COMPREHENSIVE REGIONAL IMPLEMENTATION PLAN FOR AVIATION SAFETY IN AFRICA.
-
Upload
wilfrid-reynolds -
Category
Documents
-
view
228 -
download
1
Transcript of COMPREHENSIVE REGIONAL IMPLEMENTATION PLAN FOR AVIATION SAFETY IN AFRICA.
COMPREHENSIVE COMPREHENSIVE REGIONAL REGIONAL
IMPLEMENTATION IMPLEMENTATION PLAN FOR AVIATION PLAN FOR AVIATION SAFETY IN AFRICASAFETY IN AFRICA
22
USOAP audits, missions by Regional USOAP audits, missions by Regional Officers and deficiencies identified by Officers and deficiencies identified by APIRG highlighted the need for action APIRG highlighted the need for action
ANC informal visit to Africa prompted ANC informal visit to Africa prompted urgent action by ICAOurgent action by ICAO
The Council decided toThe Council decided to::• Develop a Comprehensive Regional Develop a Comprehensive Regional
Implementation Plan for Africa (Plan)Implementation Plan for Africa (Plan)• Convene a high-level meeting prior to the Convene a high-level meeting prior to the
Assembly to initiate the PlanAssembly to initiate the Plan
HistoryHistory
33
African UnionAfrican Union AFCACAFCAC Industry Safety Strategy Group (ISSG)Industry Safety Strategy Group (ISSG) ACIACI IATAIATA Flight Safety FoundationFlight Safety Foundation
Partners in the developmentPartners in the developmentof the Planof the Plan
44
Factors addressed in the Factors addressed in the development of the Plandevelopment of the Plan
Aviation-related accidents and serious Aviation-related accidents and serious incidents in Africaincidents in Africa
Deficiencies identified by USOAP, APIRG, Deficiencies identified by USOAP, APIRG, industry and other government agenciesindustry and other government agencies
Operational constraintsOperational constraints Lack of shared resourcesLack of shared resources Regional traffic forecastsRegional traffic forecasts Recruitment, training and retention of Recruitment, training and retention of
qualified personnelqualified personnel
55
Leadership role for ICAOLeadership role for ICAO
Focus on shift from development of Focus on shift from development of SARPs to implementation in the fieldSARPs to implementation in the field
Empower the Regional Offices to:Empower the Regional Offices to:
• support ICAO’s Strategic Objectivessupport ICAO’s Strategic Objectives
• taketake a leadership role in the regiona leadership role in the region Focus on systematic collection of safety Focus on systematic collection of safety
data, analysis and risk managementdata, analysis and risk management Coordinate assistance to Coordinate assistance to Contracting Contracting
States in the AFI RegionStates in the AFI Region
66
The objectives are closely linkedThe objectives are closely linkedto ICAO Strategic Objectives:to ICAO Strategic Objectives:
A:A: Safety – Enhance global civil aviation Safety – Enhance global civil aviation safety safety
D:D: EfficiencyEfficiency – Enhance the efficiency of – Enhance the efficiency of aviation operationsaviation operations
The Plan is also linked to:The Plan is also linked to:
ICAO Business PlanICAO Business Plan
Air Navigation Integrated Programme (ANIP)Air Navigation Integrated Programme (ANIP)
77
Projects relevant to the AFI PlanProjects relevant to the AFI Plan
The Global Aviation Safety Plan, based on The Global Aviation Safety Plan, based on the Global Aviation Safety Roadmapthe Global Aviation Safety Roadmap
Conference on a Global Strategy for Conference on a Global Strategy for Aviation SafetyAviation Safety
Safe Skies for AfricaSafe Skies for Africa
Libreville Plan of ActionLibreville Plan of Action
AFI Safety Enhancement Team (ASET)AFI Safety Enhancement Team (ASET)
88
ICAO/World Bank – Programme for ICAO/World Bank – Programme for Sustainable Air Transport in Africa Sustainable Air Transport in Africa
COSCAP and other Technical Cooperation COSCAP and other Technical Cooperation projectsprojects
Action Plan for Africa of the Directors Action Plan for Africa of the Directors General of Civil Aviation in EuropeGeneral of Civil Aviation in Europe
IATA Operational Safety Audit (IOSA)IATA Operational Safety Audit (IOSA) AFI Planning and Implementation AFI Planning and Implementation
Regional Group (APIRG) , while not a Regional Group (APIRG) , while not a project, is a major contributorproject, is a major contributor
Projects relevant to the AFI PlanProjects relevant to the AFI Plan (continued)(continued)
99
Global Aviation Safety PlanGlobal Aviation Safety Plan
A new version of the GASP has been A new version of the GASP has been accepted by the Council and will be accepted by the Council and will be presented to the ICAO Assemblypresented to the ICAO Assembly
