A)L Peaking Battery -L AES Hg TankL AES 02 Tank

•LEM Batteries •Wiring •2 P&W Fuel Cells•2-25 ft2 Radiators (A)•1-7 K¥ Hr PeakingBattery•2 GSM 'Housekeeping'H2 Tanks•2 GSM 'Housekeeping'C> Tanks

•Ascent•Ascent•Ascent•Ascent•Descent•Descent•Descent•Descenting*

EngineProp SystemHe SystemCont & ElectEngine*He System*Prop Tanks*Prop Plumb-

2 Oxidizer Tanks2 Propellant Tanks2 He Tanks

Associated Plumbing

Interchange fueland ox lines attank outlets

•2 Oxidizer Tanks (c)•2 Propellant Tanks•2 He Tanks•All AssociatedPlumbing (D)

iardline IntercomInterface 09.6 Kb/sData Channel Into FMModulator

•S-Band Erect Antenna•VHP Erect Antenna

•Hardline Intercom

Controls for FuelHells, cryo tanks andoardline intercom.

2rew Safety DisplaysQuantity Gage RCSData Handling Controlsind displaysControl for peakingmttery

•ACA (l)•TCA (l)•FDAI (l)

•Revise EPS, Comm•Controls

Controls for FuelCells, cryo tanksand hardline intercom.

;risk(C) Double the LEM capacity(D) Reverse fuel and oxidizer line connections.

Vehicle Recommended

Item

Change withto

LEMrespect Removed Modified

1.0Structure Ascent Engine Cover

Engine BlastAscent PropellantDeflector &Helium Tanks

Food StorageAdditional InsulationIncrease Micrometeor-ite ShieldingWater Tank MountingSupports (conductivitychange)

2.0Stabilization &Control

Rate Gyro AssemblyAbort Guidance Sys

3-0Navigation &Guidance

• Rendezvous Radar• Alignment Optical

Telescope (AOT)

U.OCrew Provisions Soft Suits

Radiation DosimetersLiquid Cooled GarmentsBio-InstrumentationThermal/AntiMeteoroid Protect. GarmentsSuit Repair KitCrewCrew RestraintsLEM Waste Management

(ll)B-15/fL6Table B-3 Shelter

PDF Baseline

led Removed Modified Added

/indow coversfop. Hatch coverBattery SupportsCanister for WasteRadiator SupportsSupports for CrewProvisions

Ascent Engine CoverEngine Blast Deflec-torAscent Propellant &Helium Tanks

Food StorageAdditional Insula-tionIncrease Micro-meteorite ShieldingWater Tank Mount-ing Supports(conductivity

change)

Window coversTop Hatch coverBattery SupportsCanister for WasteEadiator SupportsSupports for CrewProvisions

3-band antenna X-YScanner3rogram CouplerAssembly

Abort Guidance Sys.

Pransponderluto. StarPracker Assembly

Rendezvous Radar BeaconMission Programmer(less paper tapereader)

Airlock3ne Hard Suit^ditional PLSSBatteriesPwo Additional PLSSAdditional PLSSSpare Partsih Constant .WearGarmentSxercise, Recreation'e, Hygienic Equipment[Vo Bunksfork Stations)ome & Work ToplightsAdditional Food\dditional PLSS LiOHfedical Equipment!!SM Waste Managementilxternal flood lightsj150W)

Soft SuitsRadiation DosimetersLiquid Cooled Garment'sBio-Instrumentation IThermal Garment IMeteoroid Protect GarmentsSuit Repair KitEmergency 0^ SystemCrewCrew RestraintsLEM Waste Management

One Hard SuitAdditional PLSSBatteriesTwo Additional PLSSAdditional PLSSSpare PartsIk Constant WearGarmentExercise & RecreationEquipmentTwo BunksWork StationsDome LightAdditional FoodAdditional LiOHMedical EquipmentCSM Waste Management

Vehicle Recommended

Item

Change withrespect to

LEMRemoved Modified

5-0Environmental Control LEM GOX Tanks (3)

