Conduit Penetration Flashing QMCPC

2
Jun-2019, Rev 8 BI 7.2.3-22 Conduit Penetration Flashing QMCPC AVAILABLE IN MILL, AND BRONZE ANODIZE FINISHES 2 1 12.00 12.00 5.15 6.00 4.29 2.56 THIS EDGE TOWARDS ROOF RIDGE 1.83 TOP OF FLASHING 2.66 A DETAIL A SCALE 1 : 2 CUT HERE FOR 1" CONDUIT CUT HERE FOR 3/4" CONDUIT APPLY EPDM COMPATIBLE SEALANT WHERE CONDUIT CONTACTS COUNTER FLASHING. TOP ID FOR 1/2" CONDUIT ITEM NO. DESCRIPTION QTY. 1 FLASHING, CONE, 12" X 12" X 1.8", ALUMINUM, MILL 1 2 COUNTER FLASHING, CONDUIT, 1/2", 3/4", 1", EPDM RUBBER 1 5 DO NOT SCALE DRAWING SHEET 1 OF 2 AAP SCALE: 1:4 WEIGHT: REV A SIZE TITLE: DATE: DRAWN BY: DIMENSIONS ARE IN INCHES TOLERANCES: FRACTIONAL 1/8 TWO PLACE DECIMAL .19 THREE PLACE DECIMAL .094 PROPRIETARY AND CONFIDENTIAL THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF QUICK MOUNT PV. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF QUICK MOUNT PV IS PROHIBITED. COPYRIGHT © 2019 QUICK MOUNT PV 5 4 3 2 1 UNLESS OTHERWISE SPECIFIED: 0.53 QMCPC: CONDUIT PENETRATION FLASHING, COMP 6/13/2019 FLASHING, CONE, 12"x12" COUNTER FLASHING, TRIMMED FOR EMT CONDUIT (1/2", 3/4", 1" ) SECURE CONDUIT TO RAFTER PER LOCAL BUILDING CODE (CLIPS NOT INCLUDED) EMT CONDUIT, 1/2", 3/4", 1" (NOT INCLUDED) 5 DO NOT SCALE DRAWING SHEET 2 OF 2 AAP SCALE: 1:4 WEIGHT: REV A SIZE TITLE: DATE: DRAWN BY: DIMENSIONS ARE IN INCHES TOLERANCES: FRACTIONAL 1/8 TWO PLACE DECIMAL .19 THREE PLACE DECIMAL .094 PROPRIETARY AND CONFIDENTIAL THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF QUICK MOUNT PV. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF QUICK MOUNT PV IS PROHIBITED. COPYRIGHT © 2019 QUICK MOUNT PV 5 4 3 2 1 UNLESS OTHERWISE SPECIFIED: NA QMCPC: CONDUIT PENETRATION FLASHING, COMP 6/13/2019 Drawing 2 Drawing 1

Transcript of Conduit Penetration Flashing QMCPC

Page 1: Conduit Penetration Flashing QMCPC

Jun-2019, Rev 8BI 7.2.3-22

Conduit Penetration Flashing QMCPC

AVAILABLE IN MILL, AND BRONZE ANODIZE FINISHES

2

1

12.00

12.00

5.15

6.00

4.29

2.56

THIS EDGE TOWARDS ROOF RIDGE

1.83TOP OF

FLASHING

2.66

A

DETAIL A SCALE 1 : 2

CUT HERE FOR 1" CONDUIT

CUT HERE FOR 3/4" CONDUIT

APPLY EPDM COMPATIBLE SEALANT WHERE CONDUIT CONTACTS COUNTER FLASHING.

TOP ID FOR 1/2" CONDUIT

ITEM NO. DESCRIPTION QTY.

