RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051 Jaipur Office: Office No. 2 & 3, 7 th Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774 Annexure I Compliance report for MOEF conditions stipulated in Environmental Clearance (dt. 20-07-2007 as amended on 19-11-2009) for 1080 MW Lignite- based power project of RWPL at Village-Bhadresh, District-Barmer Reporting Period: APR, 2017 – SEP, 2017 S.N. Condition Status i No land in excess of 468 ha shall be acquired for any activity of the project. Land acquisition has been carried at the time of setting up the Power Project. No additional land been acquired for this Project. ii The water requirement for the project shall not exceed 37.3 cusecs. No ground water shall be abstracted for any activity of the project. Water in excess of the mandated 37.3 cusecs would not be drawn during the operation of the Project. IGNP supplied water is being used for generation of Electricity as per EC conditions. Water being used Records of Water received from IGNP is enclosed. ANNEXURE-I iii Closed Circuit Cooling System with induced draft cooling towers shall be installed. Four numbers of closed circuit cooling tower blocks with induced draft cooling towers have been erected and are in operation. iv Treated effluents conforming to the prescribed standards shall be re-circulated and reused within the plant. No effluents shall be discharged outside the plant boundary. A common ETP (Aeration Clarifier Filtration Ultra Filtration Reverse Osmosis) to cater to all the 8 power generating units has erected. All the process effluents generated is being treated in this ETP and reused within the plant ensuring zero discharge outside the plant boundary. Effluent Water Quality Data Annexure II v Lignite with ash content not exceeding 20% and sulphur content not exceeding 2.0% shall be used. Lignite with ash content less than 20% and Sulphur content less than 2% being used. Third party analysis reports for the same are enclosed. ANNEXURE-III

Transcript of Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED...

Page 1: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

Annexure – I

Compliance report for MOEF conditions stipulated in Environmental

Clearance (dt. 20-07-2007 as amended on 19-11-2009) for 1080 MW Lignite-

based power project of RWPL at Village-Bhadresh, District-Barmer

Reporting Period: APR, 2017 – SEP, 2017

S.N. Condition Status

i No land in excess of 468 ha shall be acquired for any activity of the project.

Land acquisition has been carried at the time of setting up the Power Project. No additional land been acquired for this Project.

ii

The water requirement for the project shall not exceed 37.3 cusecs. No ground water shall be abstracted for any activity of the project.

Water in excess of the mandated 37.3 cusecs would not be drawn during the operation of the Project. IGNP supplied water is being used for generation of Electricity as per EC conditions. Water being used Records of Water received from IGNP is enclosed. ANNEXURE-I

iii Closed Circuit Cooling System with induced draft cooling towers shall be installed.

Four numbers of closed circuit cooling tower blocks with induced draft cooling towers have been erected and are in operation.

iv

Treated effluents conforming to the prescribed standards shall be re-circulated and reused within the plant. No effluents shall be discharged outside the plant boundary.

A common ETP (Aeration – Clarifier – Filtration – Ultra Filtration – Reverse Osmosis) to cater to all the 8 power generating units has erected. All the process effluents generated is being treated in this ETP and reused within the plant ensuring zero discharge outside the plant boundary. Effluent Water Quality Data – Annexure – II

v Lignite with ash content not exceeding 20% and sulphur content not exceeding 2.0% shall be used.

Lignite with ash content less than 20% and Sulphur content less than 2% being used. Third party analysis reports for the same are enclosed. ANNEXURE-III

Page 2: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

vi Space provision for FGD shall be made, if required at a later stage.

The Project is based on Circulating Fluidized Base Combustion technology for fuel firing and involves injection of lime, which absorbs Sulphur. As such, there is no requirement for FGD. However space provision has been made for FGD.

vii Four stacks of 122 m height each with exit velocity of at least 20 m/s shall be provided with continuous online monitoring system.