LEM GOX PlumbingAscent Water TanksAscent Water TankPlumbingLEM GOXRedundant GlycolLoop

* Glycol Pump• Cold Plates

6.0Landing Gear

7.0Instrumentation LEM Scientific Equip Sensors

8.0Electrical PowerSupply

• Ascent Batteries• Descent Batteries• Control Assy-Ascent

(11)3-17,1

Table B-3 (Cont)

Ided

PLSS -SupplementaryGOX TankTanks for AC FuelCell WaterManagementPlumbing Assoc. withFuel Cell Water Man-agement*12 Cabin LiOH Car-tridgesGOX for PLSS Sup-plement75 ft2 RadiatorHeat Pipe for Usewith RTG

(l) Additional VoiceStorage RecorderCartridge

Three ModifiedDescent Batteries(12.0 kwh)Battery ChargerTwo AC Fuel CellsFCA Radiator andglycol pumpOxygen Tank (Vfin-. D.) (l)Hydrogen Tanks (39in. D) (2)PlymbingOxygen (AmbientStorage)Hydrogen (AmbientStorage)RTG Unit

Removed

LEM GOX Tanks (3)Ascent Water TanksAscent Water TankPlumbingLEM GOXRedundant GlycolLoop

• Data Storage* LEM Scientific Equip

* Ascent Batteries• Descent Batteries* Control Assy-Ascent• Two Descent ControlAssembly

PDP Baseline

Modified

• Glycol Pump• Cold Plates

• Sensors

Added

• PLSS SupplementaryGOX Tank

• Tanks for Fuel CellWater Management

* Plumbing Assoc. withFuel Cell Water Man-agement

• 12 Cabin LiOH Car-tridges

• GOX for PLSS Supplement• 75 ft2 Radiator• Heat Pipe for Use withRTG

• Two Modified DescentBatteriesBattery ChargerStorage BatteryTwo P&W Fuel CellsOxygen TanksHydrogen TanksPlumbingOxygen (AmbientStorage)

* Hydrogen (AmbientStorage)

• RTG Unit

Vehicle Recommended

Item

Change withto

LEMrespect Removed Modified

9-0Propulsion System Ascent

AscentAscentAscentAscentAscentAscentAscentingAscent

Prop-UsableProp-TrappedFuel TanksOxid. TanksProp PlumbingHelium TanksHeliumHelium Plumb-

Engine

10.00Reaction ControlSystem

Ascent PropellantOne Fuel TankOne Oxidizer TankOne Set PlumbingOne Helium Tank50$ Helium50$ Press. Plumbing8 Thrusters Assy.50$ Cluster Hardware

11.0Communications

• Television S-Band antennaElectronic ControlAssembly, (to workwith X-Y scanner)S-Band Transceiverbandwidth (70 kcoutput)

i

12.0Controls & Displays Flight Controls

Abort GuidancePropulsion displaysACA (l) TTCA (2)RCS displays, (1/2)S & C displays (some)

* Waste Management* Environmental Control* Instrumentation

(II)B-I

Table B-3 (Cont)

PDF Baseline

ded Removed Modified Added

Vent Valves(3) to DescentPlumbing

Ascent Prop-UsableAscent Prop-TrappedAscent Fuel TanksAscent Oxid. TanksAscent Prop PlumbingAscent Helium TanksAscent HeliumAscent Helium Plumb-ingAscent Engine

• Vent Valves(3) to DescentPlumbing

Vent ValvesProp. tanks

to 336 Ib. PropellantOne Fuel TankOne Oxidizer TankOne Set PlumbingOne Helium Tank50$ Helium50$ Press. Plumbing8 Thrusters Assy.50$ Cluster Hardware

Command Decoder& assoc. electronicsAntenna switchingmatrixCommand Receiver

Television Command Decoder

Electric Power<FCA)