GASP provides a global framework for the GASP provides a global framework for the coordination of safety policies and initiatives coordination of safety policies and initiatives such as the AFI Implementation Plansuch as the AFI Implementation Plan
GASP defines 12 Global Safety Initiatives GASP defines 12 Global Safety Initiatives (GSIs) which are identical to the Focus (GSIs) which are identical to the Focus Areas of the RoadmapAreas of the Roadmap
1010
GASP and the GASP and the AFI Implementation PlanAFI Implementation Plan
The AFI Implementation Plan is the first plan The AFI Implementation Plan is the first plan developed under the “new” GASP (others are in developed under the “new” GASP (others are in the works in Latin America, Middle East and the works in Latin America, Middle East and Indonesia)Indonesia)
The development of the AFI Plan provides the The development of the AFI Plan provides the African States, ICAO and the donor community African States, ICAO and the donor community with the assurance that the Plan is consistent with the assurance that the Plan is consistent with an agreed set of objectives and metricswith an agreed set of objectives and metrics
The feedback from the AFI Plan will serve to The feedback from the AFI Plan will serve to improve GASPimprove GASP
1111
Expected resultsExpected results
Improved aviation efficiency and Improved aviation efficiency and safety record in the AFI Regionsafety record in the AFI Region
Coordinated implementation actions Coordinated implementation actions of all stakeholders providing of all stakeholders providing assistance to States in the AFI Regionassistance to States in the AFI Region
A new business-oriented approach A new business-oriented approach toward implementation within ICAOtoward implementation within ICAO
1212
Key milestonesKey milestones
This high-level meetingThis high-level meeting The 36th Session of the ICAO AssemblyThe 36th Session of the ICAO Assembly The initial phase of the Plan The initial phase of the Plan isis four years four years Council will Council will make recommendations on make recommendations on
subsequent phases of the Plan during the subsequent phases of the Plan during the 37th Session of the Assembly37th Session of the Assembly
The Special AFI Regional Air Navigation The Special AFI Regional Air Navigation meeting in the next triennium meeting in the next triennium will will provide another checkpoint for progressprovide another checkpoint for progress
1313
Allocation of ResourcesAllocation of Resources
The gap analysis and risk assessment will The gap analysis and risk assessment will provide valuable information as to how to provide valuable information as to how to best use scarce resources, and what new best use scarce resources, and what new resources may be needed.resources may be needed.
The list of prioritized projects also The list of prioritized projects also provides donors and financial institutions provides donors and financial institutions with appropriate guidance in order to with appropriate guidance in order to focus their assistance.focus their assistance.
1414
Total budget estimateTotal budget estimate
In addition to current Regional In addition to current Regional Programme resources, the investment Programme resources, the investment required required to initiate the Plan isto initiate the Plan is estimated estimated at US$ 3.8 million (or approximately at US$ 3.8 million (or approximately US$ 950,000 per year for the four-year US$ 950,000 per year for the four-year period).period).
1515
The next stepsThe next steps
Development of the terms of reference Development of the terms of reference and appoint the Steering Committeeand appoint the Steering Committee
Development of the terms of reference Development of the terms of reference and appoint the Programme Managerand appoint the Programme Manager
Complete the gap analysis of Complete the gap analysis of Contracting States in the AFI Region, Contracting States in the AFI Region, regional safety oversight systems and regional safety oversight systems and Regional OfficesRegional Offices
1616
The next stepsThe next steps
Develop an action plan based on the Develop an action plan based on the results of the gap analysisresults of the gap analysis
Prioritize projectsPrioritize projects Solicit State and donor resourcesSolicit State and donor resources Align projects and resourcesAlign projects and resources Monitor and report implementation Monitor and report implementation
progressprogress