A total of four bi-flue stacks, each flue of 122 m height, shall release the flue gases to the atmosphere. All these stacks being equipped with Continuous Emission Monitoring Systems (CEMS), to ensure the emission of PM, SO2, NOx & CO to be within prescribed levels. ANNEXURE-IV

viii Low NOx burners shall be installed. The boiler is designed on Circulating Fluidized Bed Combustion, system attains to very low NOx generation.

ix

High efficiency Electrostatic Precipitator (ESPs) having efficiency of 99.9% shall be installed so as to ensure that particulate emissions do not exceed 100 mg/Nm

3.

High efficiency ESPs are installed to maintain PM emission levels at less than 100 mg/Nm

3.

xi

Fly ash shall be collected in dry form and its 100% utilization shall be ensured within 3 years from the day of the commissioning of the plant. Ash to be disposed off in the ash pond shall be through HCSD system.

Fly ash is being collected in dry form from the currently operational EIGHT Units and is being lifted by M/s Shree Cement, M/s. JK Lakshmi, M/s. Ambuja Cement Limited & M/s Binani Cements and many Local Brick and Tiles Block manufacturer. Unutilized ash, if any, would be disposed off to the emergency ash pond through HCSD system. Ash Utilisation data ANNEXURE-V

xii Ash pond shall be lined with 0.5 mm thick HDPE geo-membrane lining.

The ash pond is lined with 0.5 mm thick HDPE geo-membrane, to avoid any leachate to the ground.

Page 3: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

xiii

Details of compensation to be paid to the land oustees along with number of land oustees shall be worked out and submitted to this Ministry within three months from the date of issue of this letter or before the start of work on the project whichever is earlier.

Resettlement Action Plan (RAP) was compiled and submitted to the MOEF on 30-07-2007.

xiv Necessary prior clearance from NHAI shall be obtained before laying the pipeline.

All necessary prior clearance from NHAI had obtained before laying the pipeline and a copy Submitted.

xv

Necessary prior clearance from Indian Air Force shall be obtained for construction of stacks of requisite height before starting the work on the project.

Before commencing the civil work on the stacks, necessary clearance had obtained from the Indian Air Force.

xvi

Adequate measures shall be taken up to maintain the sanctity and protection from any adverse impact from the proposed power project to the temple of Sant Ishardas Samadhi.

The Temple is outside the plant premises. In consultation with the local population, suitable developmental measures such as supply of lighting and electricity have been taken for this temple.

xvii

Regular monitoring of ground water quality including heavy metals shall be undertaken in the project area to ascertain the change, if any, in the water quality due to leaching of contaminants from the ash disposal area.

There is hardly any ground water within 20 km of the Project area.

xviii Noise levels shall be limited to 75 dBA. For people working in the high noise area, protective devices such as earplugs etc. shall be provided.

The machinery has been designed to limit the noise levels to 75 dB (A). All personnel working in the Plant have PPEs issued. ANNEXURE-VI

xix A greenbelt shall be developed all around the plant boundary and ash pond covering an area of 154 ha.

A total of 154 Ha area brought under green belt developed as designated greenbelt area. Mortality replacement work is continuous process and is being carried.

xx

Regular monitoring of the air quality shall be carried out in and around the power plant and records shall be maintained. The location of monitoring stations and frequency of monitoring shall be finalized in consultation with SPCB. Six monthly reports shall be submitted to this Ministry.

Regular monitoring of AAQ is being carried out in and around the power plant at locations and frequency finalized in consultation with the RSPCB and records are maintained. ANNEXURE-VII

Page 4: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

xxi

For controlling fugitive dust, regular sprinkling of water in lignite handling area and other vulnerable areas of the plant shall be ensured.

Regular sprinkling of water is being practiced to minimise the fugitive dust emissions.

xxii

The project proponent should advertise at least in two local newspapers widely circulated in the region around the project, one of which should be in the vernacular language of the locality concerned, informing that the project has been accorded environmental clearance and copies of clearance letters are available with the State Pollution Control Board/Committee and may also be seen in the Website of the Ministry of Environment and Forests in the http://envfor.nic.in.