Flight ControlsAbort GuidanceControllersAscent Propulsion

" Waste Management• EnvironmentalControl

* Instrumentation

* Electric

Vehicle

^\ Change w/re-spect to LEM

Sub system ^ ^

1 . 0 Structure

2.0 Stab Cont

3.0 Nav Guid

4.0 Crew Prov

5.0 Environ Cont

6.0 Ldg Gear

7.0 Instrum

8.0 Elec Pwr

9.0 Propulsion

10.0 ReactionCont

11.0 Comm

12.0 Cont & •Disp

Recommended

Removed

•Two PLSS Batteries•4 Ib Food•Three PLSS LiOHCartridges

•One LiOH Cartridge•24 Ib ©2 from DescentTank

•LEM ScientificEquipment

•Descent Batteries

•EVA Antenna•Television

•One Battery Display

Modified

•Increase Microme-teorite Shielding•Water Tank Mount-ing Supports (con-ductivity change)

A

•••

0

••

Table B-U Taxi(II)B-21X22

Ided

Window CoversPop Hatch CoverBattery Supports

t

9

?ime Programmer''or Status Datatransmission

tater Added for Dayflissionleat Pipe for use withOTGJattery Cooling/IMU-^SA Bypass.?ater tank heaters

'revisions for RTG?hree Modified DescJatteries (12.0 kw-hr)

?hree Vent Valves to)e scent Plumbing

>50 W Heater to eachtCS Cluster

tTG displays

PDF Baseline Configuration

Removed

•PLSS CalibrationUnit•Two PLSS Batteries•U Ib Food•Three PLSS LiOHCartridges

•One LiOH Cartridge•2U Ib 02 from DescentTank

•Data Storage•LEM ScientificEquipment

•Descent Batteries•Three Descent Electrical Control Assys

•EVA Antenna•Television

Modified

•Increase Micro-meteoriteShielding•Water TankMounting Supports(conductivitychange )

>

i

1

i

•Slight Modif i- _cation

Added

•Window Covers•Top Hatch Cover•Battery Supports

•Time Programmerfor Status Datatransmission

•20 Ib Water Addedfor Day MissionoHeat Pipe for Usewith RTG•Battery Cooling/IMU-ASA Bypass .•Water tank heaters

•Provisions for RTG•Three Modified DescBatteries

•Three Vent Valvesto Descent Plumbing

•250 W Heater toeach RCS Cluster

(11)3-23*

CQ

Ipq

OJ

coEH

QJ0GQJ

QJ ' — tin C

CO QJ OQJ K -H-P -PCO 0 COC -P rl

QJ -P 5)-P 0 -rlrH QJ <rl<; ft a

CO OQJ O

c~]-p•H

*- X

sH3

0EH-PoQJftCQQJK

-P•H

•dQJ•d

•dQJ•H

tt— 1•Pn

oS

QJ

0aQJ

QJbOcjjU

§-PH

J_)

QJ-p CQ CQ Cro .p -p -P 0p ^ a v -HS 0 QJ X +3,G ft a y CO QJEH ft ft co bD a

P -H rH -H ciCQ CQ PW > pqO cs1 coW H S

ao £•rH fi

GJ Cd CfHbD rl -Pco co co-P ft rHCQ QJ S PM

CQ QJ-P -P CQG QJ CQ CQQJ bO >j QJ0 Cd CQ LtCQ -P hi)< CQ H

QJ

p-PO

g-PCQ

O

rH

-

S-p

>> CQrH ^s^O £Qg

QJ QJCQ OCQ C

<^ CO

0 -H

P^ c5C5

QJ rl-P 003 ,0K <

08Co

•H-Pco i — 1-H O

•H f-{H -P•H Gr° 0cd o-pCQ

O

CM

lcd*dcdry

CQP0

QJ-daQJ

^

fa>H QJ

! ' ' 1

X ft rl^1 P QJ

+3 QJ O .*!G ^i TJ U O

<J QJ fl cdC O S r l

C CD ra 5-i co CQcd O G bD CQ O CQpq CQ cd O <; -p <

1 rl M PCQ EH PM <;

