Compton Solenoid 101 2 nd Measurements 7/2010. Axial Field Setup. Temperature. Water out – Water In DT = 10 deg C at 300 Amps for 3 hours Inside Bore – Water In DT = 6.8 deg C. Axial Field vs z. Axial Field over Current vs z. Short Coil Setup. Dipole Field vs z. - PowerPoint PPT Presentation

Transcript of Compton Solenoid 101 2 nd Measurements 7/2010

Page 1: Compton Solenoid  101  2 nd  Measurements 7/2010

Compton Solenoid 101 2nd Measurements 7/2010

Page 2: Compton Solenoid  101  2 nd  Measurements 7/2010

Axial Field Setup

Page 3: Compton Solenoid  101  2 nd  Measurements 7/2010

Temperature

• Water out – Water In DT = 10 deg C at 300 Amps for 3 hours

• Inside Bore – Water In DT = 6.8 deg C.

Page 4: Compton Solenoid  101  2 nd  Measurements 7/2010

Axial Field vs z

Page 5: Compton Solenoid  101  2 nd  Measurements 7/2010

Axial Field over Current vs z

Page 6: Compton Solenoid  101  2 nd  Measurements 7/2010

Short Coil Setup

Page 7: Compton Solenoid  101  2 nd  Measurements 7/2010

Dipole Field vs z

Page 8: Compton Solenoid  101  2 nd  Measurements 7/2010

Compton 101 1st Set vs 101 2nd Set