Published in Rajasthan Patrika Jodhpur Edition, Dt 19/08/2007

xxiii

A separate environment monitoring cell with suitable qualified staff should be set up for implementation of the stipulated environmental safeguards.

A dedicated environment monitoring cell with qualified staff has been established and is operative.

xxiv

Half yearly report on the status of implementation of the conditions and environmental safeguards should be submitted to this Ministry, its Regional Office, CPCB and SPCB.

Being complied with. Copy of Submission enclosed – Annexure VIII

xxv

Regional Office of the Ministry of Environment & Forests located at Lucknow will monitor the implementation of the stipulated conditions. Complete set of Environmental Impact Assessment Report and Management Plan along with additional information submitted to this Ministry should be forwarded to the Regional Office for their use during monitoring.

Submitted.

xxvi

Separate funds should be allocated for implementation of environmental protection measures along with item-wise break-up. These cost should be included as part of the project cost. The funds earmarked for the environment protection measures should not be diverted for other purposes and year-wise expenditure should be reported to the Ministry.

The funds earmarked for environmental protection measures will not be diverted for other purposes.

xxvii

Full cooperation should be extended to the Scientists/Officers from the Ministry and its Regional Office at Lucknow /the CPCB/the SPCB during monitoring of the project.

Being complied.

Page 5: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

ANNEXURE-I IGNP WATER BILL

APR, 2017 – SEP, 2017

Month Cuft/Month Cum/Month Cuft/day Cusecs – Day

April 20255676.8 573580 675189.2 7.81

May 43223222.8 1223952 1394298 16.14

June 62256171.2 1762908 2075206 24.02

July 54502948.8 1543360 1758160 20.35

August 66426175.1 1880990 2142780 24.8

September 61618462.4 1744850 1987692 23.77

IGNP Canal was under Shutdown During April – 2017 and May 2017

Page 6: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

Page 7: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

Page 8: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

Page 9: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

ANNEXURE-II

Effluent Water Quality APR, 2017 – SEP, 2017

SN Parameters UoM CPCB

Limits

Results

April May June July Aug Sept

1. pH 6.5-8.5 6.8 6.95 7.2 7.35 7.4 7.3

2.