^jCD

r&

PH

CQ

§!>td

'dG EHQJ O«<

08G QJO O•H C-p cdcd "dbO-H

•H P> 0cd

Ooo

_

• N.

rM

O

eEH

0-P

ajQ

too

•rHH

1<

-PO£5

•dQJ

emov

PH

CQao•HCQ•H

15£_l

>cuJ_l

o

d<

CQGo•HCQrH

O£H

PM

CDf_^

0

C5

^

bOG•HHOOO

•H•p aO QJ< -P

•H >ia CQQJ

CQ

ft CQg QJP -P

PM cdH

OO rrj

r^^O O

j_3

oftftp

CQ

QJ^H•H"-1

**

•d-pG *QJ H

2 ^Ho -prl G•rl 0

> 0GH

O

lA

bD§("1oo

CO(p

bQG•H

Co>-H

oVO

CO

oCQ <£G CdQJ 0

CQ CQ

O•H

QJ <HM-H -pcd -P Grl C QJO QJ g40 »rH ftCQ O -H

Id S W

Q l-~l

GO•H

cd

1rfp

-pCOJ5H

O

C-

|

4^ -iCO t>i JC~{

PQ ^H 'd) >

-p -p 5C3 +3 LT\ <Jcd <ij cd or ^J pp ^J p-rl

|"^|=8QJ G ' G >sp^ c3 ^ ^ ?H

r J 'ti (D

Q) >s « QJ -P> M LCN W +3O QJ COa -P > -d pqQJ QJ T)

PC tt <ij

-pG <;QJ O0 HCO<^ 08

-p >>ro QJ*d -pG -PP co

Td pqQJK

1

CO -pQJ ft

•H QJrl OQ) ><-P 043 vcdpq to

f-t•P QJG -P0) rlO QJ ^^CQ > QJQ) G GQ H O

*•>J

"ftp.

'coco'O

•H £HJH QJ•P teO O0) CMrHW

0

CO

0a00H0

K^ao o-P -H

CQ -P0 -P co

-P O ?HCO 0 Pfl ft 60En CQ -H0 0 CH

-P ^H E3H 0< £l O

-P•HJs

— ,

K!1-3o-p.po0ftCQ0Kc~|-P•H12

>d0<d

^

•d0

•HCH•H"d

S

-d0

i0

PH

<utiO

cdr£3O

S0-pH

-p aCQ C O0 0 -rl bO> o co aH CQ rH -HCO 0 P ,g

O £3-P 0 rH rHO -p PH PH0>

a-pCO

CO

ao•HCQH

0£_l

PH

-paoCQ

no•HCQ

rj

ft

0

PH

0•

ON

* 0

•P "

3 ^8 oC _H.P 1 CQ

(Jo 6D J•rH r -pCH ^ CQ

O i — 1CJ ° O

r<

^ 0 00 -P rH

-P CQ ,0CQ P -r)

P r< -d

r< 43 aft EH 0EH -P

CO H H

60aCO -H0 ,£>

•3 5> PH

-P 0a -P0

0rH CQ60 O 0EH _JS i — 1^ cH tQ

Nl-p tH O

O

0

G cd^ -H >Q bO ,13 CQ 'd

"q EH -H "n P co11 cdO3 r j rQ 03 ' 1 CO M

H S !n S EH P-i <H 03 0 p ^ fn0 PH N rH dS * ^H 0f t • H Q H p P C Q 0 - PO H <d -H -H CQ +3 CQ£n 0 *H -p i — I ' — 1 0 CQ p

PH P W 0 0 0 ^ P rHprj Q ^Q jr~{ [Xj p_j H O

o c~]H 0 0 0 0 "?6-" - EH ~^-

VD O O O O UN LACO LT\rono

rHa oO JH•H -p-P flO Oo3 o0

PH1

o•o

rH

60a•H

GcdjaoOcd(D

PP

^H 10 ^H'd oO 4-) XO -H -H0 > £HQ CO -P

CO

G SHTO C t30S d) GS "^ 4-^ 'rHo o a0 Q 3,

ao•HCQ•HJ>

H0

EH

CQao•H

3O•HaJ3ggoo

o•

HH

CQ0 rH•H O-P r<CO HPR r*O O-P O

CQ

i??HftCQ•HQ

•dGoj

CQHo

-1-pa0oH

5!