1 FLASHING, CONE, 12" X 12" X 1.8", ALUMINUM, MILL 1

2 COUNTER FLASHING, CONDUIT, 1/2", 3/4", 1", EPDM RUBBER 1

5DO NOT SCALE DRAWING

SHEET 1 OF 2

AAP

SCALE: 1:4 WEIGHT:

REV

ASIZE

TITLE:

DATE:

DRAWN BY:DIMENSIONS ARE IN INCHESTOLERANCES:FRACTIONAL 1/8TWO PLACE DECIMAL .19THREE PLACE DECIMAL .094

PROPRIETARY AND CONFIDENTIALTHE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF QUICK MOUNT PV. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF QUICK MOUNT PV IS PROHIBITED. COPYRIGHT © 2019 QUICK MOUNT PV

5 4 3 2 1

UNLESS OTHERWISE SPECIFIED:

0.53

QMCPC: CONDUIT PENETRATION FLASHING, COMP

6/13/2019

FLASHING, CONE, 12"x12"

COUNTER FLASHING, TRIMMEDFOR EMT CONDUIT (1/2", 3/4", 1" )

SECURE CONDUIT TO RAFTER PERLOCAL BUILDING CODE(CLIPS NOT INCLUDED)

EMT CONDUIT, 1/2", 3/4", 1"(NOT INCLUDED)

5DO NOT SCALE DRAWING

SHEET 2 OF 2

AAP

SCALE: 1:4 WEIGHT:

REV

ASIZE

TITLE:

DATE:

DRAWN BY:DIMENSIONS ARE IN INCHESTOLERANCES:FRACTIONAL 1/8TWO PLACE DECIMAL .19THREE PLACE DECIMAL .094

PROPRIETARY AND CONFIDENTIALTHE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF QUICK MOUNT PV. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF QUICK MOUNT PV IS PROHIBITED. COPYRIGHT © 2019 QUICK MOUNT PV

5 4 3 2 1

UNLESS OTHERWISE SPECIFIED:

NA

QMCPC: CONDUIT PENETRATION FLASHING, COMP

6/13/2019

Drawing 2

Drawing 1

Page 2: Conduit Penetration Flashing QMCPC

BI 7.2.3-22Jun-2019, Rev 8BI 7.2.3-22

Slide � ashing into place over drilled hole and apply a bead of sealant across the top side of the � ashing under the 2nd shingle course. Be careful not to rip or tear shingles.

Under the 3rd course and through the 2nd course, secure � ashing with 2 roo� ng nails at the top corners of the � ashing at the nail line. Apply sealant over nail heads.

2 3

54

Cut EPDM collar (item 2) to appropriate conduit size (see Drawing 1, Detail A on reverse). Take care to cut a clean, level line.

6

1

925-478-8269 | www.quickmountpv.com | [email protected] Mitchell Dr. | Walnut Creek, CA 94598

Conduit Penetration Flashing InstructionsInstallation Tools Required: tape measure, caulking gun, roof material & EPDM compatible sealants, drill with paddle bit, hook blade, hammer, roo� ng nails

Mark center of rafter. Using the � ashing as a template, mark the drill point so the � ashing reaches up into the 3rd shingle course. Drill your conduit hole next to the rafter so you can secure the conduit below the roof surface (see Drawing 2). For 1/2" conduit, drill 7/8" hole; for 3/4" conduit, drill 1" hole; for 1" conduit, drill 1-1/4" hole.

Slide � ashing (item 1) into position centering the � ashing hole with drilled hole. Remove any nails that prevent getting the � ashing into position. Using a hook blade, cut shingle around cone to allow correct placement of � ashing. Flashing should not hang over bottom (drip) edge of shingle below.

Apply sealant compatible with the roo� ng material on the underside of the � ashing in an upside down U.

WARNING: Quick Mount PV products are NOT designed for and should NOT be used to anchor fall protection equipment.

Your conduit penetration � ashing is now complete and ready for ad-ditional electrical work. Be sure to secure conduit to rafters below the roof surface per local building codes and NEC code requirements. Quick Mount PV conduit mounts are also available for roof surface conduit at-tachments. See website for details.

Apply a bead of sealant compatible with both the roo� ng material and EPDM rubber to both the � ashing and the conduit in the location of the EPDM collar's � nal position.*

7

Slide collar over the conduit all the way down to the � ashing.

8

*Helpful hint: to see where to apply the sealant, slide the collar into place and mark the perimeter with a marker on the � ashing and on the conduit, then slide the collar up and apply sealant just inside both marks.

©2018 by Quick Mount PV. All rights reserved.