Biochemical Oxygen

Demand (BOD) @

27Deg C for 3 days

mg/L < 30.0 23 22.75 24.4 22.75 24.05 22.9

3. Chemical Oxygen

Demand (COD) mg/L < 250 80 76.75 79.4 69.75 72.25 68.75

4. Total Kjeldhal Nitrogen

as NH3 mg/L < 100 8.53 9.33 10.16 9.55 7.93 8

5. Free Available Chlorine mg/L < 0.5 <0.18 <0.18 <0.18 <0.18 <0.18 <0.18

6. Oil & Grease mg/L < 20 1.4 1.43 1.78 1.65 2.46 3.1

7. Copper as Cu mg/L < 1 0.01 0.012 0.014 0.012 0.014 0.04

8. Zinc as Zn mg/L < 1 0.31 0.335 0.4 0.4 0.4 0.4

9. Iron as Fe mg/L < 1 0.4 0.38 0.4 0.42 0.4 0.4

10. Total Suspended Solid mg/L < 100 35 35.5 38.5 44 42.25 47.5

11. Ammonical Nitrogen as

N mg/L < 50 4.9 5.17 5.68 5.8 5.55 6

12. Nitrate Nitrogen mg/L < 10 1.97 1.8 2 1.86 1.85 1.9

13. Total Chromium as Cr mg/L < 1 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01

Page 10: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

ANNEXURE-III

COAL ANALYSIS REPORT

COAL ANALYSIS REPORT APR, 2017 – SEP, 2017

AVERAGE

Month Total Moisture

Volatile Matter

Ash Fix Carbon

Gross Calorific

Value

Sulfur

% % % % Kcal/Kg %

April 42.9 23.32 13.3 20.5 2911.4 0.94

May 42.53 24.5 12.8 20.2 2987.8 0.94

June 42.27 23.94 12.7 21.1 2991.9 0.91

July 43.56 23.5 12.4 20.5 2928.19 0.93

Aug 44.48 23.05 12.3 20.2 2865.1 0.95

Sept 44.32 23.45 12.3 19.9 2861.5 0.95

Page 11: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

Page 12: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

Page 13: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

Page 14: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

Page 15: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

Page 16: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

Page 17: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

Page 18: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

Page 19: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

Page 20: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

Page 21: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

Page 22: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

Page 23: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

ANNEXURE-IV

STACK EMISSION MONITORING RESULTS APR, 2017 – SEP, 2017

Month: Apr, 2017

SN Parameters UOM Unit-I Unit - II Unit - III Unit - IV Unit - V Unit - VI Unit-VII Unit-VIII

1 Average Velocity m/Sec 21.2 S/D 22.1 21.6 21.8 22.1 21.9 21.9

2 Flow Nm3/Sec 418.4 S/D 419.1 419.2 412.4 421.0 424.1 418.2

3 Stack Exit Temp. 0C 144 S/D 161 151 162 159 152 158

4 Particulate Matter mg/Nm3 58.6 S/D 61.2 54.7 59.3 55.6 52.8 58.3

5 Sulphur Dioxide mg/Nm3 347 S/D 351 339 372 361 342 363

6 Oxides of Nitrogen mg/Nm3 172 S/D 163 158 181 169 170 155

Month: May, 2017

Month: Jun, 2017

SN Parameters UOM Unit-I Unit - II Unit - III Unit - IV Unit - V Unit - VI Unit-VII Unit-VIII

1 Average Velocity m/Sec 20.56 20.59 20.51 18.77 22.45 21.82 24.19 22.45

2 Flow Nm3/Sec 403.8 397.8 407.7 353.5 429.7 414.7 453.5 438.8

3 Stack Exit Temp. 0C 146 153 141 164 157 160 166 148

4 Particulate Matter mg/Nm3 56.21 59.62 51.78 52.45 54.78 49.85 58.21 53.21

5 Sulphur Dioxide mg/Nm3 335.59 354.27 305.64 324.1 281.42 303.26 273.35 266.22

6 Oxides of Nitrogen mg/Nm3 206.61 218.37 1514.09 165.5 153.4 158.57 141.87 156.26

SN Parameters UOM Unit-I Unit - II Unit - III Unit - IV Unit - V Unit - VI Unit-VII Unit-VIII

1 Average Velocity m/Sec 20.94 20.05 23.45 23.4 20.78 22.42 21.14 21.86

2 Flow Nm3/Sec 413 390 442 450 416 437 426 427

3 Stack Exit Temp. 0C 144 150 164 155 138 149 135 148

4 Particulate Matter mg/Nm3 56.2 59.8 58.4 62.8 52.7 51.8 49.7 50.7

5 Sulphur Dioxide mg/Nm3 350 358 369 396 285 270 332 338

6 Oxides of Nitrogen mg/Nm3 187 174 188 191 170 164 174 177

Page 24: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

Month: Jul’ 2017

SN Parameters UOM Unit-I Unit - II Unit - III Unit - IV Unit - V Unit - VI Unit-VII Unit-VIII

1 Average Velocity m/Sec 21.1 21.2 25.1 24.2 21 23.5 22.1 22.4

2 Flow Nm3/Sec 418.4 411.5 475.9 467.5 418.4 460.5 441.4 437.9

3 Stack Exit Temp. 0C 142 151 161 153 140 147 139 148

4 Particulate Matter mg/Nm3 51 69.5 67.7 65.2 58.3 54.1 64.5 58

5 Sulphur Dioxide mg/Nm3 312 378 355 368 282 361 388 396

6 Oxides of Nitrogen mg/Nm3 112 162 174 159 155 142 152 161

Month: Aug’ 2017

SN Parameters UOM Unit-I Unit - II Unit - III Unit - IV Unit - V Unit - VI Unit-VII Unit-VIII