08 CQ

CQ OjH H0 ft!M CQ4^ -Ha POO

O•

OJrH

*

CQCQ<J

a0•H-pcorH

Orl•HO0

PH

-P

9Ho0o

•fn0rH•rHO

^_l

0-P

1

•V

o-pcdrHPa£3oo

H •O 0

rH -PC5 CO

•\ 4JrM C

EH 003 O

EH CQ0

JH Q0+? °o3 -P*2

.. 00 -P60 o3CO ^-P OCO H

0-P r<a0 COCJ 0

0 rlQ 0

-P

o -P-P cd

,0

"^o ^a

COCQ CO

0 S-P PMM 1^1

^C 5^

*

-P§o

LT\

pq

03EH

OO

CO

LU

COLU<

O

X

oz.LUQ_Q.

REMA

RKS

No-

^ 1§

°g

gsg

« l|LU (£

» Isog

N3 fi

g i§iiN

a »o:

Oe

i

4

3E

L

ii

e

II

RADA

R S

EC

TIO

N• 1

[R

END

EZVO

US

RADA

RLA

ND

ING

RA

DAR

TRAN

SPO

ND

ER

1 •

• 1

• •

CO

NTR

OL

ELE

CTR

ON

ICS

SEC

TIO

NAT

TITU

DE

CO

NTR

OLL

ER A

SSY

...

II

)

ii

! |IIISlrts^is= s"s:I:iZ -I g U

iiii

o10

If1

1

u

I

:

IfN

QC

5

SEQ

UEN

CER

ASS

YX-

Y S

CA

NN

ER

PRO

GR

AM

CO

UP

LER

ASS

V

HE

LIU

M

PRES

SUR

IZAT

ION

SE

CTI

ON

PLU

S PL

UM

BIN

G

1R

R

EM

OV

E 1

HE

, O

X,

1 PR

OPE

LLAN

T TA

NK

SP

IUS

PLU

MB

ING

S

g TH

RU

STER

S 1

>

i1:

oB

>J B

) JJ

ii

0tp0JH

I tq

PR

OP

UL

\

CR

YOG

ENIC

LI

NE

S S

ECTI

ON

1

••

«

HYDR

OG

EN C

RYO

GEN

IC H

EAT

EXC

HAN

GER

OXY

GEN

CR

YO

GE

NIC

H

EAT

EX

CH

AN

GE

RH

EAT

TRAN

SPO

RT

SE

CTI

ON

, PR

ESS

AREA

CA

BIN

TEM

P rn

HT

VA

IVr

I

1 .

1

1 .

• »

• ilsl|S s 3

Jf 3

|i|s i •-

Hi

•,

*<

•j

H39N

VH

3X3

J.V3H

N393IT

1NV

I003

I

.1

• •

jlsjjl! 1 1 1 5 i *

CO

ow

ec

EC

X

» •

*.. .1

!*

I

zo

0 « £j

T 1 Tag

7* |T*«|

o

..

E

* K

. X

: u1 (0

J 0

xKX

e.

J!Is' W)J i1-*

CRYO

REA

CTA

NT

STO

R I

SUPP

LY

SUBS

ECTI

ON

AMBI

ENT

REA

CTA

NT

STO

R (

SUPP

LY

SUBS

ECTI

ON

I

i

i

n

n

<

< »

X >

i £ 2

sg!s

«rt w <

CO

w

1

10

U M

I

i

SIG

NAL

PRO

C SE

CTIO

NAN

TEN

NA

ELEC

TRO

NICS

SE

CTI

ON

i

S-BA

ND

SEC

TIO

NCO

MM

AND

DECO

DER

••

__

COM

MAN

D R

ECEI

VER

. .