1 Average Velocity m/Sec 19.13 S/D 20.09 20.56 20.07 19.71 19.74 20.09

2 Flow Nm3/Sec 414.5 S/D 472.7 465.6 414.5 455.5 437.9 433.1

3 Stack Exit Temp. 0C 145 S/D 162 168 148 153 149 152

4 Particulate Matter mg/Nm3 42 S/D 52.8 55.5 51.6 53.3 49.8 50

5 Sulphur Dioxide mg/Nm3 301 S/D 340 361 284 355 378 387

6 Oxides of Nitrogen mg/Nm3 110 S/D 172 150 151 147 159 165

Month: Sep’ 2017

SN Parameters UOM Unit-I Unit - II Unit - III Unit - IV Unit - V Unit - VI Unit-VII Unit-VIII

1 Average Velocity m/Sec 19.69 20.95 19.79 S/D 19.65 S/D 19.09 18.22

2 Flow Nm3/Sec 410 451.2 465.3 S/D 410.2 S/D 422.2 428.9

3 Stack Exit Temp. 0C 142 155 146 S/D 160 S/D 161 135

4 Particulate Matter mg/Nm3 32.6 38.7 42.8 S/D 47.6 S/D 44.9 39.5

5 Sulphur Dioxide mg/Nm3 240 265 340 S/D 202 S/D 325 267

6 Oxides of Nitrogen mg/Nm3 98 145 152 S/D 138 S/D 123 144

Page 25: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

ANNEXURE-IV

Unit # 1 - Continuous Emission Monitoring System-CEMS DATA

Month

SOX mg/m3 NOX mg/m3 SPM mg/m3

Apr-17 Average 166.3 68.3 50.2

Max 315.1 184.2 67.3

May-17 Average 155.5 62.4 59.5

Max 240.3 96.1 79.7

Jun-17 Average 154.3 64.6 61.7

Max 291.9 90.7 85.1

Jul-17 Average 158.7 49.3 54.7

Max 265.6 103.4 72.7

Aug-17 Average 277.9 79.8 72.6

Max 472.2 142.9 82.8

Sep-17 Average 164.0 60.0 76.6

Max 280.4 89.2 97.6

Unit # 2 - Continuous Emission Monitoring System-CEMS DATA

Month

SOX mg/m3 NOX mg/m3 SPM mg/m3

Apr-17 Average 174.3 77.8 62.3

Max 382.9 102.6 70.7

May-17 Average 209.4 81.0 65.1

Max 340.2 113.0 74.0

Jun-17 Average 189.6 72.4 61.8

Max 461.2 113.9 87.4

Jul-17 Average 248.5 69.5 63.7

Max 538.0 122.3 88.4

Aug-17 Average 249.7 66.2 65.7

Max 557.7 106.1 84.5

Sep-17 Average 268.4 108.0 64.8

Max 422.1 154.7 79.1

Page 26: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

Unit # 3 - Continuous Emission Monitoring System-CEMS DATA

Month

SOX mg/m3 NOX mg/m3 SPM mg/m3

Apr-17 Average 149.9 41.8 65.9

Max 233.3 75.7 76.5

May-17 Average 168.4 42.1 66.6

Max 259.8 66.9 75.6

Jun-17 Average 89.0 36.6 24.9

Max 278.2 119.6 70.2

Jul-17 Average 194.7 62.3 65.3

Max 386.2 106.7 74.9

Aug-17 Average 165.1 56.9 65.2

Max 228.8 71.0 75.3

Sep-17 Average 191.1 57.0 67.6

Max 224.7 68.4 83.7

Unit # 4 - Continuous Emission Monitoring System-CEMS DATA

Month

SOX mg/m3 NOX mg/m3 SPM mg/m3

Apr-17 Average 121.2 35.7 51.6

Max 192.9 85.9 66.7

May-17 Average 249.3 61.6 58.3

Max 366.9 108.6 74.5

Jun-17 Average 176.6 50.1 68.9

Max 254.8 100.6 93.1

Jul-17 Average 175.3 46.0 62.3

Max 291.3 88.7 75.7

Aug-17 Average 148.9 29.2 69.1

Max 283.0 56.7 78.6

Sep-17 Average 90.2 36.7 65.2

Max 106.1 44.1 67.0

Page 27: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

Unit # 5 - Continuous Emission Monitoring System-CEMS DATA

Month

SOX mg/m3 NOX mg/m3 SPM mg/m3

Apr-17 Average 395.0 79.7 57.0

Max 443.2 118.1 59.4

May-17 Average 382.4 101.7 50.6

Max 441.8 135.8 64.7

Jun-17 Average 341.5 74.4 52.5

Max 460.2 148.5 57.0

Jul-17 Average 314.6 40.1 53.5

Max 409.6 82.3 66.6

Aug-17 Average 340.9 69.2 55.0

Max 461.0 99.3 65.0

Sep-17 Average 371.2 81.4 52.5

Max 461.0 108.2 60.3

Unit # 6 - Continuous Emission Monitoring System-CEMS DATA

Month

SOX mg/m3 NOX mg/m3 SPM mg/m3

Apr-17 Average 348.1 125.0 56.0

Max 429.5 148.7 62.6

May-17 Average 332.8 76.5 66.2

Max 433.9 142.7 76.7

Jun-17 Average 317.5 58.6 49.4

Max 386.2 84.3 60.5

Jul-17 Average 314.9 48.3 46.0

Max 431.8 124.0 54.7

Aug-17 Average 298.1 69.9 44.3

Max 442.4 118.9 85.7

Sep-17 Average 353.8 99.9 43.0

Max 463.2 128.1 70.0

Page 28: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

Unit # 7 - Continuous Emission Monitoring System-CEMS DATA

Month

SOX mg/m3 NOX mg/m3 SPM mg/m3

Apr-17 Average 299.1 70.1 59.0

Max 372.8 85.0 85.4

May-17 Average 332.4 55.4 56.4

Max 411.5 73.7 83.2

Jun-17 Average 323.1 57.6 47.1

Max 405.8 79.7 59.4

Jul-17 Average 373.3 38.9 53.8

Max 423.9 64.6 75.7

Aug-17 Average 383.2 61.6 60.8

Max 425.6 91.3 81.7

Sep-17 Average 395.3 46.5 67.2

Max 417.5 61.5 83.8

Unit # 8 - Continuous Emission Monitoring System-CEMS DATA

Month SOX mg/m3 NOX mg/m3 SPM mg/m3

Apr-17 Average 380.3 77.4 64.7

Max 445.8 123.7 80.7

May-17 Average 384.2 83.8 53.7

Max 432.7 139.4 72.9

Jun-17 Average 363.5 70.0 57.9

Max 418.0 92.4 74.4

Jul-17 Average 342.5 38.9 61.1

Max 394.0 63.9 75.6

Aug-17 Average 348.2 45.4 74.3

Max 402.8 72.2 85.9

Sep-17 Average 335.8 31.4 69.1

Max 453.7 65.3 93.0

Page 29: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

Ministry of Environment, Forest and Climate Change ANNEXURE-V

Monthly Abstract of Ash Generation and Utilisation (For the Period from April, 2017 to Sept, 2017)

Name of Thermal Power Plant: Raj West Power Limited - Jalipa-Kapurdi Thermal Plant Lignite Coal Base Thermal Plant

Ash Generation and Utilisation Mode of Ash Utilisation and Utilisation in Each Mode (IN LAKH TON)

Sr.

No Month

Co

al C

on

sum

e

(La

kh

Ton

)

Lim

e C

oa

l Co

nsu

me

d

(La

kh

To

n)

Ash

Co

nte

nt

of

Co

al

(Pe

rce

nta

ge

)

Ash

Ge

ne

ratio

n (

Lakh

To

n)

Ash

Utilis

ed

(

Lakh

To

n)

Ash

Utilis

atio

n

(Pe

rce

nta

ge

)

In M

akin

g o

f Fly

Ash

Ba

sed

Bric

ks/

Blo

cks/

Tile

s e

tc.