_AN

TENN

A SW

MAT

RIX

»

• •

Ulr-±

IUJ

*C.

1E

4

11

1)

EE

C<t

3

1

EE

eE

e

c9

E

X3

U

u

1

i

••

I

CAUT

ION/

WAR

NING

ELE

C AS

SY

SIG

NAL

CO

NDIT

ELE

C AS

SY

\a

u

E

ADD

ITIO

NAL

PC

M F

OR

EXP

ERIM

ENTS

|

•PC

M (

E/P

CM

TEA

) FO

R EX

PMTS

cr§

^RED

ESIG

NED

CSM-

TYPE

REC

ORDE

R

*

t

RECO

RDER

(E

/DS

E)

CSM

TYP

EFO

R PH

1

LAB,

TH

EN M

INO

R M

OD

2

X

3•

V

11

WAS

TE M

ANAG

EMEN

T SE

CTIO

NCR

EW S

UPPO

RT I

RES

TRAI

NT

SECT

ION

I

I

iIN

TER

IOR

LIG

HTI

NG

SEC

TIO

N

ffr

ftC

I

I

I

E3

UlE3

3ii

I

I

I

Ea

3

e

E

>

H

I

I

1

FLO

ODL

IGHT

COM

PONE

NTS

MET

ERS,

SW

ITCH

ES,

ETC

e0,

c,i

APPENDIX D

PHASE I LAB EXPERIMENTS UNDER STUDY

AES FLIGHTS 507/511 - LABORATORY EXPERIMENTS

• Radiation Environment Monitoring (0501)*• Photographic Investigations

- Cartographic "" "- Panoramic- Multispectral

Infrared (IR) SurveyingRemote Geochemical SensingUltraviolet Absorption and LuminescenceX-Ray FluorescenceGamma-Ray Mapping

• Detection of Alpha Emission• Passive Microwave• Radio Frequency (RF) Reflectivity

Measurements• Radar Imaging, Altimetry, and Sur-

face State• Micrometeorite Detection/Collection• Lunar- Gravity Measurement• Lunar Surface Probes (6 on Flight

511,- 2 on Flight 50?)• Viewfinder

AES FLIGHT 509 - LABORATORY EXPERIMENTS

Radiation Environment Monitoring (0501)X-Ray AstronomyMartian AtmosphereArtificial CometsFar Ultraviolet (UV) Image Converterfor UV Astronomy

• Radio Astronomy (0705B)

••

Small Maneuvering SatelliteMagnetometerPropellant Handling Techniques(1506) - Phase I - Water TransferExtendable Rod Performance Test(1303) - Test No. k - Stem Rod

AES FLIGHT - LABORATORY EXPERIMENTS

Radiation Environment Monitoring (0501)Capillarity Studies (0601)Evaluation of Spacesuits (1501)Manned Locomotion and ManeuveringCapability (1502)Emergency Techniques for Rescue (1503)

Development of Personnel and CargoTransfer Operations (150U)Propellant Handling Techniques (1506)- Phase II - Astronaut ManeuveringUnit (AMU) Propellant Transfer

AirlockRod Performance Tests

ExpendableExtendable

(1303)

AES FLIGHT 216 - LABORATORY EXPERIMENTS

Radiation Environment Monitoring (0501)Control Moment GyroOptical Guidance System for RendezvousDeployment of RF Reflective Structure(1302)On-board Guidance and Navigation Systems

Orbital Maneuvering and Docking(1601)Propellant Handling Techniques (1506)- Phase II - Remote Maneuvering

Unit (RMU) Propellant Transfer(H2Q2)

- Phase III - Gryogenic PropellantTransfer

*Numbers in parentheses are experiment identification numbers assigned duringthe Addendum to the LEM Utilization Studies.

CONFIDENTIAL

Grumman A i r c ra f t Engineering Corporat ion • Bethpage, New York

CONFiucNTiAL4395