In M

an

ufa

ctu

re o

f

Po

rtla

nd

Po

zzo

lan

a

Ce

me

nt

In C

on

stru

ctio

n o

f

Hig

hw

ay &

Ro

ad

s

Inc

lud

ing

Fly

ov

ers

Pa

rt R

ep

lac

em

en

t o

f

Ce

me

nt

in C

on

cre

te

In H

yd

ro S

ec

tor

as

Pa

rt

rep

lac

em

en

t o

r in

Ro

ller

Co

mp

ac

ted

Co

nc

rete

Da

m C

on

stru

ctio

n

In A

sh D

yke

Ra

isin

g

In R

ec

lam

atio

n o

f Lo

w

Lyin

g A

rea

In M

ine

Fill

ing

In A

gric

ultu

re /

Wa

ste

Lan

d D

ev

elo

pm

en

t

Oth

er

(Pl S

pe

cify)

1 April, 17 4.7963 0.243 13.21 0.8474 0.8926 105.3 0.0647 0.82786 0.0000

2 May, 17 4.9500 0.255 12.80 0.8575 0.9395 109.6 0.0746 0.86491 0.0000

3 June, 17 4.5146 0.206 12.70 0.7547 0.8940 118.5 0.0734 0.78712 0.0335

4 July, 17 4.0890 0.169 12.31 0.6518 0.7000 107.4 0.0589 0.64112 0.0000

5 Aug, 17 4.9986 0.194 12.26 0.784 0.8103 103.4 0.0635 0.71762 0.0292

6 Sep, 17 5.3816 0.203 12.34 0.8421 0.8193 97.3 0.0791 0.74014 0.0000

7 Oct, 17

8 Nov, 17

9 Dec, 17

10 Jan, 18

11 Feb, 18

12 Mar, 18

Total 28.7300 1.269 12.60 4.738 5.056 106.9 0.4140 4.57900 0 0 0 0 0 0.0630 0 0

Cement Industries and Some Fly ash Brick manufacturer has taken fly ash from Ash pond

Page 30: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

ANNEXURE-VI

Noise Level Monitoring- APR, 2017 – SEP, 2017

S

N

Month April May June July August September

Noise Levels

dB (A) Day Night Day Night Day Night Day Night Day Night Day Night

1 MAIN GATE

INSIDE 69.7 58.6 70.1 56.2 69.2 57.3 67.2 55.3 69.4 58.5 63.1 56.2

2 COOLING

TOWER END 73.7 65.5 72.9 63.5 74.1 64.3 72.4 62.2 70.5 60.7 68.5 57.8

3 NORTH WEST

CORNER 71.1 64.4 73.5 66.5 74.5 67.3 73.7 65.1 71 63.2 69.4 62.4

4 Bhadresh

Village 56.8 44.4 58.4 45.8 59.2 46.3 57.1 44.3 54.5 42.8 53.8 40.4

5 Ishrpura

Village 54.5 44.8 55.9 43.7 56.7 45.8 55.9 43.9 54.2 44 54.8 43.7

5 Chuli Village 55.8 44.5 57.4 45.8 58.2 46.3 56 44.8 53 43.2 54.3 42.9

Page 31: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

ANNEXURE-VII Ambient Air Quality Data- APR, 2017 – SEP, 2017

Month – Apr’ 2017

SN Location ( Avg.24 Hrs.) PM-10

(µg/m3)

SO2

(µg/m3)

NO2

(µg/m3)

CO

(mg/m3)

PM-2.5

(µg/m3)

1 Main Gate 52.9 33.8 33.7 32.7 0.9

2 Ash pond 53.5 34.4 33.7 34.2 0.9

3 Resevoir Area 44.8 31.8 32.5 34.4 0.9

4 Bhardesh Village 70.7 37.2 21.8 14.4 ND

5 Ishrpura Village 70.1 36.1 22.7 13.6 ND

6 Chuli Village 70.0 36.2 20.3 13.3 ND

Month – May’ 2017

SN Location ( Avg.24 Hrs.) PM-10

(µg/m3)

SO2

(µg/m3)

NO2

(µg/m3)

CO

(mg/m3)

PM-2.5

(µg/m3)

1 Resevoir Area 50.11 33.9 34.8 0.85 32.9

2 Main Gate 52.5 33.7 33.34 0.75 33.96

3 Ash pond 44.7 33.66 34.2 0.83 32.9

4 Bhardesh Village 68.26 24.22 15.76 ND 35.08

5 Ishrpura Village 65.67 20.03 12.9 ND 33.33

6 Chuli Village 66.86 18.75 12.5 ND 34.8

Month – Jun’ 2017

SN Location ( Avg.24 Hrs.) PM-10

(µg/m3)

SO2

(µg/m3)

NO2

(µg/m3)

CO

(mg/m3)

PM-2.5

(µg/m3)

1 Resevoir Area 49.7 33.5 34.1 0.9 33.4

2 Main Gate 54.2 33.33 33.2 0.8 32.6

3 Ash pond 46.4 34.1 33.2 0.9 34.1

4 Bhardesh Village 69.6 17.8 26 ND 36.6

5 Ishrpura Village 68.1 14.5 25.5 ND 36.3

6 Chuli Village 69.1 13.7 22 ND 37

Page 32: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

ANNEXURE-VII Month – Jul’ 2017

SN Location ( Avg.24 Hrs.) PM-10

(µg/m3)

SO2

(µg/m3)

NO2

(µg/m3)

CO

(mg/m3)

PM-2.5

(µg/m3)

1 Resevoir Area 41.5 33.1 31.5 0.8 32.3

2 Main Gate 41.5 33.6 31.4 0.8 32.6

3 Ash pond 41.9 32.6 31.4 0.8 32.2

4 Bhardesh Village 65.8 23.9 15.6 ND 33.3

5 Ishrpura Village 65.1 23.5 12.5 ND 33.3

6 Chuli Village 66.1 20.1 11.7 ND 34.0

Month – Aug’ 2017

SN Location ( Avg.24 Hrs.) PM-10

(µg/m3)

SO2

(µg/m3)

NO2

(µg/m3)

CO

(mg/m3)

PM-2.5

(µg/m3)

1 Resevoir Area 47 25.6 29.4 0.6 29.6

2 Main Gate 53.5 30.6 31.3 0.8 29.3

3 Ash pond 45.6 32.8 31 0.8 29.5

4 Bhardesh Village 69.3 14.4 24.8 ND 36

5 Ishrpura Village 67.8 11.7 24.1 ND 35.4

6 Chuli Village 68.3 12.6 21.8 ND 32.3

Month – Sep’ 2017

SN Location ( Avg.24 Hrs.) PM-10

(µg/m3)

SO2

(µg/m3)

NO2

(µg/m3)

CO

(mg/m3)

PM-2.5

(µg/m3)

1 Resevoir Area 34.2 25.7 25.9 0.7 24.8

2 Main Gate 50.4 29.1 29.7 0.8 27.8

3 Ash pond 44.1 31.9 30.1 0.8 28.4

4 Bhardesh Village 64.8 14.6 22.8 ND 34

5 Ishrpura Village 65.5 9.9 21 ND 32.5

6 Chuli Village 66 10.8 18.7 ND 31.2

Page 33: Compliance report for MOEF conditions stipulated in … · 2017-12-27 · RAJ WESTPOWER LIMITED Part of O.P.Jindal Group Regd. Office: Raj WestPower Ltd., JSW Center, BKC Complex,

RAJ WESTPOWER LIMITED

Part of O.P.Jindal Group Regd. Office : Raj WestPower Ltd., JSW Center, BKC Complex, Bandra (E), Mumbai – 400051

Jaipur Office: Office No. 2 & 3, 7th

Floor, Man Upasana Plaza, C-44, Sardar Patel Marg, C-Scheme, Jaipur – 302 001 Ph : 0141 2369772 Fax 0141 2369774

ANNEXURE-VIII